Installation and Servicing Instructions. Alpha GasSaver GS-1

Similar documents
Installation and Servicing Instructions. Alpha GasSaver GS-2

Alpha FlowSmart 25 and 50

Installation and Servicing Instructions. Alpha FlowSmart

Installation and Servicing Instructions

Alpha CombiMax 350 and 600

Installation and Servicing Instructions

Installation and Servicing Instructions. Alpha CD24C/32C

Installation and Servicing Instructions. Alpha CD50

Installation and Servicing Instructions. Alpha CD25C/28C/35C

Installation and Servicing Instructions. Alpha CB50

Installation and Servicing Instructions. Alpha CD25X/28X

User's Instructions. Alpha CD25X/28X. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Combination Boilers

User's Instructions. Alpha CB50

Alpha InTec 26C, 30C, 34C and 24X, 28X

Installation and Servicing Instructions. Alpha SolarSmart 90

FlowSmart. The high efficiency, high performance space saving heating system.

Installation and Servicing Instructions. Alpha 240/280. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boilers

Alpha CD13R,18R and 24R

Installation Instructions

Alpha SolarSmart 100

Alpha InTec 30C and 34C

User's Instructions. Alpha CD24C/32C. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Combination Boilers

With a power output ranging from 13kW to 24kW, they provide the flexible answer for the majority of traditional installation scenarios.

INSTALLATION AND SERVICING INSTRUCTIONS TO BE LEFT WITH THE USER

Installation and Servicing Instructions. E-Tec 28 and 33

Bosch Group. 24i RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

Light commercial products. High output boilers Cascade systems

Installation and Servicing Instructions

InTec 2 X HIGH EFFICIENCY BOILERS LOW CARBON SOLUTIONS

24i RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

kw Btu/h Metres Feet l/min. Gal/min C C

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

E-Tec Plus 28 and 33

Bosch Group. 24CDi RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

Greenstar Xtra. Installation instructions. Passive flue gas heat recovery device. For use with Greenstar CDi Compact, Si Compact and i combi boilers

Installation and User Instructions Aquaheat Unvented Water Heaters Models: AH30H

InTec² 20SE and 30SE

MULTIPOINT FF Room Sealed Fan-Assisted Water Heater

Itho Solar System CombiSolar 150. Installation and service manual

Installation and User Instructions HS10U, HS15U.

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

SEALED THERMAL STORE

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

High efficiency heating solutions for the home

SUPPLEMENT. Part No. DOC 25 Rev. 09 November SUPPLEMENTARY INSTALLATION and USER INSTRUCTIONS. COMBI 90 OUTDOOR MODULE MkII

Installation and Servicing Instructions. Alpha CD50S and 70S. Wall Mounted, Fan Assisted, Gas Fired, High Efficiency Condensing System Boilers

Bosch Group. 35CDi WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS.

Baxi Maxflow Combi WM

Bosch Group. 24CDi OF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

Ace and Ace High. Installation and Servicing Instructions To be left with user adjacent to gas meter. Wall Mounted Gas Combination Boiler

Baxi Maxflow Combi FS

Multipoint Technical Data

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water

INSTALLATION AND SERVICING INSTRUCTIONS

MULTIPOINT BF Gas Fired Balanced Flue Water Heater

Unvented Electric Water Heater 10/15 litre Undersink

Performa System 12e, 18e, 24e & 28e

Highflow 400 ELECTRONIC BF FLOOR STANDING COMBINATION APPLIANCE FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER

HALSTEAD Ace INSTALLATION & SERVICING INSTRUCTIONS FOR THE

INSTALLATION AND SERVICING INSTRUCTIONS

Baxi Bahama 100. Gas Fired Wall Mounted Combination Boiler. User s Operating Instructions

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water

RD 628 WALL MOUNTED COMBINATION BOILERS FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

Performa 24. Gas Fired Wall Mounted Combination Boiler. User s Operating Instructions

Suprima 30L - 100L. Installation & Service Instructions. About the Boiler

AIRE. Thermostatic bath shower mixer. Installation and Operating Instructions INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

INTRODUCTION STORAGE PRIOR TO INSTALLATION. Expansion Vessel Hose. Part No High Flow Rate Inlet Control Set. Part No.

CLUB HE 18 INSTALLATION AND SERVICING INSTRUCTIONS TO BE GIVEN TO THE USER SEALED SYSTEM CONDENSING BOILER. G.C. Appliance No Club HE 18

Furrows Business Park, Haybridge Road Wellington, Telford, Shropshire TF1 2FE

Unvented water heating

Baxi Combi 80Eco. Gas Fired Wall Mounted Combination Boiler. User s Operating Instructions

Instructions for Use Installation and Servicing

HOTFLO 10 / 15. Fitting Instructions and User Guide

Installation & Servicing Manual. for the Ultra range of wall mounted fan assisted balanced flue gas boilers

INSTRUCTIONS FOR INSTALLATION AND SERVICING ECOmax VUW 236 EH G.C. No

Finest. HALSTEAD Finest Finest Gold INSTALLATION & SERVICING INSTRUCTIONS FOR THE

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

Bar valve with fixed and adjustable shower heads. Installation guide. Midas Plus installation instructions Page 1

CNTENTS. 1Introduction

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

Thermostatic bar mixer valve with adjustable head Installation guide

AQ150:Midas 10/9/15 14:50 Page 1 AQ150. Thermostatic bar mixer valve with adjustable head. Installation guide

MIDAS. Installation instructions 110/220

ferroli Boiler Replacement Maxima 35C- Modena HE

Osprey 2 CFL

24SiII / 28SiII WALL MOUNTED COMBINATION BOILERS FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION. For Super SXD, SX, SCI & SC

Wall hung combination boilers. This is a CAT II2H3+ appliance USER, INSTALLATION AND SERVICING INSTRUCTIONS SUPPORTED BY

INSTALLATION INSTRUCTIONS FOR FLUE KIT

CLUB HE 18 INSTALLATION AND SERVICING INSTRUCTIONS SEALED SYSTEM CONDENSING BOILER TO BE GIVEN TO THE USER Pin 87/BQ/44

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

Compact HE. High efficiency combi boiler. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

Aquamixa. Thermo. Thermostatic shower valve with manual bath fill

TYNE. Installation and Operating Instructions. Thermostatic bath shower mixer. Installers please note these instructions are to be left with the user

Compact. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

JANUS 3 CIRCULATOR WATER HEATER INSTALLATION, COMMISSIONING & SERVICING INSTRUCTIONS G.C. No

INSTALLATION MANUAL. RD SERIES Digital Electric Water Heater Wall-hung Unvented

Quartz. Thermo. Concealed shower valve with adjustable head. Quartz Thermo installation guide page 1

ecotec Instructions for installation and servicing Wall hung room sealed fan assisted condensing boiler For the installer

Transcription:

Installation and Servicing Instructions Alpha GS-1 Passive Flue Gas Heat Recovery Device (PFGHRD) for use with an Alpha CD Condensing IMPORTANT: Read these instructions BEFORE installing the boiler For Technical help or for Service call... ALPHA HELPLINE Tel: 0844 8718764 website:www.alpha-innovation.co.uk Nepicar House, London Road, Wrotham Heath, Sevenoaks, Kent TN15 7RS Recognised by the Governments standard assessment procedure (SAP) EEC Accredited C O O L F L U E Patent Protected No. 40174 Other Patents Pending Leave these instructions with the User

CONTENTS 1 Introduction... Technical data... How does work... 4 General installation information...4 5 Installation...5 6 Commissioning...7 7 Routine inspection...7 8 Short parts list...8 9 Inspection history...8 1 INTRODUCTION The Alpha is an energy saving device listed in the Government's SAP Appendix Q as a passive flue gas heat recovery device (PFGHRD) and is fitted to the flue adaptor on top of an Alpha CD condensing boiler. A wall bracket is provided to support the device in the correct position above the boiler. Also supplied are a blending valve, template and an outer flue clamp. The device recycles heat recovered from the flue exhaust gases which is used to pre-heat the incoming cold mains water supply before entering the gas fired combination boiler or unvented storage cylinder, thereby reducing gas consumption and improving domestic hot water efficiency. The is maintenance free, requires no controls and easy to install. IMPORTANT The Alpha must be installed as detailed in these instructions and the boiler and flue must be installed in accordance with the instructions supplied with the boiler. Failure to do so will negate the warranty supplied with this unit. It is the law that all gas appliances are installed by a competent person, ie Gas Safe registered personnel, in accordance with the following recommendations:- Current Gas Safety (Installation and Use) Regulations All current Building Regulations issued by the Department of the Environment, i.e. Approved Document L1 Building Standards (Scotland) (Consolidation) Regulations issued by the Scottish Development Department UK Water Regulations/Byelaws (Scotland) Health & Safety Document No. 65 The installation should also be in accordance with the following British Standard Codes of Practice:- BS 5440:1 Flues BS 5449 Forced circulation hot water systems BS 5546 Installation of hot water supplies for domestic purposes BS 6700 Design, installation, testing and maintenance of services supplying water BS 6798 Installation of gas fired hot water boilers BS 6891 Gas installation BS 759 Code of Practice for treatment of water in heating systems BS 7671 Requirements for electrical installations, IEE Wiring Regulations Failure to install this unit or the boiler correctly could lead to prosecution. It is in your own interest and that of safety to ensure that you comply with the law. Manufacturer's instructions must NOT be taken in anyway as over-riding statutory obligations. Note: Alpha CD condensing flue components must be used when the is used with an Alpha CD boiler. TECHNICAL DATA.1 DHW SYSTEM. COMPONENTS Maximum Inlet Water Pressure *5 bar Minimum Inlet Water Pressure 0. bar Maximum Water Flow Rate 18 l/min Minimum Water Flow Rate.5 l/min Inlet Water Pipe Connection ½" BSP to 15 mm Outlet Water Pipe Connection ½" BSP to 15 mm Heat Exchanger Coil Water Content.7 litre DHW Heat Exchanger Condensate Store & Flue Connection Outer Casing Blending Valve Setting at Inlet Blending Valve Connections * If inlet water pressure is above 5 bar a pressure reducing valve (PRV) must be fitted. Stainless Steel Stainless Steel Steel - White Paint 0 C 15 mm Alpha - Contents / Introduction / Technical Data

. GENERAL.4 INSTALLATION Case Dimensions Lift Weight (empty) Lift Weight (full) Condensate Store Capacity Flue Connections Inner Flue Duct Outer Air Duct Height Width Depth 78 mm 400 mm 85 mm 15.6 kg 4 kg 5.75 litre 60/100 Concentric 60 mm 100 mm Min. Clearances required Top from casing of Bottom Sides Front Hole size required for flue assembly Equivalent flue length of 15 mm 75 mm from boiler 0 mm 450 mm 110 mm dia. m of flue length.5 PRESSURE LOSS 1. 1.0 Alpha CD X & C Pressure Loss (bar) 0.8 0.6 0.4 and 0. Blending Valve 0 0 4 6 8 10 1 14 16 Flow Rate (litre/min) HOW DOES GASSAVER WORK The is a boiler flue gas heat recovery device. The heat is recovered by using a gas to water heat exchanger to extract heat from the hot flue gases that are usually exhausted into the atmosphere and the heat within them wasted. This reclaimed heat is then used to pre-heat the cold water supply to the boiler, thereby reducing the energy required (using less gas) to heat the water to the set hot water outlet temperature. During the process of extracting the heat from the flue gases further condensing of the moisture within the flue gas occurs, this condensate is used to form a thermal store within the, allowing more recovered heat to be stored and used for recycling thereby using less gas. The flue gases leaving the are dryer and at a much lower temperature than normal boiler flue gases thereby reducing pluming and the problems associated with pluming. Pre-heated water out Incoming mains water Incoming combustion air Cooler flue exhaust gases Condensate thermal store Hot flue exhaust gases Fig. 1 Fig. Alpha - Technical Data / How Does Work

4 GENERAL INFORMATION 4.1 TYPES OF INSTALLATION - Fig. and 4 Depending on the type of boiler used, the should be installed as shown in one of the following schematics Figs. and 4. IMPORTANT: Only use connection fittings approved for use with stainless steel pipework when connecting to the inlet and outlet pipework. Combination only Mains water to Pre-heated water to boiler Alpha CD Condensing Combination DHW outlet Water inlet to boiler Blending valve set to 0 C Fig. Mains water supply System or Regular with Unvented Store Flow regulator valve Mains water to Pre-heated water to cylinder Temperature/pressure relief valve Blending valve adjusted as required DHW draw off Alpha CD Condensing, System or Regular Expansion relief valve To heating primary circuit Check valve Pressure reducing valve Filter To heating primary circuit Expansion vessel Tundish Unvented hot water storage cylinder Mains water supply Fig. 4 Discharge pipe 4 Alpha - General Information

PFGHRD brand: GS-1 4. DOMESTIC HOT WATER SYSTEM The minimum flow rate needed for the boiler flow switch and burner to operate is.5 litres/min. The incoming mains water pressure should be between 0. and 5 bar to ensure efficient operation. If the pressure is above 5 bar a pressure reducing valve must be fitted. To ensure economic use, the pipe runs between the boiler and taps should be in 15 mm copper pipe and be as short as possible. Where possible the pipework should be insulated to reduce heat loss. All taps and mixing valves used with the hot water system must be suitable for operating at a mains pressure of up to 8 bar. Showers - A shower may be used with the boiler if required. If a loose or flexible head type shower is used it may require the fitting of a double check valve, to comply with Water Bye Law 17. Bidets - No anti-syphonage arrangements are necessary, provided the outlets are shrouded and it is not possible to attach a temporary hand held spray. A supply of direct mains fed hot and cold water is permitted provided the appliance is of the over-rim flushing type. Before the mains water supply pipe is connected to the boiler, it should be thoroughly flushed out to avoid the danger of dirt or foreign matter entering the boiler. 5 INSTALLATION 5.1 UNPACKING - Fig. 5 Box contents... Mounting bracket with two top fixing bolts plus screws and wall plugs 40 mm flue clamp Blending valve Literature pack and wall template Installation and Servicing Instructions Installation instructions THIS BOILER IS FITTED WITH A 'PASSIVE FLUE GAS HEAT RECOVERY DEVICE' (PFGHRD) RECOGNISED BY THE GOVERNMENT'S STANDARD ASSESSMENT PROCEDURE (SAP) Zenex PFGHRD model: Part No. GS-1-ALPCD (For Alpha Condensing s) Serial No. GS-ALPCD- ALPHA TECHNICAL HELPLINE - 0870 00 1964 ZENEX COOLFLUE TECHNOLOGY COOLFLUE UK PATENT PROTECTED No. 40174 - OTHER PATENTS PENDING DO NOT REMOVE THIS LABEL Wall template Label for control panel cover Blending valve Flue clamp ½ BSP to 15 mm tails Mounting bracket with top fixing bolts (with screws and plugs) Fig. 5 Alpha - General Information / Installation 5

5. MINIMUM CLEARANCES REQUIRED - Fig. 6 15 85 Minimum clearance of 450 mm from front of 475 75 400 0 0 565 71 Side view 5. FIT THE GASSAVER - Figs. 7 and 8 Fig. 6 1. The is positioned on top of the boiler using a wall fixing bracket and is connected directly to the boiler flue outlet. The boiler flue kit is then connected to the flue spigot on top of the.. Before commencing installation, it is important to ensure that there is adequate clearance above the boiler to accommodate both the and flue kit. Refer to Fig. 6.. Use the wall template in conjunction with the boiler wall template (Fig. 7) to determine the positions of the flue hole and the holes for the various fixings. Side exit flue - Continue the horizontal centre line of the flue across the wall to the side wall, then along the side wall by the distance of the boiler flue position from the wall the boiler is mounted on (ensure the lines are horizontal). This will give the position of the centre of the hole for the flue. 4. Drill and plug all the necessary fixing holes and cut the flue hole. 5. Mount the boiler on the wall as described in the boiler installation instructions (do not fit the flue or make the water connections). 6. Carefully pour about ½ litre of clean, cold water into the central flue spigot of the boiler. Care should be taken to ensure that no water is allowed to spill or enter the outer air duct of the flue spigot. Note: Temporarily cover the boiler flue spigot to prevent anything from falling into it. 7. Place the mounting bracket in position and secure with three fixing screws. Secure the top fixing bolts in position using four fixing screws. 8. Remove the temporary cover from the boiler flue adaptor. Loosely fit the flue clamp, supplied with the and position it over the flue adaptor. Carefully lift the into position over the boiler flue adaptor and lower it into place, keeping the unit level to ensure the bottom flue spigot enters the boiler flue adaptor squarely. Note: Take care not to dislodge or damage the flue seal in the boiler adaptor. template Top of boiler template mounting bracket Front view Minimum top clearance 90 mm For use when fitting the to an Alpha CD boiler Fig. 8 Gassaver toggle plates fixing holes 110 mm Dia. flue C/L C/L of flue bracket fixing holes Top of casing as marked on boiler template Ensure line is level Fig. 7 Top fixing bolts Locknuts Position of 110 mm hole to be cut for side exit flue Adjust to level Position the on its mounting bracket, holding it level (ensure the weight is not transferred to the boiler). Locate the top fixing bolts into the top of the as shown in Fig. 8 and adjust the nuts to level the. 9. When the is level tighten the locknuts and tighten the flue clamp to seal the joint. 6 Alpha - Installation

OFF 0 1 RESET 1 9 8 4 7 5 6 1 9 8 4 7 5 6 1 0 4 bar Inlet Outlet 5.4 CONNECT THE PIPEWORK - Figs., 4 and 9 1. Fit the ½" BSP to 15 mm tails (supplied) to the inlet and outlet connections setting them in the required positions. Using either solder or compression fittings connect the cold mains inlet to the inlet pipe (marked inlet, see Fig. 9). Route the pipework from the outlet to the hot connection of the blending valve supplied with the.. Connect another cold mains pipe to the cold connection of the blending valve and then connect a pipe from the mixed connection of the blending valve to the cold water inlet connection of the boiler. The blending valve is pre-adjusted to 0 C and has a locking cap to prevent incorrect adjustment. Connect any remaining system pipework as described in the boiler installation instructions. 5.5 PRIME THE GASSAVER - Fig. 10 Fig. 9 Fig. 10 The relies on a store of water/condensate to deliver maximum benefit, and must be primed prior to first use. When the installation of the pipework is completed, fill the by carefully pouring 6 litres of clean, cold water into the top central flue spigot of the. Care should be taken to ensure that no water is allowed to spill or enter the outer air duct of the. Note: It is normal for some water to run into the boiler heat exchanger and out the condensate drain whilst filling. 5.6 FIT THE FLUE When priming is completed, attach the boiler flue kit to the top spigot of the as described in the boiler installation instructions. Note: The is equivalent to a m length of flue. A B C D SELECTOR THERMOSTAT THERMOSTAT 5.7 COMPLETE THE INSTALLATION A self adhesive label is supplied in the box. This label must be located as shown in Fig. 11 on the boiler control panel cover so that it can be easily seen when the cover is open. THIS BOILER IS FITTED WITH A 'PASSIVE FLUE GAS HEAT RECOVERY DEVICE' (PFGHRD) RECOGNISED BY THE GOVERNMENT'S STANDARD ASSESSMENT PROCEDURE (SAP) PFGHRD brand: Zenex PFGHRD model: GS-1 Part No. GS-1-ALPCD (For Alpha CD Condensing s) Serial No. GS-ALPCD- ALPHA TECHNICAL HELPLINE - 0870 00 1964 ZENEX COOLFLUE TECHNOLOGY C O O L F L U E UK PATENT PROTECTED No. 40174 - OTHER PATENTS PENDING DO NOT REMOVE THIS LABEL Stick label supplied with onto back of the control panel cover Fig. 11 6 COMMISSIONING Commission the boiler as described in the boiler installation instructions. Turn on the cold mains supply and open all hot taps to purge any air. Close the taps and check for leaks. It is recommended that the should be subjected to a general condition inspection at each boiler maintenance interval. 7 ROUTINE INSPECTION Due to the simplicity of the design of the, no maintenance is required. The unit contains no mechanical, electrical or serviceable parts. Alpha - Installation / Commissioning 7

8 SHORT PARTS LIST Item Part No. Wall mounting top fixing brackets....0189 Wall mounting bracket (bottom)....01405 Wall template 1.00007 Flue clamp (100 x 45)... 6.0010 Blending valve... 1.00009 Expansion vessel (optional extra)... 6.56441 Installation and servicing instructions... 1.00008 SAP label for boiler controls cover... 1.00006 Alpha/ badge... 1.0056 Top flue turret 1.09880 Top turret gasket... 1.0079 Flue seal kit... 1.0148 tail (single)... 1.016671 9 INSPECTION RECORD It is recommended that the is inspected regularly and that you complete the appropriate Inspection Record below. Service Provider: Before completing the appropriate Inspection Record below, please ensure you have carried out the boiler service as described in the boiler instruction manual. INSPECTION 1: Date... INSPECTION : Date... INSPECTION : Date... INSPECTION 4: Date... INSPECTION 5: Date... INSPECTION 6: Date... Alpha Therm Limited. Nepicar House, London Road, Wrotham Heath, Sevenoaks, Kent TN15 7RS Tel: 0844 8718764 email: info@alpha-innovation.co.uk website:www.alpha-innovation.co.uk These instructions have been carefully prepared but we reserve the right to alter the specification at any time in the interest of product improvement. Alpha Therm Limited 010. Part No. 6.00140 Instructions compiled and designed by Publications 000 - Tel: (01670) 5611 09/10/D54