Carparks Service Access Areas Golf Courses Caravan Parks Footpaths. Turf Reinforcement System

Similar documents
GRASSRINGS Turf reinforcement system

PAVING GRID OUTSTANDING DURABILITY

A New Generation of Permeable Pavers

Capillary Action Subsurface Irrigation

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

geotextiles bidim Nonwoven polyester geotextile Made in Australia Designed for performance RECYCLED Quality ISO 9001

Permeable Pavers. EZ Roll Gravel Paver. Tufftrack Grass & Gravel Paver. EZ Roll Grass Paver. High Performance Alternative to Traditional Paving

geotextiles bidim Nonwoven polyester geotextile Made in Australia Designed for performance RECYCLED

Appendix D - Technical Design Criteria for BMPs

for Owners and Maintenance Staff

Tree Pits Construction Guide

PavePro Stabilise Gravel & Decorative Stone.

Introduction. Functions of Non woven Geotextile (TechGeo) Separation. Filtration. Drainage. Containment. Tech Geo. . Geotextile Overview

Vegetation Management

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

WQ-07 INFILTRATION TRENCH

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

EROSION & SEDIMENT CONTROL

Green Infrastructure Sub-irrigated Raised Beds - Green Roof

CI/SfB (16)(17) Common Arrangement D11 Uniclass L1411/ L132/ L6634. Woven Polypropylene Geotextiles.

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Rhyno. Woven Polypropylene Geotextiles. Geosynthetics Limited

Golpla Permeable Paving Solutions for Sustainable Urban Drainage Systems

Planning, Design, and Construction of Green Infrastructure.

Green Infrastructure and Low-Impact Development Technologies

Civil engineering Fibertex Geotextiles

Low Impact Development for your homes, businesses & streets

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Woven Polypropylene Geotextiles

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).

Permeable Paving. Sustainable Control Of Urban Storm Water Pollution. The volume of storm water being diverted to

The following general requirements will be met for all planter box installations:

Post Construction BMPs

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

CI/SfB (90) Wn6 October Golpla Pre-Grown grass reinforcement and erosion systems

Natura Geo Mat. Brief Note on the System, Functioning and Peripheries

Content. 1. Particular Specification for Green Roof System. 2. Drawing. 3. Particular Preambles for Standard Method of Measurement

Fortrac 3D Geogrid. High-Tensile Anti-Slip Reinforcement with Soil Retention Function

LEADING INNOVATIONS IN SUSTAINABLE URBAN DRAINAGE

The Concept. Features. Benefits

Structural Storm Water Best Management Practices (BMPs)

EARTH STABILIZATION GEOSYNTHETIC SOLUTIONS

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Greening the Built Environment. EXTENSIVE, INTENSIVE. Roof Garden. General Specifications

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

DuPont TM Plantex landscape solutions Guidebook

Town of Essex Small Site Erosion Control Guide

COIR GEOTEXTILES. Er. Sheela Mary Cherian, M.Tech, Assistant Executive Engineer. Woven coir netting / Mesh matting used as geotextiles

geogravel in balance with nature STABLE AND RESISTANT ECO-FRIENDLY PERMEABLE

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Green Infrastructure Overview

SmartSoak Residential Stormwater Management System

Sustainable Stormwater Retrofit Best Practices

Analyzing the Bioretention Construction Sequence

Worksheet #14 Water Runoff Management

water that enters our streams during storms. Any water the rain garden can t accept will continue into the storm sewer system.

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Pozidrain. A guide to the selection and specification of Pozidrain drainage geocomposite

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

Rain Gardens. A Welcome Addition to Your Landscape

DRIVABLE GRASS. Permeable, Flexible and Plantable Concrete Pavement System

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Kittson Parkway / Watershed Park Parking Lot

Infiltration basin under normal conditions, with generous grassed area for water soakage (Source: WSUD in the Sydney Region)

EZ ROLL GRASS PAVERS TECHNICAL SPECIFICATION GUIDE. Model Numbers: EZ4X24 and EZ4X150

Proposed Credit Program

Tips for Maintaining and Enhancing Stormwater Management Areas

Weston s Wetlands, Stormwater, & Open Space

Sustainable Drainage Applied Research Group, Coventry University Priory Street, Coventry, CV1 5FB, United Kingdom 3

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

Use of Best Management Practices

Design and siting guidelines

CI/SfB (11.1) (11.3) Common Arrangement R12. Uniclass D1372/L141. Landlok. Bio-degradable Erosion Control. Geosynthetics

Homeowners Guide to Stormwater BMP Maintenance

Green Street BMP Matrix

Sustainable Sites. hblanarc.ca. RDN Workshop June 25, David Reid, FCSLA, Landscape Architect, Environmental Designer

EZ ROLL GRASS PAVERS TECHNICAL SPECIFICATION GUIDE. Model Numbers: NDC_EZ4X24 and NDC_EZ4X150

STORM TACOMA 02. Potential permitting requirements STANDARD DETAILS FOR RAIN GARDEN CONSTRUCTION. How to use this document

Need a Geotextile or Weed Control Membrane?

DUPONT TM PLANTEX LANDSCAPE SOLUTIONS Guidebook

APPENDIX G: TOWN ORDINANCE REVIEW

Chapter 14. Stormwater Quality Introduction

Pavement Removal Fact Sheet

Erosion Control for Home Builders in the. City of Jacksonville

Case Study Bioretention Installation and Maintenance

Permeable Pavement Systems

Product Execution of LEED Version 3 Goals. State of the Earth Innovation with Invisible Structures

Duplex Design Guidelines

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

SYSTEM OVERVIEW UTILITY ROOFDECKS GREEN ROOFS PODIUM ROOF DECKS PARKING ROOF DECKS 0.1

POLICY SRT/D4 STORMWATER MANAGEMENT

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

Civil engineering Fibertex Geotextiles

INSTALLATION TIPS. Site Preparation

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Raingardens and Bioretention Tree Pits MAINTENANCE PLAN. EXAMPLE June 2008

Appendix G. Detailed Design

C-10. Disconnected Impervious Surface

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

Transcription:

Carparks Service Access Areas Golf Courses Caravan Parks Footpaths Turf Reinforcement System

The grass reinforcing rings concept has been quickly accepted internationally to increase and maintain a green environment in the rapidly expanding urban spread. Grassrings is a 100% recycled injection moulded plastic structural grid system used to stabilise and reinforce grass, to prevent the compaction of the root zone, providing a luxuriant trafficable surface. Studies show that compaction of the top 35mm of soil underneath grass must be prevented. If this layer becomes compacted grass roots are unable to obtain necessary oxygen, moisture and nutrients from the soil, causing the grass to suffocate and die. Grassrings prevent this compaction. Grassrings design maximises the root development of the grass (over 90% root development area) and is invisible once installed. The grid of rings is immensely strong, capable of supporting fire trucks, aeroplanes, helicopters and other heavy low volume traffic. Port Coogee, Western Australia Benefits Open grid provides over 90% root development area and 100% grass cover. Grid is flexible will follow undulations. Manufactured from 100% recycled chemical resistant, UV stabilised impact resistant polymer. Easy and fast to install including cutting around borders, trees etc. Provides storm water drainage and retention onsite. The ring design is the strongest shape for grass paving in that it has no weak corners. Grassrings will meet and exceed all loading criteria. Can be supplied in custom size rolls for fast installation. Porous surface generally provides greater percolation rate to the natural ground. Service vehicle access, installed using Grassrings turf reinforcement Note how the grass roots develop into the porous base course Grassrings can withstand loadings in excess of highway maximums 1

Recreation area and parking at Point Fraser Swan River Foreshore, Perth, Western Australia 2

Melbourne Exhibition Centre during installation Melbourne Exhibition Centre after completion Ashdale Senior High School Private residence front grassed driveway and extra parking Golf course cart paths and drainage of low lying areas and bunkers Private resident extra parking 3

Firelanes and Service Access Lanes Fire Authorities require access lanes capable of supporting heavy vehicles to and around hydrant points within a building complex. Grassrings trafficable turf system has been designed and proven to provide a stable road construction for this purpose yet still maintaining maximum green landscape area over against the installation of hardstand paving. Very heavy fire vehicles have been tested (12-30 tonne) on the Grassrings system by Fire Authorities and found to be successful in withstanding loads imposed. In all cases the access lane needs to be marked out clearly with built in markers or shrubs to show extent of lane, with emphasis on visibility at night time. Fire hydrant and service access areas Firelane Installation Due to the heavy loads expected on firelanes and the need for base stability in spreading the load it is recommended that a woven geotextile fabric be layed onto the base soil before base course gravel is placed. This will prevent the gravel base course from pumping into the base soil, and thus losing the locking effect of the sharp gravel. The geotextile fabric should have a minimum tensile strength of 80kN/metre. After the gravel base course has been spread and levelled on the above fabric and clean course sharp sand washed into gravel it is recommended that a non woven geotextile fabric be layered over the levelled gravel and sand base course followed by the GRASSRINGS mat, fertiliser, polymer water absorbing crystals, sand topsoil and turf. The purpose of this top geotextile is to prevent the movement of base course gravel to surface when fire tenders empty large quantities of water from the tank. This geotextile is only required within 20 metres radius of the hydrant. Grass roots will penetrate this geotextile which should be minimum 120 g.s.m. weight. Firelane Marking There are many ways of marking lane boundaries and will be dependent on designers and property owners requirements, however, markers must be clearly seen from fire vehicle both day and night. Fire Authority Approval Most Fire Authority departments would know of this grass paving system and it is recommended to submit plans and specifications showing full details to gain approval. Our technical department is able to assist with the specification documentation. A white plastic dome marker insert can be supplied with the GRASSRINGS and placed within 300mm of the edge of the firelane. Concrete block markers with reflective paint are also available. Shrubs or trees can be grown along the side of the lane or concrete or brick paved kerbing strip can be installed. 4

Storm Water Detain it! Retain it! Reuse it! As time progresses urban drainage systems are being more and more challenged by the increased run-off that is generated by increased urban densities. Approximately 15% of rainwater that falls on natural surfaces finds its way into waterways, but almost 90% of rainwater that falls on the house roofs and paved driveways finds its way into the local drainage system. the water volume that would otherwise be directed to ground water or natural stream flow is vastly diminished and our environment is being severely degraded. As driveways are extended, outbuildings may be added, barbecue areas are developed and grassed areas may be replaced by feature paving. The impervious fraction of a residential site increases. Only a few decades ago, designers of residential drainage systems expected approximately 40% of rainwater that fell on a house site would find its way into their drain. By installing stormwater detention systems on site we can protect the drainage infrastructure. Approximately 85% of the rainwater that falls onto open ground percolates into the soil. A significant portion of this makes its way to the water table, but our ground water reserves are being depleted because urbanisation reduces the inflow and the increased use of bores that are sunk to enable the watering of gardens, parks, playing fields and golf links. Captured run-off may be used to water your own garden or shared with neighbours and can be circulated through the toilet flushing systems these are further options. Grassrings systems retain the permability of natural surfaces. The trafficable area installed does not increase run-off when Grassrings systems is installed over a base of coarse gravel, the interception rate will be higher than that of the open fields. The DRAINWELL system may be installed as part of a stormwater detention or retention system. The stormwater interception may be allowed to drain into the subsoil and released at a slower rate to the local drainage system or it may be captured for reuse, being stored in the DRAINWELL structural storage system can also be used for rain water harvesting. This system of stormwater storage may be designed to capture excess run-off. Roll on/ Seed Turf Grassrings filled with sand NOVATEX* Geotextile (NGT 200) 100mm depth of 8-10mm graded gravel (No Clay or Fines) NOVAGRID* Geofabric (NGT 80) Sub Soil compacted * Novatex and Novagrid geofabrics stabilise the base course which reduces the depth of graded gravel required and is necessary on firelanes and heavy traffic service areas Rainfall Turf Roll on or Seed grass GRASSRINGS INSTALLATION SECTION DETAIL Sub soil sloped to drain Sand clean sharp Lawn growing soil mix permiable Geofabric Drainage Collection Pipe Gravel 8-10mm graded GRASSRINGS DRAINAGE SYSTEM FOR SITE OR SPORTS Geofabric Drainage Collection Pipe Gravel 8-10mm graded Sand Sub soil sloped to drain Geofabric GRASSRINGS DRAINAGE SYSTEM FOR GOLF BUNKER Grate Compacted soil (min 300-500mm) Grassrings Grassrings Outlet Filtration unit Inlet pipes Clean sharp sand Drainwell Modules Geotextile/ Poly Liner DRAINWELL STORAGE TANK 5

INSTALLATION INSTRUCTIONS GRASSRINGS 1 2 3 4 6 7 8 9 Typical Installation Specification Step 1: Remove depth of soil to thickness of base course plus 35mm. Step 2: Level and compact area to engineer s requirements. Step 3 (if required): Subject to geotechnical requirements additional base course stability can be achieved by installation of NOVAGRID geomesh below the base course material. Used also to reduce base course depth. Step 4: Add graded blue metal (10-12mm) base course to designed thickness. Step 5: Compact to test requirements. Step 6: Assemble Grassrings onto prepared base. Step 7: After laying Grassrings, cut around valve boxes, sprinklers, trees or curbing using cutting pliers or secateurs. Spread fertilisers over sand (NPK blue or any grass starter). Step 8: Apply clean sharp sand of suitable growing ph value to fill rings using large broom to leave top of ring exposed, on to which roll on turf is layed. A further 15mm of top soil for seeding and hydro-mulching. Important Note: Top soil must not be inclusive of any clay or fines. Step 9: For quick lawn establishment Roll on Grass is recommended. On warm days the sand should be wet to reduce temperature and provide moist base for the roots of the grass. Step 10: Roll compact lawn with heavy roller to remove all air pockets around roots ensuring that the roots are set into the sand layer in the rings. Water and fertilise to suit weather conditions. Must not be trafficked before roots are established. Base Course Depth Guide 5 10 Dimension A Traffic Type 75-100mm Pedestrian 100-150mm Cars 200-300mm Trucks Note: Base course design will be relative to the vehicle loads, traffic volume and existing soil conditions. In commercial installations a civil or geotechnical engineer should be consulted to determine the requirements for the gravel base course with regard to depth and any need for geotextiles. This information is provided as a guide only and is not to be taken as the manufacturer s advice for any particular project. Detailed installation instructions are available. 6

Grassrings reinforce the case for parking on grass The environmentally friendly turf reinforcement module AIRFIELDS ACCESS AREAS Grassrings are moulded from recycled plastic containers etc., turning what would have been environmentally unfriendly rubbish into a product that enhances the environment. GOLF CART PATHS Environmental benefits CARAVAN/CAMPING Reduces the need for hard surfaces Waterway contamination reduced Increases the green environment Storm-water run-off reduced Tree roots protected 100% recycled plastic Erosion control Recycling of plastic keeps it out of landfill Retention and stabilisation of soil surfaces Include it in your sustainable urban drainage scheme (SUDs) Product specification Injection moulded panels nom. 500mm x 500mm x 27mm high rings with hook and hole connection for joining into rolls or easy site laying. Colour: black FOOTPATHS These suggestions and data are based on information we believe to be reliable. They are offered in good faith, but without guarantee, as conditions and methods of use of our products are beyond our control. We recommend that the prospective user determine the suitability of our materials and suggestions before adopting them on a commercial scale. Manufactured by: NOVAPLAS Pty Ltd Toll Free 1800 999 159 Tel: (08) 9455 2228 Fax: (08) 9455 2227 PO Box 1432, Canning Vale WA 6155 17 Catalano Road, Canning Vale WA 6155