Clyde Alkon 90. Floor standing condensing boilers. Natural Gas. 90 kw. LP Gas. 90 kw

Similar documents
Clyde CG. Wall hung condensing boilers. Engineering Data Sheet 769/4 November Natural Gas 60 kw to 180 kw. LP Gas.

Clyde CK40. Cast Iron Boiler. Engineering Data Sheet 663/8 May Natural gas Class D oil Dual Fuel. 350 kw to 500 kw

Superior. A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler. Outputs 120, 160, 200, 240, 280 kw

TopGas Cascade Condensing Gas Boilers Technical Information and Assembly Manual Output range 60 to 720 kw /17 Subject to modification

Quinta Pro Range. The New Remeha. Condensing Boilers REMEHA QUINTA PRO RANGE. High efficiency wall hung condensing boiler with ultra low NOx emission

Assessment Schedule - TS.6

Ultramax PB. Floor standing premix gas fired condensing boilers with outputs at 65, 85, 100 & 120kW BOILERS

Calder. Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing. Outputs kw. Calder Model

Calder Plus. High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing. Outputs kw. Calder Plus Model

Aluminium range of condensing boilers. Works every time. Designed to meet carbon reduction targets. Lifetime service and support

WALL HUNG GAS BOILER FOR C.H. AND PREDISPOSTION FOR INSTANTANEOUS D.H.W. PRODUCTION (with optional kit) MODELS 34,8 kw (depotenziata) 50 C

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar

Sirius FS. Working towards a cleaner future

WOLF GAS CONDENSING BOILERS COMFORTLINE

IMAX XTRA EL. 715kW FLOOR STANDING CONDENSING FEATURES AND BENEFITS

Hoval Cosmo heating boilers, outputs from 100 to 4000kW. Working pressures to 8 bar. Heatpack boilers. to 2900kW.

Stainless steel range of condensing boilers. Designed to meet carbon reduction targets. Lifetime service and support. Outputs from 50kW to 660kW

R e m e h a P Technical Information. Remeha P 300. Pressurized boiler. Heat output: kw

FEATURES AND BENEFITS. Up to 109.8% part load efficiency

TABLE OF CONTENTS TECHNICAL DOCUMENTATION 03. Technical Data

Ultramax R600. High output, floor standing gas fired condensing boilers with outputs from 150kW to 571kW

Installation and Operating Manual for the EcoStar 500 Oil Condensing Floor Standing Range Output Range kw

Aluminium range of condensing boilers. Works every time. Designed to meet carbon reduction targets. Lifetime service and support

Hamworthy. Purewell VariHeat

INSTALLATION & TECHNICAL MANUAL

Technical information. Remeha P 500. Pressurized boiler. Heat output: kw

Hamworthy Fleet Horizontal Floor Standing. Condensing Boilers Natural Gas Outputs 40kW to 350kW 5 YEAR HEAT EXCHANGER WARRANTY

Mikrofill Ethos Condensing combination boiler

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

HIGH POWER. VICTRIX PRO 2 ErP. High power, wall-hung condensation boiler

SEALED THERMAL STORE

Hamworthy. Stratton Wall Hung. Stainless Steel Condensing Boilers Natural Gas or LPG Outputs 45kW to 100kW

Fusion 200, 300 & 500

CAST IRON PREMIX HIGH EFFICIENCY GAS FIRED BOILER kw BRILEY DESIGN MANUAL

ALKON CARGO. A precise and fast delivery rate. A very high specific flow rate (20 litres per minute with Dt 25)

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

INSTALLATION & TECHNICAL MANUAL

Hamworthy. Stratton Wall Hung. Stainless Steel Condensing Boilers Natural Gas or LPG Outputs 45kW to 100kW

S-AF Floor Standing Condensing Boiler kW

Hamworthy. Melbury HE. High Efficiency Steel Shell Power Flame Boilers Gas, Oil, Biofuel or Dual Fuel Burners. Outputs 530kW to 10000kW

WELCOME TO REMEHA, THE EXPERT CHOICE INTRODUCING THE REMEHA GAS 110 ECO RANGE FEATURES AND BENEFITS

ZENA PLUS EASYLIFE WALL-HUNG GAS BOILERS

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Thision L. Wall mounted gas fired condensing boilers with individual unit outputs from 48kW to 145kW and multi-boiler cascade sets up to 1140kW

VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw

Hamworthy Fleet Vertical Floor Standing. Condensing Boilers Natural Gas Outputs 80kW to 1050kW 5 YEAR HEAT EXCHANGER WARRANTY

Baxi System 100 HE Plus. User s Operating Instructions. Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler

ARES Tec HIGH OUTPUT MODULAR CONDENSING BOILER RANGE

Condensing Heat Exchanger Suitable Gas Fired Ideal GT & GTE boiler ranges

heat interface units A BOILER WITHOUT A FLAME

Power X High Power Condensing Wall-Hung Boilers

STREBEL S-CB + Cascade Kits

Floorstanding Gas Condensing Boilers VITOCROSSAL 100

Power X High Power Condensing Wall-Hung Boilers

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

Euron. Compact Wall Mounted Gas Fired Condensing Boilers and Combis with Outputs 24kW - 30kW BOILERS

1 VICTRIX ZEUS Superior kw I features

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw

Installation and maintenance instructions

SPECIFICATIONS - NIKE

Cast Iron Boilers. G Series ( kW)

PLEASE LEAVE THIS INSTRUCTION WITH THE USER. Ecomfort 30 HE. User instructions

USER INSTRUCTIONS & CUSTOMER CARE GUIDE Si II SERIES

Remeha Quinta 45 and 65

superrange Super Series 4, Super Plus High efficiency modular boilers kW Commercial & Industrial Boilers

TABLE OF CONTENTS TECHNICAL DOCUMENTATION 03. Technical Data

Sirius WH. Working towards a cleaner future

Remeha Quinta 30. Technical information. High-efficiency. condensing boiler for. wall mounted. installation. Output: kw

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

Installation and Servicing Instructions R29 & R40 HE conventional Wall mounted condensing boiler for central heating

Bosch Group. 24CDi OF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

CPM, CPMSP Cascade header kits Installation, Commissioning and Maintenance Instructions

... RHeco. High Efficiency Condensing Unit Heaters... Low NO x. ErP. ErP Lot 21 Seasonal Efficiency and NOx compliant

... RHeco. High Efficiency Condensing Unit Heaters... Low NO x. ErP. ErP Lot 21 Seasonal Efficiency and NOx compliant

Hamworthy. Fleet Wall Hung. Condensing Boilers Natural Gas Outputs 40kW to 150kW 5 YEAR HEAT EXCHANGER WARRANTY

CAST IRON ATMOSPHERIC BOILERS

GB24 & GB30. User Manual

ELECTRIC COMBINATION BOILER. (European Patent No: Design Right Protected.) TH12-450U MRK 2

CI/SfB X. RHeco Series CONDENSING GAS FIRED UNIT HEATERS

Hamworthy. Wessex Modumax. High Efficiency, Fully Modulating Boilers Condensing & Non Condensing, Pre-mix, Gas Fired. Outputs 100kW to 750kW

Ethos Range High Efficiency Domestic Boilers. Combination Boilers Condensing Combination Boilers Condensing System Boilers

VIESMANN VITOCROSSAL 300 Gas condensing boiler 787 to 1400 kw

Condensing Boilers. Floor Mounted - Evomod, Imax Xtra & Imax Plus III. Commercial Heating Solutions.

ADVANCE UNIVERSAL MULTI-FUEL THERMAL STORE

CPM WALL HUNG GAS FIRED CONDENSING BOILERS. Installation, Commissioning and Maintenance instructions

Installation, operating and servicing instructions

Installation, Operation and Maintenance Instructions Thermaflow E Plate Heat Exchanger Package OM013

INDEPENDENT COMBINATION & SYSTEM BOILERS.

GREENSTAR HE system. Installation and Servicing Instructions. Wall mounted condensing boiler for central heating

Maximiser SE. USER S INSTRUCTIONS Natural gas only INSTALLER: TELEPHONE:

ADVANCE ECB ELECTRIC COMBINATION BOILER

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc

Wall Hung Condensing Boilers. Working towards a cleaner future. heating specialists

Technical documentation. ComfortLine gas condensing boilers CGB-2(K) CGW-2 CGS-2 CSZ-2 NEW

Users Manual. Gas wall hung Boiler condensing Buderus /S. Please read thoroughly before operating the unit

Eliminator TotalGuard Installation Manual

Remeha Quinta 85. Technical information. Remeha Quinta 85. High-efficiency. condensing boiler for wall. mounted installation.

ECONOFLAME R6000 GAS FIRED CONDENSING HOT WATER HEATER SUPPLEMENT

Installation, Operation and Maintenance Instructions Electric Flow Heater OM009

Transcription:

90 kw Clyde Alkon 90 LP Gas Floor standing condensing boilers Natural Gas 90 kw Contents General information Dimensions and Data Installation requirements Boiler wiring diagram Hydraulic systems Page Fully modulating burner and efficiency of up to 109.1% ncv Modulating integral pump Modular arrangement of floor standing boilers that simply bolt together Cascade of up to 8 boilers (2 x 4) without additional frames or manifold Aluminium/silicon/magnesium heat exchanger resists corrosion Counter flow heat exchange maximises heat transfer & thermal efficiency For internal and external installations 2 & 3 4 5 & 6 7 8 to 12 Engineering Data Sheet 814/1 May 2010

General information Operating principles The Alkon 90 is a floor standing condensing boiler with a counter flow heat exchanger with heat exchange pins that ensure a constant rate of heat transfer through the aluminium body. It has a fully-modulating, down-firing pre-mix gas burner (refer Figs 1 and 2). When operating in condensing mode with a flow of 50 C and a return of 30 C, it will give efficiencies of up to 109.1% (ncv). The combustion air fan and venturi (11) accurately control the volumes of gas and air and mix them in a sealed chamber prior to ignition. This ensures that there is optimum combustion at any point in the modulation range of the boiler. A small flame is held on the entire surface of the plaque burner. An integral boiler circulation pump (3) ensures an even and constant flow through the heat exchanger - refer page 8. This pump modulates to match flow rate to heat output and increases the overall operating efficiency of the Alkon 90 boiler. System circulating pumps should be hydraulically separated from the boiler(s) by a low velocity header. 13 9 13 10 11 9 11 8 18 14 9 7 16 12 8 5 5 6 3 4 2 17 14 15 19 10 12 16 7 4 6 DN 80 flow 1 16 17 3 1 R F Gas 20 Fig 1 Diagram of operating principles Fig 2 Component identification for Alkon 90 boiler Key to Figs 1 & 2 1 Non-return valve 2 Isolating valve 3 Modulating pump 4 3-way drain cock 5 Flow temperature sensor 6 Return temperature sensor 7 Low water pressure switch 8 Limit thermostat 9 Air vent 10 Heat exchanger 11 Combustion air fan and venturi 12 Condensate level sensor 13 Exhaust gas outlet (100 mm diameter) 14 Gas valve 15 Gas isolating valve 16 Low gas pressure switch 17 Condensate trap and drain 18 Ignition electrode 19 Ionisation electrode 20 Drain cock EDS814/1 page2

General information Application Alkon 90 boilers are manufactured and tested in accordance with the Gas Appliances Directive 90/396/EEC, the Boiler Efficiency Directive 92/42/EEC, the Low Voltage Directive 2006/95/EC, the Electromagnetic Compatibility Directive 2004/108/EC, EN 483, EN 625, and EN 677 and CE marked accordingly. They are suitable for use in LTHW heating systems with a maximum operating pressure of 8.0 bar and a maximum working temperature of 90 C (see Technical data). Alkon 90 boilers are suitable for use with Group H second family gases (eg natural gas, G20), and Group P third family gases (eg propane, G31). and Butane/Propane mix (G30). The boiler is suitable for use in pressurised (sealed) or open vented heating systems with a minimum static head of 0.5 bar. It is not suitable for use as a direct water heater. Where potable water is required, a matching calorifier or plate heat exchanger must be provided in the system. Statutory requirements The installation and commissioning of the boiler must be carried out by a qualified engineer in accordance with the instructions provided. Gas supplies and gas burners must be installed, serviced and commissioned by a qualified person, eg. a Gas Safe registered engineer. Handling Offloading, dry storing and placing of equipment in the boiler room is the responsibility of the installer. Equipment must be dry stored and protected from frost. Cartons must not be crushed or otherwise damaged. Commissioning Clyde undertake commissioning of boilers. Commissioning charges do not include servicing during the guarantee period, although this may be carried out under service contract or to specific order. Boilers should be commissioned in line with CIBSE Commissioning Code B. Servicing The importance of regular maintenance cannot be overemphasised if maximum efficiency is to be maintained. Customers are strongly advised to place the equipment under service contract immediately commissioning is complete. Guarantee Subject to correct handling, installation and operation, all equipment is guaranteed for twelve months from the date of despatch. Boiler heat exchangers are guaranteed for a period of two years from the date of manufacture. The guarantee is not valid if the boiler is not installed in accordance with these instructions (please refer to page 5), becomes blocked with debris and/or carbonate deposits from the system water and/or there is no documented evidence of commissioning by Clyde or their appointed engineer. Boiler Log book A boiler log book that provides a permanent record of commissioning and servicing data and measurements is supplied with every boiler. It is recommended that the owner ensures that this log book is kept safe and brought up to date on every occasion that routine or emergency work is carried out on the boiler. Emitter sizing (radiators) The boiler will operate in condensing mode whenever the return water is below 50 C and will reach its full potential if the flow water temperature is also below 50 C. However, the latter condition will mainly occur when the boiler is heating an underfloor heating scheme or transiently when recharging a DHW storage tank from cold. By careful design of a traditional heating system with radiators, and with weather compensating control in operation, the return water temperature can be held below 50 C for most of the heating season, only rising above this figure when outdoor temperatures are below zero. For optimum performance, calculate heat losses on the basis of a 20 C internal temperature and a -8 C outdoor air temperature. With no added factors, size the radiators on the basis of published EN 442 data ( T50) and size the system pump for a 20 C temperature drop. In most cases this will ensure that the boiler begins to operate in condensing mode when the outdoor air temperature rises above 1 C and becomes fully condensing when the temperature is above 5 C. For heating schemes in buildings where the occupants have special needs, different environmental conditions may apply and further advice must be sought. -8 Flow water temperature C Return water temperature C 80 C 70 60 50 40 30-5 0 5 10 15 20 20 Outdoor air temperature C Condensing Boiler C Non-condensing EDS814/1 page3

Dimensions and technical data 513 119 93 AA 1300 HO GI Co HI 448 315 149 GI Co HI Plan 129 251 430 607 Front Dimensions Left elevation Right elevation Boiler model / output kw 90 Boiler flow connection HO DN 80 Boiler return connection HI DN 80 Condensate outlet Co mm 32 Gas Inlet GI DN 50 Flue connection AA mm 100 Technical data Flow 50 C / Return 30 C Heat output (ncv) Max kw 93.6 Heat output (ncv) Min kw 24 Heat input (ncv) Max kw 90 Efficiency (ncv) 100 % 104 Efficiency (ncv) 30 % 109.1 Flow 80 C / Return 60 C Heat output (ncv) Max kw 87.5 Heat output (ncv) Min kw 21.1 Heat input (ncv) Max kw 90 Efficiency (ncv) 100 % 97.26 Efficiency (ncv) 30 % 96.03 Flue gas temperature rise at full load C 38.5 Flue gas mass flow kg/s 0.039 CO 2 in flue gas (1) min/max % 8.8 / 9.6 CO in flue gas (0% of O2) min/max m g/kwh 21.5 / 104.4 Cnodensate volume at max rate kg/h 14.54 Natural gas consumption (gross cv) (2) m ³/h 8.36 N0x Emissions m g/kwh 35.62 Boiler seasonal efficiency (3) % 97.41 Dry weight kg 135 Water volume l 10 Maximum allowable temperature C 90 Maximum hydraulic working pressure bar 8 CE Registration number 1312BR4926 Electrical protection X5D Max electrical power consumption W 303 Notes : (1) Measured at the flue gas adaptor (2) Based on GCV 38.76 MJ/m³ (3) Calculated from the non-domestic heating and cooling compliance guide for conformance with ADL2A and ADL2B 2006 us ing the form ula seasonal = 0.81 30% + 0.19 100% Water flow rates and hydraulic resistances Water flow rate at 20 C tem p. ris e l/s 1.12 Hydraulic resistance at 20 C temp. rise kpa 22 EDS814/1 page4

Installation requirements Regulations governing installation Alkon boilers should be installed in accordance with all prevailing regulations and codes of practice, including the Building Regulations, Health and Safety Regulations PM5, Water Bylaws and the current Gas Safety (Installation and Use) Regulations. Detailed relevant guidance will also be found in; BS 6644 :2005 Installation of appliances exceeding 70 kw net input BS 5449 Forced circulation hot water central heating systems for domestic premises CIBSE AM14: 2010 Non-domestic hot water heating systems CIBSE Guides B and C and Commissioning Code B Institution of Gas Engineers Utilization Procedures 1, 1A, 2, 4, 7 and 10. Water treatment Alkon 90 boilers have an aluminium/silicon/magnesium alloy heat exchanger and care must be exercised to ensure that the system water and any water treatment is compatible. Whenever a new boiler is connected to an existing system, the pipework must be thoroughly cleaned and flushed. This is to remove debris, rust particles, carbonate deposits and any existing water treatment that might be incompatible with the heat exchanger. New systems must also be thoroughly flushed to remove debris and flux deposits. Clyde recommend that a permanent means of filtration be fitted into the return pipework, such as a sludge trap, hydrocyclone or full flow duplex filters. The boiler guarantee will be invalid if waterways are blocked by debris or carbonate deposits. The ph value of the system water should be measured to ensure that it is between 6.5 and 8. Temporary hardness (calcium carbonate and magnesium carbonate) can be removed by boiling and its effects limited by preventing ingress of fresh, untreated water. Permanent hardness must not exceed 15 o FR (150 mg/litre calcium carbonate). The boiler guarantee will be invalidated by the use of incorrect or incompatible water treatment. Specialist advice should be obtained, eg from; Fernox Tel. 01483 793200 For full information on cleaning, flushing and protecting hot water systems, refer to BSRIA Application Guide AG 1/2001. Boiler condensate Alkon 90 boilers have a 32 mm flexible condensate drain that is compatible with standard plastic waste pipe. Do not use other materials, as they will corrode. The pipe size must not be reduced and there must be a continuous fall to drain. As a further precaution against freezing, condensate pipes should be run internally whenever possible and lagged when run externally. Pressurisation of systems Alkon 90 boilers should be installed as part of a pressurised (sealed) or open vented system with a minimum pressure of 0.5 bar. The maximum allowable pressure for the boilers is 8 bar. They are not to be used with a gravity circulation system. Boiler location Alkon 90 boilers can be installed external to a building if the optional top weather cover is fitted. The boiler must be mounted on a sound, smooth and level plinth of noncombustible material, capable of supporting its weight. The boiler location must be frost-free and adequately ventilated (see below). Contamination of the combustion air by inflammable vapours, high dust levels or halogenated hydrocarbons will constitute a safety hazard and will damage the boiler. The following minimum clearances around the boiler should be observed; Front Sides 500 mm 500 mm Air supply and ventilation Adequate air for combustion and ventilation is essential to the safe operation of a boiler. The air for combustion and ventilation requirements of either BS 6644:2005 or IGEM/UP/10 must be met. Table 1 shows the requirements of BS 6644:2005 for boilers with a Type B flue. This standard requires natural ventilation at both high and low levels to the outside air, and is based on the net input of the boilers. BS 6644:2005 calls for additional ventilation if a boiler is used for more than 50% of the time during the summer or if the ambient temperature of the plant room ceiling exceeds 40 C. Deaeration It is a condition of warranty that there is effective air separation and removal from the system. The air separator should be fitted at the hottest part of the system. Ventilation direct to outside air Low level High level Total kw input (net) 4 cm² per kw of total rated net input 2 cm² per kw of total rated net input Table 1 Ventilation for multiple boiler installations in a boiler room complying with BS 6644:2005 EDS814/1 page5

Installation requirements Heat exchanger hydraulic resistance The Alkon 90 boiler has a high resistance heat exchanger. The boilers should be hydraulically separated from the heating distribution system by either a low velocity header or a plate heat exchanger. With this arrangement, the boiler pump can be located in the return (where water temperature is lowest) regardless of the location of the system distribution pumps. The boiler is supplied with an integral modulating pump that will ensure flow through the heat exchanger and low velocity header. The advantage offered by a modulating pump over a constant volume circulator is that the T between flow and return is maximised at all times by the control of mass flow, thus increasing heat exchanger efficiency. Low velocity headers Low velocity headers are used to separate hydraulically the boilers from the rest of the system. In addition to helping maintain a minimum flow through the boiler, they create a low velocity region for system dirt to be deposited and separation of air from the system water. Used in conjunction with a system filter (refer page 5), they are invaluable when connecting a new boiler to an existing system. Low velocity headers should always be vertical and sized for a maximum water velocity of 0.5 m/s. Alkon 90 low velocity headers are designed to ensure a water velocity of 0.2 m/s or less and for T10 / 20, so will be suitable for most systems. Fig 3 shows dimensions for the low velocity header supplied by Clyde, and Table 3 shows dimensions for a T10 / 20 system. If the heating distribution system has been designed for < T20 and a low velocity header has not been installed, the boiler(s) will not provide heat into the system at their rated heat output. D R½ BF HF Primary Circuit b c Heating Distribution Circuit TO FILTER BR HR a R½ Fig 3 Design for a low velocity header Number of boilers in cascade D mm T 10 / 20 Boiler Flow / Boiler Return T 10 / 20 Heating Flow / Heating Return T 10 / 20 a mm b mm c mm 1 DN 125 DN 65 (PN 16) DN 65 (PN 16) 500 1000 1740 2 DN 125 DN 65 (PN 16) DN 65 (PN 16) 500 1000 1740 3 DN 200 DN 100 (PN 16) DN 100 (PN 16) 500 1000 1740 4 DN 200 DN 100 (PN 16) DN 100 (PN 16) 500 1000 1740 Table 3 Low velocity header dimensions for T 10 / 20 system EDS814/1 page6

Boiler wiring diagram 12 11 1 2 4 3 6 5 9 10 7 8 Fig 4 Schematic wiring diagram Key to Fig 4 1 Ignition electrode assembly 2 Ionisation electrode 3 Minimum water pressure switch 4 Modulating pump 5 Flow temperature sensor 6 Return temperature sensor 7 DHW temperature sensor (optional) 8 Limit thermostat 9 Flue gas temperature limit thermostat (optional) 10 Gas valve 11 Modulating fan speed control EDS814/1 page7

Hydraulic system design and control Mains connection Each Alkon 90 boiler requires a permanent mains supply of 230V 50Hz, protected by a 3 Amp fuse. The electrical supply to the boiler must be installed in accordance with current IEE (BS 7671) Regulations. A separate supply and isolating switch is required for each boiler, with at least 3 mm separation for both the phase and neutral poles. Individual boiler operation Alkon 90 boilers can operate independently of external controls, controlled by their internal flow and return thermostats. To control boiler operation with a basic room thermostat, programmable room thermostat or time clock, remove the link between terminals 1 and 2 on the boiler Y1 terminal board and connect to these - see fig 4. Cascade control, weather compensation and DHW control The addition of an E8 heating controller, connected to terminals 3 and 4 of the Y1 terminal board, will provide the following functions; Cascade control of up to 8 boilers DHW generation via a calorifier with loading pump, giving DHW priority Temperature control of one or two heating circuits. The options are one directly controlled index circuit with a mixer for a secondary circuit, or direct control of the DHW circuit as the index, with two mixers for the two heating circuits Weather compensation Integration of a solar thermal system The E8 controller can be built into a plant room control panel, mounted on the wall, or supplied with an optional wall mounting box that also serves as a boiler controls wiring centre. An E8 controller is supplied as part of the cascade kit for 2, 3 and 4 boilers, and as an optional extra for single-boiler configurations if DHW control, temperature control of more than one heating zone or weather compensation is required. Outside air sensor, DHW temperature sensor and heating circuit sensors are supplied with the E8 controller. A DHW complete wiring kit is also available. Refer to the Alkon 90 installation manual for full details and schematics. Building and Energy Management Systems A single E8 controller will be required if one or more boilers are to be controlled by a 0-10V signal from a BMS or EMS. If the overall control is by a Modbus Network, the E8 controller should be replaced with a single Boiler Communications Module (BCM) as the controlling interface. Refer to Alkon 90 installation manual for full details and schematics. Key to figs 5 to 8 Items supplied as part of standard boiler frame and pipework kits 1 Alkon 90 master boiler with side panels and flanges 2 Alkon 90 slave boiler 7 Low velocity header connection pipework 8 Y-filter section 9 Low velocity header 10 E8 controller (not shown) is standard for 2, 3 and 4 boiler cascades, and optional for single boiler installations (see above) Items supplied as optional extras to standard boiler frame and pipework kits 3 Safety device pipework manifold 4 Safety device housing 5 Safety device kit comprising limit temperature thermostat, maximum pressure switch, manometer, thermometer, common gas and water safety valves and boiler expansion vessel 6 Top cover for exterior use 11 BCM (Boiler Communications Module - not shown) 12 CGCPU Pressurisation unit (not shown) 13 DHW control wiring kit (not shown) EDS814/1 page8

Hydraulic system design and control 1832 (1) 2313 (2) 6 5 7 9 8 4 3 Fig 5 1-boiler frame and pipework Notes; (1) Overall length of the standard frame and pipework kit, which does not include items 3, 4 and 5. (2) This is the overall length including items 3, 4 and 5. These items are a safety device kit including housing, manifold, controls and boiler expansion vessel. These are optional items only and must be specifically ordered if required. EDS814/1 page9

Hydraulic system design and control 2314 (1) 2795 (2) Fig 6 2-boiler frame and pipework Notes; (1) Overall length of the standard frame and pipework kit, which does not include items 3, 4 and 5. (2) This is the overall length including items 3, 4 and 5. These items are a safety device kit including housing, manifold, controls and boiler expansion vessel. These are optional items only and must be specifically ordered if required. EDS814/1 page10

Hydraulic system design and control 2934 (1) 3415 (2) Fig 7 3-boiler frame and pipework Notes; (1) Overall length of the standard frame and pipework kit, which does not include items 3, 4 and 5. (2) This is the overall length including items 3, 4 and 5. These items are a safety device kit including housing, manifold, controls and boiler expansion vessel. These are optional items only and must be specifically ordered if required. EDS814/1 page11

Hydraulic system design and control 3417 (1) 3898 (2) Fig 8 4-boiler frame and pipework Notes; (1) Overall length of the standard frame and pipework kit, which does not include items 3, 4 and 5. (2) This is the overall length including items 3, 4 and 5. These items are a safety device kit including housing, manifold, controls and boiler expansion vessel. These are optional items only and must be specifically ordered if required. This publication is issued subject to alteration or withdrawal without notice. The illustrations and specifications are not binding in detail. All offers and sales are subject to the Company's current terms and conditions of sale, a copy of which is available on request. Clyde Energy Solutions Ltd Units 13-14 Charlwoods Rd East Grinstead West Sussex RH19 2HU e : w : info@clyde4heat.co.uk clyde4heat.co.uk