Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

Similar documents
The London 2012 Olympic Park and Green Network Legacy

St Andrews Park, Uxbridge

Lead Local Flood Authority SuDS Policy Statement

Green Roofs and Stormwater Management Virginia Stovin

Renfrew Close, London

Alma Road Rain Gardens, London

Post Construction BMPs

Promoting Sustainable Drainage Systems

SUDS: Innovation or a Tried and Tested Practice?

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

Manor Ponds, Sheffield

OUR AREA SECTION 02 I NEXT PAGE. 2.1 This section sets the scene in regard to the role of the Legacy Corporation and the baseline

Leduc Industrial Outline Plan SE W4

Sustainable Urban Drainage Systems (SuDs)

Sustainable Urban Drainage Systems. Diederik Rousseau Tineke Hooijmans

SUSTAINABLE DRAINAGE AND LANDSCAPE MANAGEMENT PLAN FOR ROBINSWOOD PRIMARY SCHOOL

paving case study GREAT WESTERN PARK DIDCOT OXFORDSHIRE

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Design Assessment Checklists for Ponds/ Wetlands

An Introduction to Sustainable Drainage

Green Streets and Water

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

TarmacDry the asphalt porous paving system. Take control of rainwater management.

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

LOCAL PLAN BACKGROUND PAPER: NATURAL ENVIRONMENT. August 2014

Promoting SuDS & Green Infrastructure

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Forest Way School Coalville, Leicestershire

Toronto Complete Streets Guidelines

Grey to Green Phase 1, Sheffield

Holnicote Multi-Objective Flood Demonstration Project Steve Rose (JBA)

eastsussex.gov.uk Guide to Sustainable Drainage Systems in East Sussex

When planning stormwater management facilities, the following principles shall be applied where possible.

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

Sustainable Stormwater Management with Low Impact Development (LID)

The checklist can be used for a single filter strip or groups of filter strips with the same characteristics.

Sustainable Drainage Systems

Taking control of SuDS - with permeable paving

Technical note. Option 3a (cyan route) Project: To: A428 Bus Enhancement Scheme. Rid Hollands, Colin Young

Clearwater Photography UK

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Sustainable Stormwater Retrofit Best Practices

URWH at various scales

Green Infrastructure & Low Impact Development

Green Infrastructure and Low-Impact Development Technologies

Just The Basics: Illicit Discharge. What does it mean to me?

Sewer Flooding Alleviation in the Counters Creek Catchment

Baca Area Drainage Issues

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Hollickwood Primary School, London

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

How You Can Help With Flood Management

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

City of Hume Planning Scheme Amendment C207. Statement of Expert Evidence Provided to Planning Panels Victoria

Greening streets, retrofit rain gardens, Nottingham

The Development of Urban Planning and Landscaping for Sustainable Drainage Systems

Draft Rhode Island Stormwater Design and Installation Standards Manual

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Hopwood Motorway Service Area, Worcestershire

Welcome to our exhibition

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

BACK TO CONTENTS I PREVIOUS PAGE I NEXT PAGE. Figure 13: Major wildlife corridors

APPENDIX G: TOWN ORDINANCE REVIEW

Northumbrian Water is required to provide investment to reduce spills at Whitburn and St Peter s, Sunderland in

Heron Court Rain Garden, London

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Delivering SuDS in Leicestershire Early Experiences. Wednesday 23 rd July Introduction

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

Park Development Framework Area Proposals. Context to Area 2 Ruckholt Road to Coppermill Lane

USF System Campus Master Plan Updates Goals, Objectives and Policies

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Water Cycle ARC-452 DESIGN VI: INTEGRATION A5 ENVIRONMENTAL SYSTEM BURGENER SIMON YANGCHUAN SUN

Priors Farm Estate SuDS Retrofitting Project, Cheltenham

London Legacy Development Corporation Queen Elizabeth Olympic Park 2013/14 Events Programme Environmental Statement Non- Technical Summary Volume I

Stormwater Solutions for Residential Sites. Section 2 Stormwater Management Approach VERSION 1.0. EcoWater Solutions. Prepared for

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

CHECKLIST FOR PHASE II DRAINAGE REPORT

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Junction of Bispham Road and Bristol Avenue, north of Blackpool town centre, Lancashire, next to the former TVR car factory.

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

Masterplanning in Hackney Wick and Fish Island

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

POLICY SRT/D4 STORMWATER MANAGEMENT

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

Delivering SuDS. in Oxfordshire

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach

SuDS Design Guidance for Hertfordshire. March 2015

LANDMARK HOUSE SUDS NOT DUDS Image Credit: RSH

6.1 Bioretention Areas

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

Cambrian North Basin, Llanelli

Frequently Asked Questions

rainwise Working with communities to manage rainwater

Transcription:

Olympic Park, London SuDS used Porous asphalt strips Wetlands Swales Filter strips Filter drains Balancing ponds Rainwater harvesting 1. Location Olympic Park, Stratford, East London, E20 2ST. 2. Description The Olympic development covers an area approximately of 250 hectares and houses the Olympic Stadium, Aquatics Centre, Velodrome, Copper Box, BMX Track, Eton Manor and Riverbank Arena together with sponsors hospitality, the international broadcast centre/main press centre complex, the Orbit Tower, extensive public access areas (landscaped & paved), transport malls and operational facilities. 1

Figure 1 Anticipated residual level of contamination post remediation works (Barry Plowright) 2

The site was formerly industrial/commercial development together with Lea Valley Park and was a known depository for building rubble from properties demolished during the Second World War. The site was known to be contaminated throughout and overlays the river terrace gravel and chalk aquifers. Following completion of enabling works and remediation, the site will still contain significant areas of residual contamination. Figure 1 qualitatively depicts the expected level of residual ground contamination following remediation. This limited the opportunity for employing infiltration drainage systems across the site. A number of strategic watercourses traverse the Park, these being: River Lea River Lee Navigation Waterworks River City Mill River Old River Lea 3

Figure 2 Masterplan of Olympic & Paralympic Park (games phase) (Barry Plowright) 4

The Park is protected against fluvial flooding and actively manages flooding generated by a 100 year return period rainfall event plus Climate Change allowance. Furthermore, the fluvial peak within the River Lea catchment was approximately 24 hours after a rainfall event and in negotiation with the Environment Agency and British Waterways it was agreed that surface water runoff generated should be collected and discharged to the watercourses in advance of the river peak flow (not providing the attenuation normally required on a SuDS scheme). The site topography was dramatically changed during the course of the development with some areas of the Park being raised in the order of 9m. Similarly forming the wetland bowl within the River Lea required significant widening of the river channel reducing existing levels to suit. Plateaus have been formed for the venues and associated facilities above the river flood level with access routes to towpath level (4.5m AOD) adjacent to the watercourse. Figure 3 illustrates the proposed topography scheme for the Park covering both Games and Legacy phases. 5

Figure 3 Olympic & legacy topography scheme (Barry Plowright) 6

Following completion of the Games the Park is to be transformed into the Queen Elizabeth II Olympic Park to form a mixed use development and significant landscaped area together with a number of retained venues converted for legacy usage. Figure 4 Masterplan of Olympic & Paralympic Park (legacy phase) (Barry Plowright) 7

3. Main SuDS components used This case study details the SuDS components specifically implemented within Areas 5, 6, 7, 10 & 15 as detailed within Figure 3. Although the methods described below were consistent throughout the development. Porous asphalt strips are extensively employed throughout the pedestrian concourse area of the Park. These strips act as collection systems for overland runoff generated and convey waters into granular trenches below the strips which contain perforated pipes. The perforated pipes drain to catchpits and thence into the spine network system into watercourses. Within the wetlands area located adjacent to the Basketball Arena/Velodrome and Riverbank Arena further SuDS components have been employed that include swales, filter strips/drains and small volume balancing ponds. Finally, rainwater harvesting has been installed at two permanent venues; Velodrome and Copper Box. 4. How it works The loop road network together with spine surface water sewers and outfall structures was installed in advance of the design for the landscaping areas and venues. The design standards adopted for surface water drainage (SWD) were outlined within the Olympic Park SWD Technical Design Strategy, a requirement of which was to ensure all assets installed were adoptable by an appropriate authority. In line with this strategy and the requirement to discharge flows from the Park in advance of the fluvial peak in the River Lea, the spine networks were designed and installed as carrier pipes and manholes adoptable by Thames Water or Local Highway Authority and were sized accordingly. 5. Specific project details Within the highways of the Park, traditional road gullies and combined kerb drainage collection systems were used. In addition, accreditation areas, back of house operational areas and transport malls were afforded similar systems supported by linear drainage channels. Figure 5 Photograph of Park taken looking south (Barry Plowright) 8

The public access areas and landscaped regions provided greater opportunity to incorporate SuDS components focussing on water quality and amenity/diversity parameters. It was intended that the north park wetland feature will form a wildlife haven for plants and animals with habitats created for otters, kingfishers, grey herons and water voles. Runoff generated within the public access paved areas of the Park is collected by the porous asphalt strips. Figure 6 Overhead photograph of wetlands during construction (Barry Plowright) Filter strips/drains were installed adjacent to the wetland pathways to treat and capture runoff generated. The collected waters were discharged through catchpits into downstream networks ultimately outfalling into adjacent watercourses. Within the soft landscape areas the filter drains were generally formed from a new product-tomarket manufactured from recycled thermoplastic material. The material was selected following a review of previous successful high profile installations and independent testing assessment the manufacture of the product was accredited as being carbon positive. 9

Figure 7 Photograph along planted swale (Barry Plowright) Swales are included within the wetlands area as conveyance devices. The swales incorporate check dams at intervals to reduce velocities and provide open water features alongside wetland pathways. Swales located west of the River Lea convey flows from the upper concourse to the river towpath level transmitting waters to an outfall structure. On the east of the watercourse, the swales deliver runoff again from high to low level but discharge into habitat ponds and a wet woodland area adjacent to the River Lea. These habitat ponds and wet woodlands act as attenuation ponds installed with weirs limiting outflows whilst maintaining a minimum depth of water. Details of the above features are shown within figures 8, 9 and 10 below. 10

Figure 8 Cross Section through swale & check dam (Barry Plowright) Figure 9 Cross Section through habitat pond outlet (Barry Plowright) 11

Figure 10 Completed wetland area photograph (Barry Plowright) 6. Benefits & achievements Surface Water Drainage systems designed and installed within the north park take account of criteria requirements agreed with Environment Agency as detailed below: The existing and proposed site characteristics including topography, hydrology (surface and ground), soil and ground conditions including infiltration potential and contamination; The standards of service adopted in the design of the drainage system taking into account potential impacts of climate change; The management of extreme flood events taking into account potential impacts of climate change; Sources of surface water contamination and the identification of appropriate methods of interception and treatment; The need to protect both groundwater and the local watercourses from pollution associated with surface water run-off; The opportunities to enhance the biodiversity and amenity of the public realm through appropriate specification of drainage infrastructure; 12

Effective integration between project teams; The specification of materials for use in the construction and maintenance of the drainage infrastructure; The whole life energy requirements of the system; The safe operation and maintenance of the drainage system through its operational life; The efficient transfer from Games to Legacy minimising waste; Whole life costs were managed. 7. Challenges The following challenges were overcome during the project: Design & implementation of the SuDS scheme with client/stakeholder buy-in; Ensure all systems are adoptable; Design criteria differed for elements; Integration and coordination of SWD discharges from numerous inputs. 8. Interaction with local authority/team A number of internal and external stakeholders contributed to the design and implementation of the SWD systems within the Park and these are listed below: London Organising Committee for the Olympic Games (LOCOG) ODA Delivery Partner CLM Olympic Park Legacy Company Designers Arup/AECOM/Buro Happold/Expedition/LDA Hargreaves/Stanton Williams Environment Agency British Waterways Thames Water. London Boroughs of Newham/Waltham Forest/Hackney/Tower Hamlets 9. Project details Construction completed: 2012 10. Project team Contractors: Skanska/BAM Nuttall/ISG/Buckingham Group/Bovis Lend Lease/Mansell Construction Services/John Sisk & Sons Ltd/Carillion. This case study has been compiled by the ODA Delivery Partner Surface Water Drainage (SWD) Coordinator (Barry Plowright Senior Engineer, Atkins) author of the SWD Technical Design. 13