EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

Similar documents
Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Guidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford

Rolled Erosion Control Products (RECPs) General Usage and Installation Guidelines for Slope

RevETMax TM INSTALLATION GUIDE

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

SECTION 900 TURF ESTABLISHMENT

SHOREMAX FLEXIBLE TRANSITION MAT INSTALLATION GUIDE

East Coast Erosion Blankets

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

BEFORE INSTALLATION BEGINS

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

SECTION LANDSCAPING

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

I N D U S T R I A L Y A R D S

A DIVISION OF L & M SUPPLY EROSION CONTROL BLANKETS, WATTLES AND LOGS

ACTIVITY: Geotextiles ES 12

Section Seeding

EROSION & SEDIMENT CONTROL

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

INSTALLATION TIPS. Site Preparation

SECTION 6. Routine Maintenance Activity Details

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Erosion Prevention Practices (EPPs) Activity: Nets and Mats (N and M)

Bio-Engineering Techniques to Revegetate Streambanks

ITEM 164 SEEDING AND EROSION CONTROL BLANKET

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS

BEFORE INSTALLATION BEGINS

Section 816. TURF ESTABLISHMENT

Tree Pits Construction Guide

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

SECTION TURF AND GRASSES

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

Information for File # JTF

Wisconsin Contractors Institute Continuing Education

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

!!!!!!!!!!!!!!!! INSTALLATION!GUIDELINES!MANUAL! January!2018,!Revision!3.0! Advanced!Revetment!Technology!

All materials in this presentation are taken from materials produced by:

Homeowner s Guide to Basic Landscape Care in Colorado

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

SECTION SODDING

1.4. Planting of Bushes

Illinois Urban Manual

Adaptive Management of Erosion and Sediment Control Best Management Practices (BMPs) Presenter: Denis Rushton, P. Eng. Date: May 18, 2016

Content. 1. Particular Preambles for Standard Method of Measurement. 2. Particular Specification for Soil Fiber System. 3.

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule.

Erosion Control for Home Builders in the. City of Jacksonville

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

ENVIRONMENTAL BEST PRACTICES EROSION AND SEDIMENT CONTROL

CHAPTER 2. VEGETATION AND SOIL STABILIZATION CONTROL MEASURES

STREAM ALTERATION PRACTICES

Vegetation. Fe=0.90 (When fully established; lower while vegetation is first growing)

for Owners and Maintenance Staff

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

GEOMEMBRANE FIELD INSTALLATION

Section 9 Landscaping and Street Trees

What Is Water Erosion?

Turfgrass Sod General

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description

EROSION & SEDIMENT CONTROL

EVALUATION OF ANCHOR SYSTEMS THROUGH FULL SCALE PULLOUT TESTING

Town of Fuquay-Varina

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

CI/SfB (11.1) (11.3) Common Arrangement R12. Uniclass D1372/L141. Trinter TM. Erosion Control Mat. Geosynthetics

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod.

Section Specification for Geotextile Used in Permanent Erosion Control Application

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:

Post Fire Restoration

Town of Essex Small Site Erosion Control Guide

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Why Control and Prevent Erosion?

Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area

Analyzing the Bioretention Construction Sequence

Biodegradabale Soil Blankets Installation Technique

SECTION SODDING

SECTION LANDSCAPE

E R O S I O N C O N T R O L

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

H841:02 Deep and severe erosion of roadside ditch to form gullies. H837:02 Deep erosion of roadside ditch

Landscape Restoration Specifications

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Soil bioengineering and ecological

Winter work with multiple permit issues of missing perimeter control, exposed soils, missing energy dissipation, and stabilized conveyance.

02 SITE 0252p LAWN SOLUTIONS in landscape natural grass surfaces

5 TH ANNUAL CAPE COASTAL CONFERENCE

SECTION SEEDING

Section 815. LANDSCAPING

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

Table 4.7.1: Swales Potential Application and Storm Water Regulation

6.9 Check Dams Description/Purpose Catchment Area Construction

APPLICATIONS IN FILTRATION AND DRAINAGE & EROSION CONTROL

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

LAWN RENOVATION & OVERSEEDING

Transcription:

EnkaTech Note Installation Guide for Enkamat Slopes and Channels Site Preparation For both slope and channel applications, the site must be shaped to the design specifications (grade, geometry, soil compaction, etc.). The area should then be dressed to be free of soil clods, clumps, roots, stumps, rocks or vehicle imprints of any significant size that would prevent the Enkamat from lying flush to surface contours. Note: A key factor in the effectiveness of Enkamat is to maintain intimate contact with the prepared soil surface. Anchor Trench Anchor trenches are required to securely fasten the Enkamat to the ground surface and to prevent undermining from erosion beyond the protected zone. Anchor trenches are installed at least 3 feet beyond the crest of the slope in a slope application. In channel applications, the initial anchor trench is installed at the beginning of the channel (lowest elevation ) and intermediate check slots are spaced at approximately 25-60 foot intervals upstream depending on flow conditions and whether or not the Enkamat is soil filled. The anchor trench/intermediate check slots should be at least 6-9 inches wide and 6-9 inches deep. The Enkamat is installed into the trench and fastened at the bottom of the trench with staples/pins spaced 3 feet apart (maximum). The anchor trench/ intermediate check slots are then backfilled and compacted in a manner that does not damage the Enkamat. Enkamat Installation Once anchored, deploy the Enkamat by rolling down the slope or up the channel. Overlaps (edge to edge) between rolls should be 3 to 4 inches. The (end to end) splice between rolls should be 2 to 3 feet and shingled in the direction of water flow. Always securely fasten to the ground the edges of the Enkamat and overlaps with intervals of 3 feet (to 5 feet, depending on geometry of the slope or channel). Securely fasten down the center of each roll staggering centerline fasteners between the outside fasteners with a spacing interval of 3 to 6 feet. Anchoring patterns will vary depending upon application, soil type, slope or channel slope, geometry, etc. Rather than try to determine the anchorage on a project-by-project basis, it has become standard practice to rely on empirically derived charts, such as Chart 1 on the next page, that relate anchor frequency to slope and channel conditions. 2014 Page 1

Sample pattern for slopes less than 3:1 48 48 Sample pattern for low flow/gradient channels and slopes greater than 3:1 48 48 6 18 30 36 36 3 16 18 16 30 36 18 30 36 1.5 to 2 Staples per S.Y. 2.5 to 3 Staples per S.Y. 2014 Page 2

Slope and Channel Anchorage of TRM Further, a general rule of thumb for estimating the amount of staples required for a project is as following: Slopes 1:1 to 2:1: Slopes 3:1 or less: High Flow Channels: Low Flow Channels: 3-4 fasteners per square yard 2-3 fasteners per square yard 3-4 fasteners per square yard 2-3 fasteners per square yard Always install two rows of pins/staples spaced 1.5 x 1.5 feet apart at all roll splice locations. Always lay Enkamat so that contact with the soil is maintained at all times. After the Enkamat is installed, go back over the Enkamat and install additional fasteners as required to ensure the Enkamat maintains intimate contact with the soil. Note: A detailed step-by-step installation guide is available from your Enkamat distributor or directly from Bonar at your request. Anchoring/Fastening Devices Wire (sod) staples (U-shaped), geotextile pins or (triangular) wooden stakes can be used as fasteners. Staples should be the type made from a minimum 11 gauge metal wire and metal pins should have a minimum diameter of 3/16 with a 1.5 steel washer at one end to form a head. Staple/pin length will vary (6-18 ) according to soil conditions but should be a minimum 6 and have a ground penetration sufficient to resist pulling out once installed. Staples/pins should be installed flush with the soil surface. If wooden stakes are used, approximately 2 of the stake should remain above ground to secure the Enkamat. In some cases, 12-30 J- shaped pins are used and are made from re-bar with a minimum diameter of ¼. Note: It is important around any penetration through the Enkamat that additional anchorage be provided. The most common penetrations involve pipes, manholes or landscaping which the Enkamat can be easily cut to fit neatly. It is at these locations that additional anchorage will be required. These areas are notoriously prone to concentrated erosion and therefore special attention is necessary. 2014 Page 3

Seeding and Soil Filling When the Enkamat is installed prior to seeding, it must be subsequently seeded and, when directed, backfilled with soil. [The open physical characteristics of Enkamat facilitates soil filling.] Seeding Often the recommended seed mixture is seeded onto the prepared soil surface. Yet, Enkamat, with its highly open structure, can alternately accommodate seeding directly into the mat, enhancing future turf reinforcement. Every effort should be made to obtain a uniform distribution over the seeded area. If hydroseeding is used, the hydroseeder should have continuous agitation action that keeps the seed mixed in the hydromulch slurry until pumped from the tank and the pump pressure is maintained such that a continuous non-fluctuating stream is maintained. If distribution of hydroseeding is not uniform, the affected areas should be reseeded. The seed-fertilizer mixture shall be used within 4 hours of adding the seed to the tank. Except under intentional conditions, seed that is allowed to remain mixed with the fertilizer for longer than 4 hours should not be accepted for use. Typical seed, mulch and fertilizer application rates should be obtained from the project engineer/architect and be suitable to the particular region where the project is located, native species work well with Enkamat. It should be noted that seeding during winter months might need to be repeated once climate conditions suitable for germination return in the Spring. Soil Filling Typically, once seeded, same day soil filling is preferred. Depending on the system design, the cover soil may be a special topsoil or simply general backfill. In either case, consideration must be made for the proper placement of the soil layer to completely fill the Enkamat without overfilling (which may prevent germination) or causing construction damage. When soil filling is recommended following seeding, a thin layer (approximately 1/2 in. - 3/4 in.) of fine soil (such as sandy loam) should be spread on top of and within the Enkamat. Blower trucks are also suitable for soil filling. The topsoil should be lightly raked (using the backside of the rake) or brushed into the mat apertures to completely fill the mat thickness. Hand implements (shovels, rakes, and brooms) are recommended for soil filling of the Enkamat. Heavy equipment traffic, sudden turning or stopping of light equipment on the newly installed Enkamat should be avoided. Temporary protection Soil filled Enkamat may experience erosion of the backfill when a significant rainfall event occurs. This can remove some of the protective soil from above the seed and increase the sediment yield from the protected area. If frequent and/or heavy precipitation is expected during or prior to plant germination and/or early vegetation establishment periods, then traditional mulch or an economical organic blanket can be deployed over the Enkamat to provide additional temporary protection. Sod Cover The Enkamat should be soil-filled with an appropriate topsoil mixture, taking care to evenly distribute the soil throughout the mat so that the mat is thoroughly covered, steel drum roller compact if possible. The sod should be placed directly on the soil-filled Enkamat and secured with appropriate sod staples or pins. This will ensure the temporary stability of the newly placed sod while root growth and reinforcement is established. [The sod will normally contain 1 to 1.5 of soil, which should result in the Enkamat at an elevation 1.2 to 1.7 below the surface. If sod contains less than 1 of soil, additional topsoil should be placed prior to sodding to provide adequate coverage] 2014 Page 4

Seeding and Soil Filling Maintenance of Seeded Areas Proper care of seeded areas is especially important during the period of vegetation establishment. The establishment period typically extends for 3 months after completion of the seeding unless the desired growth is established in a shorter period of time. When any portion of the surface becomes gullied or otherwise damaged, or when the treatment is destroyed, the affected portion should be repaired to reestablish the condition and grade of soil and treatment which existed prior to the damage. Repairs If a repair is required because the Enkamat has been accidentally damaged, a patch of the same base Enkamat type should be cut to fit over, and sufficiently beyond, the damaged area to permit joining to or anchoring through the parent Enkamat. Care and attention to detail should be given to assure proper shingling and anchorages are maintained in the repaired section. To the best of our knowledge, the information contained herein is accurate. However, cannot assume any liability whatsoever for the accuracy or completeness thereof. Final determination of the suitability of any information or material for the use contemplated, of its manner of use and whether the suggested use infringes any patents is the sole responsibility of the user. These products may be covered by patents or patents pending. 2014 Page 5