Renovation Elements Landscaping uilding Entries Signage and Identity Lobbies Lobby Seating Areas Elevators Restrooms The Pyramids at ollege Park
elevators stair The Pyramids at ollege Park F J G D Typical Lobby Plan stair E plan A LEGEND A Remove existing wood paneling and paint with accent hue to differentiate buildings. Locate new uilding Directory in this area. Remove existing wood paneling and directory, and add down-lighting, paint recess with a subtle tonal color accent, and add sculpture/floral plinth. Remove metal trim, caulk, and paint existing wood paneling to match recesses on adjacent wall. Paint elevator doors and frames in a dark charcoal color. D Remove corner to open seating area. onvert granite-clad base into a planter. Patch and paint the soffit such that it continue to define the seating area. E Remove and replace existing rug, furniture, and art. New furniture with upholstery color to coordinate with the hue schemes. Paint the walls to the south and east with a corresponding tonal accent and add more appropriate artwork. Rework existing coffered ceiling will match motif in other bays, and add a new decorative pendant light fixture. F Remove existing paneling and paint with accent tone. Add a new plasma television. G This bay will receive the accent hue mentioned in A above. J Remove metal trim from ceiling coffers, caulk, and paint with two tones.
Lobby View-North Wall existing Strategy: Simplify design and reduce level of contrast along with overall dark character. Remove existing wood paneling and building directory. Add downlighting in recesses, paint with a subtle tonal color accent, and add a sculpture or planting plinth where directory is currently located. Note the removal of the metal accent strips in the ceiling. new
Lobby View-Elevator Wall existing Strategy: Simplify design and reduce level of contrast along with overall dark character. Removal of corner column opens up space. Paint existing wood paneling at elevators and paint with a subtle tonal color accent. Add down-lighting in recesses and a plasma television in the last alcove. Paint the elevator doors and frames dark charcoal to accent openings. Note the removal of the metal accent strips in the ceiling. new
Lobby View-Seating Area existing Strategy: Open seating are to lobby by removing corner. Paint two far recesses (south and east) with a color accent individual to each building. Replicate other ceiling coffers and replace pendant light fixture. Add more appropriate artwork. Replace the seating and upholster according to building color theme. new
Lobby Materials chair arpet-onstantine PPR- 3421/Linen Texture sofa art examples new pendant
A existing cab Elevator Renovation new cab ceiling LEGEND A Remove ceiling and replace with luminous/translucent ceiling system. Remove existing wood paneling and replace with stainless steel frame and plastic laminate. Install pegs for padding in freight elevator for protection. New carpet. wall concept metal laminate Nevamar PM 6006 Stainless rushed plastic laminate Nevamar MKR-0017 Red Rust Moon Rock
D A The Pyramids at ollege Park Restroom Renovation plan A elevation D LEGEND A Remove existing mirror and replace with counter to ceiling mirror which turns the inside corner with the counter. Remove existing sinks and replace with solid surface countertop (per tricolor scheme) with under-mounted stainless steel bowls. Reduce sink count to minimum required. Replace existing diffuser lens with a parabolic diffuser. D Repaint existing stall partitions according to tricolor scheme. E Remove and add accessories to coordinate and properly accommodate visitors. color schemes existing Sink-Kohler #2612 Faucet-Sloan Touchless Solis EAF-275 Flush valve- Touchless Sloan G2 Optima Plus Zodiac Galaxy lack Zodiac Vega Rose Zodiac Storm Grey
D A The Pyramids at ollege Park plan Restroom Renovation D A Flush valve- Touchless Sloan G2 Optima Plus Faucet-Sloan Touchless Solis EAF-275 LEGEND A Remove existing mirror and replace with counter to ceiling mirror which turns the inside corner with the counter. Remove existing sinks and replace with solid surface countertop (per tricolor scheme) with under-mounted stainless steel bowls. Reduce sink count to minimum required. Replace existing diffuser lens with a parabolic diffuser. D Repaint existing stall partitions according to tricolor scheme. E Remove and add accessories to coordinate and properly accommodate visitors. color schemes elevation existing Sink-Kohler #2612 Zodiac Galaxy lack Zodiac Vega Rose Zodiac Storm Grey
Site and Landscape Renovations oncept Plan Not to Scale
Site Renovations at Entries View of Typical Entry Treatment Typical uilding Entry Plan Not to Scale View of Typical Small Plaza Treatment
Signage and Identity Strategy: Update and improve building signage and identity. Remove concrete walls at entries. reate a new arrival identity with a new granite and stainless steel sign at the main entrance. Remove cylindrical bollards at building entries and replace with granite and stainless steel building markers. View of Typical uilding Entry Identity Main Entry Drive Identity