Feasibility Study. Prepared by Dufresne-Henry. West Side Road. Hinesburg, Vermont. February DH Project No

Similar documents
DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

4-Town Comprehensive Plan DRAFT 7/30/07

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

Project Overview. Get Involved. Public Information Meeting. Contact Information

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Northern Branch Corridor SDEIS March 2017

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

The West Vaughan Employment Area Secondary Plan Policies

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

ESTABLISH AN EFFICIENT TOWN CENTER

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Agenda Summary December 11, 2017

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Appendix E Preliminary Location Hydraulic Study

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

Asbury Chapel Subdivision Sketch Plan

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Access Management: An Overview

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

Town of Peru Comprehensive Plan Executive Summary

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

SUBDIVISION & PUD SKETCH PLAN

Transportation Committee

A. INTRODUCTION B. PROJECT LOCATION

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Memorandum. Executive Summary. Dwight Bassett Town of Chapel Hill. From: Amy Massey, P.E. Date: June 21, 2013

COLVER ROAD INDUSTRIAL CONCEPT PLAN

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WASHINGTON COUNTY OREGON

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

ADOPTED AT NOVEMBER 15, 2012 PACC MEETING

Saranac River Trail Greenway C O N D I T I O N S R E P O R T

Pennsy Greenway Trail

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

Planning Districts INTRODUCTION

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

Information for File # SEK

Description of Preferred Alternative

WELCOME TO OPEN HOUSE # 3

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

Background Summary Report

Southern Gateway Project and Public Green

Appendix G Response to Comments

SECTION 4(f) DE MINIMIS DOCUMENTATION

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

M E M O R A N D U M. Senator Cheryl Rivers Representing Windsor

The GATEWAYS Sub Area Master Plan. City of Walker

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Capital Projects in and near Odenton Town Center

REQUEST: Conditional Change of Zoning (AG-1, B-1,R-15 to Conditional R-7.5)

DRAFT MAP AMENDMENT FLU 04-4

Portage Parkway Environmental Assessment Public Information Centre No. 1

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

WELCOME TO OPEN HOUSE TWO November 28, 2018

University Parkway Corridor Plan. Public Workshop Sept. 18, 2017

9IMPLEMENTATION AND PHASING

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

AMENDMENT NUMBER 2 TO AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN URS CORPORATION GREAT LAKES AND THE CITY OF ANN ARBOR

Environmental: Urban land..51 acre wet (.30%); 1.01 acres/.59% within a 100 year floodplain; no other environmental indicators limit development.

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

VILLAGE & TOWN OF BERGEN: COMPREHENSIVE PLAN

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

SECTION 9 PUBLIC FORUM DRAFT 5/31/2017 SEVEN YEAR ACTION PLAN

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Existing Conditions and Environmental Consequences Floodplains

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Transportation Improvements

PROTOTYPE DESIGN/INTRODUCTION

CITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To: From:

Trail Feasibility and Planning Project for Northern Dutchess County, New York

TOWN OF EASTON. MASSACHUSETTS CJffiCE Of the fjown c4dminiit'tato't

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

March 21, 2018 ALCA Meeting. March 21, 2018

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

Appendix I. Access Management & Land Use Zoning Strategies Memo

Mississippi Skyway Preliminary Engineering Report

1. Golf Course Residential Single Family and Townhome Community

MacDonnell Heights Town Center

ACCESS MANAGEMENT REPORT U.S S.H. 1 TO S.H. 14 S.H U.S. 287 TO I-25

Ann Arbor Intermodal Station Environmental Review

Green Gables. April 24, 2013

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

Transportation Systems and Utility Infrastructure

WHEREAS, after consideration of the evidence presented at the public hearing on January 14, 2010, the Prince George's County Planning Board finds:

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

Issues Requiring Future Study

5.0 IMPLEMENTATION STRATEGIES

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Town of New Scotland. Public Workshop. Visioning / Planning the Future of this Hamlet. New Scotland Hamlet Master Plan.

Transcription:

Feasibility Study West Side Road Hinesburg, Vermont Communities working together to meet Chittenden County s transportation needs February 2004 Prepared by Dufresne-Henry DH Project No. 6310026.02

100 Dorset Street, Suite 22 South Burlington, Vermont 05403 T 802-660-4071 F 802-660-4079 www.ccmpo.org info@ccmpo.org The preparation of this document was financed jointly by the eighteen municipalities in Chittenden County and the Chittenden County Transportation Authority; the Vermont Agency of Transportation; and the United States Department of Transportation, Federal Highway Administration, and Federal Transit Administration. Submitted by:

CCMPO Board James Condos, South Burlington Chair Jeff McDonald, Charlotte Vice Chair Michael O Brien, Winooski Secretary-Treasurer Gerard Mullen, Bolton William Keogh, Burlington Chris Conant, Colchester Jeff Carr, Essex Andrea Morgante, Hinesburg Richard Moulton, Huntington Robert Penniman, Jericho James Manley, Milton Virginia Clarke, Richmond Phil Beliveau, St. George Norman Silcox, Shelburne Stan Hamlet, Underhill Tom Buckley, Westford George Gerecke, Williston Michael O Brien, Winooski Pat McDonald, State of Vermont Chris Cole, CCTA (Ex-officio) Lewis Wetzel, CCRPC (Ex-officio) Christopher Jolly, FHWA (Ex-officio) CCMPO Staff Paul Craven, Project Manager Bernadette Ferenc, Administrative Assistant Christine Forde, Sr. Transportation Planner Peter Keating, Sr. Transportation Planner William Knight, Executive Director David Roberts, Transportation Planner Susan Smichenko, Sr. Transportation Planner Daryl Benoit, Transportation Planner Project Steering Committee David Roberts- CCMPO Alex Weinhagen Town of Hinesburg Jeanne Wilson Town of Hinesburg Fred Haulenbeek Town of Hinesburg Rocky Martin Town of Hinesburg John Buckingham Town of Hinesburg Randy Volk Town of Hinesburg George Bedard Town of Hinesburg Christopher Pecor - Dufresne-Henry Feasibility Study iii

Contents 1.0 Executive Summary 1 2.0 Potential Alternatives 3 3.0 Preferred Alternative 4 3.1Alignment...4 3.2 Permitting/Resources...5 3.3 Benefits... 6 Appendix A Alternative Alignments Appendix B Prefered Alignment Appendix C USGS Draft Flood Study, September 24, 2003 Appendix D Miscellaneous Correspondance iv Feasibility Study

Figure List Figure 1 Permitting Requirements...3 Figure 2 Physical Characteristics...3 Feasibility Study v

1.0 Executive Summary The Chittenden County Metropolitan Planning Organization (CCMPO) is responsible for performing long and short-range transportation systems analyses for Chittenden County. CCMPO has been working with the Town of Hinesburg to evaluate a range of transportation issues associated with Vermont Route 116 through Hinesburg. Dufresne-Henry (DH) was retained under the CCMPO Technical Assistance Grant Program to assist the Town of Hinesburg, Vermont. The goal was to determine the feasibility of a new north/south alternative alignment west of Route 116, from Silver Street, just south of the Route 116 intersection, to Shelburne Falls Road. Existing Conditions The northern terminus for the Hinesburg Village West Side Road Feasibility Study is just west of the signalized four way intersection of Shelburne Falls Road, CVU Road, and Route 116. This area is known as Ballards Corner and includes a small commercial center, the new town library and nearby CVU High School to the east. Continuing south, the project limits are bounded by wooded areas and the LaPlatte River on the west and Route 116 to the east. The terrain is mostly open agricultural flats. Approaching the village from the north, the eastern limits are defined by Route 116. The area includes the developing Hinesburg Commerce Park, a new post office along with mixed commercial and light industrial development that has become a new village center. The entrance to this new village center is marked by the three-way intersection of Commerce Street and Route 116 opposite the fire station. Commercial development continues south along both sides of Route 116 to the three way intersection at Mechanicsville Road. The creamery plant on the west side of Route 116, opposite the entrance to Mechanicsville Road, marks the end of the predominantly commercial development and the beginning of the old village section of the Hinesburg corridor. The western limits of the project area include the LaPlatte River and beyond. South of Charlotte Road the western limits include the LaPlatte River but are closely bounded by steep hillsides as the project approaches Silver Street at its southern terminus. The character of the old village center from Mechanicsville Road to Silver Street consists of older homes, newer senior housing, several churches, the Town Hall and a few small businesses, including Lantman s IGA opposite Charlotte Road. Route 116 traffic peaks during the morning and afternoon commute as this area provides employment support to the Burlington area. Feasibility Study 1

Goals and Objectives The Primary goals of the alternative alignment feasibility study are described below: 1. Provide a conceptual plan for an alternative street network to be used primarily by the local community. Consequently, Route 116 would remain the primary roadway for commuter traffic. 2. Provide an opportunity for in-fill type mixed use development to promote dense development within the village core instead of the more common linear type development found on many of the state routes in our Vermont towns. The specific objectives of the study include: 1. Identify potential alternative alignments 2. Determine the preferred alignment 3. Provide a list of constraints for the preferred location 4. Develop conceptual construction cost estimates for logical roadway segments 5. Identify the potential benefits of a west side road 2 Feasibility Study

C.V.U.H.S. LIBRARY CVU ROAD BALLARDS CORNER SHELBURNE FALLS ROAD ROUTE 116 MECHANICSVILLE ROAD COMMERCE STREET POST OFFICE CHEESE CO. STELLA ROAD TOWN HALL CHARLOTTE ROAD LYMAN MEADOWS ELEM. SCHOOL BUCK HILL ROAD FRIENDSHIP LANE SILVER STREET Figure 1: Project Location Map Feasibility Study 3

2.0 Potential Alternatives A site visit with the steering committee members identified two (2) general opportunities for a west side road alignment. The alignments are shown on the map provided in Appendix A. The most appropriate beginning or southern terminus was identified as south of Charlotte Road with a connection to Silver Street. The end, or northern terminus, was identified at Shelburne Falls Road, and directly across from Pleasant View Lane. Option 1 Shown in green. Generally located east of the LaPlatte River. Benefits: 1. Meets goal of road. 2. Close proximity for dense development. 3. Cost and environmental impacts are less than Option 2. Challenges: 1. Permitting 2. ROW issues with Saputo. 3. General ROW issues. Option 2 Shown in red. Same northern terminus, but crosses the LaPlatte River at Commerce Street, then runs west of the river to Silver Street. Benefits: 1. Meets goal of road. Challenges: 1. More costly than Option 1, due to additional length of road, a bridge and more ROW acquisition. 2. More difficult permitting since it will need Army Corp. permit to cross LaPlatte River. 3. More prime agricultural land and wetland impacts 4. More ROW issues than Option 1. Recommendation: Since Option 1 is less costly, has less environmental impact, has fewer permitting issues, requires less ROW impacts, and offers more dense development opportunities, the steering committee supports Option 1. 4 Feasibility Study

3.0 Preferred Alternative As described in Section 2, the preferred alternative generally is located east of the LaPlatte River. 3.1 Alignment The preferred alignment location is constrained at various points along the route while offering opportunities for flexibility within those fixed points. Starting from the southern terminus the following fixed points will define the proposed alignment (see map in Appendix A): 1. Southern Terminus at the Silver Street/Route 116 intersection. Ideally, the alignment should be located at this existing intersection, creating a four-way intersection; otherwise two offset tees would result. The disadvantage here is right-of-way constraints. 2. Connection with Charlotte Road is at the existing intersection of Stella Road, creating a 4-way intersection. This also avoids crossing the LaPlatte River. 3. As the road proceeds north, it needs to go west of the existing Stella Foods Facility, but east of the existing lagoons. If the treatment lagoons are relocated then this point can be shifted further west. An agreement with Stella Foods is required. 4. The intersection with the future Commerce Street Extension should be located approximately in a straight line extended from the existing Commerce Street west of Route 116. The newly created three-way intersection will complete the inner boundary of the new village center area. The western limits are generally defined by the 100 year flood plain. 5. The northern terminus should be located at the intersection of Pleasant View Lane and Shelburne Falls Road (approximately 700 from the Route 116 intersection). Lining up with Pleasant View Lane provides a four-way stop controlled intersection. The 700 feet from the signalized intersection should provide adequate separation to avoid conflicts with queuing. Generally, the segments between each of the fixed points can be designed to optimize dense development opportunities while minimizing impacts to natural resources. The alignment should be placed east of the limits of the 100 year flood boundary determined by the preliminary report from USGS. However, the actual final location may be very different from that shown on the plans. Factors affecting the alignment include: 1. Roadway Purpose development access or alternative local route. 2. Development goals and objectives. 3. Goals for pedestrian use. A summary of the physical characteristics of each segment is included in Table 3.1. Feasibility Study 5

Characteristics A (Silver St. to Charlotte Rd.) Segments B (Charlotte Rd. to Commerce St.) C (Commerce St. to Shelburne Falls Rd.) Soils Not free draining Existing road Not free draining ROW Impacts (# of properties) 3 (residential) 1 (Saputo) 1 (Farm) Current Land Use Residential Length 1,100 Mixed Use Commercial/Village 1,800 plus 800 for Commerce Ext. Agricultural 2,900 Estimated Construction Cost (1) $1.0 M $2.3 M $2.6 M Table 3.1 Physical Characteristics (1) Assumptions: Avg. unit price of $900/LF based on characteristics of similar projects. Planning purposes only. Does not include Engineering for ROW. Does not include signals, utilities or miscellaneous items. Includes 40 of roadway pavement width (road, shoulder, sidewalk) with base and pavement. 3.2 Permitting / Resources Resource constraints along this alignment are primarily related to the LaPlatte River. Its floodplain, associated wetlands and the heavy farming soils will dictate development opportunities. Floodplain USGS has completed the draft flood study report for the Town of Hinesburg. The revised 100-year flood plain is included on the attached mapping. The small amount of proposed roadway development outside the floodway but within the 100-year flood plain will need to be analyzed to ensure that the change in water surface elevation caused by the new road does not increase by more than 1.0 feet. The minimal impacts would not likely preclude construction of the roadway as shown in Appendix A. See Appendix B for the draft report. Wetlands issues Since Class 1, 2, & 3 wetlands are regulated by the Army Corp of Engineers, Martha Lefebvre was contacted to discuss possible impacts and permitting requirements under ACOE jurisdiction. Since the majority of these lands are considered Prior Converted Farmland (PC), then ACOE does not have regulatory authority. Class 1 & 2 wetlands are also regulated by the State of Vermont ANR. April Moulaert (ANR) indicated that some wetlands are located within the project limits but need to be specifically delineated to determine the potential impact. With proper mitigation and avoidance it is likely that permits to construct the road could be obtained. As 6 Feasibility Study

development within this area is requested, the Town should ensure its mapping is updated to reflect specific wetland delineations and permitting requirements. See Table 3.2 for likely permitting requirements needed prior to construction of each segment of the West Side Road. Segments Permits A B C ACT 250 Likely Likely Likely Prime Ag. Farmland (9B) No Possible Yes ACOE 404 (wetlands class 1, 2, & 3) No, PC No, PC No, PC ANR CUD (wetlands class 1 & 2) Class 1 or 2 are likely Some Some VTrans Access SHPO (Section 106) ANR Stream Alteration Yes, intersection with Route 116 and Silver St. Impact to historic house at Southern terminus No Yes, intersection of Commerce St. with Route 116 No Maybe, Patrick Brook No No Maybe, Patrick Brook Stormwater Permit Yes Yes Yes General Construction Permit Yes Yes Yes 3.3 Benefits Table 3.2 Permitting Requirements Planning for future development offers many benefits to the Town by establishing a master plan that helps guide development for future decision makers. The west side road alignment promotes the following smart growth concepts:! Encourage development build-out within the Village/Town center.! Discourages linear type development.! Offers alternative traffic operations and volume distribution to the heavily traveled Route 116. Resulting in congestion mitigation at the Charlotte Rd./Route 116 intersection.! Minimizes/Balances environmental impacts with economic development.! Roadway provides a safer, more appealing corridor for alternative modes of transportation like biking and walking. Feasibility Study 7