Armstrong ExpressPack Multi-Tube Steam Dispersion Panel Assembly and Installation Instructions

Similar documents
SH-2000, SH-2500, AB-3000 Bimetallic Steam Traps Installation and Operation Manual SH-2000

SH-300, SH-900, SH-1500, SH-1600 and SH-1700 Bimetallic Steam Trap Installation and Operation Manual

ICS Float and Thermostatic Steam Trap Installation and Operation Manual

Installation and Maintenance "L" and "LS" Series

Clean Steam Generators

AIC Series Float & Thermostatic Steam Trap Installation and Maintenance Instructions

Installation and Testing of Inverted Bucket Steam Traps Manual

Installation and Operation

INSTRUCTION MANUAL HS-229G

Steam Distribution. Installation Manual. Includes installation instructions for steam distributions ASD/BSD/CSD/RSD/SSD.

PRESSURE FOG HIGH ATOMIZING HUMIDIFICATION SYSTEM

Sound Cover [ , , , ]

installation, operation & Maintenance manual Floor-mounted Induction units acb 30/35

READ AND SAVE THESE INSTRUCTIONS SEISMIC. Cer tification Option. Installation Manual

STEAM DISTRIBUTORS ASD / BSD / CSD. Installation Manual C

installation, operation & Maintenance manual Floor-mounted Induction units

Installation Manual Universal Single-Arm Side-of-Pole Mount UNI-SA/21.5

Air Pump Up to 800 gallons

Read and save these instructions! DRANE-KOOLER. Water tempering device Installation, operation and maintenance manual

Rada 25R Installation and Maintenance

INSTY-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY

Please Read and Save These Instructions.

WMWLB / WMWFM / WTWLB / WTWFM Series Hydronic Heating Unit

READ AND SAVE THESE INSTRUCTIONS DRANE-KOOLER. Water Tempering Device. Installation, Operation, and Maintenance Manual

OPERATION MANUAL Dated: 04/09/2018 Document Name: SHV _OM Page 1 of 8. Ion Technologies SHV40, 75 & 100 Sewage Ejector Pump SAFETY WARNINGS

SPA BLOWER OWNER'S MANUAL XXXX, XXXX, XXXX, XXXX, XXXX, XXXX fax

Installation Manual Universal Side-of-Pole Mount UNI-SP/01A

ELECTRONIC FAUCETS INSTRUCTION MANUAL. Toll Free: (800) Haul Road Wayne, NJ krowne.

Model A Pipe Line Strainer 3, 4, 6, 8 & 10 Inch (DN80, DN100, DN150, DN200 & DN250) 175 psi (12,1 bar) General Description.

Installation and Maintenance

Service Parts, Kits and Accessories

Installation Manual Universal Side-of-Pole Mount UNI-SP/02A

MODEL CDB8 INSTALLATION INSTRUCTIONS

Ion Endeavor Pump Controller Digital Level Control with Pump Alternation and High Water Alarm

Warranty. Thanks. Thank you for purchasing the Oliso Smart Iron, a safer, smarter way to iron.

e Bath Fan with Light User s Guide

CD6102 / CD6102 OC / CD6102-2

2 INLET / HIGH HEAD DRAIN PUMP SYSTEMS MODELS , INSTALLATION INSTRUCTIONS PREINSTALLATION CHECKLIST

Honeywell Garrett Drop-in Intercooler for 2.3L Mustang EcoBoost IMPORTANT INFORMATION - PLEASE READ CAREFULLY

Compact Equipment Warranty Policy

Ion Genesis II Pump Controller Digital Level Control with Pump Alternation and High Water Alarm

Drain Tempering Reservoir READ & SAVE THESE INSTRUCTIONS. Installation, Operation, & Maintenance. TRION

ion Genesis Pump Controller

Instruction Manual. Dogeroo, Super Dogeroo, and Mini Dogeroo

Silicone Rubber Heating Tape with Adjustable Thermostat Control (HSTAT Series) Instruction Manual

MaxLite LED MICRO-T PANEL

AeroVent Standard Product Manual

installation, operation & Maintenance manual acb ceiling-mounted cassette models

GTS. User Manual. Gas-to-Steam Humidifier. Affix product label here.

Installation Manual Universal Top-of-Pole Mount UNI-TP/02

READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE PROCEEDING WITH THE INSTALLATION.

IMPORTANT INFORMATION - PLEASE READ CAREFULLY

Installation Manual Universal Top-of-Pole Mount UNI-TP/08LL

e Heater/Exhaust Fan/Light User s Guide

AeroVent 3X Product Manual

IMPORTANT INFORMATION - PLEASE READ CAREFULLY

DUST FREE CARBON Whole House Air Purifier

TrueClean ToteCleaner

AeroVent 1 Product Manual

Duct Mount. Installation Instructions

VSA/VSB & KSA/KSB Series Air Doors

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2

Steam Humidifier Fan Pack Installation & Maintenance Instructions

AG Series Electric Heaters

LETTER FROM THE FOUNDERS

Eco-Steamer SSC-0312 INSTRUCTION MANUAL CONTENTS

GASGUARD VENT LINE3. Ammonia Sensor OPERATING & INSTALLATION MANUAL

RP, GP, XP Pro Series Installation Instructions

Model CV-1FR Riser Check Valves 2 to 12 Inch (DN50 to DN300) General Description. Installation. Technical Data. Page 1 of 6 OCTOBER 2010 TFP950

Installation & Maintenance Instructions

DH07, DH07A /DH08, DH08A CONVECTED AIR DISH HEATERS

NXT Hg5 Amalgam Separator Installation and Operations Manual

COMBUSTION AIR SYSTEM

IOM & Owner s Manual. VFH-B Series. Inverter Multi Zone Ductless Mini-Split A-VFH18DB-1 A-VFH24TB-1.

Instruction Leaflet. Read instructions before operating. Retain for future reference.

G Series SAVE THESE INSTRUCTIONS. (Model B) Convector Heater for Hazardous Locations GENERAL! INSTALLATION

MN908 No. 282C Replaces 282B LB7013

Rada 320R Installation and Maintenance

NXT Hg5 mini Amalgam Separator Installation and Operations Manual

WATLOW ELECTRIC MFG CO. WATROD Duct Heater (module only) I& M Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.00

BIG BOOT COMBUSTION AIR KIT Model: CAS-2BB, CAS-2CB, CAS-2B375

WATER CLAW SUB-SURFACE FLOOD EXTRACTION TOOL AC016 - AC018. Water Claw 4282 South 590 West Salt Lake City, UT FAX

READ AND SAVE THESE INSTRUCTIONS. Air Boss Model T5200 Custom Packaged Electronic Air Cleaner. TRION

CONDENSING WATER BOILERS. (Models VLT , Q VX ,

Pole Mounting System Installation & Certification Manual

SF180 Installation Instructions

PNLDII-28 Condensate Drain Instruction Manual

Operating Instructions & Parts Manual. Silent Low-Profile Ceiling Fans. Models 3DPE2A, 3DPE3A, 1UBH6B, 1UBH7B, 1UBH8A, 5AE68B, 5AE69A

Technical Data. Installation

Wrap-Around TOTE Tank / IBC Heaters (TOTE and TOT Series)

GG-VL-R REFRIGERANT VENT LINE SENSOR. Installation and Operation Manual

CUFFED FAST-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY

Pole Mounting System Installation & Certification Manual

TrueClean ToteCleaner

e Bath Fan with Light User s Guide

INSTALLATION & OPERATING INSTRUCTIONS MODEL #17900 KEGERATOR MANUAL

First Year Limited Warranty for Residential Use Condensing Water Boilers (Includes Heat Exchanger and Component Parts)

To get started, please read and follow all instructions for usage and maintenance carefully before operating the VACMASTER BS116 Impulse Bag Sealer.

INSTY-PAC EXTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

installation instructions Fan Tray System FTA-3/FTA-6

Transcription:

Armstrong ExpressPack Multi-Tube Steam Dispersion Panel Assembly and Installation Instructions IOM-573 This bulletin should be used by experienced personnel as a guide to the installation and maintenance of the Armstrong ExpressPack. Selection or installation of equipment should always be accompanied by competent technical assistance. We encourage you to contact Armstrong or its local representative if further information is required. Table of Contents Page Preliminary Procedures... 2 Do s and Dont s... 3 Assembly and Installation... 4 Installation Concept... 5 Troubleshooting... 5 1

Preliminary Procedures The following instructions cover the assembly and installation of the Armstrong ExpressPack. The ExpressPack is a short absorption steam dispersion panel used in conjunction with an atmospheric steam generator (Armstrong s HumidiClean Series HC-6000 series, Series CS-10, Series GFH, and/or Series EHU-700). When shipped, all sizes of the ExpressPack will come disassembled with the following: ExpressPack (duct mounted or if steam header is mounted outside duct or tunnel) Contents: Header Assembly Dispersion Tube Assembly (qty depends on number of tubes) Cover Plates (2 cover plates required per tube assembly)* Outboard Tube Support Plate Hose Cuff (1 required per tube assembly) Hose Clamps (2 required per hose cuff) Bolts ((1) for each tube assembly, (2) for attaching tube support plate to roof of duct along with (2) nuts) Flat & Lock washers (1 for each tube) *If mounting in air handler (or mounting with header inside of air flow) then the cover plates are not included. Step 1: Check Shipment Against Packing List. All components are listed on the packing slip. Report any shortages immediately. If the ExpressPack components have been damaged in transit, notify us and file a claim with the transportation company. If your order covers more than one package, segregate each complete assembly. Equipment tagging will be the same as shown on the packing list. Note: ExpressPack is shipped disassembled. Step 2: Check Local Codes. The Armstrong ExpressPack should be installed in accordance with all applicable building, plumbing, and electrical codes. Step 3: Find ExpressPack Panel Location. Locate all ExpressPack equipment according to the engineer s layout or as indicated by your Armstrong Representative. If you must locate the ExpressPack yourself, be sure to read and observe the Do s and Don ts to follow. If locating the ExpressPack in the existing duct work it is best to locate it near a joint so that it can be easily accessible. Step 4: Steam piping from steam generating humidifier. If the ExpressPack steam header is to be located below the steam discharge of the humidifier, please install a P trap in the steam supply just prior to the ExpressPack inlet. Please consult the Installation, Operation and Maintenance bulletin for your specific humidifier for detail concerning the P trap, suggested steam supply piping length, diameter, pitch, trapping and installation. 2

Do s & Don ts of Location and Installation All recommendations for the application of the Armstrong ExpressPack are based on tests and field experience. However, these recommendations are based on duct air velocities and temperatures that are most commonly encountered, and the recommendations may have to be modified when air flow velocities are very high and/or air temperatures unusually low. We also reserve the right to modify recommendations without notice if subsequent tests or experience indicate that a change should be made. For these reasons, we urge you to check all applications with your Armstrong Representative before installation. 3

Assembly and Installation Step 5: ExpressPack Panel Insertion & Assembly The ExpressPack consists of the header, tubes, support plate, cover plates and hose cuffs. All of the components will be shipped loose. So following these detailed instructions becomes very important for proper installation. If mounting the ExpressPack in an application with steam header outside the face area, please follow these instructions. 1. Use Header Assembly as a guide to trace the location and size of the holes needed for the tubes of the assembly to slide through the bottom of the duct. The holes should be centered in the airflow so that the distance from the side of the duct to first tube and the side of the duct to the last tube is equal. 2. Slide the tubes through those holes and connect to the support plate using the supplied 3/8-16 x ½ bolts, washers and locking washers. Be sure when attaching the tubes to the support plate that the holes on tubes stay perpendicular to the air flow. See Figure 3-1. Figure 3-1. ExpressPack Bolt Assembly Locking Washer Nut (Attached to Tube) Bolt Flat Washer 3. Attach the support plate to the top of the duct using the two mounting holes shown in Figure 3-2. A level may be used here to insure that the tubes are plumb. 4. With the open end of the tubes exposed through the bottom of the duct the header assembly can be attached to the tubes using the supplied hose cuffs. Depending on the application these hose cuffs may need to be cut in order to fit properly. 5. Securely mount the header assembly in place using the support bracket on the opposite end as the inlet. The inlet side of the header can be secured to the bottom of the duct using galvanized slotted strap. Make sure that the header is mounted level horizontally. 6. With everything securely assembled the cover plates can be added to cover the open area around the bottom of each tube. There will be (2) plates for each tube and each plate will require (2) zip screws to hold in place. Refer to Figure 3-3 to see final assembly. Figure 3-2. ExpressPack Mounting Delta A Mounting Holes Cover Plates (1) set for each tube Support Bracket If mounting the ExpressPack in an Air Handler or in an application where the header is required to be inside the face area please follow these instructions: 1. Assembling the ExpressPack. This may have to be done inside the face area because of the final size of the panel. Connect the tubes to the support plate using the 3/8-16 x ½ bolts, washers, and locking washers supplied. Be sure when attaching the tubes to the support plate that the holes on tubes stay perpendicular to the air flow. 2. Attach the header assembly to the tubes using the provided hose cuffs. Depending on the application these hose cuffs may need to be cut down in order to fit properly. Inlet Figure 3-3. ExpressPack Assembly Detail A Detail A Drain 4

3. Stand the panel up and mount in the center of the air flow. See Figure 3-2 for mounting hole locations. Threaded rod can be used to hang the panel from the mounting holes in the support plate as well as for the attaching to the support bracket. It is recommended by the factory to also support the inlet end of the header with some sort of block or channel to hold it up in place. 4. For installation with the steam header inside the tunnel or duct, cover plates are not required. Please Note: Ceramic coated tubes are an option for the ExpressPack. If included, care must be taken during installation to prevent damage to the coating. Installation Concepts Condensate Drainage Options Condensate discharge from the ExpressPack is at atmospheric pressure. Thus the condensate must be discharged to a drain or pumped. On any application, an attempt to lift condensate even a few inches will lead to potential flooding or spitting problems from the multiple tube bank. The ExpressPack is to only be use with atmospheric steam. So when installing for use with an atmospheric steam generator, minimize the length of piping run from the humidifier to ExpressPack. Piping should not extend longer than 40 equivalent feet and should be sized according to the output of the steam generator. Slope piping back towards humidifier or toward a drainage point. Pipe a loop P trap to an atmospheric drain at any low points in piping run. Install, at a minimum, a 10 loop seal from the ExpressPack header drain connection. Please consult the installation manual for the steam generator or the factory with questions. Figure 4-1. ExpressPack Vertical Installation with Series HC-6000 (please refer to Bulletin 539 for detailed installation information) Minimum 10 Troubleshooting Guide 1. ExpressPack Spitting A. Lift or back pressure after P trap is causing the panel to flood. B. Supply steam not properly dripped. C. Top of loop seal is above the header of the panel. D. Condensate is not discharged to an atmospheric drain or a vented receiver. E. Carry over from steam generator. 2. Low or no steam output A. Loop seal on drain is not big enough and steam is blowing through. B. Supply piping is not trapped properly. C. Panel is undersized for required steam output - consult factory. D. Pipe run from steam generator is longer than 40 equivalent feet. E. High static pressure in the duct. F. Steam Generator not putting out required steam; consult the steam generating humidifiers Installation, Operation and Maintenance manual. G. Holes must be perpendicular to the airflow. 5

Armstrong International, Inc. Limited Warranty and Remedy Armstrong International, Inc. ( Armstrong ) warrants to the original user of those products supplied by it and used in the service and in the manner for which they are intended, that such products shall be free from defects in material and workmanship for a period of one (1) year from the date of installation, but not longer than 15 months from the date of shipment from the factory, [unless a Special Warranty Period applies, as listed below]. This warranty does not extend to any product that has been subject to misuse, neglect or alteration after shipment from the Armstrong factory. Except as may be expressly provided in a written agreement between Armstrong and the user, which is signed by both parties, Armstrong DOES NOT MAKE ANY OTHER REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF MERCHANTABILITY OR ANY IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE. The sole and exclusive remedy with respect to the above limited warranty or with respect to any other claim relating to the products or to defects or any condition or use of the products supplied by Armstrong, however caused, and whether such claim is based upon warranty, contract, negligence, strict liability, or any other basis or theory, is limited to Armstrong s repair or replacement of the part or product, excluding any labor or any other cost to remove or install said part or product, or at Armstrong s option, to repayment of the purchase price. As a condition of enforcing any rights or remedies relating to Armstrong products, notice of any warranty or other claim relating to the products must be given in writing to Armstrong: (i) within 30 days of last day of the applicable warranty period, or (ii) within 30 days of the date of the manifestation of the condition or occurrence giving rise to the claim, whichever is earlier. IN NO EVENT SHALL ARMSTRONG BE LIABLE FOR SPECIAL, DIRECT, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUDING, BUT NOT LIMITED TO, LOSS OF USE OR PROFITS OR INTERRUPTION OF BUSINESS. The Limited Warranty and Remedy terms herein apply notwithstanding any contrary terms in any purchase order or form submitted or issued by any user, purchaser, or third party and all such contrary terms shall be deemed rejected by Armstrong. Special Warranty Periods are as follows: Series EHU-700 Electric Steam Humidifier, Series HC-6000 HumidiClean Humidifier and GFH Gas Fired Humidifier with Ionic Beds: Two (2) years after installation, but not longer than 27 months after shipment from Armstrong s factory. Armstrong Humidification Group, 816 Maple Street, Three Rivers, MI 49093 USA Phone: (269) 273-1415 Fax: (269) 273-9500 IOM-573 10/10 armstronginternational.com