SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

EXTERIOR PLANTS

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION 605 PLANTING

Section 815. LANDSCAPING

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

DIVISION II PLANTING SECTION 02950

SECTION TREE TRANSPLANTING

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

SECTION TREES, SHRUBS AND GROUNDCOVERS

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program

SECTION LANDSCAPE

SECTION TREES, SHRUBS, AND GROUNDCOVER

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

Town of Fuquay-Varina

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

HALIFAX REGIONAL MUNICIPALITY

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

Construction Specification for Planting

2-B-18-UR. Revised: 3/27/2018

SIUE LANDSCAPE UPGRADE

Section 9 Landscaping and Street Trees

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

B. Finish Grade: Elevation of finished surface of planting soil.

SECTION LANDSCAPING

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

ACTIVITY: Trees, Shrubs and Vines ES 10

Guelph Humane Society Section PLANTING Page 1

SECTION LANDSCAPING

Selecting Quality Trees from the Nursery. Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida)

SECTION TREES, PLANTS AND GROUND COVERS

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

Success with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties

SECTION SODDING

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

City of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements.

SECTION LANDSCAPE ESTABLISHMENT

ANEW LANDSCAPE really

University of New Hampshire Scholars' Repository

OVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216.

Home Depot Page 1 of Humacao, Puerto Rico 03/19/10

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.

A. Surface parking areas shall be constructed of bituminous paving.

OVERALL LANDSCAPE PLAN

SECTION 900 TURF ESTABLISHMENT

SECTION TREES, PLANTS AND GROUNDCOVER. A. Preparation of subsoil, topsoil and planting soil mixture.

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging.

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball:

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

a. Section Irrigation b. Section Operation and Maintenance of Planting c. Section xx xx xx Trees

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

A. Contractor shall provide product data for each type of product indicated.

Planting Containerized Trees

Purposes and Uses of Hedges

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 700 LANDSCAPING 703 CONSTRUCTION STANDARDS AND METHODS


PART E SPECIFICATIONS

Punch-list Item Punch-list Photo Remedy for Signoff. Burlap and Wire Basket Visible (top 2/3 must be removed)

Revise A.5 Description to read: Supplying and Placing Base Course Material

45.2. MATERIALS Shrubs, Trees and Other Plants Planting Pit Mulch and Cover Grass Materials

F. Finish Grade: Elevation of finished surface of topsoil.

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Guidelines for planting within the 100 Ft. Buffer

The following general requirements will be met for all planter box installations:

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

SECTION 910 LANDSCAPING

SITE TOPSOIL & FINISH GRADING

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

I. DEFINITIONS For the purpose of this policy the following terms, phrases, words and their derivations shall have the meaning given herein.

SECTION FINE GRADING AND SOIL PREPARATION

WMU Tree Care Plan and Policies

2571 PLANT INSTALLATION AND ESTABLISHMENT

Where to plant your tree. Assessing the site. Choosing which tree species to plant. When to plant

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

TREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service

Orchard Establishment

DIVISION 32 EXTERIOR IMPROVEMENTS

SECTION SOIL PREPARATION

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 32 EXTERIOR IMPROVEMENTS

Cooperative Extension

LANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

REQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA

LAUREL STREET WATER TANK - LANDSCAPE RFP SECTION SECTION LANDSCAPING PLANTS

SECTION TURF AND GRASSES

Unit 4 Landscape Installation

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

Planting and Establishment

Transcription:

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of landscaping as shown on the plans for the pump station site and the site work for the pump station. This work shall include clearing and grubbing; earthwork; concrete driveway; sidewalk, and entrances; landscaping, grading and drainage pipe, topsoil, seeding, erosion and sediment control; water service installation, cleanup, and any other restoration work required due to construction activity. 40.02 MATERIALS: (Site work) See Applicable Divisions (Landscaping) A. Trees and Shrubs: Provide trees and shrubs grown in a recognized nursery in accordance with good horticultural practice. Provide healthy, vigorous stock grown under climatic conditions, similar to conditions in the locality of the project and free of disease, insects, eggs, larvae, and defects such as knots, sunscald, injuries, abrasions, or disfigurement. 1. Sizes: Provide trees and shrubs of the size shown or specified. Trees and shrubs of larger size may be used if acceptable to Engineer, and if sizes of roots or balls are increased proportionately. B. Mulch: Provide hardwood bark mulch in accordance with State Nursery Guidelines. Size of pine bark chips to be between 1/2" and 2' size. C. Inspection: The Engineer reserves the right to inspect trees and shrubs either at place of growth or at site before planting, for compliance with requirements for name, variety, size and quality. D. General: ship landscape materials with certificated of inspection as required by governmental authorities. Comply with governing regulations applicable to landscape materials. E. Do Not Make substitutions. If specified landscape material is not obtainable, submit to the Engineer proof of non-availability and proposal for use of equivalent material. When authorized, adjustment of contract amount will be made. 40-1

40.03 EXECUTION: (Site Work) A. Clearing and Grubbing: See Division 19 B. Earthwork: 1. Excavation and Backfill: Excavation shall conform to the lines and grades shown on the drawings and established by the Contractor. Excavation shall not be carried below the established grades and any excavation below the required level shall be backfilled, and tamped at the Contractor's expense unless directed by the Engineer. The Contractor shall do all sheeting, bracing, and shoring necessary to perform the work and protect workers and excavations as required to conform to all governing laws and ordinances and as directed by the engineer. All necessary dewatering and pumping shall be performed in such a manner as to keep the excavation in a satisfactory condition. The Contractor shall conduct his operations such as to provide adequate drainage of the construction area and adjacent areas affected by construction through temporary ditching, piping, or other means as may be appropriate. Drainage shall not be impeded by construction operations. 2. Backfilling shall be done with material free from large clods and foreign matter, and shall evenly and carefully be placed and tamped in a maximum of twelve (12) inch horizontal layers. Tamping shall be performed using suitable pneumatic compactors or an approved equal. Compaction equipment specifically designed for these purposes must be present and operational at the job site and shall be utilized to obtain uniform compaction. Where settlement is important and where excavation has been made through permanent pavements, curbs, and driveways, and sidewalks, or where structures are undercut by excavation, it shall be the Contractor's responsibility to provide compaction of the backfill material to ninety-five percent (95%) of its maximum density at plus or minus twenty percent (20%) of its optimum moisture. Surplus material shall be disposed of by the Contractor in accordance with all Federal, State, and local laws and regulations. 3. Compaction Tests: The City or its authorized representative reserves the right to perform compaction tests on any or all portion(s) of backfill placed in the trench at no costs to the Contractor. However, in the event the compaction of this backfill is not in compliance with the specification, Section 10.03. B, then the Contractor shall take corrective measures at no 40-2

costs to the City to bring the backfill within the limits of the Specifications, Section 10.03.B. The Contractor shall then be responsible for reimbursing the City all costs associated with the performance of compacting test(s) in those sections of the backfill that failed the compaction test(s). However if the tests should indicate compaction within the required limits, the City will then be responsible for said costs. 4. Should it be determined that removal of sheeting in excavated areas might endanger adjacent properties or structures, the Engineer may direct that the sheeting be left in place. In such instances, sheeting will be cut off one (1) foot below grade and left in place. Backfilling will be performed in accordance with appropriate sections of this specification. C. Pipe Work: Pump station contractor shall terminate the pump station pipe work 3' outside the building wall, after sheet pile removal, connection to the gravity sewer, forcemain, and the emergency pump connection will be completed by the pipeline contractor. D. Concrete Driveway, Sidewalk, and Entrances: See Division 22. E. Drainage Pipe: See Division 10. F. Erosion and Sediment Control: See Division 23. G. Topsoil, Seeding and Grading: All unpaved, and disturbed areas due to the contractor's activities shall be graded, topsoiled, seeded, and restored. Grading shall be done in accordance with the proposed grades shown on the plan. Topsoil, seeding and restoration work shall be done in accordance to Division 20. H. Water Service Installation: 1. Materials: Shall conform to Division 33 for service pipe, corporation stops, angle valve, meter box and service saddle. a. Dual Check Valves: Dual check valves shall be watts No. 7. b. Hose Bib: 1) Hose bib vacuum breaker shall be Watts No. 8 or 8A or approved equal. 2) Hose bib shall be Crane #438 valve or approved equal with male hose threads for 3/4" hose connection. 40-3

2. Installation: a. The installation of water service connections shall be in accordance with the detail shown in City Standard PFM Vol. II. b. Meter boxes shall be placed at the end of each service line with their tops set at finished grade. c. Service lines shall have a minimum of 24" to a maximum of 36" cover from the top of the tubing to finished grade. The top of the angle curb stop/valve shall be set at an elevation 12" below finished grade. I. Cleanup and Restoration Work: Provide cleanup and restoration work in accordance to the General Conditions, Supplemental Conditions, and these technical specifications. (Landscaping) A. Trees and Shrubs: Provide freshly dug trees and shrubs. Do not use trees or shrubs which have been heeled-in. Do not prune prior to delivery. Do not bend or bind-tie trees or shrubs in such manner as to damage bark, break branches or destroy natural shape. Provide protective covering during delivery. B. Deliver trees and shrubs after preparations for planting have been completed and plant immediately. If planting is delayed more than 6 hours after delivery, set trees and shrubs in shade, protect from weather and mechanical damage, and keep roots moist. C. Do not remove container-grown stock from containers until planting time. D. Layout individual tree and shrub locations, and areas for multiple plantings. Stake locations and outline areas and secure Engineer's acceptance before start of planting work. Make minor adjustments as may be requested. E. Utilities: Determine location of underground utilities and perform working manner which will avoid possible damage. Hand excavate, as required, to minimize possibility of damage to underground utilities. Maintain grade stakes set by others until removal is mutually agreed upon by all parties concerned. F. Excavate pits, beds and trenches with vertical sides and with bottom of excavation slightly raised at center to provide proper drainage. Loosen hard soil in bottom of excavation. 1. For bare root trees and shrubs, make excavations at least 1' - 0" wider than root spread and deep enough to allow for seeding of roots on a layer of 40-4

compacted backfill and with collar set at same grade as in nursery, but 2" below finished grade at site. Allow for 9" setting layer of planting soil mixture. 2. For balled and burlapped (B&B) trees and shrubs, make excavations at least twice as wide as the ball diameter and equal to the ball depth, plus the following allowance for setting of ball on a layer of compacted backfill: Allow for 3" setting layer of planting soil mixture. 3. For container grown stock, excavate as specified for balled and burlapped stock, adjusted to size of container width and depth. Dispose of subsoil removed from landscape excavations. Do not mix with planting soil or use as backfill. Fill excavations for trees and shrubs with water and allow to percolate out before planting. G. Set balled and burlapped (B&B) stock on layer of compacted planting soil mixture, plumb and in center of pit or trench with top of ball at same elevation as adjacent finished landscape grades. When set, place additional backfill around base and eliminate voids and air pockets. When excavation is approximately 2/3 full, water thoroughly before placing remainder of backfill. Repeat watering until no more is absorbed. Water again after placing final layer of backfill. Remove burlap from sides of balls; retain on bottoms. H. Set bare rootstock on cushion of planting soil mixture. Spread roots and carefully work backfill around roots by hand and puddle with water until backfill layers are completely saturated. Plumb before backfilling and maintain plumb while working backfill around roots and placing layers above roots. Set collar 1 to 2 below adjacent finish landscape grades- Spread Cut roots without tangling or turning up to surface. Cut injured roots clean, do not break. I. Set container grown stock as specified for balled and burlapped stock, except cut cans on 2 sides with an approved can cutter; remove bottoms of wooden boxes after partial backfilling so not to damage root balls. J. Mulch pits, trenches and planted areas. Provide not less than 3 inch thickness of mulch and work into top of backfill and finish level with adjacent grades. K. Prune, thin out and shape trees and shrubs in accordance with standard horticultural practice. Prune trees to retain required height and spread. Unless otherwise directed by the Engineer, do not cut tree leaders, and remove only 40-5

injured or dead branches from flowering trees, if any. Prune shrubs to retain natural character and accomplish their use in the landscape design. Required shrub sizes are the size after pruning. 40.04 MEASUREMENT AND PAYMENT: Pump Station site work will not be measured but included in the lump sum bid price for the pumping station. 40-6