BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012

Similar documents
BASIC ASSESSMENT REPORT. Background Information Document

BACKGROUND INFORMATION DOCUMENT:

SIBAYA WATERLINE BASIC ASSESSMENT PROCESS. PRE-APPLICATION MEETING WITH EDTEA March 2016

ENVIRONMENTAL IMPACT ASSESSMENT

MEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)

BASIC ASSESSMENT PROCESS

Cape Environmental Assessment Practitioners(Pty)

BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT

SITE INVESTIGATION REPORT: CONSTRUCTION OF NTUMBA VEHICULAR/PEDESTRIAN BRIDGE ACROSS A STREAM IN ROOKDALE, OKHAHLAMBA LOCAL MUNICIPALITY

PROPOSED GARDEN CITY NEW TOWN DEVELOPMENT, KRAAIFONTEIN DRAFT ENVIRONMENTAL IMPACT REPORT Summary Document

PUBLIC CONSULTATION MACROBERT INCORPORATED GREENWAY FARMS (PTY) LTD BOKPOORT OPERATIONS INTEGRATED WATER USE LICENCE APPLICATION

Draft Western District Plan

BACKGROUND INFORMATION DOCUMENT

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

SINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR

APPENDIX D PUBLIC NOTIFICATIONS

TSHWANE STRENGTHENING PROJECT PHASE 1, GAUTENG PROVINCE: Draft Scoping Report: Apollo - Verwoerdburg July 2009

Reg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web:

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015

CORNUBIA RETAIL PARK- PLANNING REPORT REVERT 3

Our Constitutional imperative

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

PUBLIC PARTICIPATION REPORT PPP SUMMARY

Environmental Impact Assessment

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Sustainability Statement. Whitby Business Park Area Action Plan

Neighbourhood Planning Local Green Spaces

Draft Eastern District Plan

Official Plan Review

Northern Territory Compact Urban Growth Policy

Longbridge Town Centre Phase 2 Planning Application

Elfrida Growth Area Study

Implementing sustainable water strategy through development industry engagement

Key issues and visual receptors

MAYFIELD WEST SECONDARY PLAN PHASE 2

Significant Tree Register

CURRICULUM VITAE MAGNUS VAN ROOYEN

Rapid Transit Implementation Working Group September 14, 2017

6 Growth Management Challenges and Opportunities

HERITAGE WESTERN CAPE GUIDELINES FOR PUBLIC MONUMENTS AND MEMORIALS

Topham Mall, Bentham, Pitt and Waymouth Street Place Plan

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY

PDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report

INDEX INTRODUCTION. The development encompasses multifaceted living and will include the following:

Attention: Interested and Affected Party (I&AP) Commenting Period: 22 November January 2018 GNEC Code: 20327

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

Public Consultation. Land at Monks Farm, North Grove. Welcome

South of Eastern Strategic Direction Status Update

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

ONTARIO MUNICIPAL BOARD

PUBLIC NOTICE UNDER CLAUSE 5 OF SCHEDULE 1 OF THE RESOURCE MANAGEMENT ACT 1991 PLAN CHANGE 12 TO THE OPERATIVE CITY OF NAPIER DISTRICT PLAN

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

PLNPCM Carl s Jr. Commercial Parking Lot at Redwood Road and 1700 South

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

Central Lake Ontario Conservation Conservation Lands Master Plan

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator

Complete Neighbourhood Guidelines Review Tool

CHAPTER 4: CONTEXTUALISING THE PROPOSED PROJECT ENVIRONMENT WITHIN THE NATIONAL AND LOCAL

Ebbsfleet Development Corporation

HAMLET OF KINGMAN AREA STRUCTURE PLAN

Wednesbury to Brierley Hill Extension

Subject: Hendry County Evaluation and Appraisal Report Letter of Understanding - Identification of Major Issues

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

PUBLIC PARTICIPATION REPORT MINUTES OF PUBLIC MEETING

RE: QUEENSLAND GOVERNMENT PLANNING POLICY REVIEW

An Evaluation of the Consequences of EIAs on KZN s Biodiversity Targets

MAYFIELD WEST SECONDARY PLAN PHASE 2

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment

Linden Homes Proposals for land off Ringwood Road, Verwood

REDZ & POWER CORRIDOR GAZETTING. 25 July Environmental Advisory Services

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Road Safety Impact Assessment

FIRE SAFETY MANAGEMENT PLAN

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

Foreword. Síle de Valera, TD, Minister for Arts, Heritage, Gaeltacht and the Islands

WEST HILL BUSINESS PARK AREA STRUCTURE PLAN

Planning for the Future Urban Area. in north Markham. Update. Development Services Committee. December 9, De Development Services Committee

Christchurch City Council Civic Offices 53 Hereford Street Christchurch. Submission on: The Draft Annual Plan 2014/15

2. PROJECT SITE LOCATION & DESCRIPTION

Kibworth Harcourt. Introduction. Introduction

Regional Context Statement

THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI

10.0 Open Space and Public Realm

Rannoch 132 / 33 kv Substation Extension

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

Transcription:

BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012 WHAT DOES THIS DOCUMENT TELL YOU? This document aims to provide you, as an Interested and Affected Party (I&AP), with background information regarding the proposed development of the Canelands Extension Site by Tongaat Hulett Developments (Pty) Ltd. The document also provides information regarding the Basic Assessment (BA) process to be undertaken. Furthermore, the document advises how you can become involved in the project, receive information and/or raise issues, which may concern and/or be of interest to you. The sharing of information forms the basis of the public participation process and offers you the opportunity to become actively involved in the project from the outset. Public participation plays an important role in the undertaking of a BA as input from I&APs ensures that all potential issues are considered within the study. WHAT DOES THE PROJECT ENTAIL? The proposal is to bring on stream this parcel of land and create an industrial development in a sensitive, appropriate and controlled manner. The proposed development is approximately 7 hectares in extent. This proposed development could be seen as an extension of the existing Canelands Industrial Park. WHAT ARE THE POTENTIAL ENVIRONMENTAL IMPACTS ASSOCIATED WITH THE PROPOSED PROJECT? During the assessment process desk-top studies combined with a site visit will identify potential issues which require further investigation within the Basic Assessment Report. Input from the public through the public participation process provides valuable input in the identification of issues requiring investigation within this BA process. The study will highlight areas that should be avoided in order to minimise potential impacts, and evaluate the project alternatives. The Basic Assessment will aim to achieve the following: to provide an overall assessment of the social and biophysical environments of the affected area by the proposed construction of the project; to undertake a detailed assessment of the preferred site/s in terms of environmental criteria including the rating of significant impacts; to identify and recommend appropriate mitigation measures for potentially significant environmental impacts; and to undertake a fully inclusive public participation process to ensure that I&AP issues and concerns are recorded and commented on. WHY ARE ENVIRONMENTAL STUDIES NEEDED? In terms of the Environmental Impact Assessment (EIA) Regulations Government Notice R. 543 to Notice R. 546 of 2010 published in terms of Section 24(5) read with Section 44 of the National Environmental Management Act (NEMA), 1998 (Act No 107 of 1998), Tongaat Hulett Developments requires authorisation from the KwaZulu-Natal Department of Agriculture and Environmental Affairs (DAEA) for the undertaking of the proposed project as it includes activities listed under 1

Regulation 544 and 546 of the NEMA EIA regulations. Activities under these listings may have a detrimental effect on the environment, hence a BA process, as prescribed in Regulations 21 to 25 of the Environmental Impact Assessment Regulations (Regulation 543), will have to be undertaken. Tongaat Hulett Developments has appointed SSI Environmental, as an independent Environmental Assessment Practitioner (EAP), to undertake environmental studies to identify and assess all potential environmental impacts associated with the proposed project. As part of these environmental studies, all I&APs will be actively involved through a public participation process. PUBLIC PARTICIPATION PROCESS It is important that relevant I&APs are identified and involved in the public participation process from the outset of the project. To ensure effective public participation, the process includes the following steps: STEP 1: Advertise the BA Process (local newspaper) STEP 2: Register I&APs and key stakeholders on the database (on-going) STEP 3: Consultation with, and transfer of information to, I&APs through consultation, a public meeting and key stakeholder workshops STEP 4: Invite I&AP comment and input on the draft BA report (40-day comment period) STEP 5: Record all comments, issues and concerns raised by I&APs within an issues trail, which will form an integral part of BA Reports. process to become involved in the process and provide comment, or raise those issues and concerns which affect and/or interest you, or about which you would like more information. Your input into this process forms a key part of the environmental studies and we would like to hear from you to obtain your views on the proposed project. By completing and submitting the accompanying response form, you automatically register yourself as an I&AP for this project, and ensure that your comments, concerns or queries raised regarding the project will be noted. Interested I&AP s are invited to register by submitting their name, contact information and interest in the project to the Environmental and Public Participation consultant before the 31 st October 2012. Ms. Sharleen Moodley SSI Environmental PO Box 55, Pinetown, 3600 Direct 031 719 5532 Fax 031 719 5505 E-mail novashnim@ssi.co.za HOW CAN YOU GET INVOLVED? 1. By responding (by phone, fax or e-mail) to our invitation for your involvement in the process; 2. By completing the attached comment form and mailing or faxing it to SSI Environmental; 3. In writing contacting consultants if you have a query, comment or require further project information; and 4. By reviewing and commenting on the draft BA Report within the allowed 40-day review period. COMMENTS AND QUERIES If you consider yourself an I&AP for this proposed project, we urge you to make use of the opportunities created by the public participation 2

Map 3

BASIC ASSESSMENT PROCESS PROPOSED CANELANDS EXTENSION DEVELOPMENT, ethekwini MUNICIPALITY, KWAZULU-NATAL PROVINCE KZN DAEA REF NO: DM/0031/2012 COMMENT FORM YOUR COMMENTS AND QUERIES ARE WELCOME Please complete this Comment Form in full before 31 st October 2012, and return to: Ms. Sharleen Moodley PO Box 55, Pinetown, 3600 Phone: (031) 719 5532 E-mail novashnim@ssi.co.za Fax: (031) 719 5505 TITLE (Prof/Mr/Mrs) FIRST NAME SURNAME CAPACITY (e.g. Secretary/Director) ORGANISATION POSTAL ADDRESS POSTAL CODE TEL. NO.: ( ) CELL NO.: FAX NO: ( ) E-MAIL ADDRES: What comments / concerns would you like to raise regarding this proposed project? (Please use additional pages, if required) PLEASE REGISTER THE FOLLOWING PERSON(S) ON THE PROJECT DATABASE: Name: Organisation: Contact details: Address: Tel.: Fax: Cell: E-mail: IF YOU WOULD NOT LIKE TO RECEIVE ANY FURTHER INFORMATION REGARDING THIS PROPOSED PROJECT AND WOULD PREFER TO BE REMOVED FROM THE PROJECT DATABASE, PLEASE TICK THE BOX BELOW AND RETURN THE FORM TO THE PUBLIC PARTICIPATION CONSULTANTS WHOM S CONTACT DETAILS ARE PROVIDED ABOVE. YES, Please remove me from the project database SIGNATURE: 4

BASIC ASSESSMENT AND WATER USE LICENCE APPLICATION PROCESS BASIC ASSESSMENT FOR THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL BACKGROUND INFORMATION DOCUMENT (JULY 2015) KZN EDTEA REF NO: DM/0031/2012 DWS REF NO: To be confirmed What does this document tell you? This document aims to provide you, as an Interested and Affected Party (I&AP), with background information regarding the initiative by Tongaat Hulett Developments to develop the site adjacent to the existing Canelands Industrial estate for industrial purposes. The site falls within the ethekwini Municipality in KwaZulu-Natal (KZN). The document also provides information regarding the Basic Assessment (BA) being undertaken. The document also advises you how you can become involved in the project by reviewing information, and making inputs thereon, including raising any possible issues. This sharing of information forms the basis of the public participation process and offers you the opportunity to become actively involved in the project from the outset. Public participation allows for local knowledge to be integrated into the BA as generated. The project can be summarised as follows: What does the project entail? Project name Local authority (Competent Authority CA) Landowner(s) Property Details Basic Assessment for the Proposed Canelands Extension, KwaZulu-Natal ethekwini Municipality The KwaZulu-Natal Department of Economic Development, Tourism and Environmental Affairs - EDTEA (Environmental Authorisation - EA); and The Department of Water and Sanitation (Water Use Licence - WUL) Tongaat Hulett Portion 2026 of the Farm Cottonlands No. 1575, 59 New Glasgow Road, Canelands. Surveyor General Identity Digits: N 0 F U 0 0 0 0 0 0 0 0 1 5 7 5 0 2 0 2 6 Site coordinates (centre) Location / Directions Latitude /Longitude Degrees Minutes Seconds South 29 37 21.80 East 31 3 35.56 From Verulam town take R102 north then turn left into Umdloti Drive. Drive along Mdloti Drive for approximately 2 km and then take left turn into MR 530. Description of the proposed project Canelands Extension (to the east of the existing establishment) is located to the south-west of the Dube Tradeport and King Shaka International Airport (KSIA) precinct. The development is situated in the north eastern quadrant of Canelands industrial area, adjacent to the north coast railway line. The development covers an area of 7.23 gross hectares. Access to the development is taken off Vincent Dickenson Road via road D499, a divisional road. The location and proposed layout of the development is indicated in Figures 1 and 2 below. 1

Developable area Extent of site Figure 1: Location of study area (inset: provincial contextualisation) Developable area Open Space Figure 2: The planned development layout Tongaat Hulett Developments wish to develop the site for industrial purposes. The site lies adjacent to the existing Canelands Industrial estate. Potential land uses may include general / light industrial, logistics, warehousing and distribution. These land uses will complement those of the existing Canelands Industrial Estate, and will ensure that this land parcel provides an extension to the existing development. It is proposed, due to the proximity of the floodplain and numerous other constraints located on site, that a single platform covering an area of approximately 1.56 hectares is created. Both a servicing and traffic report has been completed, which details how this development will be accommodated by the existing bulk infrastructure within the region. 2

The development of Canelands Extension would allow for an additional industrial platform to be created, which would in turn stimulate additional jobs and economic activity. From a policy perspective, the need for job creation, as well as locating jobs close to those who need them is stressed in both the National Development Plan (NDP), as well as the Provincial Growth and Development Plan (PGDP). The development of Canelands Extension would create jobs in close proximity to the rural periphery of the ethekwini Municipality, where jobs are required. The development of Canelands Extension is also in line with the planning frameworks of the ethekwini Municipality, including the Northern Urban Development Corridor (NUDC) plan. In addition to this, Canelands Extension is in close proximity to the KSIA and therefore forms part of the Airport City, or Durban Aerotropolis which is currently being driven jointly between provincial and local government. There is a demand for well located industrial land within close proximity to the airport / Dube Tradeport. Additional Industrial activity will further stimulate trade, and in turn increase the demand for air cargo logistics. This will translate into additional use of the service offered at the Dube Tradeport, which will further stimulate jobs and growth and investment within the region. Plates 1 to 2 illustrate the study area. Plate. 1: Point of access to the site Plate. 2: The north east view of the site What are the potential environmental impacts associated with the proposed project? Potential environmental impacts associated with the project have been identified. Therefore, as part of the BA, these potential impacts will be assessed through the following specialist studies: Specialist Study Engineering and Civil Services Ecological Assessment Geotechnical Assessment Heritage Impact Assessment Traffic Impact Assessment Wetland Assessment and Rehabilitation Plan 3 Organisation Bosch Stemele GroundTruth Drennan Maud and Partners ethembeni Cultural Heritage Aurecon GroundTruth Input from the public through the public participation process provides valuable input in the identification of issues requiring investigation within this BA process. The study will highlight areas that should be avoided in order to minimise potential impacts, and evaluate the project alternatives. The BA will aim to achieve the following: - Provide an overall assessment of the social and biophysical environments of the affected area by the proposed construction of the project; - Undertake a detailed assessment of the preferred site(s) in terms of environmental criteria including the rating of significant impacts; - Identify and recommend appropriate mitigation measures for potentially significant environmental impacts; and - Conduct a fully inclusive public participation process to ensure that I&AP issues and concerns are recorded and commented on. Why are environmental studies needed? In terms of the Environmental Impact Assessment (EIA) Regulations Government Notice (GNR) 543 to GNR 546 of 2010 published in terms of Section 24(5) read with Section 44 of the National Environmental Management Act (NEMA)(Act No 107 of 1998), Tongaat Hulett Developments requires authorisation from the KwaZulu-Natal Department of EDTEA for the undertaking of the proposed project as it includes activities listed under GNR 544 and 546 of the NEMA EIA regulations. Activities under these listings may have a detrimental effect on the environment, hence a BA process, as prescribed in the EIA Regulations (GNR 543 of 2010), will have to be undertaken. The proposed project must comply with the 2010 EIA Regulations as the application was lodged in 2012, prior to the 2014 EIA Regulations amendments, and must therefore progress under the 2010 EIA Regulations. The following activities of GNR 544 are being applied for the EA: - Activity 9 This activity is applicable for the stormwater reticulation. Basic infrastructure forms part of the project before being sold to the end-user and is therefore applied for. Furthermore, it is within 32 m from the Umdloti River;

- Activity 10 This activity is applicable for the electricity infrastructure; - Activity 23 - The transformation of undeveloped, vacant or derelict land to industrial inside an urban area, and where the total area to be transformed is 7 hectares; and - Activity 24 - The transformation of land bigger than 1 000 m 2 in size, industrial or institutional use, where, such land is zoned as amenity reserve. In terms of the National Water Act (NWA) (Act No.36 of 1998) (as amended), Tongaat Hulett Developments also requires a Water Use Licence (WUL) from the Department of Water and Sanitation (DWS). The following water uses of Section 21 of the NWA are being applied for the WUL: - (c) Impeding or diverting the flow of water in a watercourse; - (f) Discharging waste or water containing waste into a watercourse through a pipe, canal, sewer, sea outfall, or other conduit; - (g) Disposing of waste in a manner which may detrimentally impact on a water resource; and - (i) Altering the bed, banks, course or characteristics of a watercourse; Activities under these listings may have an effect on the environment, hence a BA process, as prescribed in the EIA Regulations and a WUL Application will have to be conducted. A BA is an effective planning and decision-making tool, which allows for the identification of potential environmental consequences of a proposed project, and its management through the planning process. Tongaat Hulett Developments has appointed Royal HaskoningDHV as the independent Environmental Assessment Practitioner (EAP) to conduct the required environmental studies. As part of these environmental studies, all I&APs will be actively involved through a public participation process (PPP). Public Participation Process It is important that relevant I&APs are identified and involved in the PPP from the outset of the project. To ensure effective public participation, the process includes the following steps during the BA Process: - STEP 1: Create awareness of the BA process (by way of advertisement in local newspaper, circulation of BID [this document] and erection of site notices); - STEP 2: Register I&APs and key stakeholders on the database (on-going); - STEP3: Consultation with, and transfer of information to, I&APs through consultation and stakeholder engagement; - STEP 4: Invite I&AP comment and input on the draft BA report (BAR) (40-day comment period for BA and 60-day comment period for WUL Application); and - STEP 5: Record all comments, issues and concerns raised by I&APs within an issues trail, which will form an integral part of the BAR. How can you get involved? - By responding (by phone, fax or e-mail) to our invitation for your involvement in the process. - By completing the attached comment form and mailing or faxing it to Novashni Sharleen Moodley at Royal HaskoningDHV. - In writing contacting consultants if you have a query, comment or require further project information. - By reviewing and commenting on the draft BAR within the allowed 40-day or 60-day review periods. If you consider yourself an I&AP for this proposed project, we urge you to become involved. Please make use of the opportunities created by the public participation process to become involved in the process and provide comment. If you have issues and/or concerns which affect and/or interest you, please raise them. Or, if you would simply like more information, let us know. Your input into this process forms a key part of the environmental studies and we would like to hear from you to obtain your views on the proposed project. By completing and submitting the accompanying response form, you automatically register yourself as an I&AP for this project, and ensure that your comments, concerns and/or queries raised regarding the project will be noted. Comments and queries on the project can be directed to Mrs Novashni Sharleen Moodley Royal HaskoningDHV PO Box 55, Pinetown, 3600 Tel 031 719 5532 Fax 031 719 5505 Email novashni.moodley@rhdhv.com 4

BASIC ASSESSMENT AND WATER USE LICENCE APPLICATION PROCESS BASIC ASSESSMENT FOR THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL BACKGROUND INFORMATION DOCUMENT (JULY 2015) KZN EDTEA REF NO: DM/0031/2012 DWS REF NO: To be confirmed YOUR COMMENTS AND QUERIES ARE WELCOME (TEAR THIS SHEET AND RETURN) Please complete this Comment Form in full and return to: Mrs Novashni Sharleen Moodley PO Box 55, Pinetown, 3600 Tel 031 719 5532 Fax 031 719 5505 Royal HaskoningDHV Email novashni.moodley@rhdhv.com Title (Prof/Mr/Mrs) First name Surname Capacity (e.g. Secretary / Director) Organisation Postal address Postal code Tel No. ( ) Cell No. Fax No. ( ) Email address What comments / concerns would you like to raise regarding this proposed project? (Please use additional pages, if required) PLEASE REGISTER THE FOLLOWING PERSON(S) ON THE PROJECT DATABASE: Title (Prof/Mr/Mrs) First name Surname Capacity (e.g. Secretary / Director) Organisation Postal address Postal code Tel No. ( ) Cell No. Fax No. ( ) Email address Signature IF YOU PREFER NOT TO RECEIVE ANY FURTHER INFORMATION REGARDING THIS PROPOSED PROJECT, AND, WOULD PREFER TO BE REMOVED FROM THE PROJECT DATABASE, PLEASE TICK THE BOX BELOW AND RETURN THE FORM TO THE PUBLIC PARTICIPATION CONSULTANTS (CONTACT DETAILS AS PROVIDED ABOVE). Yes, remove my name 5