GOLD. Venting Supplement. Water Boiler Series 3 & 4. for 3" venting

Similar documents
GOLD GV. Venting Supplement for 3 venting. Water Boiler Series 3 & 4

Venting Supplement Saf-T Vent 3" venting Special gas vent system vent and combustion air supplement for 3" diameter venting Hazard definitions

GOLD GV. Venting Supplement. Water boiler Series 3. Special gas vent system vent and combustion air supplement. Hazard definitions.

GWS. Venting Manual. Gas-Fired Water Boilers. Hazard definitions. Contents. Venting method definitions

Venting Supplement. Direct Vent Through-Roof or Through-Unused-Chimney. Water Boiler Series 3 & 4

Vent Supplement Ultra-80, -105, -155, -230 & -310

PVC, CPVC, PP & SS Vent Supplement

User s Information Manual

GOLD. User s Information Manual. Water Boiler Series 4

User s Information Manual

Aqua Balance. User s Information Manual. WMB-155C Wall Mount Gas-Fired Combination Boiler Heating and Domestic Hot Water

User s Information Manual

Esteem 399 Low NOx Gas Fired Boiler

User s Information Manual

MC Series Gas-Fired Heating Appliance

GOLD CGt. User s Information Manual. Natural gas-fired water boiler with tankless heater

User s Information Manual

PVC, CPVC, PP & SS Vent Supplement

GWC. User s Information Manual. Gas-Fired Water Boilers. Model

Installation & Operation Manual Models: Starting Serial #H07H

Residential Gas Hybrid Water Heater

200i. Vent/air manual. Installation instructions for vent and air piping. Also read and follow: 200i Boiler manual 200i Control manual

Elite. User s Information Manual. Elite and Elite VWH* All Models

Power-Fin 4:1 HOT WATER HEATING BOILERS DOMESTIC HOT WATER SUPPLY BOILERS 1,500,000, 1,700,000 and 2,000,000 Btu/hr MODELS

PVC, CPVC, PP & SS Vent Supplement

Installation & Operation Manual Models:

Universal Fire Tube Boiler Wall Mount Models

Installation & Operation Manual Models:

Gas Fired Residential Combi Boiler Floor and Wall Mount Models

Installation & Operation Manual Models:

Vent and air piped through a side wall (concentric termination)

Installation & Operation Manual Models:

ProLine XE Combi Boiler

User s Information Manual Models:

User s Information Manual Lynx Direct-Vent Sealed Combustion Condensing Boiler Model LX-90, LX-120, LX-150

Noble Fire Tube Boiler and Combi Installation & Service Manual NKC NKB

Tankless Water Heater

Direct Exhaust Venting Kit Instructions

Installation & Operation Manual Models: Series: 100 & 101

INSTALLATION AND SERVICE MANUAL

User s Information Manual

Installation & Operation Manual Models:

Installation & Operation Manual Models:

User s Information Manual Models:

Installation guide and material checklists

Installation & Operation Manual Models: WH

Contents. Hazard definitions

Installation & Service Manual Models:

Installation & Operation Manual Models:

Installation & Operation Manual Models:

Installation & Operation Manual Models:

Manual Addendum. This Addendum needs to be used in conjunction with the Evergreen Boiler Manual P/N _0518

GOLD CGs. Boiler Manual. Gas-Fired Water Boilers. Maintenance Parts. Installation Startup

Fire Tube Combi Boiler Installation & Service Manual Models:

Installation & Operation Manual Models: WH

WHAT TO DO IF YOU SMELL GAS

User s Information Manual

Installation & Operation Manual Models:

Aqua Balance. Direct Exhaust Venting Kit Instructions

SEPARATED COMBUSTION WARNING

If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.

SEPARATED COMBUSTION. General WARNING

User s Information Manual

User s Information Manual Models:

Please read before proceeding

User s Information Manual Models:

User s Information Manual Models:

INSTALLATION AND SERVICE MANUAL. Hot Water Heating Boilers Domestic Hot Water Supply Boilers 399, ,000 Btu/hr Models

Installation & Operation Manual Models: 502, 752, 1002, 1302, 1501, 1701, and 2001 Up To 5:1 Turndown Beginning with Serial #

If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.

Operating Instructions and User s Information Manual VITOROND 200 WARNING WARNING IMPORTANT. Read and save these instructions for future reference.

SEPARATED COMBUSTION. General

ASX7-5-IOM-3 J

R5-9/09. Price - $5.00

User s Information Manual Models: WH

Do not use this vent pipe or fittings for venting incinerators of any kind.

LYNX IMPORTANT READ ALL OF THE FOLLOWING WARNINGS AND STATEMENTS BEFORE READING THE INSTALLATION INSTRUCTIONS

Inspection Checklist Mechanical Rough in

INSTALLATION AND SERVICE MANUAL

Introduction Engineering and Design Manual

GAS FIRED BOILERS FOR FORCED HOT WATER VENTING ADDENDUM. ECR International Ltd. - Olsen Division P.O. Box 900 Wallaceburg, Ont.

AquaBalance SERIES 2 WALL MOUNT GAS-FIRED WATER BOILER Boiler Manual. Contents. Page. Hazard definitions

User s Information Manual Models: Starting Serial #H05H

INSTALLATION AND SERVICE MANUAL

PVC, CPVC, PP & SS Vent Supplement

INSTALLATION AND SERVICE MANUAL

ASX7-4-IOM-6 J

Boiler Manual. Wall Mount Gas-Fired Water Boilers 70/110/155

R4-2/06. Price - $5.00

User s Information Manual Models:

Contents. Hazard definitions

DIRECT-VENT SEALED COMBUSTION CONDENSING BOILER HOT WATER MODEL LX-90, LX-120 & LX-150 GAS-FIRED BOILERS FOR NATURAL AND L.P.

PVC, CPVC, PP & SS Vent Supplement WARNING

INSTALLATION INSTRUCTIONS

User s Information Manual Models:

HOT WATER/GAS MULTIPLE AND CASCADING BOILERS APPLICATION GUIDE

POWER VENT. Standard Power Vent, Fan Type Unit Heaters: Standard Power Vent, Blower Type Unit Heaters: General WARNING WARNING. Model UDAP & Model APD

Installation Instructions

Installation & Operation Manual Models: Up To 4:1 Turndown

INSTALLATION INSTRUCTIONS

Transcription:

GOLD GV Water Boiler Series 3 & 4 Venting Supplement for 3" venting Special gas vent system vent and combustion air supplement for 3" diameter venting. The following manufacturers AL29-4C Stainless Steel Special Gas Vent System may be used in new installations of GV-3 through GV-6 boilers: Heat-Fab, Inc. Saf-T Vent Flex-L International, Inc. StaR-34 Z-Flex, Inc. Z-Vent II ProTech Systems FasNSeal Hazard definitions The following defined terms are used throughout these Instructions to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product. Indicates presence of hazards that will cause severe personal injury, death or substantial property damage. Indicates presence of hazards that can cause severe personal injury, death or substantial property damage. Indicates presence of hazards that will or can cause minor personal injury or property damage. Indicates special instructions on installation, operation or maintenance that are important but not related to personal injury or property damage. To the installer: This Venting Supplement must only be used by a qualified installer/service technician. Read these Instructions completely before beginning the installation. Failure to follow all instructions can cause severe personal injury, death or substantial property damage. To install a new vent system follow instructions in: This Venting Supplement. GV Boilers Vent/Air Intake Termination Assembly Instructions, if using Weil-McLain Vent/Air Intake Termination Kit. OR GV Water Boiler Series 3 & 4 Direct Vent Through-Roof or Through- Unused-Chimney Venting Supplement, if using Weil-McLain Through-Roof or Through-Unused-Chimney Termination Kit. Vent manufacturer s instructions supplied with vent material. For installations above 5,500 feet use only direct vent (ducted combustion air) when sidewall venting. All of the vertical (through-roof or throughunused-chimney) methods in this Venting Supplement are acceptable and can result in severe personal injury, death or substantial property damage if ignored.

Combustion air supply Special note Refer to GV Boiler Manual for sizing free area of combustion/ventilation air openings. All boilers experience some condensation in section assembly during start-up. Unlike most conventional boilers, condensation is minimized in the GV Boiler by a built-in mixing system, maintaining boiler return water temperature above 130 0 F, during steady state operation. Flue gas condensate is slightly acidic. In most cases ph level is not harmful to vents or drains. When combustion air is contaminated by vapors from products and areas, listed in Table 1 below, condensate acidic levels increase. Higher acidic levels attack many materials, including stainless steel commonly used in high efficiency systems. You may choose to use outside combustion air for any of the following reasons: Installation is in an area containing contaminants listed in Table 1 below, which will induce acidic contamination. You want to reduce infiltration into your home through openings around windows and doors. Table 1 Corrosive contaminants Products to avoid Spray cans containing chloro/fluorocarbons Permanent wave solutions Chlorinated waxes/cleaners Chlorine-based swimming pool chemicals Calcium chloride used for thawing Sodium chloride used for water softening Refrigerant leaks Paint or varnish removers Hydrochloric acid/muriatic acid Cements and glues Antistatic fabric softeners used in clothes dryers Chlorine-type bleaches, detergents, and cleaning solvents found in household laundry rooms Areas likely to have contaminants Dry cleaning/laundry areas and establishments Swimming pools Metal fabrication plants Beauty shops Refrigeration repair shops Photo processing plants Auto body shops Plastic manufacturing plants Furniture refinishing areas and establishments New building construction Remodeling areas Garages with workshops Adhesives used to fasten building products and other similar products To prevent the potential of severe personal injury or death, check for areas and products listed above before installing boiler. If found: remove products permanently OR provide outside combustion air 2

Vent termination Venting method definitions Direct vent Uses outside combustion air with combustion air connector piping sealed at all joints and seams. Also known as sealed combustion. Non-Direct vent Uses inside combustion air with no combustion air connector piping. Properly locate vent termination Follow instructions on this page when determining vent location to avoid possibility of severe personal injury, death or substantial property damage. 1. When using direct vent method Refer to separate instructions packed with Weil-McLain direct vent termination kit and vent pipe manufacturer's instructions for additional locations. 2. For location of non-direct vent vertical termination, see vent pipe manufacturer's instructions. 3. Gases will form white plume in winter. Plume could obstruct window view. 4. Prevailing winds could cause freezing of condensate and water/ice buildup on building, plants or roof. 5. Locate or guard vent to prevent accidental contact by people or pets. 6. Do not terminate vent in window well, stairwell, alcove, courtyard, or other recessed areas. 7. Non-Direct vent installations only Vent must terminate more than 4 feet below or to side of all doors or windows. 8. Vent must terminate more than 1 foot above grade or anticipated snow line. In addition, vent termination must be at least 7 feet above public walkway and 3 feet above any forced air intake within 10 feet. Stay well away from trees, shrubs, and decorative items. Site conditions may dictate greater clearances. See Figure 1. 9. Vent must terminate at least 4 feet horizontally, and in no case above or below, unless a 4 foot horizontal distance is maintained, from electric meters, gas meters, regulators, relief valves, and other equipment. 10. Locate or guard vent to prevent condensate from damaging exterior finishes. 11. Do not extend exposed vent pipe outside of building. Condensate could freeze and block vent pipe. 12. Vent must terminate at least 6 feet away from adjacent walls. 13. Do not terminate vent closer than 5 feet below roof overhang. 14. Do not terminate vent above any door or window. Condensate can freeze, causing ice formations. 15. Vent may pass through an unused chimney or vent as a raceway if allowed by vent manufacturer and installed per vent manufacturer s instructions. 16. Do not connect: Any other appliance to vent pipe. Multiple boilers to a common vent pipe. 17. Do not wrap or insulate vent pipe and fittings. 18. Canadian installations See B149.1 or B149.2 Installation Code. 19. A gas vent extending through an exterior wall shall not terminate adjacent to the wall or below building extensions such as eaves, parapets, balconies or decks. Failure to comply could result in severe personal injury, death or substantial property damage. Figure 1 Non-Direct Vent termination locations Forced air intake 3 feet If within 10 feet 7 feet Public Walkway 26507 3

Installation Pre-installation planning 1. Follow national, state, local or provincial codes or regulations when venting GV boiler. 2. Choose vent method from those shown on page 5. 3. Select vent run components from the CGi, CGs & GV Vent Component Supplement. Table 2 states maximum vent run lengths and number of elbows. Do not exceed data in Table 2. See Figure 2 for slightly reduced boiler output. 4. The following items are available through Weil- McLain: Weil-McLain Vent/Air Intake Termination Kit (part number 382-200-430). Weil-McLain Through-Roof or Through- Unused-Chimney Termination Kit (part number 382-200-435). 5. If installing with direct vent method, use same maximum run length and number of elbows from step 2. Vent and combustion air connector piping configurations must match. Use suitable 3" material for combustion air connector piping, such as: Dryer vent Galvanized steel PVC (3" I.D.) 6. Refer to vent termination WARNING, item 19 on page 3. Table 2 Vent and combustion air connector piping lengths and number of elbows Figure 2 % Output 26500 Boiler output 100 99 98 97 96 95 GV-6 0 20 40 60 80 100 Total equivalent length (feet) of vent (from boiler to vent termination) GV-3 GV-4 GV-5 Select vent method For altitudes more than 5,500 feet above sea level Do not use non-direct vent through sidewall methods as shown in Figures 4 and 6. Can cause severe personal injury, death or substantial property damage if ignored. Figure 3 GV direct vent through sidewall (using Weil-McLain Vent/Air Intake Termination Kit) Figure 4 GV non-direct vent through sidewall (using Weil- McLain Vent/Air Intake Termination Kit) (See WARNING above.) 4

Installation continued Select vent method continued Figure 5 GV direct vent (using Weil-McLain Through-Roof or Through-Unused-Chimney Termination Kit) Figure 6 GV non-direct vent through sidewall (using termination coupling) (See WARNING above) Figure 7 GV non-direct vent through roof (See WARNING above) Connect vent starter tee to boiler Follow the instructions in the GV Boiler Manual to connect the vent starter tee to the boiler. Construct vent and optional combustion air run Follow vent pipe manufacturer's instructions for sealing the vent. Vent and combustion air connector piping must be sealed gas-tight to prevent possibility of flue gas spillage and carbon monoxide emissions, resulting in severe personal injury or death. 1. Follow vent manufacturer's instructions to construct vent run and for methods of supporting vent runs. Clean joints before sealing. See vent pipe manufacturer's instructions to clean joints. Use their specified sealant (maximum 250 0 F flue temperature). Do not use screws. Do not mix types or manufacturers of vent materials. Maintain minimum one-inch clearance from combustible materials to vent pipe; 0" clearance for noncombustible materials. Install vent pipe with seams on top of vent runs. If needed: a. Saf-T Vent and Star-34 use slip connector to adjust for nonstandard pipe lengths. b. Z-Vent II and FasNSeal male end of vent pipe may be cut to provide correct length. See vent pipe manufacturer's instructions for use. 2. If installing with direct vent through sidewall method, use instructions provided with Weil- McLain Vent/Air Intake Termination Kit. See Figure 3 page 4. 5

Installation assembly Connect vent run to termination Venting through sidewall 1. If using Weil-McLain Vent/Air Intake Termination Kit, see instructions provided in that kit. Applies to direct (Figure 3, page 4) or non-direct vent (Figure 4, page 4) method. 2. If using non-direct method with termination coupling only, see Figures 8 and 10. Do not seal slip connector to inside or outside plate. If passing through noncombustible wall, provide hole diameter large enough to insert the slip connector through. Sleeve and spacers are not required. 3. Maintain minimum one-inch clearance from combustible materials to vent pipe; 0" clearance for noncombustible materials. 4. Refer to vent termination WARNING, item 19 on page 3. Venting through existing chimney or roof 1. Direct vent method follow instructions supplied in Weil-McLain Through-Roof or Through-Unused-Chimney Termination Kit to assemble termination. 2. Non-Direct vent method (through the roof): Vent pipe must extend through roof flashing, jacket or thimble. See Figure 9. Vent may pass through floor, inside wall or concealed space when installed according to vent pipe manufacturer's instructions. 3. Maintain minimum one-inch clearance from combustible materials to vent pipe. Figure 8 Non-direct vent through sidewall (using termination coupling) Follow vent manufacturer s instructions for proper installation of vent runs, including slope and support. Figure 9 Non-direct vent through roof Follow vent manufacturer s instructions for proper installation of vent runs, including slope and support. Install combustion air piping 1. Seal all combustion air piping joints and seams, using sealant as below: a. Dryer vent A piece of 3" galvanized is required at each end to adapt. Seal all pipe joints and seams between pipe and dryer vent with silicon sealant. b. Galvanized pipe Seal all joints and seams using silicone sealant. c. PVC pipe Seal all joints using PVC cement. Except where noted otherwise above, seal air piping using either the sealant specified by the vent pipe manufacturer for vent joints or one of the following silicone sealants: Dow Corning 700 or 732 General Electric 108 or 800 2. Combustion air pipe may be pitched slightly toward outside termination to preent rain from entering boiler. Support the air piping in the same manner as specified for the vent pipe by the vent pipe manufacturer. Do not support the air pipe from the sidewall termination. Venting multiple GV boilers Do not connect multiple boilers to the same vent. Failure to comply could result in severe personal injury, death or substantial property damage. Sidewall Space terminations apart as shown in the figure below. Vertical Multiple GV boilers may be vertically vented with vent terminations at the same height. Maintain spacing as noted in the figure below. 6

Installation assembly continued Figure 10 Sidewall termination installation (non-direct venting) 7

Installation assembly continued Finish the vent installation Installing condensate tubing 1. See Figure 11 to install condensate tubing (provided by others). Use condensate pump if floor drain is higher than condensate drain on boiler. If required: use a low-profile pump OR set boiler on foundation (see GV Boiler Manual) to allow gravity flow to discharge. 2. Size pump in gal/hr (boiler model): 0.78 (GV-3) 1.17 (GV-4) 1.56 (GV-5) 1.95 (GV-6) Refer to pump manufacturer's instructions. Drain to a non-freezing area. Figure 11 Installation of condensate tubing If vent pipe or combustion air pipe must be reassembled When vent pipe or combustion air pipe is disconnected for any reason, it must be reassembled and resealed according to this Venting Supplement, the direct vent termination kit instructions and the vent pipe manufacturer's instructions. Sealant recommended by vent pipe manufacturer must be used as indicated in their instructions. Vent and combustion air connector piping must be sealed gas-tight to prevent possibility of flue gas spillage and carbon monoxide emissions, resulting in severe personal injury or death. 8