NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE SCHOOL

Similar documents
ARLINGTON COUNTY, VIRGINIA

CITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To: From:

December 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation

Oconomowoc Area School District Facility Construction Update August 25, 2017

Kelly Elementary School 9030 SE Cooper Street, Portland, Oregon

A. INTRODUCTION B. PROJECT LOCATION

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 25, 2017

SITE CITY PLANNING COMMISSION AGENDA ITEM NO: 5 STAFF: LONNA THELEN FILE NO: CPC CU QUASI-JUDICIAL ART C. KLEIN CONSTRUCTION

COMPLETE GREEN STREET CHECKLIST

Courthouse Square Planning & Urban Design Study Working Group Meeting #11 September 2, 2014

PROPOSED DEVELOPMENT CONCEPTS

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

30% Design Community Meeting

California Environmental Quality Act (CEQA) Environmental Review Process

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

3.13. Development Guidelines

Kittson Parkway / Watershed Park Parking Lot

NYC Department of Education

26/Old Dominion Task Force

Community Response Buchanan Elementary. December 13, 2016

PLANNING BOARD REPORT PORTLAND, MAINE

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Gas Stations ottawa.ca

Beyond the Commute. Presented by: L. Dennis Burns, CAPP Green Gov Symposium, October, 2010 Washington, DC

City of Burlington Downtown Street Design & Construction Standards

MADISON MANOR PARK RENOVATIONS

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

SITE PLAN REVIEW COMMITTEE MEETING SUMMARY

Community Co-Design Process. Create the ability to house a large school on the Cubberley site in the future.

Master Facility Planning Update School Board Meeting May 26, 2016

Spokane River Forum: City of Spokane Permeable Pavements

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

UNIVERSITY OF NORTHERN IOWA

Guidelines. Building. The minimum setback of an attached garage from the lot line shall be 6m. 4. Zoning Provision

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

The subject site plan amendment proposes the following revisions to the approved site plan:

Can Urban Redevelopment Restore Aquatic Resources

The George Washington University Square Phase 1 Design Garage Base Building

14825 Fruitvale Ave.

EXHIBIT A. Chapter 2.7 SPECIAL PLANNED DISTRICTS. Article XVIII 15th Street School Master Planned Development

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Public Workshop. November 8, 2014 Key Elementary School

NEPONSET WATERSHED TOWN BYLAWS AND REGULATIONS THAT ARE CONSISTENT WITH PROPER STORMWATER MANAGEMENT

Rose Kennedy Greenway Ramp Parcels Study

NYC Department of Education

BEACON HILL INTERNATIONAL SCHOOL

2010 Campus Master Plan Update - USF TAMPA Campus Master Plan Update USF TAMPA

NYC Department of Education

New High School Concept

Rock Spring Master Plan Community Meeting #8: Preliminary Recommendations

ARCHITECTURAL REVIEW BOARD SUPPLEMENTAL PACKAGE 3402 PICO BLVD SANTA MONICA, CA APRIL 10, 2017

Planning Board Hearing October 20th, 2016

Case Martin Luther King Drive and 212 and 216 North 6 th Street

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

CITY PLAN COMMISSION STAFF REPORT

26 th Street & Old Dominion Drive Master Planning Task Force Meeting #9 Summary. March 21, 2019, 6:30-10:00 pm. Marymount University, Rowley 107

WESTERN ILLINOIS UNIVERSITY

MONTGOMERY COUNTY PLANNING DEPARTMENT

Beaverton City Council: Work Session. SIDEDistrict. May 6, 2014

Neighborhood Districts

APPENDIX G: TOWN ORDINANCE REVIEW

6 May 14, 2014 Public Hearing

Neighborhood Infrastructures Blue Green Infrastructure

B. PROPOSED REFINEMENTS POTENTIALLY AFFECTING URBAN DESIGN AND VISUAL RESOURCES

COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321

A revised Planning Justification

February 17, Sara Ullman Planner I. Sincerley,

Zoning Interface: Districts and Forms for Sioux Falls Zoning Ordinance

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

ARLINGTON COUNTY, VIRGINIA

SITE FEASIBILITY TEST FIT LAYOUT NORTHERN AREA INTERNATIONAL SCHOOL DECEMBER 2016

CITY OF BIDDEFORD PLANNING DEPARTMENT PLANNING BOARD REPORT. Larry Patoine, Chair & Members of the Biddeford Planning Board

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

VEHICULAR AND PEDESTRIAN CIRCULATION

July 23, 2014 Wilson School. Working Group Meeting #3 Preliminary Site Analysis School Siting Considerations Guiding Principles

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

Staff Report Bourbon County Joint Planning Office SPECIAL MEETING September 4, 2018

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

MISSION STREETSCAPE PLAN. Neighborhood Commercial Streets handle continuous activity. Neighborhood Commercial STREET ROW: Main Design Treatments

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

Steve, Following are our notes from the first two meetings with Montgomery County Planning Group:

Zoning:CS FLU: LI/CS 4, SF 10' HT 21,120 SF 24.5' HT Proposed Usable Open Space (120 SF) 4,774 SF 10' HT 4, SF 15.5' HT 4, SF 15.5'

MONTGOMERY COUNTY PLANNING DEPARTMENT

WINDSOR GLEN DESIGN GUIDELINES

TOWN OF LOCKPORT NOV 1` PLANNING BOARD. November 17, 2015

Access Aisle (Van) (Flow Test) Water Mains (Location & Sizes) Building Entrances. Building, Facilities, Element. Curb Ramps (Built-up)

Verona Area School District New High School Site Plan Review Written Description EUA Project No.:

RIVERSIDE, Newton MA June 9, 2011

The Residences at Alewife Station

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

Town of Avon Village Center. A New Village Center for Avon October, 2015

VIRGINIA KEY CONSENSUS MASTER PLAN

Transcription:

JULY 27, 2016 NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE SCHOOL Joint BLPC - PFRC Meeting 1

Project Parameters 1. New Elementary School for the Henry Community 2. Support Strategic Plan Goal #4 Provide Optimal Learning Environments 3. Address capacity by providing 725 seats 4. Open by start of school 2019 5. Multi story building in northwest corner of site 6. Structured parking 7. Project cost $59 million 2

General Schedule Timeline AUGUST 2016 ARLINGTON COUNTY FAIR AUGUST 2017 ARLINGTON COUNTY FAIR AUGUST 2018 ARLINGTON COUNTY FAIR AUGUST 2019 ARLINGTON COUNTY FAIR July 2016 October 2016 January 2017 March 2017 June 2017 September 2019 Early Construction Packages Concept Design Schematic Design Design Development Use Permit Review Construction Documents Construction (21 months) Concept Design Approval Schematic Design Approval Design Dev. Approval Use Permit Approval Final Design Approval First Day of School Net-Zero Energy & Water Year Starts! 3 Overall schedule

General Schedule Timeline 20 April 4 May 18 May 1 June 15 June 23 June 27 July 17 August 31 August 21 Sept Joint BLPC PFRC BLPC Joint BLPC PFRC PFRC then BLPC Joint BLPC PFRC PFRC Joint BLPC PFRC BLPC Joint BLPC PFRC Joint BLPC PFRC Community forum Concept Design to School Board Community forum Schematic Design to School Board 4 6/8 7/1 info 7/20 approval 9/13 10/6 info 10/20 approval BLPC PFRC Community School Board

Concept design was approved, but concerns exist about. Lines of sight to middle school and theatre from SOG Loss / lack of Canopy trees and viability of trees growing in containers on top of garage Exploration of options to reduce the height of the garage Exploration of options to fully submerge the garage Universal design considerations Impact of surface parking north of ES and the theatre Impact of gym on neighbors Footprint uses too much green / permeable space 5

6 Still life with fruit dish on a table. P. Picasso, 1914-15

7 Approved Concept Design

8 Approved Concept Design

Elementary school play surface over parking structure Tallest height of play surface (at SW corner): 10.5 feet + 42 fence Size of elevated ES playground south of building: 48,163 square feet Variety of play surfaces: Non-crumb turf, poured rubber, pavers. Natural surfaces in raised beds, including school gardens Trees on play surface in raised containers 9 Approved Concept Design (Option A)

One level parking garage with 9 foot clearance. Handicap van parking accommodated in garage (8-2 clearance required) 8 HC total, 2 of which are van spots May still need curbside HC spots on SOG and HC spots north of theater Combined drop off / pick up lane for elementary and middle school, opening out to a pedestrian mall with new accessible entrances to MS Longest possible single file, on-site car queuing: 16 cars 10 +/- 225 parking garage spots with additional possible surface spots Approved Concept Design (Option A): parking level

Existing pervious surface: 38% Proposed pervious surface: 16% Stormwater would be treated in: Outdoor classroom in bus loop Bio-swale in pedestrian mall Outdoor classroom at SW corner Stormwater would be retained in: Underground tanks under bus loop driveway and new SW corner park 11 Approved Concept Design (Option A) : pervious v/s impervious

Middle School outdoor space on west side: 57,076 square feet Elementary School outdoor space on west side: 60,374 square feet 12 Approved Concept Design (Option A) : MS v/s ES outdoor space

Shortest distances from Arbors of Arlington to school building: North condo: Center condo: South condo: 99 feet 100 feet 180 feet Shortest distances from Arbors of Arlington to school gym: North condo: Center condo: South condo: 189 feet 97 feet 110 feet Shortest distances from Arbors of Arlington to elevated playfield: North condo: Center condo: South condo: 303 feet 150 feet 100 feet 13 Approved Concept Design (Option A): distances to Arbors Condos

Since our last BLPC / PFRC presentation on June 23 rd. Constructability and Cost review by Whiting Turner: all cast-in-place concrete Added Rich & Associates of Detroit, MI as design consultants national experts in parking garage design improved turning radii and sightlines added striped areas for pedestrian paths added a second elevator and stair changed from 27 grid to 29 grid Net result: 225 garage spots reduced to 197, but could be achieved in a slightly thinner garage footprint 14 Development of Concept Design parking layouts

29-0 29-0 Since our last BLPC / PFRC presentation on June 23 rd. Constructability and Cost review by Whiting Turner: all cast-in-place concrete 27-0 27-0 Added Rich & Associates of Detroit, MI as design consultants national experts in parking garage design improved turning radii and sightlines added striped areas for pedestrian paths added a second elevator and stair changed from 27 grid to 29 grid Net result: 225 garage spots reduced to 197, but could be achieved in a slightly thinner garage footprint 15 Development of Concept Design parking layouts

16 Approved Concept Design (Option A): parking level

One level parking garage with 7 foot clearance. Parking level lowered one foot. (maximum it can go and still open out to mall) Handicap van parking NOT accommodated in garage, provided in 90 degree HC spots off South Old Glebe & HC spots north of theater. Combined drop off / pick up lane for elementary and middle school, opening out to a pedestrian mall with new accessible entrances to MS Longest possible single file, on-site car queuing: 22 cars 17 200 parking garage spots with additional possible surface spots Option B: parking level. Top of garage lowered 2.5 feet

Elementary school play surface over parking structure shifted 15 east while maintaining a 50 wide pedestrian mall Tallest height of play surface (at SW corner): 8 feet + 42 fence Size of elevated ES playground south of building: 37,838 square feet Variety of play surfaces: Non-crumb Turf, poured rubber, pavers. Natural surfaces in raised beds, including school gardens More shade trees in ground at SW & eastern edges of play surface No ramps or stairs to front door of ES 18 Option B:

Existing pervious surface: 38% Proposed pervious surface: 17% Stormwater would be treated in: Outdoor classroom in bus loop Bio-swale in pedestrian mall Outdoor classroom at SW corner Bio-swale b/w garage and SOG Stormwater would be retained in: Underground tanks under bus loop driveway and new SW corner park 19 Option B: pervious v/s impervious

Middle School outdoor space on west side: 56,900 square feet Elementary School outdoor space on west side: 54,833 square feet 20 Option B: MS v/s ES outdoor space

Shortest distances from Arbors of Arlington to school building: North condo: Center condo: South condo: 105 feet 110 feet 175 feet Shortest distances from Arbors of Arlington to school gym: North condo: Center condo: South condo: 204 feet 110 feet 114 feet Shortest distances from Arbors of Arlington to elevated playfield: North condo: Center condo: South condo: 340 feet 185 feet 120 feet 21 Option B: distances to Arbors Condos

70% of elementary school play surface at natural grade Series of retaining walls at 3 feet or less, and playground would be fenced. Size of ES playground south of building: 38,391 square feet Variety of play surfaces: Non-crumb turf, poured rubber, pavers. Natural surfaces in ground including school gardens; all tress in ground Not digging out along middle school & leaving SW corner as is (potential removal of parking lot) 22 22 wide drop off lane on SOG Option C: 2 level underground parking garage under ES

Upper level of parking garage with 8.5 foot clearance. Handicap van parking accommodated on this level only. Probably want some ES HC parallel spots off South Old Glebe & HC spots north of theater. 100% underground and one entry and exit point for vehicles Two stairs and two elevators (same with all options) No student drop off in garage Longest possible single file, on-site car queuing in surface lane off SOG: 16 cars 111 parking spaces on this level 23 Option C: parking level 1

Lower level of parking garage with 7 foot clearance. Bottom elevation of +190-6. 13 feet below bottom level of TJMS, but garage held as far away from it as possible. One ramp to lower level and a loop circulation layout 113 parking spaces on this level 224 total parking garage spots in underground parking structure with additional possible surface spots 24 Option C: parking level 2

Existing pervious surface: 38% Proposed pervious surface: 23% Stormwater would be treated in: Outdoor classroom in bus loop Prominent Bio-swale b/w ES and MS Outdoor classroom at south end of ES play area Stormwater would be retained in: Underground tanks under bus loop driveway and a series of tanks under the bio-swale 25 Option C: pervious v/s impervious

Middle School outdoor space on west side: 56,900 square feet Elementary School outdoor space on west side: 57,640 square feet 26 Option C: MS v/s ES outdoor space

Shortest distances from Arbors of Arlington to school building: North condo: Center condo: South condo: 105 feet 110 feet 175 feet Shortest distances from Arbors of Arlington to school gym: North condo: Center condo: South condo: 204 feet 110 feet 114 feet Shortest distances from Arbors of Arlington to elevated playfield: There is none! 27 Option C: distances to Arbors Condos

28 Approved Concept Design (Option A)

29 Approved Concept Design (Option A) -Model View

30 Approved Concept Design (Option A) with double row of trees

31 Option B

32 Option C

33 Approved Concept Design (Option A)

34 Approved Concept Design (Option A) with double row of trees

35 Option B

36 Option C

37 Approved Concept Design (Option A)

38 Option B

39 Option C

40 Approved Concept Design (Option A)

41 Option B

42 Option C

43 Approved Concept Design (Option A)

44 Option B

45 Option C

46 Approved Concept Design (Option A)

47 Option B

48 Option C

Option A Option B Option C 16% pervious 17% pervious 23% pervious 49 Comparison of pervious area

Option A Option B Option C 48,163 sf 37,838 sf 38,391 sf 50 Comparison of ES vs MS outdoor areas

Option A Option B Option C 60.3K sf ES 57.0K sf MS 54.8K sf ES 56.9K sf MS 57.6K sf ES 56.9K sf MS 51 Comparison of ES play area south of school

Option A Option B Option C Size of ES play area south of building Max height of ES play area south of building At grade ES play area south of building Total outdoor ES space on west side Total outdoor MS space on west side Percent pervious Pedestrian mall w/ MS accessible entrances Number of parking spots in garage Additional surface spots (without SW corner lot) Handicap van parking available in garage Mechanically ventilated garage Drop off lane in garage Length of drop off lane queue (single file) Cost 48,163 sf 37,838 sf 38,391 sf 10.5 feet 8 feet At grade No No Yes 60,374 sf 54,833sf 57,640 sf 57,076 sf 56,900 sf 56,900 sf 16% 17% 23% Yes Yes No 197 200 224 5 + 6 = 11 5 + 6 + 14 = 25 5 + 6 = 11 Yes No Yes No No Yes Yes Yes No 16 cars 22 cars 16 cars same as Option C about $220K less same as Option A 52 Comparison

NEXT STEPS August 17 BLPC August 31 Joint BLPC PFRC September 13 Community Forum September 21 Joint BLPC - PFRC October 6 Schematic Design info item to School Board 53

ADJORN For further information please contact: APS Project Manager Steve Stricker 571-220-0048 steven.stricker@apsva.us County Project Manager Marco Rivero 703-228-3572 mrivero@arlingtonva.us Web links: APS Project Website PFRC Project Website Submit Public Comment and Sign up for Email Distribution 54