St. Clair Avenue West Area Transportation Master Plan

Similar documents
WELCOME TO OPEN HOUSE TWO November 28, 2018

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Mavis Road Class Environmental Assessment

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

WELCOME TO OPEN HOUSE # 3

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

City of Toronto. Emery Village Transportation Master Plan

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #1 SEPTEMBER 28, 2016

TORONTO COMPLETE STREETS GUIDELINES

Public Information Centre #1

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Elfrida Growth Area Study

Portage Parkway Environmental Assessment Public Information Centre No. 1

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

North York Centre South Service Road

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

Heritage Road Improvements from Steeles Avenue to Rivermont Road

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade.

Rapid Transit Implementation Working Group September 14, 2017

Purpose of Open House #3

Public Meeting #3 May 9, 2009 MVVA Team

Toronto Complete Streets Guidelines

Building the transportation network we need for the future

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers

WELCOME and introduction

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

Ashbridges Bay TTC Maintenance and Storage Facility

Toronto Complete Streets Guidelines

Burloak Drive Grade Separation

The Gore Road Queen Street East to Castlemore Road

Commissioners Road West Realignment Environmental Assessment

Bridge Type Assessment and Evaluation

Transportation Master Plan Environmental Assessment

PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications. February 21, 2017

CHAPTER 5: GUIDING PRINCIPLES

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

City of London Adelaide Street North - Canadian Pacific Railway Grade Separation Class Environmental Assessment Study Report

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Master Environmental Servicing Plan & Secondary Plan

Master Plan Class Environmental Assessment for Downtown Mississauga Road Improvements

Evaluation Criteria. Detailed Evaluation Criteria

38 Queen s University Campus Master Plan Part 1

Emery Village Road 2A Municipal Class Environmental Assessment Study

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Lambeth Main Street Streetscape Improvements

Rapid Transit Implementation Working Group

TRANSPORTATION COMMITTEE

New. Stations. Smart Track I tlo MTDRONIO. Public Information Centre

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

DAVENPORT VILLAGE SECONDARY PLAN

Richmond Road Complete Street Meeting #1, April 25, 2016

Welcome to the Public Information Update for

MOUNT PLEASANT SECONDARY PLAN & VILLAGE BLOCK PLAN. Wednesday, March 5, 2008 Informal Public Open House

Director, Community Planning, Toronto and East York District

Welcome to the Oakridge Centre Open House

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015

This Review Is Divided Into Two Phases:

Queensborough Eastern Neighbourhood Node. Community Open House

Mount Dennis Mobility Hub Study Public Meeting December 12 th, :30pm 9:30pm York Memorial Collegiate, Cafeteria 2690 Eglinton Avenue West

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

Executive Summary. NY 7 / NY 2 Corridor

Transportation. Strategies for Action

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Shift Rapid Transit Public Participation Meeting May 3, 2017

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

Western Road/Wharncliffe Road North Widening from Platts Lane to Oxford Street. Municipal Class Environmental Assessment Public Information Centre #1

Issues Requiring Future Study

Bloor St. W. Rezoning - Preliminary Report

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Official Plan Review

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

Alaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016.

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

Commissioners Road West Realignment Environmental Assessment

The purpose of tonight s PIC is to:

MAYFIELD WEST SECONDARY PLAN PHASE 2

planningalliance City of Toronto Lawrence Allen Revitalization Project Transportation Master Plan

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

This page left intentionally blank.

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Transcription:

1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015

2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present information on the following: 1. Study area 2. Problem and opportunity to be addressed 3. Proposed Alternatives 4. Criteria that will be used to evaluate alternatives We are interested in your feedback on the: 1. Existing transportation challenges 2. Proposed Alternatives 3. Criteria that will be used to evaluate alternatives Project Team representatives are available to discuss the project with you. The information presented today is available online at: www.toronto.ca/stclairwesttmp

3 Study Process This is being carried out according to the Municipal Class Environmental Assessment (EA) process. This is an approved assessment approach for municipal infrastructure projects under the provincial Environmental Assessment Act. The process includes: Identifying the problem and/or opportunity to be addressed; Developing and evaluating a range of alternative solutions; Providing opportunities for public input; and Identifying a preferred solution. The (TMP) will be completed to evaluate and select infrastructure improvements and outline an implementation strategy. The TMP will document all four phases of the Schedule C Municipal Class EA process.

4 What previous studies and plans are Considered? The following studies and plans provide an overview of the planning context for the St. Clair Avenue West Environmental Assessment. City of Toronto Official Plan (Adopted by Council 2002; Approved, in part, by the OMB in June 2006 & June 2015) The Official Plan sets out the vision for where and how Toronto will grow to the year 2031. St. Clair Avenue West Transportation Infrastructure Planning Study (2015) A Functional Planning Study was completed to identify the existing constraints, problems and issues within the study area, and to identify short-term and longterm solutions to improve vehicular operations. St. Clair Avenue West Avenue Study (Keele to Glenholme) (2009) The St. Clair Avenue West Avenue Study examined the mixed-use corridor along St Clair Avenue West between Keele Street and Glenholme Avenue to identify a vision and implementation strategy for future development along this avenue segment. Toronto Pedestrian Charter (2002) The Charter reflects the principle that a city's walkability is one of the most important measures of the quality of its public realm, and of its health and vitality. City of Toronto Bike Plan (2001) The Toronto Bike Plan establishes a vision for cycling, by setting out integrated principles, objectives and recommendations about safety, education and a comprehensive bikeway network. AODA Design of Public Spaces Standards Accessibility for Ontarians with Disabilities Act (AODA) The Province enacted that Accessibility for Ontarians with Disabilities Act (AODA), which governs the provision of public infrastructure including sidewalks, walkways, stairs, curb ramps, tactile walking surfaces, pedestrian signals and parking spaces. The City of Toronto has developed standards for all newly constructed or redeveloped infrastructure to ensure compliance with AODA.

5 Problem and Opportunity Statement The north/south rail corridor in the vicinity of St. Clair Avenue West between Keele Street and Old Weston Road limits east/west movement for cyclists, pedestrians and vehicles. This results in issues of congestion and connectivity. The will evaluate alternatives to improve movement using existing and potential new road connections for the benefit of all modes of travel.

6 Here is the Area we are Studying Study Area: The alternatives being studied are located within this area. There may be secondary effects beyond the study area, and these will be considered as well.

7 Challenges Rail bridge built in 1931; Traffic impacts that may result from the bridge replacement construction; No continuous east-west cycling connections in the study area; Accommodating the travel demands created by potential and ongoing developments in and around the study area; Potential rail station; Property impacts; and Need to minimize impacts to GO rail and UP express services. Benefits Better east/west connectivity; Safer more pleasant environment; Pedestrian lighting; New sidewalks; New bike lanes; and Less overall vehicle delay.

8 Existing Transportation Conditions St. Clair Avenue West is a heavily-used road that features two lanes in each direction alongside the dedicated TTC streetcar right-of-way. However, at the railway underpass between Keele Street / Weston Road and Old Weston Road, the narrow bridge span limits the roadway to one lane in each direction. The railway has limited the number of east-west road connections in the study area. Development continues to occur in this area, increasing the travel demands. As a result, congestion occurs in both directions, causing drivers to divert through the surrounding community and raising concerns about safety, environmental effects, and business impacts. There are currently no continuous cycling facilities through the study area. These were some of the factors that led to consideration of a broad study area, and other possible road crossings of the railway. The current study builds on the Functional Planning Study completed in June 2015 for the St. Clair Avenue West Underpass. A copy of the Functional Planning Study is available online at: www.toronto.ca/stclairwesttmp

9 Existing Cycling Facilities There are cycling trips that begin and/or end in this area, suggesting that increased cycling may occur if existing facilities could be extended. There are currently no continuous cycling facilities through the study area. For each alternative proposed, bike lanes are being evaluated as part of the new or enhanced street. Connection opportunities which are realized may be used to inform the development of new Cycling Network routes in this area. Outcomes of this will be integrated with Toronto s 10 Year Cycling Network Plan.

10 Existing Natural and Social Environment It is important to understand existing natural and social conditions in order to define the effects that the transportation alternatives may have on them. Natural Environment There are some parks and little of the natural environment remaining in this area. There is one watercourse located east of the railway. Social Environment The area has seen new residential and retail development in the past ten years. These developments are highlighted on the map in yellow. Other facilities such as schools and parks are also shown.

11 Existing Traffic Conditions Weekday AM Traffic conditions have been analyzed based on current traffic counts, to understand the existing issues in the study area.

12 Existing Traffic Conditions Weekday PM Weekend conditions are not assessed as part of since weekday AM and PM expected to be the critical periods. However, it is noted queuing and delays also occur during weekend periods in around the study area. this are that and

13 Alternatives A number of new roads and road expansions are being considered. These are shown below, and described in detail on the following boards.

14 Alternative 1: Widening St. Clair Avenue West

15 Alternative 2: Extending Gunns Road from Weston Road to Union Street

16 Alternative 3: Connecting Davenport Road to Lloyd Avenue

17 Alternative 4: Extending Keele Street south to meet the Gunns Road extension between Weston Road and Union Street

18 Alternative 5: Extending Davenport Road to Union Street and Implementation of Alternative 4

19 Potential Alternative 6

20 Evaluation Criteria Below are the criteria and indicators proposed to evaluate the alternatives. Factor Measures Indicator Socio-Economic Environment Impacts to Private Property Nuisance Effects Public Amenities (e.g. art, furniture, trees) and Streetscape Permanent takings Temporary occupation Temporary access obstruction during construction (incl. businesses) Permanent access closures Construction noise & vibration Operational noise & vibration Construction dust and emissions Impact on existing streetscape amenities (type and number affected) Opportunity to add new streetscape amenities (type and potential for new) Impacts to streetscape layout (incl. change to elevation roads above/below and allocation of space) Have we missed anything? Please provide your comments on the criteria.

21 Evaluation Criteria Factor Measures Indicator Natural Environment Groundwater Surface Water Aquatic Species and Habitat Terrestrial Species and Habitat Excess Materials Management Air quality Air quality effects Groundwater quality Groundwater quantity Water flow effects Effects on drainage and stormwater management Changes to fish and fish habitat including species of conservation concern Vegetation communities including species of conservation concern Wildlife and wildlife habitat including species of conservation concern Types and quantities of excess materials to be managed Storage and/or use of excess materials Archaeology Archaeological resources Cultural Environment Heritage Built Heritage Resources Cultural Heritage Landscapes Have we missed anything? Please provide your comments on the criteria.

22 Evaluation Criteria Factor Measures Indicator Transportation Adherence to City of Toronto design standards and guidelines for transportation Design facilities Accessibility (Compliance with City Accessibility Design Guidelines and provincial AODA) Network capacity Average delay for traffic (peak hour) Transit travel time and service reliability Intersection operations (existing and Transportation efficiency Cycling connections Pedestrian connections Emergency response and incident response Neighbourhood traffic infiltration Future rail network expansion proposed weekday peak hours) Number of people that can be moved, by all modes Travel time/average speed Ability to introduce new cycling facilities and connections Ability to introduce new or widened pedestrian facilities and connections Number of lanes available to bypass road incidents and respond to emergencies Intersection operations (existing and proposed weekday peak hour) Travel time on major streets Accommodation of additional rail track Accommodation of potential rail station Opportunity to provide access to potential rail station Have we missed anything? Please provide your comments on the criteria. Evaluation Criteria

23 Factor Measures Indicator Constructability Impact on current transportation activities Transit, pedestrian, road, rail, and bike mobility through the study area based on capacity, continuity and directness of connections for each mode, and duration of disruption Staging Number of stages/duration Utilities Number and scale of utilities affected Cost Construction Cost Total construction cost estimate Property Cost Property cost estimate Have we missed anything? Please provide your comments on the criteria. Following this PIC, the Project Team will complete the evaluation of the long-term alternatives. Next Steps

24 After this PIC, the Project Team will: Review and respond to comments; Evaluate the solutions and select the recommended plan; Meet with stakeholders, external agencies, and a technical advisory committee; and Prepare for a second public meeting in 2016. Stay in Touch 1 2 3 Go to the project webpage www.toronto.ca/stclairwesttmp Speak with members of the project team at public events. You are encouraged to contact the Project Team if you have any questions or feedback regarding the information presented at this PIC. Robyn Shyllit Senior Public Consultation Coordinator City of Toronto Metro Hall, 19th Floor 55 John Street Toronto. ON M5V 3C6 Tel: 416-392-3358 TTY: 416-397-0831 Fax: 416-392-2974 Email: rshyllit@toronto.ca Please feel free to ask questions and fill out a comment sheet before you leave. Comments can be left in the box provided or forwarded to the Project Team by December 18, 2015.