21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

DIVISION 23 - HVAC HVAC

Austin Independent School District Police Department Policy and Procedure Manual

Building Coordinator Training

Muskogee Public Schools. Lockout/Tagout. Program

SUBJECT: Effective Date: Procedure Number:

SECTION ELECTRICAL SYSTEMS COMMISSIONING

KELTRON LS 7000 ALARM MANAGEMENT SYSTEM Keltron Alarm Monitoring, Dispatch, and Reporting Software

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

FIRE IMPAIRMENT NOTICE

Currently, all electrical upgrades would be voluntary, but there are situations in which upgrades would be required.

PRINTED: 06/09/2017 FORM APPROVED CENTERS FOR MEDICARE & MEDICAID SERVICES OMB NO (X2) MULTIPLE CONSTRUCTION A. BUILDING 03 - A BUILDING

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Demonstration and Training of MEP Systems Page 1 of 15

Project Description Clinical Research Building (CRB) Animal Area Renovation

NORTH BAY PARRY SOUND HEALTH

Old Jail HVAC Replacement Feasibility Report

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Maintenance Road Show

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

Emergency Support Function #2 Communication

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

Fire Drill Procedure

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

4. OVERVIEW OF MECHANICAL SYSTEM

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

Virginia Tech Standards for Building Automation System

Advantage Services Capabilities

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

Appendix B. Facilities Assessment Report

F&S Control of Hazardous Energy Program

SECTION SECURITY TESTING AND COMMISSIONING

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

EMERGENCY PREPAREDNESS: EVACUATIONS

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

Fire System Impairment Policy

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Programmatic Policy and Procedure

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

What does it take to maintain a campus? What are the costs? UNIVERSITY OF ALASKA FAIRBANKS

Section 9 THE GUIDELINES FOR DEVELOPING AN EVACUATION PLAN FOR INDIVIDUALS WITH DISABILITIES. Shelton School District Emergency Response Plan

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

EMERGENCY LOCK DOWN PROCEDURE

INTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES


Summary of 60-Day Notice: Heating Efficiency

CENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

FAIR LABOR ASSOCIATION INDEPENDENT EXTERNAL MONITORING REPORT

16620 EMERGENCY POWER SYSTEMS

APPENDIX H (DESIGN SUBMISSION CRITERIA)

University of Houston Master Construction Specifications Insert Project Name

ELEVATOR RESCUE PROCEDURE

North West Regional Center SITE EMERGENCY RESPONSE PLAN

HEOA Institutional Disclosure Requirements Emergency Response and Evacuation Procedures

Electrical Program. Electrical Laws & Rules. Electrical RCW WAC B. Permits Inspections Access Description Directions Comments.

Building Operations. Associate Director: Lou Galante;

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

TABLE OF CONTENTS: Building Executive Definition..3. Building Executives Areas of Responsibilities...4. Operational Issues..5

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

DUKE UNIVERSITY DESIGN GUIDELINES

Department of School Safety and Security MONTGOMERY COUNTY PUBLIC SCHOOLS Rockville, Maryland

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

Architectural and Engineering Specification for a Real-Time Locating System Flare

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Iowa State Fire Marshal

MODEL AC-SCC-5 INSTALLATION, OPERATION & MAINTENANCE MANUAL

Computing Services Center

MCPS School Safety and Security Presentation at Damascus High School

LINDENWOOD UNIVERSITY BASIC EMERGENCY ACTION PLANS

Challenges and Methods of Estimating a Conceptual HVAC Design

SECTION FIRE DETECTION AND ALARM

SECTION ENCLOSED CONTROLLERS

DIGITAL SCREENS PROJECT CONSULTATION. Enhancing Communication through Digital Screen Technology

Loudoun County Public Schools Continuity of Operations Plan (COOP) Facilities Assessment Study Related to Critical Systems

Electrical Safety Program

SECTION INTEGRATED AUTOMATION COMMISSIONING

Emergency Evacuation Lighting Inspection & Maintenance

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

THAT Council receive for information the March 16, 2015 report titled Westminster Substation Outage Plans.

Keys to an Effective School Lockdown

RFP P College-wide HVAC Service and Maintenance

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

LASER SAFETY TRAINING CATALOG LASER INSTITUTE OF AMERICA S MAKE LASER SAFETY YOUR PRIORITY LASER

Transcription:

U N I V E R S I T Y O F HOUSTON Facilities Management Planned and Emergency Utility Outage Policy Presentation

Agenda Purpose What do we want to do? Summary of Planned Outage Procedure Summary of Project Related Planned Outage Procedure. Who takes action University representatives Project related planned outage. Emergency Restoration Procedure. Contact list

Purpose What do we want to do? Define roles and responsibilities in requesting, coordinating, scheduling and executing Planned utility outages Restoration procedures for emergency outages,

Summary of Planned Outage Process Evaluate Coordinate Request Schedule Execute & Communicate 4

Project related Planned Outage Process Evaluate Coordinate Request Schedule Execute & Communicate

Who takes action Process Evaluate Outage Coordinate Outage Request Outage Schedule Outage Execute and communicate Outage Who takes Action University Personnel who deems the outage necessary should review the policy to ensure the outage is not identified as an exception University representative for the party performing the work and Utilities supervisor University representative University Representative and Utilities supervisor Utilities supervisor and Communications Coordinator (when applicable) 6

University representatives Facilities Management Department Facilities Operations & Maintenance including Technical Services, Zone Maintenance and Central Plants and Mechanical Supervisors and other Utilities Administrators Facilities Planning and Construction Project Managers and Construction Administrators Building Coordinators and Administrators

Planned Evaluate -UH Rep/ PM Outage of water, heat, electricity or HVAC that will affect building systems. Planned Planned major repair work Emergency - Immediate repairs to safeguard property and health. Exception to the policy Outage to a point of service device that will result in loss of service to only specific equipment and where the party affected by the operation of the device is informed of the outage, duration and effects. 8

Planned Coordinate Uh rep/pm with Utility services and Building r University representative - complete the outage request form and contact appropriate Utilities Supervisor to discuss the outage, Impacts Preferred Scheduling Outage Duration Contingency plans to minimize disruption and protect the building system. Contact information for the designated person and their availability during outage. Work may not proceed without the approval of the Utilities Supervisor for the outage and its associated details. 9

Planned Request Uh rep/pm Prepare the appropriate notifications and submit to the Utilities Supervisor for final approval and publication. Use the standard template form (Attachment- 4 of policy). 10

Planned Schedule Uh rep/pm Coordinate with the building manager /coordinator or department representatives in an attempt to minimize impacts. Provide 120 hour (five business days) notice to facility users and key service providers using the Utilities Department Scheduled Outage Notification Procedure Ensure through notification acknowledgement from the affected parties, that the building coordinator, business manager or representatives to be affected by a scheduled outage have been contacted directly and are aware of the impending outage. 11

Planned Execute and Communicate Outage notifications shall be issued 120 hours (5 business days) prior to the scheduled outage to all persons identified by the Utilities Outage Notification Procedure and the building managers and representatives of the buildings to be affected. When outages have widespread impact an additional correspondence will be sent to the campus community by the Communications Coordinator. This does not apply to cases of emergency or imminent failure 12

Planned Execute and Communicate Outage notifications will be distributed through various outlets depending on the level of impact. UHPD and campus IT will be copied on all outages. Sample outlets and means of communication will include: UH Building Contact or Representative Faculty/Staff Listserv Department Business Administrators Listserv Student Listserv Administration & Finance Website Plant Operations Website PIER System (as applicable) 13

Planned Planed & Emergency Outage Notification form Plant Operations Website found here. 14

Emergency Outage Emergency outages are the type of repairs that must be accomplished immediately to safeguard property and health. RESPONSIBLE PARTY handling an emergency outage shall call the Facilities Service Center (FSC) at 3-4948 if outage occurs during normal working hours and the Central Plant operator (3-5791) if outage occurs during non-working hours. The Central Plant operator or the FSC representative will contact the appropriate people at that time.

Restoration of Service Services would be restored in the general priority below: 1. Building Life Safety 2. Research Buildings 3. Residential Life and Hilton Hotel 4. Auxiliary Areas 5. Classrooms and Offices After restoration of services, technicians representing each technical area will survey the affected buildings/areas ensure all systems in their respective areas are operational equipment set in their normal operating positions.

Fire alarm Fire alarm technicians All fire alarm panels are on battery backup. outage is less than 48 hours and there are no fire alarm events, all the systems will continue to stay online. extended outage scenario, fire alarm batteries will start recharging after power is Restored. After Power Restoration - Fire alarm technicians will log on to their True Site workstation confirm working of the campus fire alarm system. Buildings with a failed fire alarm be addressed

HVAC and Controls Lead mechanical technician, Controls technician Lead mechanical technician will Confirm all equipment and systems that were locked down and tagged out during the outage are ready for start up. (chillers, boilers, airhandlers, pumps, exhaust fans, fume hoods, and domestic water system, etc) Bring these systems on-line to pre-event operating Conditions. Controls technician will Start the equipment and building checkups via controls workstation interface (onsite or remotely). For buildings without direct digital control (DDC) systems, the controls technician will physically visit each area of the building and confirm the operations of heating, ventilation and cooling systems.

Elevators Elev. Technicians Prior to the outage all building elevators would be brought to the lower level and locked in place to prevent entrapments Technicians in elevator shop will confirm operations of elevators in affected buildings, after the outage event.

Electrical High voltage Electricians High voltage (12.47kV and greater) system outages prior to deenergizing feeders, electricians will take the amperage readings on primary and secondary campus feeders de-energize the electrical feeders involved in the outage and rack out breakers and ground when necessary After work is completed, steps above will be followed in a reverse order prior to re-energizing the feeders and feeder readings compared to pre-event readings to confirm all systems are back in operation. Critical systems like domestic pumps, chillers, pumps, air handlers will be physical checked.

Electrical Building voltage systems Electricians Prior to any repairs electricians will de-energize the building 480V main switch lock out and tag out Post outage event, the electricians will confirm the electrical systems are ready to be put back in. remove the locks and tag. re-energize the system. Critical building systems will be physically checked by the electricians in the affected buildings.

Plumbing Plumbers After the services are restored, Facilities Management plumbers will walk the affected buildings to confirm all the fixtures and systems are operational and set back to the normal operating conditions

KEY POINT-Project related Planned Outage Process Evaluate Coordinate Request Schedule Execute & Communicate

Contact list Function Lighting, electrical power, emergency generator and elevators Contact Manager - Avinash Rahurkar (3-2749) Supervisor Karl Keilbach (3-5606) (ELEC.) Supervisor Mike Aguilar (3-5605) (ELEV) Fire Alarms Supervisor Art Hajecate (3-5762) Energy Management Controls, Heating Ventilation and Air Conditioning and mechanical systems Central Plant Operations including chilled water, steam, and utility infrastructure Manager Michael Burriello (3-4562) Supervisor Jesse Gonzalez (3-5798) Supervisor Paul Robinson (3-5680) Project Manager/Advisor Jack Gill (3-5457) All other questions or areas not identified above Director Facilities Ops & Maintenance Sameer Kapileshwari (3-5797) 24