EQUIPMENT & MATERIALS REQUIRING DGMS APPROVAL SL.NO. EQUIPMENT PROVISION OF REGULATION STANDARD FOLLOWED BIS LICENSING

Similar documents
CMD-1. Our Ref: CMD-1/23: Subject: Revision in the list of items under Mandatory Certification of BIS

Contractor Worksheet Underground Fires Major Hazard Standard

NATIONAL COAL BOARD INFORMATION BULLETIN

MSA Safety Solutions. for the Oil, Gas and Petrochemical Industry. Because every life has a purpose...

contents iii Drilling Tools 27 Adjustable Choke 27 Automatic Drillers 29 MWD and LWD Tools 30 How They Work 30 Uses 30

Bearing monitoring on underground conveyors. Clement Matshavha Junior Engineer 24 April 2013

RULES 1978 UNDERGROUND COAL MINES FIRE PRECAUTIONS

NITOL INSURANCE COMPANY LIMITED

Trainee Handbook. Module 0.1. JSTC Rules and Safety Procedures

PROFILE. industrial services rental trading

Many different instruments Many different operating principles including: May sample many different gases & vapour From relatively simple to complex

The following checklists are to be used during an aerodrome RFFS inspection/ audit.

Quarterly Stakeholder Call

Flexible Schedule of Accreditation. SIRA CERTIFICATION SERVICE Unit 6, Hawarden Industrial Park, Hawarden, CH5 3US.

Flexible Schedule of Accreditation. SIRA CERTIFICATION SERVICE Unit 6, Hawarden Industrial Park, Hawarden, CH5 3US.

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

In the year 1988, Amit Industrial Corporation is a reputed name in the industry for Manufacturing and

BUREAU OF INDIAN STANDARDS (CMD-1) Our Ref: CMD-1/12:

We are pleased to offer products covering a multitude of SIC Code categories:

FIRE SUPPRESSION TECHNICIAN

Official Journal of the European Union

hp Dust Collector With Vacuum Attachment

Highly Protected Risks in Power Generation Stewart Kidd outlines the issues to consider when installing active fire suppression in power stations THE

Certified according to ISO 9001:2008 and ISO 14001:2004

NZQA registered unit standard version 1 Page 1 of 5. Install fixed gas detection apparatus in hazardous areas

CHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY

WORKPLACE AND SAFETY SIGNS

FIREFIGHTER II MANIPULATIVE SKILL OBJECTIVES

PPE HAZARD ASSESSMENT CERTIFICATION FORM

Index to contents of Files I and II. File I

FIRE SAFETY PRACTICES AND PROCEDURES

KIA Magnet Co. PLANT EQUIPMENT SUPPLIER & PRODUCER 1

Chapter 17 Test. Directions: Write the correct letter on the blank before each question.


SEI Certification Program Manual

RULES FOR STATUTORY SURVEY OF SEA-GOING SHIPS. FIRE-FIGHTING EQUIPMENT AND ESCAPE EQUIPMENT 2017 January

Présentation du. Presentation from. Ministère du travail de l Ontario. Ontario Ministry of Labour PMD 14-P1.8

UK Direction BS7671 BS 8492 BS /01/2018

SUPPLEMENT REPORT No.: XPL/13600/

SIMRAC A MANUAL FOR BEST PRACTICE FOR EMERGENCY RESPONSE PROCEDURES PART 4

Fire/General Safety Review Program Key Performance Indicators Environmental Health and Safety

Corporate Profile. Firefox Fire Solutions Inc. Toll Free:


Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

VOLUNTEER FIRE FIGHTER Certification Training Record

product guide 240 VOLTS NO ENTRY 240 VOLTS DANGER SAFETY SIGNS AND LABELS WE DESIGN IT - WE MAKE IT - IN AUSTRALIA

OPERATING MANUAL UNIT 8 - WHITEBRIDGE INDUSTRIAL ESTATE STONE STAFFORDSHIRE ST15 8LQ ENGLAND TEL: +44 (0) FAX: +44 (0)

(Notices) EUROPEAN COMMISSION

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

ENGINEERING STANDARD FOR FIRE STATIONS ORIGINAL EDITION NOV. 1993

C 319/6 Official Journal of the European Union

1.1 SECTION INCLUDES.1 Materials and installation for aboveground oil storage tanks..2 Section Waste Management and Disposal.

General Industry Safety and Health Checklist Guidelines. Building and Premises. Loss Control Bulletin

(Publication of titles and references of harmonised standards under Union harmonisation legislation) (Text with EEA relevance) (2015/C 335/02)

1303 Trans Canada Way SE Medicine Hat, AB T1B 3Z9 Phone

WHITE PAPER. Standard Product Safety Sign Catalog for Automotive Fire Apparatus RATIONALE

Paper Subject and Papers Examination. Duration Mark I

This place covers: Devices, apparatus and methods to prevent fires from happening, and to fight or contain active fires.

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

B.) Accident -- Any suddenly occurring unintentional event which causes injury or property damage.

(Notices) NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION

(Publication of titles and references of harmonised standards under Union harmonisation legislation) (Text with EEA relevance) (2016/C 126/02)

GENERAL PROCEDURES TO FOLLOW IN CASE OF EMERGENCY SAFETY RULES TO PREVENT FIRES

APPENDIX D Inspection Check List for Chartering Non-UNOLS Vessels

Personal Protective Equipment. Shawn Appling Associate Extension Agent, Culpeper County Office Serving Culpeper, Madison, and Orange

MANDATORY SIGNS. These signs indicate that a particular course of action must be undertaken. Wear mask. Hand protection. must be worn. Wear.

OH&S Purchasing Guidelines

Lamorinda CERT - Unit 2 09/15/2016

A WORD ABOUT PORTABLE ELECTRIC GENERATORS

Smoke detection in hazardous areas:

To provide the requirements needed for Care Facilities Having 6 or Fewer Clients. This occupancy is classified as an R-3.1.

2010 FIRE CODE OF NEW YORK STATE

GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard

CITY OF GREATER SUDBURY (CGS) ARENA EVENTS FIRE REGULATIONS

Presented by: Timothy Maley, Deputy Commissioner Michelle Ellison, Assistant Commissioner

OVERVIEW OF INDIAN HAZARDOUS LOCATION SYSTEM. By B K Gupta

Australian/New Zealand Standard

Hot Work Permit. Can this job be avoided? Is there a safer alternative? Permit No.:

26 th January 2016 SESSION TWO TECHNICAL REQUIREMENTS

TABLE OF CONTENTS PART 4 - HAND TOOLS AND POWER DRIVEN PORTABLE TOOLS

CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

Overview of Hazardous Locations as They Relate to Solenoid Valves

Fixed plant and mobile equipment fires on surface coal mines

GENERAL INFORMATION. The candidate is allowed to bring the following items into the examination room:

9S / 9E Inspection Worksheets. The fire department should complete the following sheets prior to inspection date

Fire Safety HDT Rally Jack Mayer, jackdanmayer.com

Machine and Power Tool Safety Checklist. Version 1.2 January Chestnut Street, Suite 400, Philadelphia, PA

Test procedure/ method name. method identification. Testing of industrial and explosion isolation valves and tank lining

Feed Table FT42. Operator s Manual

Generic and Sector Specific PPE Standards

An ISO 9001 : 2008 Certified Company SUBURBAN INDUSTRIAL WORKS (LESSEE)

Hot Work Program & Operational Guidelines. Environmental Health, Safety and Emergency Management (828)

Official Journal of the European Union

Wagner Meters has been an industry leader for over 40 years, creating innovative top-of-theline moisture measurement equipment.

Explosion Protection Engineering Principles

Contents. Ultrawave baths are manufactured in the UK and conform to exacting international standards.

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

ELEVATORS. Integration of Codes between Fire Alarm, Sprinklers, and Elevators 12/5/2017

PPE HAZARD ASSESSMENT CERTIFICATION FORM

Transcription:

APPENDIX-I EQUIPMENT & MATERIALS REQUIRING DGMS APPROVAL SL.NO. EQUIPMENT PROVISION OF REGULATION STANDARD FOLLOWED BIS LICENSING CMR, MMR, OMR, MINE 1957 1961 1984 RESCUE 1. Flame Safety Lamp 2(2) 2(2) 11(5) IS:7577-1986 2. Cap Lamp a) Flexible cable for miners cap lamps. b) Miners cap lamp assemblies (incorporating Pb-acid batteries) c) Miners cap lamp batteries (Pb-acid type) 3. Permitted Explosives a) Permitted explosives b) Detonators c) Detonating fuses 2(2) 2(2) 2(23) 2(23) 9 IS:2593-1984 IS:5679-1986 IS:2512-1978 IE(60079-35 Part 1 & 2 Cap lights for use in mines and IS:6609(part-2/Sec.2)-1974 IS:6609(part 3)-1974 IS:6609(part 4)-1984 Recommendations of the workshop on testing of permitted explosives held at DGMS(HQ) on Feb. 1994 being followed 4. Tub Couplings 89(1)(c) 97(1)(c) General design approval vide DGMS circulars No.4 of & No.1 of 1986. No individual approval 5. (a) CO detector/tube type (b) CO detector other than tube type 113(3)(c) 118A(3)(a)(I) 119(1)(b) 121 125(3)(b) 142(5) 116(3)(b) 120(1)(b) 10(2)(c) 122 126(3)(b) 141(5) Tubes IS:13293-1992 CO detectors IS/IEC 60079-0:2004 IS/IEC 60079-11:2006 These are intrinsically safe type instruments.

SL.NO. EQUIPMENT PROVISION OF REGULATION STANDARD FOLLOWED BIS LICENSING CMR, 1957 MMR, 1961 OMR, 1984 MINE RESCUE 6. CO2 Detector 119(2) (d)(ii) 7. Oxymeter 119(2) (c)(iii) 8. Multigas detector/ Toximeter Regulation as per the facility for measuring the gases 9. (a) Gravimetric Dust Sampler (b) Personal Dust Sampler 123(3) (b) 124(2)(b) NCB MRE 113 A design as prototype 10. Stone dust barrier 123(c) (2) 11. (a) Portable Methanometer (b) Infra red type 145(1) (a) - General design approval vide DGMS Circular No.6 (Legis) of 1975. - Portable (electrical type) IS:9937-1981 IEC 60079-0:2004 IEC 60079-11:2006 12. Glass of Flame Safety Lamp 157(4) 151(4) IS:5676-1986 13. Cap Lamp Bulbs 157(4) 151(4) For 4V, 0.8A- IS: 2596-1980 4V, 1.0 A- 14. Oil for Flame Safety Lamp 157(5) - IS: 7577-1986 15. Mechanically propelled vehicle for transport of explosives 164(A) (2)(a) 16. Exploders 174 165(3) IS: 9836-1981 Circuit tester: IS: 9836-1981 17. Protective Footwear a) Safety rubber canvas boots. b) Protective boots for oilfield workmen. 191 182 87 10 IS: 3976-1995 IS:9885 (Part I)-1981 General approval granted Circular approval 2/1986. Proposed by CCOE

SL.NO. EQUIPMENT PROVISION OF REGULATION STANDARD FOLLOWED BIS LICENSING CMR, MMR, OMR, MINE 1957 1961 1984 RESCUE c) Leather safety footwear having direct moulded soles. d) Miners safety boots with leather soles. e) Rubber knee boots. f) Leather safety shoes for women workers in mines and steel plants IS: 11226-1993 IS:1989 (part I)-1986 IS:3738-1975 IS: 11225-18. Helmet 191-A 182A 88 IS:2925-1984 19. Fire-resistant brattices including plastic 181(3) sheeting and ventilation ducting. (a) Fire resistant brattice cloth. (b) Fire resistant brattice sheeting made from unsupported plastics. (c) Ventilation ducting-vinyl coated semi rigid. (d) PVC ventilation tubing (flexible ducting) (a) IS: 4355-1977 (b) IS: 11884-1986 (c) IS: 12814-1989 (d) IS: 3768-1996 20. Industrial Safety Belt & Harness 181(3) 27 & 93 IS3521-1999 No separate approval required since 1993, if conforms to relevant IS and covered under BIS licensing scheme 21. Friction Props And Prop Setting Devices 181(3) IS-7586:1975 22. Hydraulic Props 181(3) IS-8421:1977 23. Link Bars 181(3) IS-9171:1979 24. Powered Supports 181(3) ICIS-001:1991 25. Man Riding Haulage System 181(3) IS-9494:1980 DGMS guideline Mech(HQ)/R-H-M- R/670-D/12331-60, dt 01.09.82 11

SL.NO. EQUIPMENT PROVISION OF REGULATION STANDARD FOLLOWED BIS LICENSI NG CMR, 1957 MMR, 1961 OMR, 1984 MINE RESCUE 26. Cage Suspension Gear 181(3) IS-7587:1993 27. Cage Suspension Gear Including Bridle Chains 181(3) & IS-9011:1978 28. Winding Rope 181(3) IS-1855:1977; IS-3626:1978 29. Balance Rope 181(3) IS-5203:1969 30. Haulage rope for man riding 181(3) IS-1855:1977; IS-3626:1978 31. Underground conveyor belting 181(3) IS-3181:2006 for PVC belting; BCS-730 for Steel cord belting. 15143:2002 32. Underground locomotive (Diesel) 181(3) Reg 95(1) & TM 12 of British 95(1) Coal, BIS-9999: 1981 33. Internal Combustion Engine 181(3) EN 1834 95(1) Part 1 to 3 34. Flame Proof and Intrinsically safe Equipment 181(3) IS/IEC 60079-0:2004 IS/IEC 60079-1:2007 IS/IEC 60079-11-2006 35. Automatic Contrivance 181(3) Reg. 76(7) of CMR 57 36. Power Brake 181(3) Reg. 74(2) of CMR 57 37. Automatic Speed Chart Recorder 181(3) Reg. 76(6) of CMR 57 38. Emergency Steam Valve 181(3) Reg. 74(3) of CMR 57 39. Water ampoules/ Gel ampoules for stemming high explosives (a) Self sealing PVC water ampoules for use in shot holes 181(3) NCB 414/1964 40. High pressure hydraulic hose with its end fittings (Fire resistant) 181(3) BCS-174:1992; BCS 638; EN 856:2003 IS for Steel cord belting under preparation. To be included 12

SL.NO. EQUIPMENT PROVISION OF REGULATION STANDARD FOLLOWED BIS LICENSING CMR, MMR, OMR, MINE 1957 1961 1984 RESCUE 41. Dust respirators 181(3) 182(B) IS: 9473-1980 42. Hydraulic fluid used in underground IS 10532:1983; machinery (Fire resistant) IS 7895:1975 43. Cables used in high, medium and low voltage electrical systems & also flexible cables/ control cables used for electrical systems for all voltages. For use in U/G coal mines and oil mines. 181(3) 75(2) IS-1554(Part-I & II) IS-9968 (Part-I & II), IS-1026; IS-691, 7098 (Part-I & II) 44. Breathing apparatus 11(5) IS-10245 (Part-I & II) 1996 (1 st rev.) 45. Smoke helmets & apparatus serving 11(5) IS-10245 (Part-III): 1982 same purpose 46. Reviving apparatus 11(5)(c) IS-13366:1992 47. Self Rescuers 191D(1) 11(5)(f) IS-15803:2008 IS/IEC 60079-0:2004 IS/IEC 60079-1:2007 13 NCB -188 Accepted 48. Electrical lighting apparatus 181(3) 75(2) IS-2148, IS-2206 (Part-I) 49. Electrical equipment for use in hazarus area (Zone 1 & 2) 75(2) IS-2148, 5780, 13408, 13346, 13947 IS/IEC 60079-0:2004 IS/IEC 60079-1:2007 IS/IEC 60079-2:2007 IS/IEC 60079-6:2007 IS/IEC 60079-7:2006 IS/IEC 60079-11:2006 IS/IEC 60079-15:2005 IS/IEC 60079-18:2004 IS/IEC 60529:1989 50. Gas detectors (Telemonitoring Systems) 11(5) 1. IS:13109 (part 21) 2. Performance test for respective gases as per relevant standards. For FSR, for chemical O2 type EN-401 followed For methanometers IS:9937-1981

SL.NO. EQUIPMENT PROVISION OF REGULATION STANDARD FOLLOWED BIS LICENSING CMR, 1957 MMR, 1961 OMR, 1984 MINE RESCUE *60079/0-2004 60079/11-2004) *60079/0-2004 51. Portable hand lamps for use in storage tanks 55(6) (c) (ii) API Standard followed 52. Life line 27 & -- 93 53. Petroleum storage tanks 55 API 620, 650 54. Pipe lines and fittings (Specification approval if not as per ISS) 62 API-5L; ANSI- B31.4, B 31.8 55. Safety Goggles 181(3) 191(D) 182(B) EN 166, 170 & 172 General circular to be notified. 56. Ear Plugs 181(3) 191(D) 182(B) IS 9167-1979 & IS 6229-1971 57. Reflective/ High Visibility Harness 181(3) 191(D) 182(B) EN 471:2003 General circular to be notified. 58. Fire Fighting & Fire suppression systems 181(3) 73(1) including automatic fire detection and suppression systems 59. Steel supports (cogs, chock, props), Roof Bolts, Cement & Resin grouts 181(3) 14

APPENDIX-II & REGULAR APPROVAL PERIOD FOR EQUIPMENT & MATERIALS REQUIRING DGMS APPROVAL S. No. EQUIPMENT PERIOD OF 1. Flame Safety Lamp Three months of 9 hrs. Each day QUANTITY TO BE SUBJECTED TO PERIOD OF APPROVAL 3 nos. in 3 mines. Two (2) years three (3) years 3 nos. in 3 mines. 2. Cap Lamp Six months for 9 hrs. each day 3. Permitted Explosives and detonators Six months. 100 Kgs (explosives) Two (2) years two (2) years. Minimum 500 detonators for electric detonators. For delay, 200 for each delay Nos. 4. Water/gel ampoules/stemming plugs. Six months. 1000 nos. Two (2) years three (3) years. 5. Tub Couplings - - - General approval vide DGMS circular No.4 of & 1 of 1986 6. Co detector Three months 3 nos. in 3 mines. Two (2) years three (3) years. 7. Dust sampler Three months for 9 3 nos. in 3 mines. hrs. each day 8. Stone dust barrier - - - General approval vide DGMS circular No.6 (Legis) of 1975. 9. Methanometer Three months. 3 nos. 3 mines Two (2) years three (3) years 10. CO2 Detector Three months. 3 nos. in 3 mines 11. Multigas Detector Three months. 3 nos. in 3 mines 12. Oxymeter Three months. 3 nos. in 3 mines 15

S. No. EQUIPMENT PERIOD OF 16 QUANTITY TO BE SUBJECTED TO PERIOD OF APPROVAL 13. Glass of Flame Safety Lamp Three months. 3 nos. in 3 mines 14. Cap Lamp Bulbs Three months for 9 20 nos. each in 3 mines. hrs. each day. 15. Oil for Flame Safety Lamp Three months. 50 Litres 16. Mechanically propelled vehicle for transport of explosives - - - DGMS Circular No.36 of 1972 followed as guideline 17. Exploders Six months. 2 nos. in two mines Two (2) years three (3) years. 18. Protective Footwear Six months. 3 pairs each in three mines 19. Safety goggles Six months. 30 nos. 20. Reusable Ear Plugs Six months. 100 nos. 21. Visibility harness Six months 30 nos. 22. Noise level meter Six months. 2 nos. 23. Steel supports Six months. 5 nos. each in three mines 24. Roof bolts. Six months. 2% of one batch, in three mines. 25. Cement & resin grout. Six months. 2% of one batch, in three mines. 26. Chemical additives for dust suppression Twelve months 2% of one batch, in in coal mines. three mines. 27. Emergency escape devices in oil mines Twelve months 1 no. in 1 mine 28. Dust suppression/prevention systems in Three months. 1 no. in 1 mine drilling m/c 29. All lighting fixtures/systems used in all U/G mines. Twelve months 1 No. each in three mines 30. Environmental monitoring system/ telemonitoring systems Six months. 1 No. each in three mines. 31. Helmet Six months 3 nos. each in three mines

S. No. EQUIPMENT PERIOD OF 32. Fire-resistant brattices including plastic sheeting and ventilation ducting. Six months QUANTITY TO BE SUBJECTED TO One roll of 50 m. Each in 3 mines PERIOD OF APPROVAL 33. Safety Belt/full body harness Six months 10 nos. No separate approval required if conforms to IS- 3521:1983 and covered under BIS licensing scheme 34. Friction Props And Prop Setting Devices Twelve months 50 nos. 35. Hydraulic Roof Support Twelve months 50 nos. 36. Link Bars Twelve months 50 nos. 37. Powered Supports Twelve months One set. 38. Man Riding Haulage System Twelve months One set. 39. Detaching Hook Twelve months Four sets. 40. Cage Suspension Gear Including Bridle Twelve months One set each. Chains 41. Winding Rope Twelve months One length. 42. Balance Rope Twelve months 43. Haulage rope for manriding Twelve months 44. Underground conveyor belting Twelve months No restriction. 45. Underground locomotive Three months One set. 46. Internal Combustion Engine Three months One set. 47. Flame Proof and Intrinsically safe Three months One set. Equipment 48. Automatic Contrivance Three months One set. 49. Power Brake Three months One set. 50. Automatic Speed Chart Recorder (ARSI) Three months One set. 51. Emergency Steam Stop Valve Three months One set. 52. Water ampoules/ Gel ampoules for Six months 1000 nos. stemming high explosives 53. High pressure hydraulic hose with its end fittings. Twelve months No restriction. 54. Dust respirators. Three months, 8 hours each day 10 Nos. in at least three mines. 17

S. No. EQUIPMENT PERIOD OF FIELD TRIAL 55. Hydraulic fluid used in underground machinery 56. Cables used in high, medium and low voltage Three months. electrical systems & also flexible cables/ control cables used for electrical systems of all voltages. QUANTITY TO BE SUBJECTED TO PERIOD OF APPROVAL 1000 Hrs. In two machines. Trials to be carried out in at least 2 mines. 50 meters to 100 meters Shot firing cable and cable depending on situation under NCB 188-1975 and equipment with which specifications are approved it is fitted. for one year only. 57. Breathing apparatus - Performance test at two rescue stations. 58. Smoke helmets & apparatus serving same - Performance test at two purpose rescue stations. 59. Reviving apparatus - Performance test at two rescue stations. 60. Self Rescuers - Performance test at two rescue stations. 61. Electrical lighting apparatus Three months One set. 62. Electrical equipment for use in hazarus Three months One set. area (Zone 1 & 2) 63. Gas detectors Three months 3 nos. in 3 mines Minimum 30 readings shall be taken and compared in each mine. 64. Portable hand lamps for use in storage tanks - 3 nos. in 3 mines API Standards followed. 65. Life Line - - 66. Petroleum storage tanks - - API 620, 650 67. Pipe lines and fittings (Specifications approval if not as per ISS) - - API-5L; ANSI- B31.4, B 31.8 18