Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

Similar documents
Logan Gilbertsen, EI, CFM Phil Stuepfert, Sr. Project Manager

Stormwater Basin Retrofit Project P-6 St. Peters, MO 30% Design Meeting Willott Square / Pegasus Farms

Patrick E. Lindemann INGHAM COUNTY DRAIN COMMISSIONER. Towar Rain Garden Drains A Low-Impact Urban Retrofit

Appendix D - Technical Design Criteria for BMPs

New Development Stormwater Guidelines

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

Lesson 2: Stormwater Best Management Practices (BMPs)

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

Low Impact Development for your homes, businesses & streets

Ames City Hall Campus: Stormwater Improvements

Post Construction BMPs

City of South Portland Stormwater Manual

Green Infrastructure Stormwater Management Options in an Ultra-Urban Redevelopment. Sandy Doyle-Ahern

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Homeowners Guide to Stormwater BMP Maintenance

2012 Saginaw Bay Watershed Conference

Draft Rhode Island Stormwater Design and Installation Standards Manual

Use of Best Management Practices

Stormwater Low Impact Development - A Natural Solution

Stormwater Management Plan (SWMP) Revision Date: 11/05

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

When planning stormwater management facilities, the following principles shall be applied where possible.

USF System Campus Master Plan Updates Goals, Objectives and Policies

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Chapter 3 Site Planning and Low Impact Development

Figure 1 Cypress Street Study Area Location Map

BIORETENTION CELLS. Green Infrastructure For Stormwater Management WHAT ARE BIORETENTION CELLS? WHERE ARE BIOCELLS INSTALLED?

4. UTILITIES ELEMENT.

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

All About Rain Gardens

BIORETENTION FACILITY

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

North Street Reconstruction & Integrated Stormwater Management System

Urban Water Management and Soils (ESRM 311 & SEFS 507)

SECONDARY BENEFITS OF STORMWATER BMPS. Growing Sustainable Communities, October 2017

3. Are there any projects exempt from the definition of Regulated Projects?

Attachment 2: Permeable Pavement Design Guidelines

Urban Watershed Mentors

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Table 4.7.1: Swales Potential Application and Storm Water Regulation

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

The Engineer/Developer s Perspective on Storm Water Management

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Green and Gray Infrastucture

Bioretention cell schematic key

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Importance of Master Planning Marcy Colclough

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

Case Study: Dallas Green Infrastructure for Stormwater

Low Impact Development Ideas and Effects in the Built Environment

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Inspection and Maintenance of Stormwater Best Management Practices

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

Review Zone Application for D&R Canal Commission Decision

Rain Gardens: Are They the Answer? Holmdel Homeowner Education Program. Holmdel, NJ October 9, 2010

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Green Infrastructure Recommendations For Parks and Public Spaces

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

Costs Design Construction Operation Maintenance

Kittson Parkway / Watershed Park Parking Lot

Stormwater Runoff and the District of Columbia RiverSmart Homes Defined:

Catawba Area Plan Advisory Group

The Conservation Foundation

Why a new Food & Farm Ordinance?

Costs Design Construction Operation Maintenance

Kearney Post-Construction Stormwater Program

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend

Rain Gardens. A better way to manage stormwater. Thinking Globally and Acting Locally

92 Minnesota Stormwater Manual

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Coffee Creek Park Development Low Impact Development (LID)

4.6. Low Impact and Retentive Grading

Adopting the Manual of Best Management Practices for Stormwater Quality. Facts for Communities

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer

Appendix I. Checklists

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

Sustainable Stormwater Retrofit Best Practices

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Green Infrastructure Overview

Green City, Clean Waters

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

New State Storm Water Rules: WHAT MUNICIPALITIES NEED TO KNOW &

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Transcription:

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives Village of Hinsdale, IL

Presentation Agenda Project Overview Goals and Objectives Design Approach Public Coordination Recap Questions

Project Location

Project Location

Previous Studies September 2008 Drainage Study Reconstruct roadways with curb and gutter Traditional storm sewer conveyance Large storm sewers with underground detention were required Design provided collection and conveyance of 100-year, 24- hour duration storm 2008 Cost estimate for drainage improvements - $24.4 Million December 2009 Feasibility Study Focused on green initiatives Combination of rain gardens, permeable pavers, and underground storage was utilized to model 100-year, 24-hour duration storm Projected costs for drainage improvements - $15.0 Million

Existing Conditions

Existing Conditions

Existing Conditions

Existing Conditions

Existing Conditions

Existing Conditions

Existing Conditions

Goals and Objectives Maintain Subdivision Characteristics Minimize increase in impervious area Stay within ROW Minimize Storm Sewers Maximize BMP s for infiltration and storage Minimize Tree impacts Minimum 10-year storm with no surcharge

Design Approach Identify flooding locations Delineate sub-watershed areas (approx. 1 2 acres max.) Develop flow path and correlate to flooding locations Develop concept BMP s (type and location) Verify suitability for infiltration using soil borings Review conveyance path Series of staff meetings and public meetings Finalize concept BMP s Develop a XP-SWMM model Finalize stormwater management plan and design

Concept Exhibit

Concept Exhibit

Model Set-up Delineate Propose Build the BMP Sub-Watersheds Model Locations

XP SWMM model of Phase 1

North System 50-year Storm 10-year Storm

South System 10-year Storm 50-year Storm

North System Measurement Point Event Peak Flow Without BMPs Peak Flow With BMPs % Reduction 50-year 2-hour 69.85 cfs 23.45 cfs 66% 10-year 2-hour 35.25 cfs 15.87 cfs 55% Without Storage With Storage

South System Measurement Point Event Peak Flow Without BMPs Peak Flow With BMPs % Reduction 50-year 2-hour 44.04 cfs 15.67 cfs 65% 10-year 2-hour 22.98 cfs 9.47 cfs 58% Without Storage With Storage

Hydrographs

Landscape Approach and Concept Conventional methods - Collect, concentrate and convey polluted runoff directly to our lakes, streams and groundwater. Typical Drainage Flow Underground pipes Water temperature increases and lawn fertilizer, motor oil, anti-freeze, paint, pesticides, detergents, pet waste flow into our water bodies NEW WAY Rain gardens and bio-swales filter the pollutants cool the water down infiltrate into the sub-surface Native landscape plants are often used in these stormwater features.

Landscape Approach and Concept Mix of Non-Native Plants. and Illinois Native Plants

Landscape Approach and Concept The landscape palette needed to blend in with this manicured neighborhood

Landscape Approach and Concept BE CAREFUL WITH THE LANDSCAPE! Native landscape plants look like weeds to most people

Landscape Approach and Concept Turf grass roots - 2 to 4 max Non-native shrubs - 1 to 3 max Native Plants - 3 to 12 +

Landscape Approach and Concept KEY ELEMENTS OF THE RAIN GARDENS AND BIO-SWALES SOIL MIXTURE 30% sand, 30% compost and 40% topsoil NATIVE PLANT MIX (low areas only) COMMON NAME BOTANICAL PERCENTAGE Nodding Wild Onion (Allium cernum) 25% Blue Flag Iris (Iris virginica) 25% Common Fox Sedge (Carex stipata) 25% Foxglove Beardtongue (Penstemon digitalis) 25%

During construction under drains are critical with poor sub-surface soils (i.e. clay).

Landscape plant palette was modified above large underground storage units.

Under construction.

Landscape Approach and Concept -The goal was to have a more clean look than all native plants that may appear weedy in a more urban environment. -Maintenance is key for long term success.

Public Coordination 2005 Drainage and Woodlands Improvement Task Force (DWIT) 2007 Woodlands-Highlands Drainage Study (Traditional Study) Questionnaires 217 residences (82 responses) 2009 Woodlands Green Initiatives for Stormwater Management Study Neighborhood Meeting (s) support for Green Initiative

Public Coordination 2011 - The Woodlands Phase 1 Design - May 2011 - Concept Plan Review w/ Arborist, Village Engineer, Village Manager, Public Works Director June 2011 Neighborhood Meeting Improvements Concept Plan Roadway Typical Section Rain Garden/Bio-swale Details Planting Species & Details Special Service Area

Public Coordination Summer 2011 Neighborhood Survey Proposed Concept Improvements Special Service Area (SSA) Winter 2011 - Project Concept/SSA Concurrence Feb. 2012 Neighborhood Meeting 60% Plans & Specifications Planting Plans & Details Summer 2012 Phase 1 Construction Field Stake Rain Gardens/Bio-swales Field Meetings - Individual Residences Field Adjustment of Design Elements

Recap Green Initiatives, a viable cost effective tool for stormwater management Potential 20% to 40% cost savings over traditional stormwater management Start public coordination early and make it an ongoing process during the design and implementation of your project Make your BMP details and specifications as clear as possible including effective erosion control management during construction

QUESTIONS? Contact Information: Ajay Jain, P.E., CFM Phone: (815) 509-8302 Email: ajain@hrgreen.com Scott Creech, P.E. Phone: (815) 320-7119 Email: screech@hrgreen.com Daniel Deeter, P.E. Village of Hinsdale Village Engineer Phone: (630) 333-6846 Email: ddeeter@villageofhinsdale.org