GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

Similar documents
Planning Guide for the Refurbishment, Renovation, or Construction of Instructional Space Environments

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

H107 Video Conference Room

CUSTODIAL SERVICES CUSTOMER SERVICE GUIDE

PHYSICAL FACILITIES Consultant s Handbook Division 01 General Special Requirements Instructional Spaces. Page 1 of 9

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM

Hawthorn Building. Penn State Altoona Campus Altoona, PA. Walter Nichols. Lighting/Electrical Option Faculty Advisor: Dr.

Abbreviated Accessibility Checklist (Reception, Telephones, and Emergency Procedures) Reception Telephones

Lighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1

Section 5: General Design Considerations

UBC Technical Guidelines Section Edition Interior Building Lighting Page 1 of 5

Facilities, Custodial Services

Number of persons with a disability that live with a disability in your community?

Center for Health Research and Rural Advocacy

3.2.4 OFFICE FACILITIES

CUSTODIAL CUSTOMER SERVICE GUIDE

UMass Amherst Standard Procedures

University of Delaware

Bethlehem University 2008 Projects Summary

Beaufort County Community College. Maintenance and House Keeping Plan

Life Safety - Means of Egress/Exits NFPA 101

Custodial Guide

RHBL 7325 ENVIRONMENTAL ANALYSIS. By: Whitney Musick

JANITORIAL SPECIFICATIONS

Some Basics of School Library Design

MEDIA CENTER September 30, 2010

WSA120: New Energy Codes and Lighting Controls

PLATTEVILLE MIDDLE SCHOOL

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

MCB/DDS Partnership Orientation & Mobility/Low Vision Services

Classroom Design & Technology Standards

Columns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD

Lighting Control Strategies. to meet code requirements save energy and improve building performance

Cleaning Service Levels

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top

WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 26 ELECTRICAL

Facilities Management State-Funded and Billable Services

University of Kentucky Physical Plant Custodial Master Plan PART A

Thesis Proposal. Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration.

University of Kentucky Med Center Custodial Master Plan PART A

B115/B116, B117, B118, B132, B205, B206,

B115/B116, B117, B118, B132, B205, B206,

MAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents;

DIVISION 12 FURNISHINGS FURNISHINGS

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES

LIGHTING CONTROLS

ATTACHMENT A - Services Specifications

Lighting Existing Conditions and Design Criteria Report Brian Regan Ltg./Elect. Virginia Historical Society 10/8/03

DIVISION 08 OPENINGS HARDWARE AND KEYING PART 1 - GENERAL 1.01 SUMMARY

Product Specifications Dialog Room Controller* (*patent pending)

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

SMEAL COLLEGE OF BUSINESS BUILDING University Park, PA

3 rd Floor Programming Date: April 24, 2011

Quarterly Safety/Building Inspection Form

EXIT ROUTES, EMERGENCY ACTION PLANS, AND. FIRE PREVENTION PLANS. PART 1: INTRODUCTION

TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN

New Brunswick Campus Operations Service Guide. Maintenance repair or replacement in

Custodial- General Cleaning Duties

Pty. Ltd. 1. Classroom Cleaning Daily Wkly Mthly Other Vacuum and mop all hard surfaces Vacuum and spot clean all carpeted areas Remove any cobwebs Cl

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile

EXHIBIT A-1 CITY OF BELLFLOWER JANITORIAL MAINTENANCE SPECIFICATIONS

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Lighting. Basis of Design

Dissecting Lighting Control Requirements ANSI/ASHRAE/IES Standard & 2013

TRINITY LUTHERAN SCHOOL RENOVATIONS

HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013

Mulch fires, trash can fires, or other fire outside a building should be reported by the following methods:

4.0 SERVICES AND SCHEDULE

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

A. Layout. B. Furniture

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

Common Area Cleaning Guide

University of Maryland FIRE EVACUATION PLAN

PLAN REVIEW SUBMITTAL GUIDE

UNIVERSITY OF PENNSYLVANIA NEURAL AND BEHAVIORAL SCIENCES BUILDING 415 University Ave, Philadelphia, PA 19104

Library stacks and records storage 150 LB/SF live load

4.9 Mendocino Avenue Corridor Plan Design Guidelines

FOOD SERVICE May 6, 2016

3. Franchisee has successfully completed the STRATUS training program and carries all required certifications and insurance.

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,

Safe at Home. Suggestions for Homeowner Created in partnership with the Administration on Aging. Assessor: Assessor: Homeowner Name: Address:

New High School Concept

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

FOOD SERVICE May 6, 2016

Stanfield School District Cleaning Standards

Safe at Home. Suggestions for Homeowner Created in partnership with the Administration on Aging. Assessor: Assessor: Homeowner Name: Address:

Jamie Devenger Senior Thesis Princeton University Sherrerd Hall 1 Lighting Proposal Memo September 11, 2009

Tech Report 1, Part 1: Lighting Proposal Memo TO: Shawn Good

F & S Caretaking Department Design Standards For New or Renovated U of T Premises February 2015

FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

MANDATORY MEASURES INDOOR LIGHTING CONTROLS. (Reference: Sub-Chapter 4, Section 130)

SPACE TYPE: JUDICIAL CHAMBER

Related Sections: TBD. Effective Date: January 1, 2016

SITE FURNISHINGS STANDARDS MANUAL

Briar Crest Elementary

Facilities Procedure for Accessibility or Compliance Related Requests:

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Lighting. Basis of Design

GREEN BUILDING AT EVERGREEN SEMINAR II BUILDING

Transcription:

University of Iowa FSG - Design & Construction Services Design Reference Manual 2 Design Standards 2.02 Classroom Design Standards Classroom Design Standards GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS The standards in this section must be applied to general assignment classrooms. They do not represent standards for other classrooms, but may provide useful guidelines for the design of those rooms. A. Index Accessibility Acoustics Ceiling Doors & Locks Electrical Systems Flooring Lighting Systems Mechanical Systems Media Technology Miscellaneous Furnishings Room Placement Signage Seating Requirements Seating Specifications Wall Surfaces Windows Writing Surfaces B. Accessibility 1. It is expected that the Uniform Federal Accessibility Standards and The Iowa State Building Code be observed and guide all classroom planning standards to ensure accessibility and usability.

2. Special consideration will need to be given in classrooms for inclusion of specialized equipment for persons with disabilities such as wiring and lighting. Remote Real Time Captioning- Additional telephone lines with access to long distance and an electrical outlet in the front of the room for all auditoria seating 100+. It would be prudent to provide an extra Ethernet connection for future web access to replace the current method. Lighting for Signer- A separate light for a sign language interpreter in all auditoria seating 100+ will need to be placed adjacent to the front of the room. This light should not spill onto the projection screen. The light control may be located with other controls at the podium. C. ACOUSTICS 1. All walls must extend to the floor above or to the roof construction, and not stop at ceiling. 2. Select system components (fans, ductwork and diffusers) that will meet the acoustical criteria for classrooms. D. CEILING 1. Ceiling height should be based on the classroom capacity and design. Therefore, requirements may differ for seminar rooms, classrooms, and auditoria within the same building. Other design issues that impact the height dimension of the ceiling are: Audiovisual requirements for sight and media projection lines as well as screen size Flooring design due to size of room; i.e., flat, tiered or sloped floor 2. The ceiling surface must have acoustical properties consistent with room capacity. see MEDIA TECHNOLOGY; ACOUSTICS

E. DOORS & LOCKS 1. The preferred door location for smaller, flat-floored classrooms is at the rear of the classroom. 2. The number of entrances shall meet the requirements of The Iowa State Building Code. 3. Equip doors with delay action closures, kick plate, and glass vision panels in accordance to applicable codes. 4. Doors and hardware must meet code and accessibility requirements. Doors must operate quietly. 5. Locking capabilities must include both manual and electronic functions consistent with Space Planning & Utilization's locking procedures. In new construction, conduit should be run in order to provide for a future classroom cluster electronic marlock system. F. ELECTRICAL SYSTEMS 1. All conduit and electrical circuits shall have the same ground reference. It is preferable to have two separate grounds, one for telecommunications and one for the building. 2. All audio, video, and control electrical circuits should be fed from "clean legs" from the transformer, free of high inductive loads. There must be NO elevator motors, compressor motors, blower motors, etc. on the side of the power transformer that feeds the media equipment. 3. Conduit to teaching podium in general assignment classrooms must be pulled ready for installation by Space Planning & Utilization, Equipment Services. see MEDIA TECHNOLOGY 4. The number of outlets required in classrooms will depend on the size of the room. These must be distributed throughout the room for overhead projectors, computer access, and vacuum cleaners, etc. The number and location of the outlets will be coordinated with Space Planning & Utilization in the design phase of the project.

5. In new construction, conduit should be run in order to provide for a future classroom cluster electronic marlock system. G. FLOORING 1. Flat Floors: Install smooth, non-slip surface of rubber or vinyl composition tile in general assignment classrooms. All flooring shall be as resistant to stains and spills as possible. 2. Sloped or Tiered Floors: A non-slip surface is required for corridors, cross aisles, and for rows if moveable seating is used. Rubber flooring or vinyl composition tile is preferred to carpet for maintenance reasons. Sealed concrete is acceptable; painted concrete is unacceptable. 3. Carpet should be used only when warranted by physical configuration of room or when authorized by Space Planning & Utilization. If carpet is used, it should be variegated in color, not solid, in order to hide dirt and wear. If the classroom contains carpeted stair aisles, the edge of stair risers must be easily seen to prevent tripping. In new construction, aisle lighting is required. H. LIGHTING SYSTEMS 1. Lighting levels shall be guided by the industry standard and be designed to meet program requirements for each classroom. The lighting system must provide a comfortable level for reading/note taking at the student stations plus the ability to light the chalkboard and screen at the instruction area independently of the rest of the classroom. 2. Lighting must permit a level of room darkening to view various projections on front screen but permit sufficient lighting for note taking. In addition, adjustable lighting with no screen spill is necessary over the instructional area. The needs for dimming depend on size and location of classroom, plus demands of current projection technology. 3. All classrooms shall have no less than two separately controlled lighting areas seating area and instructional area. The ability to dim both areas shall be provided as standard. When the classroom is dimmed for projection, some lighting will be required at the presentation area.

Special lighting on the equipment rack or technology controls may be needed. 4. In auditoria seating over 100, a separate light for a sign language interpreter will need to be placed adjacent to the front of the room. This light should not spill onto the projection screen. The light control may be located with other controls at the podium. 5. Dimmer or toggle switches are preferred; no programmable lighting system should be installed without Space Planning & Utilization's prior approval. 6. If rooms are equipped with motion sensor lighting, BOTH motion and heat, not just motion alone, must trigger it. In addition, a manual override system should be in place. 7. At every entrance to the room, locate switches to provide at least minimal room illumination so users do not enter a dark room. 8. An engraved switchplate clearly labeling lighting controls shall be located on the wall nearest to the instructional area as design standard. Duplicate lighting controls should be placed in the projection booth, if applicable. 9. Do not place any type of light fixtures between the ceiling mounted video projector and the main screen. 10. Emergency lighting should be installed in accordance with standard building codes. These lights must ONLY come on when a power failure occurs in the classroom. I. MECHANICAL SYSTEMS 1. The mechanical systems of the building should be designed to maintain the same temperature levels in classrooms as in other occupied spaces and be designed in accordance with room capacities. 2. Classrooms should be buffered from internal noise of mechanical systems, elevators, restrooms, offices, etc.

3. System components selected should meet the criteria under ACOUSTICS. 4. Room thermostats should have a clear, locking cover placed to prevent unauthorized adjustments. J. MEDIA TECHNOLOGY 1. If a media consultant is retained, Space Planning & Utilization must specify all media equipment for general assignment classrooms prior to purchase. 2. An audio/visual storage closet with storeroom lock needs to be provided in or near classrooms for portable media equipment for use in general assignment classrooms without permanent media equipment installed. Space Planning & Utilization will specify the appropriate closet dimensions. 3. Ceiling height should be adequate to accommodate a screen size as specified by Space Planning & Utilization, or by a media consultant with approval by Space Planning. 4. There will be a motorized tension projection screen in all general assignment classrooms. Any and all screen size, surface and placement will be specified or approved by Space Planning & Utilization. Space Planning & Utilization will normally provide the screen for installation by contractor. 5. All general assignment classrooms will have the capability for connecting to any or all of the following: telephone, Internet, and campus cable. 6. All general assignment classrooms will be wired to the classroom "Classnet" computer network. 7. Signal and power pathways, conduit size, and termination points in the general assignment classrooms will be approved or specified by Space Planning & Utilization, Information Technology Services, Broadcast Services, and Video Center, if appropriate. see ELECTRICAL SYSTEMS

8. An enclosed projection booth for equipment is preferable, if space permits. Where an enclosed booth is not possible a securable cabinet shall be provided instead. Space Planning & Utilization will specify cabinet size. The enclosed projection booth will have a projection shelf and window. The size of each window opening will be approved or specified by Space Planning. 9. General assignment classrooms with technology installed will have a teaching podium where various media will be installed or a small equipment closet near to the teaching podium. There will also be a video/data projector either mounted to the ceiling or in a projection booth, if appropriate. Design and location of the teaching podium and projector will be either approved or specified by Space Planning & Utilization. 10. If media equipment is to be installed by FSG, installation will not begin until the classrooms are "media ready". Media ready means that all finish work is complete, any fixed seating or tables are in place, and all outlets and lights are energized and working. The time required to install the media equipment and teaching podiums will be a minimum of 2 working days per room. Any variance for the minimum installation time will need to be approved by Space Planning & Utilization. 11. All general assignment classrooms must be completely finished and operational 1 week (7 days) prior to opening of classes, to allow time for faculty training. K. MISCELLANEOUS FURNISHING 1. Classroom furnishings will be determined by room use and specified by Space Planning & Utilization. Items furnished may include: atomic clocks, moveable tabletop lecterns, free standing lecterns, and trash receptacles. 2. Typical classroom furnishings include an instructor's table and chair. No instructor's table is provided in a seminar classroom. In classrooms seating 50 or more, a media equipped teaching podium is standard. see MEDIA TECHNOLOGY

3. Tack surface locations are based on discussions with building occupants. Space Planning & Utilization normally prefers that tack surfaces not be installed in the general assignment classrooms. L. ROOM PLACEMENT 1. In general, the preferred classroom location is on the lower floors but buffered from outside noise. Classrooms should be buffered from internal noise of mechanical systems, elevators, restrooms, offices, etc. It is also preferred that classrooms be grouped together in cluster on the same floor. 2. Restrooms should be located in the vicinity of lecture halls. To limit noise problems, there should be NO common wall between restrooms and classrooms. 3. Vending or dining areas should be placed away from lecture rooms or classroom clusters. The vending area should include sufficient trash/recycle containers. 4. Appropriate lobby space should adjoin auditoria to provide a gathering area. 5. Building design should provide for corridor seating outside the auditoria and along the hallways of the classroom clusters. This seating must be placed in compliance with fire code. M. SIGNAGE 1. Room numbers should identify all classrooms at the door entrance and be consistent with building signage. N. WALL SURFACES 1. All wall surfaces are to resist pencil and pen marks and other stains. All painted surfaces must be washable. No flat paint should be applied. 2. In classrooms with moveable chairs, a chair rail shall be provided at an appropriate height for the selected seating on both back and side walls.

3. A durable, easy-to-clean surface such as epoxy paint must be applied below the chalkboard, from the bottom of the chalkboard to the baseboard. O. WINDOWS 1. If windows are present, they should be at the side of the room, and not at the front or back. 2. Light control suitable to support media projection must be provided at each window. P. WRITING SURFACES 1. Slate chalkboards shall be provided in each classroom. 2. Where chalkboards are present, provide the maximum amount of writing surface possible at the instruction end of the classroom. Storage space for erasers and chalk should be provided. 3. The board shall be 4' in height and mounted with the top of the board 86" above the finished floor. In no case shall the bottom of the board be lower than 36" from the floor. 4. All boards are to be provided with cork tack strip along the entire top. The strip will be equipped with map hooks, one per every 2' of board length. Date Last Modified: 05/29/2003