Soil Bioengineering-An Erosion Prevention Technique Applicable to Low-Volume Roads

Similar documents
SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

USING PLANTS TO STABILIZE STREAM BANKS

Bio-Engineering Techniques to Revegetate Streambanks

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

Biotechnical streambank stabilization

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

Coir Block System (fabric attached coir block) add New Dimension to Streambank Stabilization Projects

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

STREAM ALTERATION PRACTICES

Stream Bank Erosion: Soil Bioengineering Solutions

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

Section 815. LANDSCAPING

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

V. EROSION CONTROL. -Drainage swales separation -Under rip-rap protected -Under rip-rap unprotected

DIVISION II PLANTING SECTION 02950

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

900 Roadside Improvement

Breakthrough Innovations

Streambank Protection (SP)

Planting Trees & Shrubs. Choosing Trees and Shrubs. Tree Quotes

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball:

HOW TO CONTROL STREAMBANK EROSION

ANEW LANDSCAPE really

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Section Specification for Geotextile Used in Permanent Erosion Control Application

Planting Trees & Shrubs. and Shrubs Study Guide

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

Rolled Erosion Control Products (RECPs) General Usage and Installation Guidelines for Slope

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ITEM 164 SEEDING AND EROSION CONTROL BLANKET

III.DRAINAGE. This section describes the use of geotextiles in underdrains for two different field conditions:

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

RevETMax TM INSTALLATION GUIDE

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

SECTION 900 TURF ESTABLISHMENT

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

B511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

SHOREMAX FLEXIBLE TRANSITION MAT INSTALLATION GUIDE

SECTION 6. Routine Maintenance Activity Details

Vegetating Disturbed Road & Stream Banks. By Mike Fournier NRCS Resource Conservationist

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

CHAPTER 5. Soil Bioengineering Techniques

The following general requirements will be met for all planter box installations:

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

Guidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

Protecting Existing Landscape Trees from Construction Damage Due to Grade Changes

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

ACTIVITY: Trees, Shrubs and Vines ES 10

Soil bioengineering and ecological

INSTALLATION TIPS. Site Preparation

A. Contractor shall provide product data for each type of product indicated.

Original Contract Amount $ 754, Change Order #1 $ 129, New Contract Amount $ 883, New Contract, Compared to Original 117.

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

FURNEAUX CREEK 5 CHANNEL

HYDRAULIC DESIGN involves several basic

Section 9 Landscaping and Street Trees

Bioengineered designs

SITE PREPARATION GRADING

PRINCIPLES OF PRUNING AND TRAINING G. A. Cahoon and R. G. Hill, Jr Department of Horticulture Ohio Agricultural Research and Development Center

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

SECTION TREE TRANSPLANTING

HALIFAX REGIONAL MUNICIPALITY

Grafting and Budding Nursery Crop Plants AG-396. Grafting

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

EXTERIOR PLANTS

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

DITCH BANK STABILIZATION TECHNIQUES

Installation & WillowCreekPavingStones.com POWER TOOLS YOU MAY NEED TO RENT PROJECT COMPONENTS. Willow Creek pavers Aggregate base material

Subsurface Infiltration Bed

5.0 Storm Water Landscape Guidance Introduction

Orchard Establishment

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Turfgrass Sod General

6.0 Soil Bioengineering for Slope Stability

Section Seeding

PROPER PLANTING & MAINTENANCE METHODS

Guidelines for Streambank Protection

A16 Building a garden path

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

SECTION TREES, SHRUBS AND GROUNDCOVERS

SECTION SODDING

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Property. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing

SECTION LANDSCAPING

KEEPING PLANTS HEALTHY

cc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design P. Sanders FROM: Bart Asher, P.E. V.

Technical Supplement 14D. Geosynthetics in Stream Restoration. (210 VI NEH, August 2007)

Town of Weston Guardrail Overview Report

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

Pan-African Soybean Variety Trial Protocol Training. I

EROSION & SEDIMENT CONTROL

Transcription:

TRANSPORTATION RESEARCH RECORD 1291 Soil Bioengineering-An Erosion Prevention Technique Applicable to Low-Volume Roads LEONARD M. DARBY Soil bioengineering is one of several new and innovative engineering practices being used on the FHW A Cumberland Gap tunnel project to prevent erosion and provide permanent stream bank protection. Four installations of soil bioengineering, using primarily sandbar and black willow cuttings, were constructed to provide stable and aesthetic creek bank protection and stream redirection for Little Yellow Creek in the Cumberland Gap National Historical Park. These four installations included a live boom (stream redirection), a brush mattress, live stakes, and joint planting. During the first 6 months, the dormant, primarily willow stems and trunks in all four installations sprouted new branches, leaves, and extensive roots that retained the soil and protected the banks in an effective and aesthetic manner. Over the next 2 years, the plant material weathered an officially recorded drought, insect attack, extreme heat and cold, and moderate flooding. Throughout these attacks, the plants showed remarkable resiliency and continued to expand vertically and horizontally both above and below the ground surface. After 3 years of growth, healthy plants up to 6 ft tall are maintaining aesthetic stream bank protection and their root system has stabilized the soil that makes up the stream bank slopes. The Cumberland Gap tunnel project consists of twin, 4,6- ft-long, two-lane highway tunnels and portal buildings, eight roadway and two pedestrian bridges, 5 mi of four-lane divided highway, 3 mi of local two-lane and park roads, along with several miles of low-volume access roads and pedestrian walkways, including parking areas. The design and construction management is being done by the Eastern Federal Lands Highway Division (EFLHD) of FHWA headquartered in Sterling, Virginia, through their Cumberland Gap project office located in Middlesboro, Kentucky. The total project price tag is approaching $25 million and the work is broken down into about 25 separate contracts. The most current design and construction techniques and innovative engineering practices are being incorporated into the project by the EFLHD where the FHW A Demonstration Projects Division originated back in 1968. The project work is entirely in the Cumberland Gap National Historical Park, dictating maximum erosion control and pollution prevention compliance. The project includes a combination of complex high-volume road installations and basic low-volume road installations. All of the work has some, if not significant, application to low-volume roads, especially in the erosion prevention and stream bank protection area. FHWA, Eastern Federal Lands Highway Division. P.O. Box 15, Harrogate, Tenn. 37752. Low-volume roads will be considered to be those that generally have the following cost-effective design and construction characteristics Maximum use of readily available and easily obtainable material, Can be built using conventional construction equipment. and Maximum constructibility with simple designs. Soil bioengineering is a new and innovative erosion prevention technique successfully used in the construction of the Cumberland Gap tunnel project that meets the cost-effective low-volume road design and construction criteria. Its specific use was stream bank protection and stabilization to prevent bank erosion. Conventional stream bank protection and stabilization has generally been to heavily reinforce the stream banks with moderate to heavy, 1- to 3-lb maximum size. compact riprap. This usually tedious operation requires many pieces of equipment to haul and place large quantities of quarry rock in unstable marshy areas adjacent to creeks. It is often an expensive operation because of the length that suitable riprap rock may have to be hauled and the cost of developing and maintaining a stable access road. Once completed, the riprap protection is usually as strong as it ever will be because the soil beneath the riprap only generates scrub brush with little to no reinforcing root system. A decision to proceed with four soil bioengineering installations was made by EFLHD in concurrence with the National Park Service after a series of studies, meetings, and assurances by the soil bioengineering consultants. The innovative technology and environmental aspects of soil bioengineering seemed best suited to fulfill the requirements for aesthetic, permanent stream bank protection along Yellow Creek in the Cumberland Gap National Historical Park near Middlesboro, Kentucky. The four soil bioengineering units were installed on a newly constructed stream bank along Yellow Creek by prime contractor Meleo-Greer, Inc., under CGNHP Project 25E7 during the winter of 1987. Two of these depended entirely on soil bioengineering for stream bank protection and stabilization. The third involved a combination of soil bioengineering and riprap to produce a combination system. The fourth was a special structure that redirected the stream and protected the redirected structure. It also used a combination riprap and soil bioengineering system. All four units were less than 1 ft long and used various lengths of willow branches

18 TRAl\'SPORTA TION RESEARCH RECORD 119/ and trunks or a minimum Class 2 ( 1-lb-size) riprap. The 5-year design flow along Little Yellow Creek is 2.1 ft'/sec. Placed in layers in a mattress-like fashion along newly graded banks adjacent to Yellow Creek. a soil bioengineering unit comprised primarily of lengthy dormant willow branches and trunks termed a "brush mattress was constructed as shown in Figure 1. Its purpose was to quickly provide vegetation capable of retaining critical soil along the bank on the west side of the creek. Once growth is established. the extensive network of willow roots should provide a soil retention cohesiveness that is both natural and Jiving. growing stronger with each year's growth. potentially retaining more and more soil. Advocates maintain that the brush mattress' continued growth ensures future soil retention qualities. in contrast to riprap. the other consistently used creek bank protection technique. which may be undermined as years pass. The second unit incorporating soil bioengineering was a mound structure. termed a "live boom: and designated and constructed to redirect water flow away from vulnerable creek bank areas. as shown in Figure 2. The live boom is constructed from below the stream bed rising through the water and protruding several feet above the water, to a height capable of ensuring maximum water deflection to protect adjacent critical creek banks. This soil bioengineering unit was a timeintensive endeavor. Like most soil bioengineering units. it must be performed while the plants are dormant. usually after the first frost in the fall and before the sap rises in the spring. A third unit of soil bioengineering constructed was termed a "live stake." A live stake is a dormant willow stake driven randomly on about 18- to 24-in. centers throughout the area designated to be live-staked. The live stake is about 2 ft long and '12 to l '12 in. in diameter. The cut or basal end of the onowihq PLMiT fmtenlj\l ( HOT Pfl SENT IHITll\ll Y ) LIVE ANO DEAD HAKES LIVE FASCINE SECTION A - A > LIVE BRUSH WIRE LIVE FASCINE > PLAN VIEW FIGURE I Brush mattress.

Darb_1 I~! MAJOR FLOW NOTE: SEE FIGURE 6 FOR LIVE FASCINE CONSTRUCTION LIVE FASCINES RIPRAP ROCK LIVE STl\KES (JOINT PLANTING) LIVE FASCINES FILL RIP RAP ROCK EXISTING BED GRADE. SECTION A - A FIGURE 2 Live-boom construction. stake, normally the rooted end, is driven into the ground, and if properly installed, will tie the bank soil together through an extensive network of below-ground-level roots and a prolific growth of above-ground-level leaves and branches as shown in Figure 3. The fourth unit of soil bioengineering constructed is termed "joint planting." Joint planting is basically the placement of live stakes that are driven through a riprap layer to tie the underlying earth bank, surface riprap layer, and plants together in a living protective network as shown in Figure 4. MATERIALS, EQUIPMENT, HANDLING, AND STORAGE Materials used consisted of several rolls of hay baler twine; wire, similar to rebar tie wire used in concrete; hundreds of 2-ft x 2-in. x 4-in. diagonal wooden stout stakes (see Figure 5); hundreds of 2-ft live stakes consisting of 2-ft lengths of dormant willows 1 /2 to 1 V2 in.; and 6- to 9-ft lengths of live, but dormant, primarily willow trunks and branches V2 to 1 1 /2 in. in diameter for making live fascine bundles and constructing brush mattresses. Ninety percent of the plants were sandbar or black willows. The remaining 1 percent were swamp poplar, common alder, and swamp dogwoods. Equipment used consisted of the following: 2-ton, mediumduty, C6 Chevrolet flatbed truck; Caterpillar 235 trackmounted hydraulic excavator; three chain saws; five loping shears; three 3-lb impact-absorbing hammers; several sledgehammers; and 1 Homelite 3-in. water pump. Two handling techniques, cutting and transportation, were used. Live but dormant plant material is cut and handled with care to avoid bark stripping and trunk wood splitting. Cuts are made 8 to 1 in. from the ground when cutting from the approved, natural growing, source sites. Cuts shall be made flat or at a blunt angle to ensure that the source sites will

FIGURE 3 Live-stake construction. (} LIVE STAKE ELEVATION c. LIVE STAKES EXISTING RIPRAP FIGURE 4 Joint planting. PLAN VIEW

Darby,_/ -</ 1... 2 x 4 SAWN 2 X 4 TIMBER TIMBER (PRODUCES 2 STOUT STAKES) FIGURE 5 Stout stakes. regenerate rapidly. During transportation. the live but dormant cut branch groups are placed on the transport vehicles in an orderly fashion to prevent damage and facilitate handling. The live but dormant cut plant materials shall be covered with a tarp or burlap material during transportation. Plants not installed on the day of arrival at the job site shall be stored and protected. Outside storage locations shall be continually shaded and protected from the wind. Live but dormant cut-plant material shall be heeled-in in moist soils, or kept in water. Live but dormant cut materials shall be protected from drying at all times. When the temperature is 5 F or above, the live-cut branches shall not be stored but shall be planted on day of arrival. However, when the livecut branches have been prepared in fabricated building lengths, such as for live-stake planting or similar uses, they shall be used that day. This prepared material may not be stored. BRUSH MATTRESS CONSTRUCTION During the stream channel construction, banks on the west side of Yellow Creek were realigned using 6-in. minus silty sand borrow material meeting AASHTO soil classification A-4 requirements, and were finished at a 2:1 slope. Except for areas reserved for brush mattress and live stakes, the slopes received a covering of polypropylene support (filter) fabric over which was applied a 2-ft layer of Class 2 (1-lb nominal size) limestone riprap near the outlet of a triple 1- x 1-ft reinforced concrete box culvert. Before installation of the brush mattress, the slope receiving the brush mattress was raked and fertilized. Also. two trenches, approximately 8 ft apart and parallel to the stream, were dug to a depth of about I ft. Willow branch and trunk material called "live brush" were laid flat against the ground with the large cut (basal) end of the willow brush material pointing toward the creek with the smaller end pointing up the slope. The live brush material, spread evenly along the slope. was then wired to wood stakes driven on 2-ft centers to form a brush mattress. Wire was then interwoven in a zig-zag fashion and capable of holding the brush mattress closer to the ground. Sledge hammers were used for tamping the stout (nonliving) stakes deeper into the ground to ensure greater soil contact with the brush mattress and increasing the potential for quick willow growth. Two long-life fascines, 6-in. diameter x 1-ft-long bundles, were dropped into the two previously dug trenches as shown in Figure 6. These bundles cover the cut ends of the willows along the bottom of the slope and along the middle of the slope, if two lengths of willows are used. Afterward, this material was completely covered with topsoil, permitting a thin layer of exposure to facilitate the sun's ability to bring forth the willow growth. Small branch nodules from the cut willows lying against the soil become roots while branches facing the sun become stems. Good soil contact must exist to initiate and maintain growth. In fact, good soil contact must be maintained before completion of the brush mattress in accordance with the contract requirements. This is accomplished by uniformly tamping the topsoil, without damaging willows, to fill all voids and air pockets. LIVE-BOOM CONSTRUCTION The second phase of the soil bioengineering work encompassed the use of another living structure known as a "live

184.. TRANSPORT A TIO! > RESEARCH RECORlJ 1291. / - ~, ~ LIVE BRANCHES STAKE LIVE STAKE c c () : \_ EXISTINO BANK 1 SECTION LIVE BRANCHES WIRE OR TWINE FIGURE 6 Live fascine bundle. J i boom," shown in Figure 2, to effect stream redirection. The live boom begins as an area excavated within the stream bed and ends as a mound-like, triangular-shaped structure constructed of multiple layers of live but dormant willow material, termed "live fascines," similar to the ones used in the brush mattress. Each successive layer was covered with 6 in. of topsoil. However, that area below the creek was constructed using alternating layers of 6-in. maximum crusher run stone instead of soil, because the living material below the creek is not expected to grow, but merely deteriorate, providing additional plant food for living rooted material above. The bullet-shaped live boom was constructed as an integral part of the surrounding creek bank in order to provide support to the live boom. The bullet-shaped structure was completed by driving live stakes in close proximity, on 1- to 2-ft centers, throughout the length of the live boom. Hand-placed riprap was used to armor the live boom to protect it from erosion until the willow population became established. Live stake and live fascine root growth will combine to create the live boom's soil erosion qualities. When heavy rains cause the creek to rise, the currents are deflected by the live boom while preventing erosion of critical creek bank areas. When it is not working to control the adverse effects of heavy stream flow and redirecting the stream, the live boom performs as an aesthetically pleasing ecological biome that becomes an integral part of its environment. LIVE-STAKE CONSTRUCTION An integral part of soil bioengineering is the use of cut primarily willow trunks and branches approximately 1/2 to 11/2 in. in diameter and 2 ft long. These willow trunks are termed "live stakes." While still live but dormant, they are driven perpendicularly into the ground being live-staked. Live stakes are trimmed with an angled cut at the bottom or normally rooted end of the stake. The top of the stake is flat as a result of harvesting. Hence, the flat portion of the stake is tamped with an impact-absorbing hammer driving the stake deeply into the soil, exposing about 5 in. of the top portion of the stake. This unit was only used sparingly along the top portion of the creek bank to tie the brush mattress and joint planting units into the existing terrain. If properly installed, when spring budding occurs and the sap is on the rise, the live stakes will grow into an extensive network of roots and branches. Because the live stakes are installed on about 18- to 24-in. centers throughout, growth should provide an aesthetically pleasing ground cover, as well as an interlocking network of roots. JOINT PLANTING CONSTRUCTION Joint planting is basically live staking, which is used in riprapped areas. This application is almost identical to live staking because

Darby 11'5 it uses willows of the same diameter as live staking ( V> to l 'h in.) with the length being increased by approximately the thickness of riprap. Also an iron rod with a diameter slightly smaller than the willow stake can be used to drive a pilot hole to be filled with a joint plant. COST The single live boom contract lump sum bid price was $2.. However. the contractor maintains that being unfamiliar with labor-intensive soil bioengineering techniques and installation procedures. he used an unexpectedly large number of manhours, which resulted in a huge (factor of 1 +)cost and time overrun in the construction of the single live boom. It took several weeks to construct rather than the several days the contractor had estimated. Approximately 4 yd 2 of brush mattress was constructed in a single day's time after the harvest of the willows requiring less time and manpower than expected. The contractor reported that the brush mattress cost less than the $2./yd 2 unit bid price that was based on an estimated quantity of 6 yd 2 However. on subsequently bid CGNHP Project 25E9. the average of seven contractor unit bid prices was $25. l 9/yd 2. The joint planting was constructed at 2-ft centers throughout the riprap area. The contractor received his unit bid price of $15. for each of the approximately 3,5 joint stakes planted. The contractor readily admitted that this endeavor cost much less than the $15. each. unit bid price, that was based on an estimated quantity of 2.5. Approximately 1 joint plants were installed each single shift day. Subsequent CUGA Project 25E9 bid prices from seven contractors averaged $7.85 each, based on an estimated quantity of 1.7. Live (dormant) stakes driven into designated areas along the top of the creek bank (not between riprap) were paid for at the unit bid price of $1. each. whereas their furnishing and placement cost much less. Live stakes and joint stakes are nearly identical. the only difference being that th.: live stakes are directly installed into the ground. whereas the joint plantings are installed into the ground through riprap layers. Approximately 1 live stakes were instalkd each singk-shift day. Subsequent CUGA Project 25E9 unit bid prices from seven contractors averaged $6.88 each for the estimated quantity of 6.5. CONCLUSION In the Cumberland Gap National Historical Park. four installations of soil bioengineering using primarily willow cuttings were utilized to provide stable and aesthetic creek bank protection and stream redirection. These four included a live boom (stream redirection). a brush mattress. live stakes. and joint planting. During the first 6 months. the dormant (primarily) willows in all four installations vigorously grew from a dormant state to a flourishing vegetative system beginning to retain the soil and to protect the banks in an effective and aesthetic manner. Root systems were found to exceed the surface trunk and branch system. Over the next 2 years. the plants weathered an officially recorded drought, insect attack. extreme heat and cold. and recent high water. Throughout these attacks, the plant materials showed remarkable resiliency and continued to expand vertically and horizontally both above and below the ground surface. After 3 years of growth. healthy plant materials up to 6 ft tall are maintaining aesthetic stream bank protection while the root system has stabilized the soil that makes up the stream bank slopes.