Official Plan Amendment Setbacks from Railway Operations

Similar documents
Papazian Heisey IMyers. June 10, 2014

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

Revised Planning Rationale in Support of an Application for Site Plan Control Leitrim Road City of Ottawa

Planning Primer Legislative Background, Policy Documents and Development Review Processes. Presented by: Planning Services Date: April 6, 2017

1071 King Street West Zoning Amendment Application - Preliminary Report

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

Figure 1- Site Plan Concept

Re: Hazeldean Road - Minto Potters Key Subdivision Responses to Resident Concerns

Background Summary Report

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

AGINCOURT SECONDARY PLAN

Bressa Developments Limited. Planning Justification Report. Revised Draft Plan of Subdivision and Zoning By-Law Amendment

The West Vaughan Employment Area Secondary Plan Policies

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

ONTARIO MUNICIPAL BOARD

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

DAVENPORT VILLAGE SECONDARY PLAN

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc.

K. SMART ASSOCIATES LIMITED

2983 NAVAN ROAD ZONING BY-LAW AMENDMENT

Committee of the Whole Report

MOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND MOBILITY HUB GUIDELINES

20 & 30 Frank Nighbor Place

Planning Rationale Fernbank Road, Ottawa. Major Zoning By-law Amendment and Site Plan Control Application Ontario Inc.

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning Division. Pg12013 (File No NNY 34 OZ)

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Demolition of a Designated Heritage Property Roncesvalles Avenue

PLANNING RATIONALE. 223 McLeod Street Ottawa, ON K2P 0Z fotenn.com. 17 December 2015

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions.

141 GEORGE STREET PLANNING RATIONALE

Draft Urban Hamilton Official Plan. Amendment No. XX

Riverside South. Rapid Transit Study. Riverside South. Value Planning Workshop

MORNINGSIDE HEIGHTS COMMUNITY SECONDARY PLAN

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator

Official Plan Review

Greystone Village Main Street. Terraces at Greystone. City of Ottawa. Planning Rationale

Official Plan Review: Draft Built Form Policies

PLANNING RATIONALE FOR ZONING BY-LAW AMENDMENT MINTO COMMUNITIES INC. ARCADIA RESIDENTIAL STAGES 3 & 4 ARCADIA COMMERCIAL STAGE 2 CITY OF OTTAWA

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

WITNESS STATEMENT Of. Ronald Blake. On behalf of the Intervenor The Corporation of the City of Markham

HEALTH SCIENCES BUILDING

Buffers and Agricultural Protection: The BC Experience

Director, Community Planning, North York District

Employment and Commercial Review Analysis of Policy Directions

178 Carruthers Properties Inc.

11.9 West Vaughan Employment Area Secondary Plan

CHAIR AND MEMBERS PLANNING & ENVIRONMENT COMMITTEE JOHN M. FLEMING MANAGING DIRECTOR, PLANNING AND CITY PLANNER

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

Evaluation Criteria. Detailed Evaluation Criteria

Carleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University

PLANNING COMMITTEE REPORT JULY COMITÉ DE L URBANISME RAPPORT 34 LE 11 JUILLET ZONING 968 ST.

The Corporation of the TOWN OF MILTON

Commissioners Road West Realignment Environmental Assessment

10 COPE DRIVE. May 08, 2018 Planning Rationale and Design Brief. Site Plan Control

Planning Rationale Report

5.0 Community Design Plan

150 Eighth Street Zoning By-law Amendment Application Preliminary Report

Bloor St. W. Rezoning - Preliminary Report

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

PLANNING JUSTIFICATION REPORT

Intention to Designate under Part IV, Section 29 of the Ontario Heritage Act 844 Don Mills Road and 1150 Eglinton Avenue East

The protection of the agricultural resources of the Province;

Dupont Street Regeneration Area Study Official Plan Amendment and Zoning Amendment Final Report

Port Credit Local Advisory Panel October 20 th Meeting

URBAN DESIGN POLICY DEVELOPMENT STEP 1: BACKGROUND RESEARCH

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

From: Director, Community Planning, Scarborough District. Ward 40 Scarborough-Agincourt

Draft Urban Hamilton Official Plan. Amendment No. XX

MAYFIELD WEST SECONDARY PLAN PHASE 2

3095 Albion Road North. Zoning By-law Amendment and Site Plan Control Applications PLANNING RATIONALE ADDENDUM

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Royal Thai Embassy Ottawa. Major Zoning Amendment Proposal for 180 Island Park Drive. Planning Rationale

11.3 Steeles West Secondary Plan

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

1 Introduction. Chapter. In this chapter:

City of Toronto. Emery Village Transportation Master Plan

St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report

Planning Rationale in Support of an Application for Zoning By-Law Amendment. 4495, 4499, 4509 & 4515 Innes Road City of Ottawa

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

13 Extending the Esri Enterprise Licence Agreement

Planned Development Review Revisions (Project No. PLNPCM )

From: Director, Community Planning, Etobicoke York District

St. Clair Avenue West Area Transportation Master Plan

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

1325 Lawrence Avenue East and 30 Railside Road Proposed Heliport Landing Pad - Preliminary Report

Report to Council. Date: December 15, 2014 Jeff Watson, Policy Planner

770 BRONSON AVENUE. Zoning By-law Amendment and Site Plan Control

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

1120 Haist Street - Pelham Arena Community Co-Design Recommendation Report Haist Street - Pelham Arena Community Co-Design Recommendation Report

7.4 Maintenance and Storage Facility

Transcription:

Official Plan Amendment Setbacks from Railway Operations August 12, 2015

Send your comments to: Krista Libman, Planner City of Ottawa Planning and Growth Management Tel: 613-580-2424 ext. 27893 E-mail: krista.libman@ottawa.ca Website: ottawa.ca/publicconsultations 2 Official Plan Amendment: Setbacks from Railway Operations

Table of Contents Introduction... 4 Background... 4 Provincial Policy Statement (2014)... 5 Guidelines for New Development in Proximity to Railway Operations... 5 Rail Corridors in Ottawa... 6 Proposed Amendments to the Official Plan... 6 Next Steps... 11 How to Provide Input... 11 3 Official Plan Amendment: Setbacks from Railway Operations

Introduction The purpose of this Discussion Paper is to: Outline the updated policy framework for railway corridors in the Province of Ontario Present information on the current policy framework for railways in the City of Ottawa Present information on the current and potential railway operations in the City of Ottawa, and Propose an amended policy framework to respond to the Provincial Policy Statement (2014) and the Guidelines for New Development in Proximity to Railway Operations. After reading this paper, we hope that interested stakeholders will join the discussion. The future use of the railway rights-of-way within the City of Ottawa is difficult to predict, however the value of these linear corridors for transportation uses is recognized. Since their inception, railways have transported a variety of goods and people. The type and amount of commodities transported by rail is continually changing in Canada. The transportation of dangerous goods and the potential for disastrous effects in the event of a derailment have raised consciousness of the safety issues surrounding railway corridors. Setbacks are required for all rail operations. A commuter train derailment at higher speeds may have locomotives and coaches travelling farther off the track than a slow-speed freight derailment would, and the future use of the corridor can change over time. Light rail is not considered in this discussion paper. Setback requirements for this type of rail use would be determined through the Environmental Assessment process. Background In May 2013, the Federation of Canadian Municipalities together with the Railway Association of Canada published Guidelines for New Development in Proximity to Railway Operations. The Guidelines were published in response to the steady development of commercial, industrial and residential uses in proximity to railway operations as well as the steady growth of passenger and freight operations on railways. They recommend a 30 metre setback and a 2.5 metre earthen berm in many cases. The Provincial Policy Statement (2014) includes expanded direction to municipalities to protect transportation corridors for future use. At the same time, populations along rail corridors continue to grow, and the City continues to actively position rail as a preferred mode of transit. There are currently no planning policy and/or tools available to the City to provide protection from development encroachment along all heavy rail corridors (active or inactive). Setbacks are intended to preserve the long-term intended use of the corridors and to address safety concerns. 4 Official Plan Amendment: Setbacks from Railway Operations

Provincial Policy Statement (2014) The Provincial Policy Statement (2014) (PPS) details several requirements for planning authorities with regard to defined transportation and infrastructure corridors. It requires municipalities to plan for and protect corridors and rights-of-way for infrastructure, including transportation, and transit to meet current and projected needs. The PPS also requires protection from development in planned corridors that could preclude or negatively affect the use of the corridor for the purpose(s) for which it was identified. Language added through the 2014 PPS review required new development proposed on lands adjacent to existing or planned corridors and transportation facilities to be compatible with and supportive of the long-term purposes of the corridor. Lastly, the PPS encourages the preservation and reuse of abandoned corridors for purposes that maintain the corridor s integrity and continuous linear characteristics. The Official Plan does not currently fully respond to these policy directions. Guidelines for New Development in Proximity to Railway Operations The Guidelines for New Development in Proximity to Railway Operations (the Guidelines) strongly recommend that municipalities take a proactive approach to identifying and planning for potential conflicts between rail operations and new developments in proximity to railway corridors. The main objective of the Guidelines is to mitigate railway-oriented impacts such as noise, vibration and safety hazards, to ensure that the quality of life of a building s residents and users is not negatively affected. The guidelines are intended to be applied primarily to new residential development but may also be useful for all other types of new development. Since the early 1980s, Canadian railways have promoted a 30 m setback and berm criteria as a safety measure for development along rail corridors. The Guidelines clarify the origin of the 30 m setback and berm, as follows: These measures have been developed based on a detailed analysis of past incidents and derailments by the railway industry for our first guidelines in 2004. The 30 m setback with berm was devised by a careful analysis of aerial photographs of derailments. It was determined through this analysis that 30 m, with a berm, was a minimum safe distance for derailments. It must be mentioned, however, that a 30 m setback will not afford protection in the event of a catastrophic event involving hazardous materials. (Ref 47). Though reduced setbacks can be considered in combination with alternative safety measures including crash walls, grade separation or increased height of the safety berm, the standard recommended building setbacks for new residential development in proximity to railway operations are as follows: 5 Official Plan Amendment: Setbacks from Railway Operations

Freight Rail Yard 300 metres Principle Main Line 30 metres Secondary Main Line 30 metres Principle Branch Line 15 metres Secondary Branch Line 15 metres Spur Line 15 metres The Guidelines recommend that municipalities should establish minimum setback requirements through a zoning by-law amendment. Setbacks are justified for other sensitive land uses as well. Rail Corridors in Ottawa Of the rail corridors in Ottawa, some carry active rail service, while others are currently abandoned and may support interim uses, such as multi-use trails; some are City-owned while others are owned by VIA, CNR or CPR. The future use of these corridors is difficult to predict, however the value of these linear corridors for transportation and utility use is recognized in the Official Plan. Proposed Amendments to the Official Plan The following changes are proposed to the text and schedules of the Official Plan: Section / 2.3.1 - Transportation The City will purchase surplus railway rights-ofway and select utility (i.e. hydro line) corridors and will consider purchasing spurs, and other associated railway corridor properties as they become available, for use as future transportation and utility corridors. When such rights-of-way are acquired, recreational and agricultural uses may be permitted as interim uses. Future use Insert the following after the first sentence: In order to protect active existing and potential future rail corridors for transportation use the City will regulate the development and use of land adjacent to these corridors to ensure that the continuation, future safe introduction or reintroduction of railway uses to the corridors remains possible. PPS Compliance: To introduce the concept of regulating adjacent land uses for the protection of potential future railway uses. 6 Official Plan Amendment: Setbacks from Railway Operations

Section / as a transportation or utility corridor will have priority over any permitted interim uses. Provision will be made for recreational uses to continue wherever possible. 3.1 Generally Permitted Uses Existing policies regarding uses that are considered to be characteristic and supportive of the daily life and functioning of the community and are permitted in all land use designations, subject to the policies included in Section 3.1. Add a new sub-heading and policies: Railways and Transportation Corridors 17. There are several identified rail corridors within the City of Ottawa, as well as the Prince of Wales Bridge. These corridors have a number of owners and/or operators including the City of Ottawa, the Canadian National Railway (CN) and VIA Rail Canada (VIA). Protection of these corridors from incompatible development and providing public safety adjacent to these corridors is a priority of this Plan. Proponents of new development within 300 metres of a rail corridor or potential rail corridor will: PPS Compliance: To recognize the need to regulate adjacent land uses to protect potential future railway uses. Implementation of the Guidelines: To require development applicants to provide information regarding setbacks from railway operations; to authorize the Zoning Bylaw to require minimum setbacks from existing and future railway corridors; to establish criteria for reducing minimum setbacks required by the Zoning By-law. a. consult the appropriate owner and operator of the rail line; 7 Official Plan Amendment: Setbacks from Railway Operations

Section / b. ensure that the appropriate setbacks and mitigation measures (which may include a combination of the provision of a berm, a deflection barrier, fence or similar physical measures) are incorporated into the development; and c. place a notice on title alerting future purchasers of the present or potential future use of the corridor adjacent to the property. 18. In order to maintain flexibility in the use of active existing and potential future rail corridors and to protect adjacent lands along those corridors the City may, through the Zoning By-law, require minimum setbacks between new buildings or land uses and the existing and the potential rail corridors, identified on Annexes XX and XY. 19. The setback required by the Zoning By-law may only be reduced where suitable alternative measures are provided that achieve the same standard of protection. In considering such requests to reduce the setback the City will 8 Official Plan Amendment: Setbacks from Railway Operations

Section / consult with the rail corridor Owner/ Operator. The information provided in support of a different setback may include, but will not be limited to: a) information regarding existing land uses that will limit the future use of the corridor for rail use; b) information regarding grade separation between the transportation or rail corridor and the proposed development; c) information regarding an alternate technology for deflection; or d)other information limiting the future use of the corridor. 4.8 Protection of Health and Safety Existing table with policies for adjacent designations and in which locations action is required. Add three rows to the table: 1) Consult the appropriate railway company; Implementation of the Guidelines: to require setbacks and mitigation in accordance with the Zoning By-law 2) Setbacks and mitigation measures in conformity with Zoning By-law; To increase public awareness of active and potential railway corridors. 3) Notice on Title. D Rapid Transit and Transit Priority Current Designation: Abandoned Railway Corridor shown in green Remove this designation from the, and show the three green lines on the map (South Kanata and Stittsville, To change the perception that these corridors will stay abandoned or remain 9 Official Plan Amendment: Setbacks from Railway Operations

Section / Network southwest of Leitrim and north of the Mer Bleue Bog and Navan) as a background grey dashed railway line. passive in function. Annex 1 Road Classification and Rights-of- Way As currently worded the City may acquire additional rights-of-way only for existing rail corridors. 7. Rail Crossings The City may also require additional rights-of-way where there is an atgrade crossing of a city road and an active existing or potential future railway corridor. This land will be in the shape of a triangle, at each corner of the crossing. Where a road and railway line or potential future rail corridor cross, the maximum length of the triangle along the road will be in the range of 170 metres, and the maximum width of the triangle measured from the road will be in the range of 15 metres. This land may be used to construct a grade-separated crossing at some time in the future. Detailed City-approved engineering requirements will establish the exact requirements for such planned widening of various types of roads where there is an active existing or potential future rail line crossing. To allow the City to acquire lands in additional circumstances. Annex X Rail Corridors This is a new Annex. To identify current active and potential future railway corridors for the 10 Official Plan Amendment: Setbacks from Railway Operations

Section / purposes of policies in Sections 3.2 and 4.8. Next Steps Following the completion of the Official Plan Amendment process, it is expected that a more detailed zoning study will begin. The zoning study will look in detail at the active and unused corridors to determine the appropriate setback requirements for specific locations along the corridors. How to Provide Input We encourage all interested parties to get in touch with us with their views for, against and about Setbacks from Railway Operations. e-mail: Krista.Libman@ottawa.ca Krista Libman Setbacks from Railway Operations City Hall 110 Laurier Avenue West, 4 th Floor Mail Code 01-14 Ottawa, ON K1P 1J1 Fax: (613) 580-2459 ottawa.ca/publicconsultations 11 Official Plan Amendment: Setbacks from Railway Operations