secure signalling systems for I&HAS

Similar documents
a guide to the interpretation of

TECHNICAL BULLETIN No: 0040

WEBWA al Y arm 2 sig 4 nall2 in 4

Summary of changes between PD 6662:2010 and PD 6662:2017 a guide

ALL YOU NEED TO KNOW ABOUT THE NEW STANDARDS IN ONE HANDY POCKET GUIDE. Updated for 2016 to include IA1501. Brought to you by: In association with:

A guide to the changes between BS 8418:2010 and BS 8418:2015

Telemetry Communications Device. Installation Guide. Interface for the Emizon managed network. Issue 1: February 2008

A guide to the changes of Amendment 1 of BS

DualCom GradeShift UDL QUICK GUIDE & INSTRUCTION MANUAL

DigiAir QUICK GUIDE & INSTRUCTION MANUAL

Security Systems and Alarms Inspection Board. Code of Practice For Scaffold Alarm Systems

GRADESHIFT UDL INSTRUCTION MANUAL 2.5 APPENDIX

Loss Prevention Standard

Security Systems and Alarms Inspection Board. Code of Practice For Vacant / Void Property Alarm Systems

Fratech Multipath-IP STU

600 Range Dialer Installation Manual. Version 1.0

CONDITIONS OF SERVICE - NBN SERVICES 1. ABOUT

A basic guide to BS 8418:2015 CCTV Systems for Installers

IMQ SPA scope as CertAlarm CCB and RTL. Last update: 12th June 2017

GRADESHIFT UDL INSTRUCTION MANUAL

Monitoring solutions

Installation Manual. for D2300 DualCom GPRS

VdS Guidelines for Hazard Warning Systems (HWS) VdS 3431en. System requirements. VdS 3431en : (01)

PERMACONN PM1030 Includes DI300. Installation Manual

WebWayOne. Installation Manual

User/Installation Guide

Fratech Multipath-IP

User/Installation Guide

Fact File 48 Guide to BS EN 54-13:2017 Fire Detection and alarm systems:

IP & SMS Alarm Communicator

For business, corporate and public sector security. Protected premises, protected network

GRADESHIFT UDL INSTRUCTION MANUAL 3.1 PSTN CONNECTION

EURO 46 V10 User Manual

Installation, Maintenance and Operation Manual

TECHNICAL BULLETIN No. 0018

Common Questions & Answers

August 2013 Technical Requirements for Remote Controlled Temporary Traffic Management Signs for use on the Highways Agency Strategic Road Network

IRIS Touch Firmware Enhancements and Additions from Version to Version

IRIS Touch 200 Range Dialler Installation Manual. Version 1.4

IRIS Touch Quick Installation & Maintenance Guide. Version 1.0

i on Compact Security System

DRAFT TANZANIA STANDARD

Loss Prevention Standard

Australian/New Zealand Standard

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

COMMUNICATOR ET08 / ET081

This document is a preview generated by EVS

IRIS Touch Quick Installation & Maintenance Guide. Version 1.0

Intruder Alarm Handbook

Sentient. Downloader Manual D4854

IRIS Touch 400 & 600 Range Installation Manual. Honeywell Galaxy Range. Version 2.0

Methods of Software Integration of Alarm Systems

INTRUDER ALARM FOR BUSINESS SECURITY

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 16: Sound system control and indicating equipment

AS/NZS IEC 62560:2014

BS 8418: 2015 Installation and remote monitoring of detector-activated CCTV systems Code of practice

DRAFT TANZANIA STANDARD

The system is expanded via the RCC network with each RCC capable of passing information to and from up to 31 detection or output devices.

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

Fact File 75. Published Document PD CEN/TS 54-32:2015 Fire detection and fire alarm systems

AS/NZS IEC :2013

Any additional devices linked to the system ET08 (computer, sensors, relays etc.) must be approved by LST EN standard.

Euro ONE. RENDER ALARMS Your security, above all else. User Manual. t: f:

DRAFT EUROPEAN STANDARD pren NORME EUROPÉENNE EUROPÄISCHE NORM April English version

RVRC Training Manual Fast Trace Installer Menu

Australian Standard. Closed circuit television (CCTV) Part 4: Remote video AS AS

SC-F3G User Manual 1.0

GLOBAL. InstallatIon & operation manual

Changes for EN50131 BS8243 PD6662

Technical Specification for Remote Controlled Temporary Traffic Management Signs for use on the Highways Agency Strategic Road Network

SOUTH AFRICAN NATIONAL STANDARD

DRAFT EUROPEAN STANDARD pren NORME EUROPÉENNE EUROPÄISCHE NORM October English version

ISO INTERNATIONAL STANDARD

Vocia VACIE. Reference Guide

This document is a preview generated by EVS

Upgrade of PSTN network Alarm System

MODEL 5100 BROADBAND ALARM COMMUNICATOR INSTALLATION & USER S GUIDE PRODUCT ID #

ALARM SYSTEMS - INTRUSION AND

A guide to integrated security management systems

Networked Access Control Panel. Installation Guide

Technical Manual The Next Generation Nano

National Broadband Network. User Guide. Includes important information about your NBN equipment

English. Doro CareIP Mobile. User Guide

INDEX INDEX 2 FOREWARD 3 SECTION 1 COMPANY INFORMATION 4 SECTION 2 GRADING AND CERTIFICATION 5 SECTION 3: ADDITIONAL REQUIREMENTS 6 7

BRL-K21030/02 5 August Certification of Alarm Communication. Certification Alarm Transmission Systems (ATS) Alarm Transmission Systems

Preparing for the network. Fibre to the Premises (FTTP) guide

ANEP S-BOX EMERGENCY TELEPHONE FOR ELEVATORS.

CG500SKE SKYEYE GATEWAY USER MANUAL VERSION OCTOBER Disclaimers and Copyright

AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment

EURO 46 User Manual. For use with EURO 46 (version 9.1 or above) RINS1531-2

Australian Standard. Automatic fire detection and alarm systems System design, installation, and commissioning AS

Australian/New Zealand Standard

UC-351. Installation, Maintenance and Operational Manual. Model UC-351GH, UC-351-3GH

EURO User Manual. For use with EURO 76, MSX 162, MSX 280 software: Version 9.1 or above RINS1527-2

CCU Family of Modules

TABLE OF CONTENTS. Page 2

Guidance Note FIA Application Guidance on BS :2015

VACIE REFERENCE GUIDE REVISION 1.2.6

INTRUDER ALARM FOR BUSINESS SECURITY

Changes in NFPA

Transcription:

installation of IP-based secure signalling systems for I&HAS an industry guide May 2008 For other information please contact: British Security Industry Association t: 0845 389 3889 f: 0845 389 0761 e: info@bsia.co.uk www.bsia.co.uk Form No. 234. Issue 1 This document is the copyright of the BSIA and is not to be reproduced without the written consent of the copyright owner.

Contents Foreword 3 Introduction 3 Sections 1. Scope 3 2. Normative references 3 3. Terms, definitions & abbreviations 4 4. Transmission network components 4 5. Recommendations 6 6. Management of IT system 8 7. Service provision matters 8 8. Maintenance 8 9. Documentation and Records 9 Acknowledgements 9 Bibliography 9 Annex A IPCRes Guidance 10 Page 2

Foreword Information about this document This guidance has been drawn up to assist all parties in the design and installation of IP-based secure signalling systems for use with Intruder and Hold Up Alarm Systems (I&HAS). It is intended to be used in conjunction with PD6662, Scheme for the Application of European Standards for Intruder and Hold-up Alarm Systems. Use of this document This document takes the form of guidance and recommendations. It should not be quoted as if it were a specification. Introduction The introduction of Internet Protocol (IP)-based technology into the field of secure signalling for I&HAS has led to confusion and uncertainties which have inhibited the exploitation of the benefits available by adopting it. This guidance has therefore been prepared to provide a stable platform from which such systems can be designed, installed and maintained in a way that is acceptable to the industry as a whole, and can be inspected in a consistent way. This guide may be supplemented by specific requirements of insurers on a system-by-system basis, see Annex A. 1. Scope This guide applies to the design, installation and maintenance of I&HAS installed to comply with PD6662:2004, and which utilise IP-based technology for the notification of alarms and other information to an Alarm Receiving Centre (ARC). It is applicable to all forms of IP-based communication, e.g. broadband via PSTN, wireless, etc. 2. Normative references PD6662:2004 pren50131-1:2004 Scheme for the Application of European Standards for Intruder and Hold-up Alarm Systems Alarm systems - Intrusion systems - Part 1: System requirements TS 50131-7:2003 EN50136-1-1:1998 EN50136-2-1:1998 pren50136-1-5:2006 Alarm systems Intrusion systems Part 7: Application guidelines Alarm systems - Alarm transmission systems and equipment Part 1-1: General requirements for alarm transmission systems Alarm systems - Alarm transmission systems and equipment Part 2-1: General requirements for alarm transmission equipment Alarm systems - Alarm transmission systems and equipment Part 1-5: Requirements for Packet Switched Network PSN Page 3

3. Terms, definitions and abbreviations Definitions and abbreviations used are as shown in EN50131-1; EN50136-1-1 and pren50136-1-5, except as shown below: Alarm transmission equipment (ATE) Equipment which is used primarily for the transmission of alarm messages. Alarm transmission system (ATS) Equipment and network used to transfer information concerned with the state of one or more I&HAS to one or more alarm receiving centre. Ethernet module or interface This term is used in pren50136-1-5 to identify the interface between the alarm system equipment (covered by EN50136-2-1) and the transmission network components. Local area network (LAN) A physical network installed and managed entirely by the user. Receiving centre transceiver (RCT) Supervised premises transceiver (SPT) These terms (as defined in EN50136-1-1) are more specific than the generic alarm transmission equipment (ATE) and therefore preferred where relevant. Transmission network components Components, e.g. router, etc. forming part of the transmission network between SPT and RCT, some of which may be located at the supervised premises but do not form part of the ATE (see clause 4) and hence are not required to meet the requirements of EN50136-2-1. This would typically be the case where alarm messages utilise the routing equipment of a client s LAN. Wide area network (WAN) A computer network that allows the connection of LANs and other networks to allow users and computers to communicate from one location to another. 4. Transmission network components EN50136-1-1 clause 4.5 defines alarm transmission equipment as that primarily used for the transmission of alarm messages from the supervised premises. Note 2 permits exemptions for certain equipment, which could include modems/routers used for general purposes. The term primarily will have to be defined on a site-by-site basis by agreement with the client, and if applicable insurer, as part of the risk assessment. In this connection, pren50136-1-5, section 5 states: Note 1: Transmission network components: Network components including ADSL modems, SDSL modems, routers, ethernet switches, ethernet hubs, external firewalls and network wiring etc. may not meet the requirements in the standard for alarm transmission equipment in EN 50136-2-1. Ethernet modules/interfaces at the alarm transceiver are not part of the transmission network. Page 4

Such transmission network components, which may be the responsibility of the client, may thus, under some circumstances, be considered part of the transmission network. In that case, these components are not part of the SPT and are thus not required to comply with the requirements of EN50136-2-1. pren50136-1-5 identifies that the ethernet module/interface at the SPT is NOT part of the transmission network. This therefore should meet all requirements of EN50136-2-1. This is true of the interface to any type of IP connection. This is clarified by the Figure 1, illustrating which standards are applicable to the various equipment and interconnections. See also Annex A. Figure 1 I & HAS EN50131-1 Supervised premises Supervised premises transceiver (SPT) Alternative path EN50136-2-1 Transmission network components Ethernet module or interface Transmission network External transmission network Alarm transmission system EN50136-1-1 ARC Receiving centre transceiver EN50136-2-1 Anunciating equipment TS50136-4 Page 5

5. Recommendations 5.1 Location of equipment The SPT (which includes the ethernet module or interface) should be located as close to the control and indicating equipment (CIE) as is practicable (see TS50131-7 clause 7.3.2). The network connection point should be as close to the I&HAS ethernet module or interface as is practicable. If a wireless IP connection (example GPRS connection from SPT) is used, the antenna should be located in the most secure position possible commensurate with adequate signal strength. The wireless signal level at the time of installation should be recorded and a check made that it meets requirements. 5.2 Dual path systems The point of decision as to the path to be used should be within the SPT or CIE (see Fig 1). Where one path is routed via network transmission components not part of the ATE, the other path should comply with the relevant requirements of EN50136-2-1 and EN50131-1 table 11. All paths should have a contractual basis e.g. not using a pay-as-you-go SIM. 5.3 Fault responses. Fault, disconnection or loss of power of any network component, of any interconnection between those components or of any interconnection between the I&HAS ethernet module or interface and the network components within the supervised premises should result in an ATS fault response at the ARC and at the I&HAS within the reporting time specified, according to grade, by EN50131-1 Table 11. Note: It is recommended that this fault response be available within 3 minutes, by use of ATS with fault reporting time of T4 at all grades. 5.4 Tamper security The provision of tamper protection and detection for housings of transmission network components installed at the supervised premises is not mandatory. Where such protection is not provided, design of the I&HAS should ensure that this equipment is located such that, when the I&HAS is set, it cannot be accessed without generating a confirmed alarm. 5.5 Interconnections The provision of tamper detection for the ATS path, including intermediate interconnections between network components within the supervised premises, is not mandatory. Where such detection is not provided, precautions should be taken to prevent accidental or unauthorised disconnection (example: connections requiring a tool for removal). 5.6 Power supply 5.6.1 Mains supply Whilst secure connections (example: hard-wired fused spur) are preferred for mains connections to transmission network components within the supervised premises, these may be by plug and socket. Where this is the case, precautions should be taken to prevent unauthorised disconnection (example: labelling or fixed cover to connection). Page 6

5.6.2 Secondary power supply pren50136-1-5, section 5 (Transmission network requirements) states: Note 2: Network power fails reporting to alarm receiving centre: Network equipment which is located at the supervised premises which is not classified as being part of the alarm transmission equipment is not required to have a secondary power supply. Thus a secondary power supply is not mandatory for transmission network components installed at the supervised premises. The reference to alarm transmission equipment in this note should be understood to refer to the SPT. 5.6.3 Prime Power Source (PPS) Fault message If a PPS Fault message for the I&HAS is required to be sent to the ARC (or other remote centre) in order to reduce the battery standby time as permitted by EN50131-1 clause 9.2, and the signalling path is dependent upon the presence of mains to transmission network components at the supervised premises, there should be means to transmit this message. Note: The EN50131 family of standards is in the process of replacing PPS by EPS External Power Source. Examples: a) Provision in a single path system of a PSTN modem path. b) The I&HAS may be provided with a second ATS path independent of the ethernet connection operating using an APS. 5.7 Integrity of performance Where transmission network components at the supervised premises are excluded from the SPT, there is potential for disruption to the transmission of such messages in the event of failure of or disconnection of parts of the IT system. The following warning should be reproduced in the system design proposal and as-fitted document in bold type: Important: If your security system makes use of your broadband router/switch, any loss of service resulting from disconnection, failure, etc. of your equipment will generate a fault alarm resulting in the ARC contacting your premises or a keyholder. In these circumstances, alarm messages will not be sent currently to the ARC. They may be lost or delayed at your premises until the service is restored (dependant upon equipment type). The intention to transmit alarm messages and information via your IT equipment should be specifically advised to your insurers. Such IT equipment should be suitably managed, as required by clause 6. Note: Assessment of the availability of the overall ATS (i.e. including equipment not dedicated for the I&HAS but forming part of the ATS) for a period of time is recommended in order to ensure that the system is fit for its intended purpose. Guidance may be found in EN50136-1-1, clause 6.4. Page 7

6. Management of IT system Where transmission network components at the supervised premises used for alarm message transmission are excluded from the SPT and are the responsibility of the client, the system to which this equipment is connected should be managed to a) Prevent unauthorised access to cables and connections affecting the integrity of the ATS whilst the I&HAS is unset. b) Prevent unauthorised disruption to messages to/from the I&HAS. c) Minimise disruption to messages to/from the SPT during planned or emergency maintenance d) Ensure that the ARC and the I&HAS maintenance company are notified of such maintenance in advance. Contractual agreement should detail the responsibilities of the client and I&HAS maintenance company in these areas and the responsibility for security issues during such periods. See also clause 5.8. 7. Service provision matters 7.1 Internet Service Provider (ISP) The Broadband (Digital Subscriber Line) connection contract should not allow for service interruption resulting from excessive usage. Changes to the DSL connection contract or ISP provider could result in breaks of service or other problems. The following warning should therefore be reproduced in the system design proposal and as-fitted document in bold type: Important: Your attention is drawn to the fact that changes to your broadband connection contract or Internet Service Provider could affect the ability of the system to deliver its designed performance and thus invalidate your insurance cover. You should therefore consult your alarm company and insurer before making any such changes. 7.2 GSM / GPRS Service Provider The SIM should have a full contractual basis, not pay-as-you-go or otherwise subject to service interruption. Changes to the SIM contract or provider could result in breaks of service or other problems. The following warning should therefore be reproduced in the system design proposal and as-fitted document in bold type: Important: Your attention is drawn to the fact that changes to your SIM contract or service provider could affect the ability of the system to deliver its designed performance and thus invalidate your insurance cover. You should therefore consult your alarm company and insurer before making any such changes. 8. Maintenance The I&HAS should be maintained in accordance with the requirements of Annex D of PD6662:2004, according to grade, in particular the requirement for all transmission paths to be checked. Responsibility for maintenance of the IT equipment through which alarm messages are transmitted or other transmission network components should rest contractually in accordance with clause 6. Page 8

A review of the ATS performance should be included as part of the system maintenance programme, as required by EN50136-1-1. The signal level of a wireless connection should be checked at each service and compared to the level at installation. 9. Documentation and records The System Design Proposal and As-Fitted Documentation should include the following information: a) If applicable, a statement that transmission network components at the supervised premises used for alarm message transmission are the responsibility of the client. (see clause 4 and 5.8). b) Details of the client s responsibilities in managing and maintaining any IT equipment that forms part of the ATS (see clauses 6 and 8). c) Record of the service providers and contracts (see clause 7). d) A warning that changes to service contract(s) or provider(s) could affect system performance (see clause 7). Note: Where information is supplied by the client for incorporation into the system documentation, this should be noted. Acknowledgements The BSIA would like to thank the IP technical committee for its contribution to the production of this guide. Bibliography IPCRes Guidance Documents: Alarm Signalling using the internet protocol: Part 1: An overview. Alarm signalling using the internet protocol: Part 2: Considerations for insurers. BSIA Guidance Documents: A basic user guide to the use of Internet Protocol in the security industry (Form 211). An installer guide to Internet Protocol in the security industry (Form 210). Page 9

Annex A (informative) IPCRes Guidance Appendix 1 of the IPCRes guidance document Alarm signalling using the Internet Protocol: Part 2: Considerations for insurers includes a model for IP-based alarm signalling systems, with two levels of installation. The appendix IP Signalling Part 2 may be downloaded from: www.infires.co.uk/downloads The model is summarised below: Note: the IPCRes model uses the term signalling equipment to include the SPT and all transmission network components located at the supervised premises. (i) SINGLE PATH SYSTEMS: All signalling equipment at the supervised premises, is subject to the EN50131-1 requirements for PS back up, fault recognition and tamper security. (ii) DUAL PATH SYSTEMS: Level A: All signalling equipment at the supervised premises, for all paths, is subject to the EN50131-1 requirements for PS back up, fault recognition and tamper security. Level B: All signalling equipment at the supervised premises, for one path, is subject to the EN50131-1 requirements for PS backup, fault recognition and tamper security. Signalling equipment for the other path is located in an area where entry will immediately generate a full alarm activation whilst the I&HAS is set. This is clarified to mean that it should NOT be sited in an area configured as part of an entry route, but is to be sited in an area where a confirmed alarm can be generated. Note: Figure 1 of this guide (with transmission network components at the supervised premises not part of the ATE) is equivalent to a level B installation. Page 10