Presentation Outline. Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011

Similar documents
Architectural Engineering Senior Thesis Mechanical System Redesign

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

Energy Efficiency Through Waste Heat Recovery. Heat Recovery Centrifugal Chillers and Templifier Water Heaters

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

Appendices. Included in this section are

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

TEMPERATURE CONTROL POWER COMPRESSED AIR EMERGENCY OR PLANNED, SHUT DOWN OR TURN AROUND. 24/7/ / ers-cat.com

Description of All Alternatives Considered-

60 TON AIR-COOLED CHILLER. Call us today! (800) PA-ACCTR-60 GENERAL DIMENSIONS ELECTRICAL DATA 60 TON AIR-COOLED CHILLER FEATURES

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

4. OVERVIEW OF MECHANICAL SYSTEM

EarthWise System Seminar

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

F.W. Olin Physical Science Laboratory

GARCIA GALUSKA DESOUSA Consulting Engineers

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY

Update Dedicated Heat Recovery Chiller Technology. Don Frye. Gulf South

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

Bosch BVA Series Air Handler

MEP CONDITION ASSESSMENT

Des Places Residence Hall

Energy Recovery with Cooling and Heating

C13-Series Engineering Guide

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

MHNCCW (4-Pipe) Chilled/Hot Water Ceiling Concealed 208/230V 4-Pipe Heating & Cooling Fan Coil 12,000 BTUH

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.

Architectural Alliance Incorporated MDP CONSULTING ENGINEERS, INC N 11th Street Beaumont, TX 77702

Technical Assignment 3 11/15/04. Executive Summary

The School District of Philadelphia Administration Headquarters

Cook - Wissahickon Elementary School

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

National Institutes of Health Building 37 Modernization Bethesda, Maryland MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM

SUBMITTAL. Project. CLU Swenson Center. Date 01/07/2010. Mechanical Contractor. West Coast Air Conditioning. Mechanical Engineer

2 Existing Mechanical System

Daikin Blueprint: Delivering Hot Water with a Chiller

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

HVAC 101. H V A C S y s t e m s

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

TECHNICAL SPECIFICATIONS

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island

Technical Assignment 3

The Ed Roberts Campus

Massachusetts Energy Efficiency Partnership. 5. High Efficiency Systems for Large Boilers

7. MECHANICAL SYSTEM DESIGN

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

MHCCW Chilled Water Ceiling Concealed Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000 BTUH

MHCCW Chilled Water Ceiling Concealed With 5kW Electric Heat 2-Pipe Heat / Cool Fan Coil 30,000 BTUH

The Ed Roberts Campus Berkeley, CA

COMMERCIAL HVAC PACKAGED EQUIPMENT. Rooftop Units Level 1: Constant Volume

ENGINEERING. Edition No. 13 October 2002

Technical Guide SUNLINE 2000 DESCRIPTION ACCESSORIES FIELD INSTALLED SPLIT-SYSTEM EVAPORATOR BLOWER K4EU NOMINAL TONS (WORLD 50 HZ)

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

EMBASSY SERIES SINGLE PACKAGE AIR CONDITIONERS (WATER-COOLED) C2ED060, 090, 120 & 180 5, 7-1/2, 10 & 15 Nominal Tons

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A

VertiCool Aurora Engineering Guide

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

4.0 Mechanical Redesign

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

Richard Henry Lee Elementary School

A.H.U / Fan Room (p1 of 2) (approx. sizing using rules of thumb)

NET ENERGY WATER LOOPS A clear path to net zero energy buildings

RTC. Stainless Steel Condensing Floor Standing Boilers Technical data sheet. High efficiency commercial heating

CFFWA4P-16-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 48,000 BTUH

CFFWA4P-12-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 36,000 BTUH

Technical Report Three

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

CEILING FANS THE PREMIUM QUALITY LINE FROM COMMERCIAL/INDUSTRIAL & SPECIAL APPLICATION. World Leader in Ceiling Fan Systems

CFFWA4P-08-1-U Chilled/Hot Water Universal Mount Fan Coil (4-Pipe) 4-Pipe Heat / Cool Fan Coil 24,000 BTUH

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Strategies for Building Energy Efficiency

Challenges and Methods of Estimating a Conceptual HVAC Design

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

Wall Mounted Air Conditioners with Gas Heat Models AVGA

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

August 15, 2013 Page 1 of 19

Boiler & Water Heater

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS*

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

ReCooler Heat-Pump Energy efficient cooling unit for eq Air Handling Unit

The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA

Francis M McKay Elementary School

JH Series Installation

SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE

PRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Implementation of Energy Saving measures in Existing Buildings

FLD = Furnished by Trane U.S. Inc. / Installed by Equipment Submittal Page 3 of 13

Classic 13 Heat Pumps High Efficiency Vertical Packaged Heat Pumps Models HVPA and HVPSA

A TRUE GAME CHANGER - The Vortex Heat Recovery Center CONDENSING EFFICIENCIES FOR TRADITIONAL BOILERS & HEATERS

Transcription:

Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011

Project Team Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Owner: Maryland Stadium Authority Architect: Cochran, Stephenson & Donkervoet Construction Manager: Gilbane Mechanical Engineer: James Posey Associates Electrical Engineer: Diversified Engineering Structural Engineer: Hope Furrer Associates Civil Engineer: Site Resources Coppin State University Physical Education Complex Kaylee Damico Mechanical Option April 12 th, 2011

Project Overview Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Project Site New Main Entrances for University Adjacent track and field and other sporting fields Architecture 246,000 GSF $136 million 1-4 stories LEED Silver Certification

Project Overview Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Project Site New Main Entrances for University Adjacent track and field and other sporting fields Architecture 246,000 GSF $136 million 1-4 stories LEED Silver Certification Specialty Spaces 4,100 seat Arena 8-lane NCAA regulation pool Dance Studio Auxiliary Gym Fitness Center

Existing Mechanical Systems Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Air Systems 14 Variable Air Volume AHUs Single zone and multiple zone 2 Energy Recovery Units 1 Pool Dehumidification System

AHU-1: Level 1 Shops AHU-2: Level 1 Offices AHU-3: Project Team Level 2 Offices AHU-4: Project Overview Level 3 Offices AHU-5 Existing & Mechanical 6: Arena Systems AHU-7: Proposed Concessions Redesign AHU-8: Mechanical Level Depth 3 Coach Offices AHU-9 Electrical & 10: Breadth Auxiliary Gym AHU-11: Construction Classrooms Management & Dance Breadth Studio AHU-12: Cost and Multipurpose Energy Savings Room AHU-13: Summary Fitness and Conclusion Area AHU-14: Heating Unit for Shops PDU-1: Pool ERU-1 & 2: Locker Rooms Existing Mechanical Systems Air Systems 14 Variable Air Volume AHUs Single zone and multiple zone 2 Energy Recovery Units 1 Pool Dehumidification System AHU-1 AHU-2,3 & 4 AHU-5 & 6 AHU-7 & 8 AHU-9 & 10 AHU-11,12 & 13 AHU-14 PDU ERU-1&2

Existing Mechanical Systems Air Systems 14 Variable Air Volume AHUs Single zone and multiple zone 2 Energy Recovery Units 1 Pool Dehumidification System Central Plant Two 500 ton chillers 1000 ton cooling tower AHU-1 AHU-2,3 & 4 AHU-5 & 6 AHU-7 & 8 AHU-9 & 10 AHU-11,12 & 13 AHU-14 PDU ERU-1&2

Existing Mechanical Systems Boilers Primary Heating Water Pumps Secondary Heating Water Pumps Variable Flow Heating Water Pumps Pressure Relief Storage Tanks Air Systems 14 Variable Air Volume AHUs Single zone and multiple zone 2 Energy Recovery Units 1 Pool Dehumidification System Central Plant Two 500 ton chillers 1000 ton cooling tower Three dual fuel 250HP boilers Primary-Secondary system Space for future expansion

Proposed Redesign Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Design Objectives More efficient mechanical systems Lower Overall Energy Usage Lower Emissions Design Components Ground Source Heat Pump System Heat Recovery Chiller Electrical Redesign of MCC Construction Reorganization

Project Team Proposed Redesign Mechanical Depth GSHP HRC Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Mechanical Depth - GSHP Site Soil Type Resistance Depth Allowed Paleozoic basic igneous rock

Mechanical Depth - GSHP Site Soil Type Resistance Depth Allowed Calculations Only Zones A and B 55 bores at 400 each Equipment 5 water to water heat pumps Each with 11 bores Reverse Return Polyethylene Piping # of Bores: Total Flow Rate: (GPM) Piping Nominal Diameter: (Inches) Piping Internal Diameter: (Inches) Average Fluid Velocity: (FPS) Total Loss Per 100' of Pipe: (Feet) Piping Efficiency (20% P.G.): Max Dia for Turb Flow: 11 70 21.5 3 2.9 3.5 1.71 High Efficiency 10 63.6 19.6 3 2.9 3.2 1.44 High Efficiency 9 57.3 17.6 3 2.9 2.9 1.18 High Efficiency 8 50.9 15.7 3 2.9 2.5 0.95 High Efficiency 7 44.5 13.7 3 2.9 2.2 0.74 High Efficiency 6 38.2 11.7 3 2.9 1.9 0.56 High Efficiency 5 31.8 9.8 2 1.9 3.4 2.63 High Efficiency 4 25.5 7.8 2 1.9 2.8 1.74 High Efficiency 3 19.1 5.9 2 1.9 2.1 1.02 High Efficiency 2 12.7 3.9 1.25 1.4 2.8 2.76 High Efficiency 1 6.4 2.0 1.25 1.4 1.4 0.76 High Efficiency Paleozoic basic igneous rock

Mechanical Depth - HRC Project Team Proposed Redesign Mechanical Depth GSHP HRC Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Sizing Hourly loads Available heating hot water HRC can handle 52% of load Reheat Load (MBH) 1000 = GPM 500 ΔT Reheat Load = 3500 MBH ΔT = (140 F - 120 F) = 20 F

Mechanical Depth - HRC Sizing Hourly loads Available heating hot water HRC can handle 52% of load Equipment (2) McQuay Templifier HRC (5) Weil McLain Condensing Boilers Downsize Reheat Load existing (MBH) Cleaver 1000 = Brooks GPM 500 ΔT boilers Reheat Load = 3500 MBH ΔT = (140 F - 120 F) = 20 F Boilers Boilers Primary Primary Heating Heating Water Water Pumps Pumps Secondary Secondary Heating Heating Water Water Pumps Pumps Variable Variable Flow Flow Heating Heating Water Water Pumps Pumps Pressure Pressure Relief Relief Storage Storage Tanks Tanks Heat Recovery Chillers Condensing Boilers

Mechanical Depth - HRC Q = 100 G^(0.5) Where, Q = airflow (CFM) G= 49.9kg of R134a Sizing Hourly loads Available heating hot water HRC can handle 52% of load Equipment (2) McQuay Templifier HRC (5) Weil McLain Condensing Boilers Downsize existing Cleaver Brooks boilers Refrigerant Leak Detection Exhaust 1400 CFM required for R-134a 2 Roof Upblast Fans Boilers Primary Heating Water Pumps Secondary Heating Water Pumps Variable Flow Heating Water Pumps Pressure Relief Storage Tanks Heat Recovery Chillers Condensing Boilers

Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Electrical Breadth Calculations Electrical Information HP KVA FLA Electrical Info of Equipment Added for HRC Equipment Removed HP KVA FLA Boiler Blower Motor 1 10 11.14 14 Boiler Blower Motor 2 10 11.14 14 Boiler Blower Motor 3 10 11.14 14 Equipment Added New Boiler Blower Motor-1 7.5 8.4 10.1 New Boiler Blower Motor-2 7.5 8.4 10.1 New Boiler Blower Motor-3 7.5 8.4 10.1 Condensing Boiler Motor-1 1.75 2.0 2.4 Condensing Boiler Motor-2 1.75 2.0 2.4 Condensing Boiler Motor-3 1.75 2.0 2.4 Condensing Boiler Motor-4 1.75 2.0 2.4 Condensing Boiler Motor-5 1.75 2.0 2.4 HRC-1 23 25.8 31.1 HRC-2 23 25.8 31.1 Electrical Info of Equipment Added for GSHP Equipment Added HP KVA FLA HP-1 16.6 18.4 41.4 HP-2 16.6 18.4 41.4 HP-3 16.6 18.4 41.4 HP-4 16.6 18.4 41.4 HP-5 16.6 18.4 41.4

Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion Electrical Breadth Calculations Electrical Information HP KVA FLA Scheduling Spares and spaces on previous MCC s MCC-2 Partial Schedule Electrical Info of Equipment Added for HRC Equipment Removed HP KVA FLA Boiler Blower Motor 1 10 11.14 14 Boiler Blower Motor 2 10 11.14 14 Boiler Blower Motor 3 10 11.14 14 Equipment Added New Boiler Blower Motor-1 7.5 8.4 10.1 New Boiler Blower Motor-2 7.5 8.4 10.1 New Boiler Blower Motor-3 7.5 8.4 10.1 Condensing Boiler Motor-1 1.75 2.0 2.4 Condensing Boiler Motor-2 1.75 2.0 2.4 Condensing Boiler Motor-3 1.75 2.0 2.4 Condensing Boiler Motor-4 1.75 2.0 2.4 Condensing Boiler Motor-5 1.75 2.0 2.4 HRC-1 23 25.8 31.1 HRC-2 23 25.8 31.1 MCC-3 Partial Schedule Main Bus: 1200A Volts: 480VAC Phase: 3 Vertical Electrical Bus: 600A Info of Equipment Added Wires: for GSHP 4 Compartment Circuit Load Name Plate No. Equipment Number Added HP KVA HP FLA KVA FLA 5BR HP-1 MCC3-27 SPARE 16.6 18.4 - -41.4-7HL HP-2 MCC3-48 SPARE - - - 7HR MCC3-49 SPARE ` 16.6 18.4 41.4 - - - 8DL HP-3 MCC3-55 SPARE 16.6 18.4 - -41.4-9G HP-4 - SPACE 16.6 18.4 - -41.4 - Total Load: HP-5 1399 KVA 16.6 18.4 Total Load: 1808.95 41.4 Amps Demand Factor:70%

Feeders from HRC Equipment Compartment # 1BL 2BL 3BL 3M 4K 4M 5B 5D 5F 5J Feeder Size 3#12+1#12G, 1/2" C 3#12+1#12G, 1/2" C 3#12+1#12G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#10G, 1/2" C 3#8+1#8G, 1" C 3#8+1#8G, 1" C Feeders from GSHP Equipment Compartment # Feeder Size 5BR 3#8+1#8G, 1"C 7HL 3#8+1#8G, 1"C 7HR 3#8+1#8G, 1"C 8DL 3#8+1#8G, 1"C 9G 3#8+1#8G, 1"C Electrical Breadth Calculations Electrical Information HP KVA FLA Scheduling Spares and spaces on previous MCC s Installed and replaced with new equipment Sizing Feeders sized for each addition New MCC-2 MCC-2 Partial Partial Schedule Schedule Main Bus: 600A Volts: 480VAC Phase: 3 Vertical Bus: 300A Wires: 3 Compartment Circuit Load Name Plate No. Number HP KVA FLA 1BL MCC2-1 New Boiler #1 Blower Motor 7.5 8.4 10.1 2BL MCC2-2 New Boiler #2 Blower Motor 7.5 8.4 10.1 3BL MCC2-3 New Boiler #3 Blower Motor 7.5 8.4 10.1 3M MCC2-26 Condensing Boiler Motor - 1 1.75 2 2.4 4K MCC2-31 Condensing Boiler Motor - 2 1.75 2 2.4 4M MCC2-32 Condensing Boiler Motor - 3 1.75 2 2.4 5B MCC2-33 Condensing Boiler Motor - 4 1.75 2 2.4 5D MCC2-34 Condensing Boiler Motor - 5 1.75 2 2.4 5F MCC2-35 HRC-1 23 25.8 31.1 5J MCC2-37 HRC-2 23 25.8 31.1 Total Load: 435.8 KVA Total Load: 524 Amps Demand Factor:70% New MCC-3 MCC-3 Partial Partial Schedule Schedule Main Bus: 1200A Volts: Volts: 480VAC 480VAC Phase: Phase: 3 3 Vertical Bus: Bus: 600A 600A Wires: Wires: 4 4 Compartment Circuit Load Compartment Circuit Name Plate Load No. Number Name Plate HP KVA FLA No. Number HP KVA FLA 5BR MCC3-27 HP-1 16.6 18.4 41.4 5BR MCC3-27 SPARE - - - 7HL MCC3-48 HP-2 16.6 18.4 41.4 7HL 7HR MCC3-49 MCC3-48 HP-3 SPARE 16.6-18.4-41.4-7HR 8DL MCC3-55 MCC3-49 HP-4 SPARE ` 16.6-18.4-41.4-8DL 9G MCC3-62 MCC3-55 HP-5 SPARE 16.6-18.4-41.4-9GTotal Load: 1491 KVA - SPACE Total Load: - 1974 Amps - - Total Load: 1399 KVA Demand Factor:70% Total Load: 1808.95 Amps Demand Factor:70%

Project Equipment Team Costs for HRC Equipment Removed Cost Boiler 1 $ 131,500.00 Boiler 2 $ 131,500.00 Boiler 3 $ 131,500.00 Equipment Added Proposed New Boiler -1 Redesign $ 129,650.00 New Boiler -2 $ 129,650.00 Mechanical New Boiler -3 Depth $ 129,650.00 Condensing Boiler $ 6,499.00 Electrical Condensing Boiler Breadth $ 6,499.00 Condensing Boiler $ 6,499.00 Construction Condensing Boiler Management $ 6,499.00 Breadth Condensing Boiler $ 6,499.00 Cost HRC-1 and Energy $ 250,500.00 Savings HRC-2 $ 250,500.00 Summary Total Cost Added and Conclusion $ 527,945.00 Equipment Costs for GSHP Equipment Added Cost HP-1 $ 24,900.00 HP-2 $ 24,900.00 HP-3 $ 24,900.00 HP-4 $ 24,900.00 HP-5 $ 24,900.00 Total Cost Added $ 124,500.00 Construction Management Breadth Costs GSHP Installation Piping Equipment HRC Equipment Length of Pipe (ft) Man Power (ft/day/rig) Cost of Labor and Equipment for GSHP Installation # of rigs Days Man Power Cost per linear foot Piping Installation Cost Renting rig ($/week) Cost rigs Total Price 22000 400 2 28 $24 $528,000 $4,500 $24,750 $ 552,750.00 Cost Polyethylene Pipe Size (in) # of Wells Depth (ft) Total Length (ft) Price per 40' Price per Size 3 30 400 12000 1.32 15840 2 15 400 6000 1.1 6600 1.25 10 400 4000 0.66 2640 Total $ 25,080.00

Construction Management Breadth Equipment Costs for HRC Equipment Removed Cost Boiler 1 $ 131,500.00 Boiler 2 $ 131,500.00 Boiler 3 $ 131,500.00 Equipment Added New Boiler -1 $ 129,650.00 New Boiler -2 $ 129,650.00 New Boiler -3 $ 129,650.00 Condensing Boiler $ 6,499.00 Condensing Boiler $ 6,499.00 Condensing Boiler $ 6,499.00 Condensing Boiler $ 6,499.00 Condensing Boiler $ 6,499.00 HRC-1 $ 250,500.00 HRC-2 $ 250,500.00 Total Cost Added $ 527,945.00 Equipment Costs for GSHP Equipment Added Cost HP-1 $ 24,900.00 HP-2 $ 24,900.00 HP-3 $ 24,900.00 HP-4 $ 24,900.00 HP-5 $ 24,900.00 Total Cost Added $ 124,500.00 Costs GSHP Installation Piping Equipment HRC Equipment Site Installed in adjacent parking lot Trailers can be moved Excavation Finishing Zone B Length of Pipe (ft) Man Power (ft/day/rig) Cost of Labor and Equipment for GSHP Installation # of rigs Days Man Power Cost per linear foot Piping Installation Cost Renting rig ($/week) Cost rigs Total Price 22000 400 2 28 $24 $528,000 $4,500 $24,750 $ 552,750.00 Cost Polyethylene Pipe Size (in) # of Wells Depth (ft) Total Length (ft) Price per 40' Price per Size 3 30 400 12000 1.32 15840 2 15 400 6000 1.1 6600 1.25 10 400 4000 0.66 2640 Total $ 25,080.00

Cost and Energy Savings Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Breadth Cost and Energy Savings Summary and Conclusion

Cost and Energy Savings Redesign Cost of Utilities Baseline Cost of Utilities

Cost and Energy Savings Pollutants Annual Emissions for Baseline lb of Pollutant per 1000 cubic feet of Natural gas Natural Gas per year (1000 cubic feet) Amount of Pollutant per year (lb) CO2 11.6 30,486 353,638 Nox 0.0164 30,486 500 Sox 1.22 30,486 37,193 Pollutants Annual Emissions for Redesign lb of Pollutant per 1000 cubic feet of Natural gas Natural Gas per year (1000 cubic feet) Amount of Pollutant per year (lb) CO2 11.6 20,530 238,148 Nox 0.0164 20,530 337 Sox 1.22 20,530 25,047 Emission Comparison in pounds of Pollutant

Summary and Conclusion Project Team Proposed Redesign Mechanical Depth Electrical Breadth Construction Management Depth Cost and Energy Savings Summary and Conclusion

Summary and Conclusion Suggestions to Owner Definite Additions Heat Recovery Chiller Possible Additional Savings Ground Source Heat Pump Implementing both can possibly increase LEED points Owner s Discretion Initial Capital Cost 30-Year LCC Details Discount Rate Yearly Maintance 30-Year Life Cycle Cost (NPV) Discounted Payback Period (years) Baseline $ 1,567,600.00 7% $ 87,283 $ 9,130,491 0 GSHP $ 2,293,202.00 7% $ 90,976 $ 9,505,982 13.6 HRC $ 1,799,600.00 7% $ 98,625 $ 9,635,367 4.7 Both $ 2,694,202.00 7% $ 110,763 $ 10,049,383 9.8

Special Thanks to: James Posey Associates Gilbane Company McClure Company Professors Family and Friends Questions or Comments?