Inspection and Test Plan for Switchgear

Similar documents

MANUFACTURER OF LT PANELS

INSPECTION REPORT Nr IDD/S-09/922

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES

Independent, accredited testing station Member laboratory of STL and LOVAG

10.6 Schedule of Accreditation

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

This is a preview - click here to buy the full publication. High-voltage switchgear and controlgear

Product Guide Low Voltage Switchboard & Switchgear

Development of standards for MV Switchgear for Arc Flash protection. ABB Group May 20, 2013 Slide 1

SECTION AUTOMATIC TRANSFER SWITCHES

APPENDIX H (DESIGN SUBMISSION CRITERIA)

SUGGESTED SPECIFICATION For Series 300 Manual Transfer Switches (3MTS)

SECTION COMMERCIAL-KITCHEN HOODS

Factory Equipment Testing of Single Lift Substation

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

PGR-8800 TECHNICAL FAQ

DIRECTIVE NO: D-B

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

SECTION Fluorescent Dissolved Oxygen Measuring System

OPERATING AND MAINTENANCE MANUAL FOR ELECTRIC STAINLESS STEEL HEATER FOR DEIONIZED (DI) WATER ELECTRIC HEATER COMPANY BASE MODEL D

NEW HV/LV TRANSFORMER SUBSTATION WITHIN A BUILDING INTENDED FOR OTHER NON ELECTRICAL USES WITH ADVANCED FUNCTIONALITIES

SECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CONTENTS AUTOMATIC TRANSFER SWITCHES

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

DC POWER DISTRIBUTION BOARD

MHCCW Chilled Water Ceiling Concealed With 5kW Electric Heat 2-Pipe Heat / Cool Fan Coil 30,000 BTUH

Lloyd s Register Type Approval System Test Specification Number 3

MHCCW Chilled Water Ceiling Concealed Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000 BTUH

GMA Panels with double busbar

UFGS (August 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS

IECEx TEST REPORT IEC Explosive atmospheres Part 0: Equipment General requirements

STCP 02-1 Issue 005 Alarm & Event Management

Installation Guide for AL400ULM. Multi-Output Access Control Power Supply Charger

MODEL GPT-130 SINGLE POINT HEAT TRACE CONTROL THERMOSTAT

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS

SECTION SECURITY TESTING AND COMMISSIONING

Installation Guide for AL600ULM. Multi-Output Access Control Power Supply Charger. Rev

Smoke Vent Control Panel PCB4 V4 Installation Manual

MODULAR CONNECTOR 154 (58 AND 96) POS, WATERPROOF PRODUCT SPECIFICATION

EG Controls. SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF E G

MAINTENANCE OF LV SWITCHGEAR SECTOR / ENGINEERING TECHNICAL & CERTIFIED TRAINING COURSE

NPS/003/025 Technical Specification for Fault Throwers

SECTION ELECTRICAL SYSTEMS COMMISSIONING

MODEL FPT-130 SINGLE POINT FREEZE PROTECTION HEAT TRACE CONTROL

Installation Guide for AL300ULM. Multi-Output Access Control Power Supply Charger

FORM ACCL-PC1 ACCL WITNESS TEST PROCEDURE AND CHECKLIST

26 of 128 9/23/2014 9:25 AM

EFCOG Best Practice #121

Contents. Preface. Chapter 2 Faults, types and effects The development of simple distribution systems Faults-types and their effects 7

TOSVERT VF-S15. ATEX Guide. ATEX applications in explosive gas atmosphere or in the presence of combustible dust

Systems of inspecting the existing building and the procedures of auditing engineering plans. M. Mostafa

SACE PR021/K SIGNALLING UNIT

SECTION INDUCTIVE CONDUCTIVITY ANALYZERS

2 (Section 1.0) & Yellow Book

NOTE TO SPECIFIER: This section is based on the products manufactured by Soundmask Australia Pty Ltd:

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION DOMESTIC WATER HEATERS

FALCON SERIES 12 METAL CLAD

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Duct heaters for ATEX/IECEx hazardous areas or in non-atex version

SECTION GENERATOR PARALLELING CONTROLS

PRODUCT SPECIFICATION FireMaster Plus

Installation, operating and servicing instructions

SECTION Process and Immersion Turbidity and Total Suspended Solids Sensor

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL ECO 18 ECO 24 ECO 27 IMPORTANT SAFETY INFORMATION

(Notices) EUROPEAN COMMISSION

Arc Fault Protection System D1000

Dual Point General Purpose Heat Trace Control TRACON MODEL GPT 230 Installation and Operation Manual

D1000 Arc-fault Protection System

GENERAL SPECIFICATION ELECTRICAL

MODULAR TRACTION SUBSTATIONS CITY ELECTRIC TRANSPORT

DWA2000. WAAS Annunciator. Installation and Operations Manual. Rev 1.0 August 2014

SECTION Free/Available Chlorine Analysis System

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

Process Water Heater For Industrial Applications All Voltages, Single or Three Phase Up To 88 KW

Installation, Operation and Maintenance Manual

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

FALCON SERIES 12 METAL CLAD

Installation and Operations Manual

CHECKFIRE 210 Detection and Actuation System

SPECIFICATIONS MODEL EHV X VACUUM OIL PURIFIER

SECTION ROTARY-SCREW WATER CHILLERS

GASTEC QA. Approval Requirements 15. for the GASTEC QA product certificate for Steel pipes and sockets for the transport of gas. KE 15 January 2012

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Telecity. Table of Contents. Page. Section 3.2

Installation instructions for Plenum-mounted add-on electric heaters

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00

Greentrol Automation, Inc.

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

CITY OF MEXICO BEACH REQUEST FOR QUOTES: LIFT STATION PANELS REPLACEMENT

BRL-K774/ Evaluation guideline. for the Kiwa product certificate for Compression fittings to tighten with matching clamping device

Electrical Safety Requirements

PART GENERAL 1.01 SECTION INCLUDES

Operating Manual MS220KA and MSR220KA

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

Pipe Freeze Protection Control SCFP-CO-F130 Installation and Operation Manual

Installation Instructions

Transcription:

Inspection and Test Plan for Switchgear No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Remark Manuf. TPI Client 1 Pre Inspection Meeting Spec. Spec. MOM H H H Before Manufacturing 2 DWG, Design, Calculation Document DWG, Calculation book H R A 3 Switchgear Resistance Test 4 Switchgear Withstand Voltage Test (Dielectric Test) 5 Switchgear Sequence Test 6 Switchgear Characteristics Test of Protection Relays 7 Switchgear Mechanical Operation Test Materials 1

8 Raw Material Inspection ASTM ASTM Original Material Certificates H H 9 Review of Certificates ASTM ASTM Certificates H H 10 Material Identification ASTM ASTM Report H H During Fabrication 11 Fabrication Inspection 12 13 14 Outline Dimensions, Interface Dimensions, Busbar Dimensions and Clearances and other Specified Dimensions Inspections Tightness / Torque Inspection of Terminals Control for Degree of Protection DWG/Spec DWG/Spec DWG/Spec H W DWG/Spec DWG/Spec Report H H 2

15 16 17 Inspection to Confirm that Instruments, Compartments, Control Switches, protective relays, fuses and etc. are Correctly Rated and are Correctly Located, with Specified Labeling. Inspection to Confirm Earthling Arrangements for Continuity in Circuit Checking to Confirm Wiring Correct Grade and Size, Wiring Tightness in Terminations. www.inspection for industry.com DWG/Spec DWG/Spec DWG/Spec H H 18 Checking for Incoming and Outgoing Cable Boxes and Glands. 19 20 21 Checking all Circuit Breakers for Fit up and Fitting Ease of Operation Range and Setting of Meters and Relays, Correct Fitting of Doors, Circuit Labels and Dimensions to Checking Complete Boards for Finish, Lines Out of Units 3

22 23 Checking all Shutters and Interlock Operation Welding Inspection on Welded Component www.inspection for industry.com WPS WPS Report H SW 24 Switchgear Resistance Test Report H H 25 Switchgear Withstand Voltage Test (Dielectric Test) Report H H 26 Switchgear Sequence Test Report H H 27 Switchgear Characteristics Test of Protection Relays Report H H 28 Switchgear Mechanical Operation Test Report H H Final Inspection 29 Final Visual & Dimensional Check DWG DWG Report H H 30 Check of Final Book Spec. Spec. DWG/ P.O H R Documentation 31 Inspection Reports Spec./DWG Spec./DWG Report H R 32 NCR Spec./DWG Spec./DWG Report H R 33 Review Final Data Report Spec./DWG Spec./DWG Report H R Pre Shipment Inspection 4

34 Preservation and Packing Spec. Spec. Report H H 35 Marking Spec. Spec. Report H H 36 Loading Inspection Spec. Spec. Report H H 37 Shipping Document Control Spec. Packing List H H Abbreviations: H: Hold Point = Hold on the production till TPI Inspector performs inspection and supervise the required test W: Witness Point = Manufacture shall notify client and TPI Inspector but there is no hold on the production; Client can waive this inspection based on his discretion and informs TPI Inspector accordingly. R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT s and etc. A: Approval SW: Spot Witness = for items with spot witness manufacture shall notify TPI inspector as fulfilling the monitoring; For example one random visit for whole UT tests or one or two visits for whole surface preparation works for painting. MOM: Minute of Meeting P.O: Purchase Order for more information review following articles: http://www.inspection for industry.com/third party inspection for switchgear.html http://www.inspection for industry.com/inspection and test plan for switchgear.html 5