P-3819 MOA Page 1 of 22

Similar documents
Appendix E Memorandum of Agreement between FHWA and the SHPO

TOWN OF AURORA HERITAGE IMPACT ASSESSMENTS AND CONSERVATION PLANS GUIDE

Chesterfield County Project Update

Draft Environmental Assessment Appendix A. SHPO Correspondence, January 19, 2017

WHEREAS, the SI initiated Section 106 consultation with the DC SHPO regarding the Undertaking by letter dated October 9, 2014; and

2013 Annual Status Report St. Elizabeths Programmatic Agreement. January 29, 2014 Page 1 of 8. PA Ref. Line Begin End. Description Timeframe Category

January 29, 2015 Page 1 of Annual Status Report St. Elizabeths Programmatic Agreement. PA Ref. Line Begin End. Description Timeframe Category

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

Corridor Management Committee. September 29, 2017

ER# /22/03

Lathrop Homes Section 106 Consultation Meeting. October 4, 2016

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

ITS Concept Development Activity Descriptions

INTERGOVERNMENTAL COORDINATION ELEMENT

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

7.0 SECTION 4(F) EVALUATION

Project Description. Dear Ms. Roland-Nawi:

Welcome! Get On Board!

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

ENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F)

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

DAVENPORT VILLAGE SECONDARY PLAN

LOCATION AND DESIGN DIVISION

Environmental Resources Branch

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

The proposed project will impact a large amount of aquatic resources.

APPENDIX 2 NORTHEAST AIR ALLIANCE. SMOKE MANAGEMENT PLAN For Butte, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama

Right-of-Way Acquisitions and Relocations Technical Memorandum

Request for Qualifications. Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

City of Toronto. Emery Village Transportation Master Plan

Landscape Act. (Act No. 110 of June 18, 2004)

APPENDIX J SHPO COORDINATION

Page. I. Introduction 1. II. Project Purpose and Need 1. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) Property 3

C-I-10. The effect of establishing a comprehensive site review as follows will: B. Reduce the cluttered aspects of current development by:

Summary of Other State Archeological Guidelines

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

Stakeholders Meetings

Project Consulting Team:

Historic and Archaeological Resources

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

6. Consistency with Local Plans

STATE OF NORTH CAROLINA DECLARATION OF

SECTION 4(f) DE MINIMIS DOCUMENTATION

7.0 DRAFT SECTION 4(f) EVALUATION

RESOLUTION NO

Urban Planning and Land Use

Appendix E Section 4(f) Evaluation

ii

Pennsy Greenway Trail

Purpose of Report...1. Planning Framework Provincial Policy Statement Draft PPS...2. Ontario Heritage Act...3

VANCOUVER ISLAND HIGHWAY AGREEMENT

Summary of Information and Consultations for National Historic Preservation Act Section 106 Compliance, ANC Millennium Project, 2012

PUBLIC HEARING May 18, 2010 SUMMARY AND RECOMMENDATION

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

Hockessin Community Redevelopment Plan

GUIDELINES FOR CULTURAL HERITAGE IMPACT ASSESSMENTS

Stewardship. Streamlining. Consensus

PROJECT COMMITMENTS. Research Parkway -- Winston-Salem. From Stadium Drive to Third Street. Forsyth County. WBS Element TIP Project U-4918

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

Section 106 Consulting Parties Kick-off Meeting

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

Northeast Corner of Steeles Avenue West and Jane Street, City of Vaughan

Beckett Bridge PD& E Study. Presentation to: Board of County Commissioners

Camden County Development Regulations. Updated February 2017

2.1 Decision Making Matrix

The Corporation of Delta. COUNC~L REPORT Regular Meeting. Burnsview Secondary School/Chalmers Park Memorandum of Understanding

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

Bassett Creek Valley Working Group. October 4, 2017

April 4, 2013 Rana Ahmadi San Francisco Municipal Transportation Agency 1 South Van Ness Avenue, 7th Floor San Francisco, CA 94103

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 26, 2017

North River Mills Bridge Hampshire County State Project # S314-45/ Federal Project # ARRA-4520(003)D FR#: HM-1

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

CEQA and Historic Preservation: A 360 Degree Review

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room

SECTION 7A: WHAKARONGO RESIDENTIAL AREA

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

PROGRAMMATIC AGREEMENT AMONG THE SMITHSONIAN INSTITUTION THE DISTRICT OF COLUMBIA STATE HISTORIC PRESERVATION OFFICE

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

Decision Notice. Proposed Action

Northern Branch Corridor SDEIS March Table of Contents

Public Information/Cultural Resources Committee Workshop August 15, Florida Department of Transportation District One

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER

National Historic Preservation Act Section 106 Compliance

Final Initial Study. Chalice Unitarian Universalist Congregation Conditional Use Permit

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

THE MINISTRY OF INFRASTRUCTURE AND THE ENVIRONMENT OF THE KINGDOM OF THE NETHERLANDS

The transportation system in a community is an

Bus Rapid Transit Environmental Assessment and Section 4(f) Evaluation Summary

Beautification Advisory Committee Mission Statement and Goals & Objectives

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

Transcription:

PROPOSED SOUTHEAST HIGH-SPEED PASSENGER RAIL PROJECT SEGMENT WHEREAS, the Federal Railroad Administration (FRA) proposes to provide financial assistance to construct the infrastructure to support high-speed passenger rail service in the travel corridor from Washington, District of Columbia, through Richmond, Virginia, including the Hampton Roads, Virginia region, and Raleigh, North Carolina, to Charlotte, North Carolina, collectively referred to as the Southeast High-Speed Rail (SEHSR) project with construction by the North Carolina Department of Transportation Rail Division (NCDOT-Rail), and the Virginia Department of Rail and Public Transportation (DRPT); and WHEREAS, the FRA developed a Programmatic Agreement (Agreement) pursuant to 36 CFR Part 800.14(b), regulations implementing Section 106 of the National Historic Preservation Act (54 USC 300101 et seq.), to provide a consistent process for considering the effects of each portion of the SEHSR project on historic properties and resolving adverse effects where appropriate; and WHEREAS, the Agreement was signed by FRA, North Carolina State Historic Preservation Officer (NC SHPO), Advisory Council on Historic Preservation (Council), NCDOT-Rail, DRPT, and the Virginia State Historic Preservation Office in April 2016; and WHEREAS, the FRA and NC SHPO have agreed that the improvements and upgrades required for that portion of the SEHSR project from the Virginia-North Carolina State line to Raleigh (the Undertaking) will have effects upon historic properties listed on or determined eligible for listing on the National Register of Historic Places (NRHP) (historic properties); and WHEREAS, the FRA notified the Council of the potential for adverse effects for this portion of the SEHSR Project pursuant to 36 CFR Part 800.6, and the Council declined to formally participate in the development of this Memorandum of Agreement (MOA); and WHEREAS, the FRA and NCDOT-Rail have shared information about the SEHSR Project with the public multiple times via the NEPA process and NCDOT-Rail and the State Historic Preservation Office have conducted public outreach with towns, communities, and directly affected property owners to discuss and consider their views concerning design and construction options adjacent to or within historic properties or districts and solicit other consulting parties; and Page 1 of 22

WHEREAS, the NCDOT-Rail has participated in the identification of the historic properties and assessment of effects and with FRA will be responsible for implementing minimization and/or mitigation measures, and has been invited by the FRA, and NC SHPO to be a signatory to this MOA; and WHEREAS, the parties listed below were invited to participate as consulting parties for the portion of the SEHSR project, from the Virginia and North Carolina state line to Raleigh, and have been invited to concur with this MOA; and Catawba Indian Nation Atlantic Coast Line & Seaboard Air Line Railroad Historical Society Civil War Preservation Trust CSX Transportation Preservation North Carolina City of Henderson Town of Wake Forest and the Wake Forest Historic Preservation Commission Town of Franklinton City of Raleigh and the Raleigh Historic Development Commission Town of Youngsville M.L. Barnes of the Gulf Petroleum Products Warehouse SCP York Powerhouse, LLC. of the Raleigh Electric Company Power House WHEREAS, to the best of NCDOT-Rail s knowledge and belief, no human remains, associated or unassociated funerary objects or sacred objects, or objects of cultural patrimony as defined in the Native American Graves Protection and Repatriation Act (25 USC 3001), are expected to be encountered in the construction work required for the Undertaking; NOW, THEREE, FHWA, NCDOT-Rail, and NC SHPO agree that the Undertaking shall be implemented in accordance with the following stipulations in order to take into account the effects of the Undertaking on the historic properties. STIPULATIONS The FRA and NCDOT-Rail will ensure that the following measures are carried out: I. General Provision: Fencing The location of fences throughout the project corridor will be determined during development of the Final Design and Right-of-Way plans by NCDOT-Rail in cooperation with municipal governments and the owner of the rail corridor. Black aluminum fencing will be used when the barrier is within the following NRHP-listed or eligible historic districts. 1. Henderson Historic District and Boundary Expansion 2. South Henderson Industrial Historic District 3. Franklinton Historic District 4. Youngsville Historic District 5. Glen Royall Mill Village Historic District 6. Wake Forest Historic District Page 2 of 22

7. Downtown Wake Forest Historic District During final plan preparation and prior to completion of the Construction Consultation, NCDOT-Rail shall afford the NC SHPO and the municipal governments an opportunity to review and comment on the specifications for the fencing. If no comments are received from NC SHPO or the municipal governments within thirty (30) days of confirmed receipt, NCDOT-Rail may assume that the parties do not object to the proposed fencing. II. III. IV. General Provision: Closed Crossings The closure of existing rail crossings throughout the project corridor will be finalized during development of the Final Design and Right-of-Way plans by NCDOT-Rail and in cooperation with municipal governments and the owner of the rail corridor. Within the historic districts listed above in Stipulation I, NCDOT-Rail will use a phased approach with the closings that: (a) begins with installation of a concrete Jersey barrier, cautionary signage, and landscaping with evergreen shrubs and/or small trees, or a combination of both, (b) after NCDOT-Rail determines that the public s habitual use of the crossing has been eradicated, the Jersey barrier will be removed, (c) followed by removal of the signage so that only the plant material remains. Guardrail will not be erected either temporarily or permanently at the closed crossings within the historic districts listed in Stipulation I. All new plant materials will be warranted for two growing seasons and replaced by NCDOT-Rail, if they fail within that time period. General Provision: Bridges and Mechanically Stabilized Earth (MSE) Walls For the new bridges and MSE walls constructed within the historic districts listed in Stipulation I, NCDOT-Rail and NC SHPO will work together to develop a set of three (3) options for both texture and color treatments that they will provide to representatives of each of the historic districts. Within thirty (30) days of confirmed receipt, the representatives will provide NCDOT-Rail their preferences for the treatments within their district from the three options. If no comments are received from a representative(s), NCDOT-Rail and NC SHPO will jointly determine the texture and color for the bridges and MSE walls within the representative s jurisdiction. General Provision: Landscaping For proposed landscaping installations within the historic districts listed in Stipulation I, NCDOT-Rail will develop landscape plans and provide them to representatives of each of the historic districts. The representatives will have thirty (30) days of confirmed receipt to provide NCDOT-Rail their comments on the landscape plans within their district. If no comments are received from a representative(s), NC SHPO will provide comments on the landscape plan within the unresponsive representative s jurisdiction. NCDOT will install the plants as per agreed upon plan and warranty their survival for two (2) years from planting. V. General Provision: Pedestrian Structures in Glen Royall Mill Village and Wake Forest Historic Districts For the new pedestrian structures constructed within the Glen Royall Mill Village and Wake Forest historic districts, NCDOT-Rail will organize a design charrette with Page 3 of 22

representatives from the State Historic Preservation Office and each of the communities to determine the design aesthetics of each structure including colors, textures, and other embellishments. After the charrette, NCDOT-Rail will develop design plans and provide them to the State Historic Preservation Office and the communities. The community s representatives will have thirty (30) days after confirmed receipt to provide NCDOT-Rail their comments on the design plans. If no comments are received from a representative(s), NC SHPO will provide NCDOT-Rail comments on the design plan within the unresponsive representative s jurisdiction. VI. VII. VIII. IX. Stop Sign at Chapel of the Good Shepard To insure no adverse effects to Chapel of the Good Shepard (WR0003), NCDOT-Rail will maintain a stop sign at the existing intersection of SR 1104 (Ed Petar Road) and Ridgeway-Warrenton Road during and after construction. Access at the William J. Hawkins House To ensure no adverse effects to the William J. Hawkins House, NCDOT-Rail will coordinate with the property owner to provide access to the property during and after construction. Preservation of Cedar Creek Railroad Bridge Piers To insure no adverse effects to the Cedar Creek Railroad Bridge Piers, the piers will be preserved in situ and a preservation easement will be placed on the remains if the rightof-way is transferred from CSX Transportation to another owner. Cross Street Improvements in the Youngsville Historic District To insure no adverse effects to the Youngsville Historic District, the necessary improvements to North Cross Street for the accommodation of truck traffic during the construction of the grade separation on Main Street will be limited to the back of the existing right-of-way on the west side of North Cross Street within the historic district. NCDOT-Rail will also install temporary plastic fencing with tree protection signs along the west side of North Cross Street within the historic district prior to the initiation of construction on North Cross Street. The fencing will be removed when the improvements have been completed. X. Photo-documentation of the Gulf Petroleum Products Warehouse Prior to the initiation of construction, the Historic Architecture Group of NCDOT will photographically record the existing condition of the Gulf Petroleum Products Warehouse and associated structures in accordance with the attached Historic Structures and Landscape Recordation Plan (Appendix A). Copies of the documentation will be deposited in the files of the State Historic Preservation Office and Historic Architecture Group of NCDOT. XI. Pedestrian Structure at Raleigh Electric Company Power House For the new pedestrian structure to be constructed at Jones Street, NCDOT-Rail will organize a design charrette with the owner of the Raleigh Electric Company Power House, representatives of the State Historic Preservation Office, and representatives of Page 4 of 22

the Raleigh Historic Development Commission to determine the design aesthetics of the structure including the color, texture, and other embellishments. After the charrette, NCDOT-Rail will develop design plans that they will provide to the charrette attendees. The owner and charrette attendees will have thirty (30) days from confirmed receipt to provide NCDOT-Rail their comments on the design plans. If no comments are received from the representatives, NC SHPO will provide comments on the design plan. XII. XIII. XIV. XV. North Carolina Railroad Historic Context The Historic Architecture Group of NCDOT will compile a historic context documenting the history and impacts of CSX Transportation (including the Clinchfield Railroad, the Seaboard Air Line, and the Atlantic Coast Line) and Norfolk Southern Railway on the development of North Carolina communities, agriculture, and manufacturing in their operations area in North Carolina. The document will record the types of structures, buildings, and objects historically associated with CSX Transportation and Norfolk Southern Railway and their activities. The context will be used to evaluate other railroad structures, buildings, and objects in future projects and better understand and assess the effects future projects will have on communities along the corridor. The context will compile documentary materials, bibliographical sources, National Register eligibility considerations, and digital images. The draft report will be provided to the State Historic Preservation Office and they will have will have sixty (60) days after confirmed receipt to provide NCDOT-Historic Architecture Group their comments. The final report will be in a digital format and will be provided on a CD-ROM to the State Historic Preservation Office. An additional copy of the report will be deposited in the files the Historic Architecture Group of NCDOT. The final digital product shall be completed and distributed within three (3) years of the execution of this MOA. Unanticipated Discovery In accordance with 36 CFR 800.11(a), if NCDOT identifies additional cultural resource(s) during construction and determines it (them) to be eligible for the NRHP, all work will be halted within the limits of the NRHP-eligible resource(s) and the FRA and NC SHPO will be contacted. If after consultation between the Primary Signatories additional mitigation is determined necessary, the Historic Architecture and/or Archaeology Group(s) of NCDOT, in consultation with the Primary Signatories, will develop and implement appropriate protection/mitigation measures for the resource(s). Inadvertent or accidental discovery of human remains will be handled in accordance with North Carolina General Statutes 65 and 70. Amendments Should any of the Primary Signatories to this MOA believe that its terms cannot be carried out or that an amendment to the terms must be made, that party shall immediately consult with the other party(ies) to develop amendments in accordance with 36 CFR 800.6(c)(7). If an amendment cannot be agree upon, the dispute resolution process set forth in Stipulation XV will be followed. Dispute Resolution Should any Primary Signatories or concurring party to this MOA object within (30) days to any plans or documentation provided for review pursuant to this agreement, that party Page 5 of 22

shall notify all parties to this agreement. The FRA shall immediately consult with the objecting party(ies) to resolve the objection. If the FRA or the objecting party(ies) determines that the objection cannot be resolved, the FRA will forward all documentation relevant to the dispute to the Council. Within thirty (30) days after receipt of all pertinent documentation, the Council will either: Provide the FRA with recommendations, which the FRA will take into account in reaching a final decision regarding the dispute, or Notify the FRA that it will comment pursuant to 36 CFR Section 800.7(c) and proceed to comment. Any Council comment provided in response to such a request will be taken into account by the FRA in accordance with 36 CFR Section 800.7(c)(4) with reference to the subject of the dispute. Any recommendations or comments provided by the Council will be understood to pertain only to the subject of the dispute; the FRA s responsibility to carry out all of the actions under this agreement that is not the subject of the dispute will remain unchanged. XVI. XVII. Termination Any of the Signatory Party(ies)to this MOA may terminate the agreement by providing notice to the other parties, provided that the signatories and concurring parties will consult during the period prior to termination to seek agreement on amendments or other actions that would avoid termination. Termination of this MOA will require compliance with 36 CFR 800. This MOA may be terminated by the execution of a subsequent MOA that explicitly terminates or supersedes its terms. Duration Unless terminated pursuant to Stipulation XVI above, this MOA will be in effect until FRA, in consultation with the other Signatory Parties, determines that all of its terms have satisfactorily been fulfilled, that amendments are needed in accordance with Stipulation XIV above, or or if NCDOT-Rail is unable or decides not to construct the Undertaking. Page 6 of 22

Execution of this Memorandum of Agreement by FRA, NCDOT-Rail, and NC SHPO, its AGREE: Federal Railroad Administration: Date: North Carolina State Historic Preservation Officer: Kevin Cherry, Ph.D. Date: North Carolina Department of Transportation Rail Division: Date: FILED: Advisory Council on Historic Preservation: Date: Page 7 of 22

Catawba Indian Nation Page 8 of 22

Atlantic Coast Line & Seaboard Air Line Railroad Historical Society Page 9 of 22

Civil War Preservation Trust Page 10 of 22

CSX Transportation Page 11 of 22

Preservation North Carolina Page 12 of 22

City of Henderson Page 13 of 22

Town of Wake Forest Page 14 of 22

Wake Forest Historic Preservation Commission Page 15 of 22

Town of Franklinton Page 16 of 22

City of Raleigh Page 17 of 22

Raleigh Historic Development Commission Page 18 of 22

Town of Youngsville Page 19 of 22

M.L. Barnes of the Gulf Petroleum Products Warehouse Page 20 of 22

SCP York Powerhouse, LLC. of the Raleigh Electric Company Power House Page 21 of 22

APPENDIX A Historic Structures and Landscape Recordation Plan For Proposed Southeast High-Speed Rail Project Segment From the Virginia-North Carolina State Line To Raleigh, North Carolina TIP Project No. P-3819 Federal Aid Project No. FR-HSR-0057-11-01-00 Photographic Requirements Overall views of the Gulf Petroleum Products Warehouse, its associated structures, and surrounding landscape. Views of the property and landscape showing the relationship to the railroad and road. All views to be keyed to a site plan that includes a North arrow. Photographic Format Color digital images (all views). Images are to be shot on a SLR digital camera with a minimum resolution of 6 megabyte pixels, at a high quality (preferably RAW) setting, to be saved in TIF format as the archival masters and labeled according to the State Historic Preservation Office standards. All processing to be done to archival standards. The accompanying printed inventory of the images including subject, location, date, and photographer information for each image is to be completed according to the State Historic Preservation Office standards. Copies and Curation One (1) set of all above mentioned photographic documentation, including a compact disc of labeled images, will be deposited with the North Carolina Office of Archives and History/Historic Preservation Office to be made a permanent part of the statewide survey and iconographic collection. One (1) contact sheet shall be deposited in the files of the Historic Architecture Group of NCDOT. Page 22 of 22