2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Accredited to ISO/IEC 17065:2012) to provide product conformity certification 4th Floor, Mill 3 Pleasley Vale Business Park Mansfield Nottinghamshire NG19 8RL Contact: Ms S Delaunay Tel: +44 (0)845 543 0330 Fax: +44 (0)845 543 0332 E-Mail: stephanie.delaunay@napit.org.uk Website: www.napit.org.uk Locations where certification activities covered by the above Accreditation are undertaken NAPIT Certification Ltd 4 th Floor, Mill 3 Pleasley Vale Business Park Mansfield Nottinghamshire NG19 8RL Assessment Manager: KG1 Page 1 of 7
DETAIL OF ACCREDITATION Micro-generation scheme Micro-generation installation standard: MCS 001 Installer scheme requirements. Micro-generation installer standard: MIS 3001 handover of solar heating micro-generation systems. Micro-generation installer standard: MIS 3002 handover of Solar Photovoltaic Systems. Micro-generation installer standard: MIS 3003 handover of Micro and small wind turbine systems. Micro-generation installer : MIS 3004 handover of Solid Bio fuel heating systems. Micro-generation installer standard: MIS 3005 handover of heat pump systems. Micro-generation installer standard: MIS 3007 handover of Micro CHP systems. Additional Requirements for MCS Installation Companies to become Green Deal Authorised MCS 023 Requirements for electrical installations in dwellings referred to in Part P of the Building Regulations 2000 (as amended) and the IET Electrotechnical Assessment Specification (Work Category A1.1) BS 7671 2008 (2011) Assessment Manager: KG1 Page 2 of 7
Requirements for electrical installations in buildings (other than dwellings) and industrial locations referred to in the IET Electrotechnical Assessment Specification (Work Category A1.2) BS7671:2008 (2011) Installation of following measures: Condensing Boilers, Natural Gas-fired and Liquefied Petroleum Gas-fired (domestic and non-domestic) Condensing Boilers, Oil Fired (domestic and non-domestic) Heating and Hot Water System Controls Under-floor Heating Flue Gas Heat Recovery Devices Natural Gas-fired and Liquid Petroleum Gas-fired Warm-air Heating Systems Electric storage heaters (domestic and non-domestic) Cavity wall insulation, including that installed in party walls Flexible Thermal Linings Loft Insulation Pitched Roof Insulation Flat Roof Insulation Internal Wall Insulation External Wall Insulation Hybrid Wall Insulation Draught Proofing Floor Insulation Heating System Insulation (pipes and cylinders) Energy Efficient Glazing and Doors including replacement insulating glass units (IGU)Light Fittings, Lighting Systems and Lighting System Controls Solar Blinds, Shutters and Shading Devices (internal and ext) Chillers Hot water systems Mechanical Ventilation and Heat Recovery Radiant heating (non-domestic) Water efficient taps and showers Variable speed drives for fans and pumps Low energy circulator pumps Low temperature radiators and fan convectors Electric storage heaters (including electric warm air heating units that incorporate heat storage) PAS 2030:2017 Specification for the installation of energy efficiency measures (EEM) in existing buildings Edition 4 - February 2017 PAS 2031:2017 Certification of energy efficiency measure (EEM) installation in existing buildings Edition 3 March 2017 Assessment Manager: KG1 Page 3 of 7
Installation of fixed low or extra-low voltage electrical installations in dwellings. Installation of fixed low or extra-low voltage electrical installations in dwellings, as a necessary adjunct to or arising out of other work being carried out by the registered person. Installation of an energy efficient lighting system or electric heating system, or associated electrical controls in buildings other than dwellings. Installation of (a) an oil-fired combustion appliance; or (b) oil storage tanks and the pipes connecting them to combustion appliances. This paragraph does not apply to the provision of a masonry chimney. Installation of a solid fuel burning combustion appliance. Other than a biomass appliance. This paragraph does not apply to the provision of a masonry chimney. Assessment Manager: KG1 Page 4 of 7
Installation in a building of a system to produce electricity, heat or cooling (a) by microgeneration; or (b) from renewable sources (as defined in Directive 2009/28/EC of 23 of the European Parliament and Council on the promotion of the use of energy from renewable sources (15)). Installation of a sanitary convenience, sink, washbasin, bidet, fixed bath, shower or bathroom in a dwelling, that does not involve work on shared or underground drainage. Installation of a wholesome cold water supply or a softened wholesome cold water supply. Installation of a supply of non-wholesome water to a sanitary convenience fitted with a flushing device that does not involve work on shared or underground drainage. Installation of a heating or hot water system, or its associated controls Assessment Manager: KG1 Page 5 of 7
Installation of an air conditioning or ventilation system in a dwelling that does not involve work on a system shared with other dwellings Installation of a mechanical ventilation or air conditioning system or associated controls, in a building other than a dwelling, that does not involve work on a system shared with parts of the building occupied separately Installation, as a replacement, of a window, rooflight, roof window or door in an existing dwelling Installation, as a replacement, of a window, rooflight, roof window or door in an existing building other than a dwelling. This paragraph does not apply to glass which is load bearing or structural or which forms part of glazed curtain walling or a revolving door. Installation, as a replacement, of the covering of a pitched or flat roof and work carried out by the registered person as a necessary adjunct to that installation. This paragraph does not apply to the installation of solar panels Assessment Manager: KG1 Page 6 of 7
Insertion of insulating material into the cavity walls of an existing building Installation of insulating material to the internal walls of a building, not including the installation of flexible thermal linings Installation of insulating material to the external walls of a building, not including insulation of demountable-clad buildings Installation of insulating material to the external and internal walls of a building ( hybrid insulation ), not including insulation of demountable-clad buildings, and not including the installation of flexible thermal linings END Assessment Manager: KG1 Page 7 of 7