City of Meriden Harbor Brook Flood Control Project Overview

Similar documents
Ann Arbor Intermodal Station Environmental Review

Examples of Asset Based Approaches to Development. Economic and Community Development Suffield, CT

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Capital Projects impacting Odenton Town Center

NASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES. A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Green Infrastructure The Indianapolis Greenways Connection

Kensington Center. Public Meeting # Transit-Oriented Development, Town of Berlin, CT

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

Capital Projects in and near Odenton Town Center

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Meeting Agenda. 1. Introductions (5 min)

BeltLine Corridor Environmental Study

Pace University Land Use and Sustainable Development Conference Tensions and Opportunities in Urban Revitalization

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

Public may provide comments on the GDP within the next two weeks (December 24)

495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

Plan-It Greenville (2009) Comprehensive Plan 5-Year Update

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

South Central Connecticut Region Plan of Conservation & Development 2018 Update. Municipal Planners

Planning Districts INTRODUCTION

Developer s Program. The Station at East 54

The transportation system in a community is an

Mississippi Skyway Preliminary Engineering Report

Panel Discussion: Developing Economically Sustainable Communities

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

City of Waco Stormwater Management Regulations

Preliminary Plan Framework: Vision and Goals

We are a determined group residents, industry, and government and by working together an incredible future lies ahead for Troy.

City of Royalton Comprehensive Land Use Plan 2005 to Revision February 8, 2011

The Hartford Line Transit-Oriented Development (TOD) Action Plan. Maxwell L. Sokol, AICP WSP USA, Lead Planner New York, NY

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

BeltLine Corridor Environmental Study

I-84 HARTFORD PROJECT HARTFORD, CONNECTICUT DRAFT PURPOSE AND NEED STATEMENT

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Route 1 Corridor Study

Environmental Review Part 55 Floodplain Management Subpart C. 8-Step Decision Making Process

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WEST OAKLAND SPECIFIC PLAN & DRAFT ENVIRONMENTAL IMPACT REPORT

1 Introduction. Chapter. In this chapter:

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

Technical Memorandum 5

Farmers Investment Co. (FICO) Sahuarita Farms Specific Plan & Minor General Plan Amendment Community Meeting July 1, 2014

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Dyersville Downtown Plan. Open House October 24, 2017

Hopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

OFFICIAL CONTROLS IMPLEMENTATION LEGAL REQUIREMENTS

ESTABLISH AN EFFICIENT TOWN CENTER

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

Silver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA

3 Vision and Goals. Vision and Goals. Blueprint for Bloomsburg. Vision. Town of Bloomsburg Comprehensive Plan,

MEADOW RIVER RAIL TRAIL

QUEEN-RIVER SECONDARY PLAN

Southern Gateway Project and Public Green

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

Making Transit Oriented Development Work For Boonton, NJ

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

Northwest commuter rail station US 36 BRT. Westminster Station

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

DRAFT City of Titusville 2040 Comprehensive Plan Future Land Use, Housing, and Transportation Elements April 16, 2018

New Partners for Smart Growth Conference February 5, 2010

Albert Lea. Redevelopment Plan. 701 Xenia Avenue South, Suite 300 Minneapolis, MN Tel: (763) Fax: (763) wsbeng.

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

Wasatch CHOICE for 2040

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Appendix E Preliminary Location Hydraulic Study

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

Downingtown Station Relocation Plan Site Selection Memo June 12, 2012

THE ASHLAND OVERVIEW. FXCollaborative SPAN Architecture WSP USA ICOR Associates Site/Civil Geotechnical Environmental Surveying/Geospatial

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

March 30, 2017

FUTURE LAND USE PLAN 7

Aligning brownfields remediation to transit oriented development

Multimodal Station Planning Working Session Rebuilding a Better I-84 in Hartford. August 10, 2017

WALTER RAND TRANSPORTATION CENTER

Linking Land Use and Transportation

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

the South Lincoln Redevelopment, Denver, CO

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Description of Preferred Alternative

STAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION

DRAFT. Waterfronts and Open Spaces. 10 The Riverfront Open Space System

178 Carruthers Properties Inc.

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

STP/SNK BIKE AND PEDESTRIAN PROJECTS

Background Summary Report

Transcription:

City of Meriden Harbor Brook Flood Control Project Overview Updated August 2013 OVERVIEW The center of Meriden, including the HUB site is the low point of the town which is ringed by basalt ridges. Running through the Hub site is Harbor Brook, approximately 3.5 miles in length, which drains into Hanover Pond and the Quinnipiac River. The Harbor Brook watershed covers 12.3 square miles, or approximately 50% of Meriden s total land area. Over 300 properties/structures in Meriden (residential, commercial, sheds, garages, etc.) fall within the existing Harbor Brook FEMA-approved 100-year floodplain. This equates to roughly 225 acres. At least eleven major flooding incidents since the late 1860 s have caused substantial economic damage in Meriden s central city. Various efforts to resolve the flooding problems failed due to lack of funding or NIMBY issues. Major floods in 1992 and again in 1996 caused over $26 million in property damage and led to the relocation of major employers out of the city center area. The City began the Harbor Brook Flood Control project in 1994 and has continued those efforts to date. HARBOR BROOK FLOOD CONTROL PLAN The Harbor Brook Flood Control Plan is a comprehensive design of various flood control measures along Harbor Brook. The implementation of the plan will address historic flooding problem once and for all and will provide economic opportunities for the central city. Several dam and bridge projects have been completed to date. The City s Capital Improvement Program calls for the completion of $22.15 million in project elements over the next five years (2014-2018). That is in addition to the HUB site project, which will provide 53 acre feet of detention and create a town green and provide economic development space next to the new transit center being constructed as part of the New Haven-Hartford-Springfield commuter and high speed rail project. State and Federal funds, where available, are needed to offset these costs. Key flood control projects include: Floodwater Detention: Areas will be designed to detain floodwater following significant storm events HUB site-53 acre feet of floodwater storage to be constructed Falcon Field-21.8 acre feet of floodwater storage to be constructed Bridge Replacement: Bridges that do not allow for the passage of the 100 year storm, do not meet current safety and design standards and have the potential to be adversely impacted by floodwaters associated with Harbor Brook. Cook Ave. Bridge: Cook Avenue bridge replacement project was completed by the State of Connecticut in 2013. Cooper Street Bridge Mill Street Bridge South Butler Street Bridge Center Street Bridge: partial design completed Broad Street Bridge Bridge Relief Culverts: Relief culverts will be constructed where costs to replace the bridge are prohibitive. Columbus Ave. Bridge: The Columbus Avenue bridge relief culvert is fully funded and expected to be advertised for bids in and begin construction in 2013. Amtrak Railroad Bridge: in design with construction in 2014 dependent on funding. Hanover Towers Bridge 1

Property Acquisition and Demolition: Church & Morse Building and Liseo Building/South Colony Street Channel Realignment: properties acquired, demolition expected in 2013 Factory H Demolition (completed) Harbor Brook Channel Improvements Improvements include the widening, deepening, and minor realignments to the channel. Flood Proofing: Following implementation of the Harbor Brook Flood Control Plan 24 structures (residential/commercial buildings, detached garages and sheds) will remain within the floodplain. Flood proofing of these structures will be required. Sixteen properties will be acquired and demolished as part of this project. FLOOD CONTROL AT THE HUB SITE & DEVELOPMENT OF THE MERIDEN GREEN The Harbor Brook Flood Control Plan recommends the use of the Hub site to store flood waters in certain storm conditions and to prevent flooding in the immediate downtown area. This recommendation has led to the opportunity to develop a town green that Meriden for historic reasons never had. Combining that central green space with the linear trail system designed alongside the Harbor Brook channel will provide a recreation link and green space diagonally across the city from the Cheshire border to Middletown. The first phase of the trail, the Quinnipiac River Gorge Trail was completed in 2011 and the second phase is in construction with completion in 2013. Federal funding for phases III and IV have been applied for. Final HUB park design and construction bid documents are complete and the project is fully permitted. The design includes several key features that will help enhance the quality of life and provide an element of environmental justice in the City Center: Public park with gathering places and links to the regional greenway system Pedestrian links to the new Intermodal Transit Center Amphitheater and great lawn area for public events Day lighted Harbor Brook 3.4 Acres available for economic development that would provide a 150,000 square foot footprint on which 1.2 million square feet of development would be allowed under the City s new Transit Oriented Development Zoning ordinance Construction will commence after all funds have been secured. Funding secured to date includes: $3.5 million Urban Act funds (12/2011) $2 million State Bond Funds (PA 7-07, 9/2011) $500,000 OBRD funds, (3/2012) $7 million State Bond funds (PA 7-07), legislatively authorized; $3.8 million awarded June 2013; remainder awaiting State Bond Commission Approval. All permits for construction have been secured, including: DEEP Water Diversion and Water Quality Certificate issued, RAP approved FEMA Conditional Letter of Map Revision issued US Army Corps of Engineers permit approved 2

THE IMPACT OF FLOOD CONTROL ON FUTURE DEVELOPMENT The Hub site was initially developed as a manufacturing site to take advantage of the nearby rail line and Harbor Brook as a source of power. The City believes that if rail fostered economic development then, it can do so again in a better, smarter way. Implementation of the Flood Control Plan will: Open up properties to development and protect existing development by removing 227 properties wholly or partially within the 100-year floodplain and reducing acres wholly or partially within the 100-year floodplain from 225 to 95 acres Allow for the redevelopment of the Mills Memorial Housing Complex, a distressed and obsolete high rise public housing complex which currently is in the 100-year flood plain Allow development to occur on two key brownfields sites, Factory H and the HUB, without the risk of economic damage from future flood events. Create new development opportunities in a timely manner to coincide with State and Federal investments in rail infrastructure Reduce flooding risks for new development throughout the central city Create an attractive public park and town green around which development can be constructed POTENTIAL DEVELOPMENT SITES MERIDEN HUB: The Meriden HUB site historically served as a center of industrial and commercial activity in Meriden s downtown. The City will transform this brownfield site into a City park that serves the dual purposes of providing public green space and flood storage. Construction is planned for 2013 dependent on funding. Project completion is estimated in 18 months. COLONY STREET: The City is developing preliminary traffic engineering plans to convert Colony Street into a complete street, provide a link to the new Transit Center via a new pedestrian walkway and restore two-way traffic to adjacent downtown streets. Together with several state agencies, the City is preparing plans to leverage the State investment in rail parking facilities with mixed income housing in the Colony Street area. MERIDEN TRANSIT CENTER: Meriden has been identified as a station stop on the new high speed/commuter rail line proposed for the New Haven Hartford Springfield corridor. The existing station area will be developed into multi-modal transit center that includes commuter parking, a pedestrian flyover and new rail passenger platforms. Construction is anticipated to begin in 2014 and service is scheduled to begin in 2016. 3

MILLS MEMORIAL HOUSING COMPLEX: The City and the Meriden Housing Authority are working together to develop a plan to replace 140 Mills units with up to 500 mixed income units in mixed use developments in the TOD area. The City and MHA, which will be jointly filing a HUD Choice Neighborhood Planning Grant application this month, are committed to reusing the current Mills site, providing affordable housing opportunities to existing residents and ensuring that new development is integrated into the neighborhood transformation plan. OTHER DEVELOPMENT SITES: The City owns the former International Silver Factory H and 116 Cook Avenue sites that together comprise approximately 10 acres. The industrial buildings at the Factory H site have been demolished and extensive environmental assessment has been completed. Completion of flood control infrastructure is necessary to redevelop the site for housing and other uses. This site and a nearby vacant 300,000 square foot former hospital site are located in the TOD zone and within walking distance to the new rail service. The City is utilizing a HUD Sustainable Communities Challenge Grant to identify, assess and purchase other sites within the one-half mile TOD area suitable for new housing development. TOD POLICY SUPPORT The City is working closely with its partners to help them provide the resources needed for neighborhood families to have the cradle to career educational and employment opportunities necessary to produce sustainable transformation in the city center. The Meriden Family Zone project, recipient of a USDOE Promise Neighborhood planning grant, will coordinate the efforts of over 40 agencies, foundations and educational institutions to connect families to needed services in a coordinated data driven plan with a special emphasis on early childhood education. The Meriden Board of Education is a State leader in addressing education achievement gaps by incorporating national best practices. For more information, please contact Lawrence J. Kendzior, City Manager Juliet Burdelski, Director of Economic Development Aya Beckles Swanson, Economic Development Associate City of Meriden 142 East Main Street Meriden, CT 06450 For More Information Visit: www.cityofmeriden.org www.meridentod.com www.meridenbiz.com 4

Light Blue = Existing Floodplain area, Dark Blue = Proposed Floodplain area with Flood Control improvements. See Department of Public Works for Official Maps. 5