Guidelines for planting within the 100 Ft. Buffer

Similar documents
Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Section 815. LANDSCAPING

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

2-B-18-UR. Revised: 3/27/2018


ACTIVITY: Trees, Shrubs and Vines ES 10

HG Homeowner Landscape Series: Planting Problems of Trees and Shrubs

DIVISION II PLANTING SECTION 02950

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

5.0 Storm Water Landscape Guidance Introduction

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

OVERALL LANDSCAPE PLAN

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

Rain Gardens. A Welcome Addition to Your Landscape

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;

Success with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties


DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

Town of Essex Small Site Erosion Control Guide

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

Town of Fuquay-Varina

Landscape area requirement compliance and landscape plans

CHECKLIST BMPs for FIELD NURSERIES REGULATIONS, SITE SELECTION, WATER MANAGEMENT

Construction Specification for Planting

ARTICLE XIX SCREENING, LANDSCAPING AND TREES

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

Selecting Quality Trees from the Nursery. Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida)

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

by Barbara Guilland With help from Spokane Master Gardener Program

Section 9 Landscaping and Street Trees

Get help from landscape experts.

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1300 OF PUTNAM COUNTY, WEST VIRGINIA Page 119 ARTICLE 1300 LANDSCAPING AND SCREENING

The following general requirements will be met for all planter box installations:

SECTION LANDSCAPE

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

TREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service

HALIFAX REGIONAL MUNICIPALITY

River Friendly Landscape Program Frequently Asked Questions (FAQs) December 2016

EC Building a Bluegrass Lawn

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!

Article 10: Landscaping and Buffering

EXTERIOR PLANTS

City of Sheridan Landscape Plan Checklist

Peninsula La PENINSULA LAKES COMMUNITY GUIDELINES

CHAPTER 9 LANDSCAPE REGULATIONS

Your Guide to Water-Wise Landscaping for the Inland Northwest

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

LANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

ANEW LANDSCAPE really

How to Create a Streamside Vegetative Buffer Garden

City of South Portland Stormwater Manual

Riparian Buffer and Upland Restoration With Woody Species. Dan Salas Delaware Riverkeeper Network

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

Unit 4 Landscape Installation

Root-bound potted tree after pot removal

Dan, this is a list of the items included in the submittal package for the Plan Commission Public Hearing on May 24, 2018:

Rebate Amount for Lawn Conversions. $150 (300 ft² LOTS < 4,750 ft²) $250 (500 ft² LOTS 4,750 ft²)

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging.

Guideline SpeciVications for Selecting, Planting, and Early Care of Young Trees

Planting Landscape Trees

Guelph Humane Society Section PLANTING Page 1

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

WMU Tree Care Plan and Policies

CITY OF GEM LAKE, RAMSEY COUNTY, MINNESOTA ORDINANCE NO. 100

Wise Watering Practices: Trees and Shrubs

Sullivan County Tree Selection Guide

2.1.4 Roof Downspout Rain Gardens


OVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216.

SECTION SODDING

The planning and zoning board held workshops on January 11, 2016, January 18, 2016 and January 25, 2016 to discuss the issue.

Water Conservation in the Landscape

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

H2Overhaul: A Water-Wise Landscape Transformation

Watering Guide. 1. Trees, Shrubs, Perennials, Annuals Sod Seed Pruning Plants Fertilizing Plants...

Transforming your lawn into a Xeriscape Garden. Presented by: Bill Melvin of Ecoscape

PLANT LIST (CONTRACTOR RESPONSIBLE FOR ALL PLANTS SHOWN ON PLAN) SHRUBS PERENNIALS/ORNAMENTAL GRASSES

SECTION RESIDENTIAL LANDSCAPING, STREETSCAPING, AND AMENITY STANDARDS

Riparian Restoration Plan for the Quiet Waters Homeowners Association Reach of the Yachats River. Site Overview

Delaware s Green Industry $21,774,000. Delaware s Green Industry. What/Who is the Green Industry? 10/26/2017

ACTIVITY: Tree Preservation & Maintenance TP 01

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Section 3 Non-Structural BMPs

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

ARTICLE VI LANDSCAPE REQUIREMENTS

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

SECTION TREE TRANSPLANTING

The standards of this Article are considered the minimum necessary to achieve these purposes.

Don t Put a $100 Tree in a $10 Hole

Create your own. Rain Garden

Plant Care Guide. Watering

Growing Lavender in Colorado

Transcription:

CAPE COD COOPERATIVE EXTENSION PO Box 367 Barnstable, MA 02630 508 375-6690 (www.capecodextension.org) Guidelines for planting within the 100 Ft. Buffer Introduction: The Barnstable County Extension Service initiated the formation of a committee to develop guidelines for planting within the 100-ft. buffer zone of a resource area subject to the jurisdiction of Conservation Commissions. The purpose of the committee has been to develop a uniform approach, in regards to plant materials, planting specifications and follow-up maintenance, to use in the development of wetland projects and in mitigation of violations. It is hoped that this document will be considered for adoption by town Conservation Commissions on Cape Cod. Committee members represent Conservation Commissions, Green Industry professionals, private consultants, and Extension Educators. Current landscape standards of the various disciplines were reviewed and discussed to prepare a comprehensive document that utilized the combined experience of the members. Consideration was given to the interests of the regulatory authority, the costs to homeowners, and the best planting measures as determined by industry standards. The plant list was limited to native woody species as compiled from the lists of the various Conservation Commissions on Cape Cod. Specifications for planting include species, optimum plant size and spacing requirements, sun and soil preferences, and salt tolerance. The committee hopes that the guidelines will help standardize planting practices proposed by applicants or imposed by Commissions towards the establishment of successful plant communities. Please note that this document does not take into account the various factors that a Conservation Commission will review when considering an appropriate remediation/restoration plan for clear-cutting violations. Site preparation and post-planting maintenance is also addressed. A supplemental list of non-native, low maintenance, non-invasive plant material that may be considered for use in less sensitive areas has also been developed. Recommendations for site preparation and correct planting practices Proper site preparation and planting procedures are important for plant establishment and survival. 1. Compost or other organic amendments should be mixed into the back-fill soil to increase water-holding capacity where appropriate. 2. Planting hole depth for trees should be only as deep as measured from the trunk flare to the bottom of the root ball. 3. Planting hole width should be a minimum of three times the diameter of the root ball. 4. If plant material is balled & burlapped, all burlap should be removed or cut from the top third of the root ball. If large materials are in wire baskets, the top third of

the basket should be cut and removed. The trunk flare should be located to insure correct planting depth. 5. Large trees may be staked for stability for one growing season. 6. All plants should be thoroughly watered in at the time of planting (15-20 gal. per plant). 7. Container plants should be planted at the same depth as grown in the container. 8. Root balls should be mulched. 9. No fertilization is necessary at planting time. Recommendations for planting areas within the 100FT vegetated buffer zone Each town has its own requirements for an undisturbed buffer zone; contact local Conservation Commissions for their regulations. The applicant should limit the amount of vegetation that is to be removed from the site to a minimum that is required to accommodate the proposed buildings, driveways, and associated grading. The applicant should be responsible for planting all areas within the scope of the project except as may be required for drainage catchement areas. The intent is to preserve natural vegetation and to re-vegetate those disturbed areas with indigenous or compatible species. Where practical, sods of existing, native vegetation may be lifted from those areas that will be disturbed and replanted in other areas. Depending on the project complexity, work should be performed or supervised by a certified landscape professional or as approved by the conservation commission. (Massachusetts Certified Horticulturist, Massachusetts Certified Landscape Professional, Massachusetts Certified Arborist, or equivalent). Recommended Minimum Landscape Material Specifications High quality plant material will establish more readily in the landscape. Efforts should be made to ensure that adequate root dimensions in relation to caliper exist. The American Standard for Nursery Stock lists these minimum root dimensions in the following table.

Minimum root ball diameter for selected sizes of shade trees (ANSI Z60.1) Caliper (measured in inches, Minimum root 4 inches above the ground) spread (inches) 1 16 2 24 3 32 4 42 5 54 6 60 7 70 8 80 Trees: Tree size may depend on site conditions and site accessibility. Deciduous: An effort should be made to provide a variety of sizes and species. Sizes should range from a minimum of 1-inch to 3-inch caliper as specified by American Standards for Nursery Stock. Multi-stemmed deciduous trees such as Betula nigra (River birch) should be of a comparable height (8 to 10 ) to a 1 3 caliper tree. Evergreen: Evergreen trees should be at varying heights ranging from five to ten feet at the time of planting. Shrubs: The minimum shrub size of planting material varies according to species. Please refer to the tables for shrub spacing requirements. The plants should cover the dimensions of the container. The spacing of the plant material shall be appropriate to the chosen species, based on an approved landscape plan. Inclusion of a variety of species is recommended. Where appropriate, living groundcover planting material should be provided and maintained beneath trees in all plantings. Groundcover will be spaced in a manner to achieve complete coverage within two years. Where a 4-inch container is used, groundcover should be spaced at a maximum of 12-inches on-center. Where a one gallon container is used, groundcover should be spaced at a maximum of 24-inches on-center. Groundcover is not required beneath the drip line of shrubs. All plant materials should conform to American Standards for Nursery Stock, latest edition. Trees and plants species should be selected on the basis of having similar climatic, water, soil, and maintenance requirements.

Suggested Maintenance through Establishment Period (3 yrs 5 yrs) Spacing of plant material should be sufficient to allow for maintenance during the establishment period. Size of plant material should be such that original canopy cover is achieved at the end of 5 years. Where appropriate, a community of plants should be used to establish layers within the planting area. For mitigation purposes, efforts should be made to replicate what is adjacent to the violation in terms of percent tree layer, percent shrub layer, and percent herbaceous ground cover, with spacing to allow for future growth. Water: Water is crucial for good plant establishment. All newly planted areas should receive approximately 1 of water per week during the growing season from April through October. Temporary irrigation may include drip tubing on a timer to be removed after establishment. Applicants and/or commissions might consider alternative technologies such as TreeGators. Mulch: Root zones of newly planted trees and shrubs should be mulched to a depth of 2 to 2 _ to the drip-line, except for the area directly adjacent to the trunk. Mulching materials may include shredded leaves, aged wood chips, bark mulch, or other conservation commission approved material; or may be a hydro-seeded mixture of grasses and forbs. If hydro-seeding, a minimum of 4 of topsoil should be put down prior to seeding. On steep slopes, biodegradable erosion fabric may be used. Efforts will be made to prevent erosion and sedimentation in the planted areas. Weeding: Hand removal of weeds is to be conducted where appropriate. Fertilizer: No fertilizer should be applied at planting. In subsequent years, slow release fertilizers may be appropriate based on plant growth. Removal of invasive species: Consideration shall be given to the removal of those species of plants listed by the mass. Dept. of Agricultural Resources Division of Regulatory Services. For a list of invasive species, go to: http://www.mass.gov/agr/farmproducts/proposed_prohibited_plant_list.htm or http://www.newfs.org/conserve/docs/mipag040105.pdf Committee Members: Kristin Andres Roberta Clark William Clark Lynne Hamlyn Sue Hofer Jim Ingram Chatham Conservation Agent Cape Cod Cooperative Extension Cape Cod CooperativeExtension/DennisConservation Commission Hamlyn Consulting S.C. Hofer Design/Brewster Conservation Commission Bartlett Tree

Arne Johnson Darcy Karle Michael Neath Lindsey Strode Deborah Swanson Wayne Tavares Harry Johnson Tree Farm Barnstable Conservation Department Michael P. Neath Landscape Co. Cape Organics/Harwich Conservation Commission Plymouth County Extension Tavares Land Design.