HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

Similar documents
HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

IYRS School of Technology & Trades RCRA CONTINGENCY PLAN Bristol Facility 40 CFR 265 Subpart D 29 CFR Emergency Evacuation

These telephone numbers are provided as a general aid to emergency notification. Be advised that additional agencies may be required to be notified.

This plan, its contents, and emergency notification procedures shall be made available to all appropriate university employees.

Hazardous Materials Protection and Contingency Plan for Carnegie Mellon University Doha Campus

HAZARDOUS WASTE CONTINGENCY PLAN

5.0 CONTINGENCY PLAN. It is necessary to amend the plan if:

School EMERGENCY PLAN

Contingency Plan for Hazardous Materials and Waste Releases

WESTERN CONNECTICUT STATE UNIVERSITY HAZARDOUS WASTE CONTINGENCY PLAN PROCEDURE E-115

Emergency Evacuation Plan. Kettering Labs. School of Engineering

State University of New York College at Oneonta Contingency Plan for Incidents Involving Hazardous Materials and Waste

Fire Prevention and Protection Plan

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University

State University of New York College at Oneonta Contingency Plan for Incidents Involving Hazardous Materials and Waste

Dutchess Community College. Emergency Action Plan. Conklin Hall College Residence

Emergency Evacuation Plan South Patterson Building (SPB)

Alfred University. Emergency Response Plan for Hazardous Materials Release

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University BLUE BAND BUILDING ( )

Harvard University - OEB Glasshouse Emergency Evacuation Plan

BUILDING EMERGENCY ACTION PLAN. for Your Building Name

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University

ANGELO STATE UNIVERSITY HAZARDOUS CHEMICAL STORAGE & SPILL CONTINGENCY PLAN

SCALES NW EMERGENCY ACTION PLAN

Emergency Preparedness Guide

EMERGENCY PREPAREDNESS: EVACUATIONS

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University ARTS COTTAGE ( )

Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University

Occupant Emergency Plan Revised 9/09/2008

FACILITY OF EMERGENCY PLAN. (Template)

FIRE EMERGENCY POLICY

Emergency Action Plan for

Fire Prevention Plan

Emergency Notification Plan. Developed By: Cleveland State University Police Department Office of Emergency Management

ELEVATOR RESCUE PROCEDURE

Emergency Action Plan

FIRE PROTECTION PROGRAM

Emergency Evacuation Plans and Exercises. Risk Management Services

Emergency Action Plan for Sycamore House 3818 Winding Way

North West Regional Center SITE EMERGENCY RESPONSE PLAN

CAMPUS EMERGENCIES CAMPUS EMERGENCIES WHAT TO DO IN THE EVENT OF A CAMPUS EMERGENCY

HEALTHWEST PROCEDURE. No Prepared by: Effective: February 6, 2008 Revised: June 5, 2017 Environment of Care Committee

Emergency Action Plan Program

Evacuation Fire Safety Program

RAMBLER PARK FIRE SAFETY INFORMATION

Fire Prevention Plan

Mulch fires, trash can fires, or other fire outside a building should be reported by the following methods:

Kaufert Laboratory Building Emergency Plan

Xavier Field Office Emergency Action Plan. For. Xavier Field Office Dana Avenue

El Segundo Fire Department. Unified Program (UP) Form CONSOLIDATED CONTINGENCY PLAN I. FACILITY IDENTIFICATION

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,

Alternate Evacuation Route B: Secondary direction of egress considered safe with the information available.

CAMDEN COUNTY FIRE COORDINATOR

Mukwonago Community Library Emergency Procedures

HUDSON VALLEY COMMUNITY COLLEGE BUILDING EMERGENCY ACTION PLAN FOR OUTSIDE EMERGENCY ASSISTANCE: DIAL 911 TO REACH THE SARATOGA CTY POLICE & FIRE

Emergency Action Plan. Revised: 1/22/2018

REED COLLEGE DEPARTMENT OF COMMUNITY SAFETY DEPARTMENTAL DIRECTIVE CSO FIRE & FIRE ALARM SYSTEM RESPONSE GUIDELINES

LAKE COUNTY SCHOOL DISTRICT

Emergency Action Plan For Alumni Center 1507 Dana Avenue

Truro Police Department. Fire Emergencies. Policy Number: OPS-9.02 Effective Date: June 1, 2000 REFERENCE:

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY

COLUMBUS STATE COMMUNITY COLLEGE EMPLOYEE SAFETY MANUAL

Emergency Action Plan. Emergency Response Plan. Emergency

FIRE PREVENTION PLAN EMERGENCY ACTION

Liberal Arts and Humanities. Building # 275. Emergency Evacuation Plan

Emergency Action Fire Prevention Plan

Emergency Response Team (ERT) Areas of Accountability

VICI. Emergency Evacuation Plan

COUNTY OF ALAMEDA County Administrator s Office Risk Management Unit th Street, 3 rd Floor, Oakland, CA 94607

Pollution Incident Response Management Plan

Campus Emergency Procedures Guide

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

EMERGENCY ACTION PLANS HOW READY ARE YOU?

Health and Safety Plans Health and Safety Policy Statement Fire Prevention Plan Objective

Business Emergency Plan

Physics Department. Emergency Action Plan & Evacuation Guide. In compliance with: California Code of Regulations. Title 8, Section 3220

Hospital Codes, Safety, Exposure Control, Emergency Plans Handout

University Center of Lake County. Emergency Preparedness Guide

Enter Department Name Emergency Action Plan

X0.01 Emergency Management. Approved: September 27, 2002 Revised: July 15, Next Scheduled Review: July 15, 2014 PROCEDURE STATEMENT

2.1 WHAT TO DO IN THE EVENT OF AN ACCIDENT OR EMERGENCY

EMERGENCY PROCEDURES FOR WCSD SCHOOLS AND SITES

Fire and Evacuation Guide

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

EMERGENCY PROCEDURES

HOT WORK SAFETY PROGRAM:

Emergency Planning and Preparedness

Property Name & Address [ Property Name ] - [ Property Address ]

PROSPECT COLLEGE HEALTH AND SAFETY PLANS FIRE PREVENTION PLAN

Campus Emergency Response Plan Standard Operating Procedure

SAFETY BEGINS WITH YOU!

Office of Research Safety Laboratory Safety Manual 215 Chemical Spill Response

SAFETY BEGINS WITH YOU!

University of Maryland FIRE EVACUATION PLAN Columbus Center POLICE FIRE MEDICAL EMERGENCY - 911

Department of School Safety and Security MONTGOMERY COUNTY PUBLIC SCHOOLS Rockville, Maryland

Transcription:

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus Issued By: Office of Finance and Administration Name: Chief Financial Officer Effective Date: November 1990 Revised: Dec. 2010, June 2011, July 2012, Dec.2012, Jan. 2015, Oct. 2015, Dec.2016, June 2017, Mar 2018 Purpose: This document outlines the University of Southern Maine s (USM) contingency plan for emergency response and prevention procedures related to a hazardous materials or hazardous waste incident. The procedures described have been designed to minimize risks to public health, safety and the environment from major spills, explosions, fire, and the release of hazardous materials/wastes. The plan was designed in accordance with all Federal and State laws related to emergency preparedness and prevention of emergency events, including the Environmental Protection Agency requirements contained in 40 CFR 264 subpart D, 40 CFR 265 subpart D, 40 CFR279.52, (SPCC) 40 CFR 112, and State of Maine Department of Environmental Protection (Handbook for Generators of Hazardous Waste) Site Locations: A. Portland Campus Science Building, Room 95 (Hazardous Waste Storage) B. Portland Campus- Science Building, Room 61A (Low Level Radioactive Storage) Identified Hazardous Waste Stored: I. Flammable II. Acids III. Corrosives IV. Reactive V. Low Level Radioactive Emergency Coordinators (EC): Director, Environmental Health and Safety 222 Bailey Hall, Gorham, ME 04038 1. Cell 420-4831 2. Work 780-5338 3. The emergency coordinator is responsible for: a) Declaring a hazardous materials emergency, recognizing, and identifying hazardous materials involved b) Contacting the appropriate emergency response organizations using the Office of Public Safety as an emergency liaison c) Performing a hazard risk assessment of the incident d) Operating field survey equipment (i.e. flammable/combustible meters, detector tubes). e) Performing limited containment and control (absorption) procedures on hazardous materials releases within the resources and equipment provided f) Determining if emergency evacuation is required, and insuring that the evacuation procedures have been put into effect g) Notifying the appropriate regulatory agencies in the event of a release of a reportable quantity.

Safety and Health Specialist II - Alternate Emergency Coordinator: 222 Bailey Hall, Gorham, ME 04038 4. Cell 347-1553 5. Work 780-5227 a) The Alternate Emergency Coordinator will assume all of the responsibilities of the Emergency Coordinator when the Emergency Coordinator is unavailable or unable to perform these duties. I. Emergency Recognition A. A distinction exists between incidental releases of hazardous substances and releases that require emergency response. Those which require the initiation of emergency response procedures are also required to be in compliance with the Occupational Safety and Health Administration (OSHA) regulation 29 CFR 1910.120 (q) Emergency Response to hazardous substance releases. B. Releases can be categorized in three distinct groups in terms of planning and response requirements: i. Releases that are clearly incidental regardless of the circumstance; ii. Releases that may be incidental or may require emergency response depending on the circumstance; and, iii. Releases that clearly require emergency response regardless of circumstance. iv. Note: Maine DEP/Public Safety shall be notified immediately regardless of the release amount. II. III. Incidental releases: A. An incidental release of a hazardous material is a release that does not pose a significant safety or health hazard to the people in the immediate vicinity or to the person cleaning it up, nor does it have the potential to become an emergency within a short period of time. Incidental releases are limited in quantity, exposure potential, and toxicity. If the hazardous substances that are in the area are always stored in very small quantities, such as in the laboratory setting, the risk of a release that escalates into an emergency is reduced. B. It may be possible for the person who generated the spill to perform the cleanup provided that all of following conditions are met: i. The individual is trained in the hazards and clean-up methods of the spilled materials, ii. Adequate Personal Protective Equipment (PPE) and Spill Response Supplies are available and used, iii. And, the individual is certain that there is no level of personal danger to themselves or anyone else on campus. C. If a release involves a hazardous substance of extreme toxicity, regardless of the quantity released, the situation will always warrant an immediate emergency response. If there is any risk of injury to any campus personnel including the person who generated the spill, or if available PPE is in any way inadequate, or if the number or qualifications of on-site personnel is in any way inadequate, outside resources must be requested immediately by dialing 911. Do not allow anyone to enter the hazard area until emergency response personnel arrive. Circumstantial Releases: (may be incidental or may require emergency response) A. The properties of a hazardous substance (toxicity, volatility, flammability, explosiveness, corrosiveness, etc.), as well as the specific circumstances of the release (quantity, confined space considerations, ventilation, etc.), and the level of training of the personnel involved, may result in a spill that requires emergency response. If any doubt exists on the part of the personnel who first became aware of the spill, the spill must be handled as an emergency in accordance with the requirements of this plan. Outside resources must be requested immediately by dialing 911 or activating the evacuation alarm if evacuation of the building is deemed necessary. Do not allow anyone to enter the area until emergency response personnel

arrive. IV. Releases Requiring Emergency Response: A. Releases of hazardous substances that pose a significant threat to public health, safety, or welfare or the environment from fires, explosions, spills or any unplanned sudden or nonsudden release of hazardous material/waste or hazardous material/waste to air, soil, surface water, or ground water, by their very nature, require an emergency response regardless of the circumstances surrounding the release or the mitigating factors. B. A release of hazardous material/waste that occurs in excess of reportable quantities identified under 40 CFR 355 shall also be designated as an emergency. C. Outside resources must be requested by dialing 911 or activating the building evacuation alarm if evacuating the building is deemed necessary. Do not allow anyone to enter the area until emergency response personnel have arrived. V. Internal (USM) Emergency Communication: A. Two employees, namely the Director and Safety Specialist carry a cell phone when handling substances and inspecting sites. In the event of an emergency, said employee will immediately notify the USM Public Safety at 911. VI. VII. Important Emergency Phone Numbers A. Oil Spill 800-482-0777 B. Hazardous Materials Incident i. (In state & Out of state) 800-452-4664 C. DEP Regional Office i. Southern Maine 207-822-6300 ii. Central Maine 207-287-7688 D. Maine Emergency Management Agency i. (In state) 800-452-8735 ii. (Out of state) 207-624-4400 Office of Public Safety: A. The Office of Public Safety will be responsible for the following actions: i. Dispatching the emergency coordinator defined in this plan whenever a hazardous material spill or release is brought to their attention, ii. Dispatching the Portland Fire Department at the direction of the Emergency Coordinator or in the event of a suspected or confirmed emergency, as defined above, iii. Dispatching emergency response organizations such as ambulance and/or contracted haz mat teams at the direction of the Emergency Coordinator or in the event of a suspected or confirmed emergency requiring these emergency response organizations iv. Dispatching Public Safety Personnel to the scene to ensure the safety of others and to secure the scene until the Portland Fire Department arrives on the site. VIII. Portland Fire Department The Portland Fire Department has a designated Hazardous Materials Response Team. The senior fire department official at the scene is in charge of the incident as Incident Commander. The Incident Commander (IC) can summon the Hazardous Materials Response Team if the situation requires such action. To contact the Portland Fire Department, dial 911

IX. Maine Medical Center In the event that injuries related to a hazardous materials incident require medical attention, the individual will be transported to Maine Medical Center via ambulance. To contact Maine Medical Center or to call for an ambulance, dial 911 and USM s Office of Public Safety will complete the dispatch. To reach Maine Medical Center directly: (207) 662-0111 X. Designated Hazardous Materials Response Contractor: A. In the event of an emergency requiring off-site emergency response, the following designated Emergency Response Contractor will be called to the site: Clean Harbors (207) 799-8111 (24-hour service) B. The designated emergency response contractor will be responsible for conducting emergency hazmat response and spill clean-up activities at the request of the emergency coordinator. XI. Spill Response and Personal Protective Equipment A. The following list of equipment is maintained at designated locations on the campus, to be used in the response of an incidental spill. Emergency level hazardous incidents will be controlled under the direction of, and using the response equipment provided by the Portland Fire Department or their designee. In the event that the Portland Fire Department or their designee requires additional response personnel or equipment, the Designated Hazardous Materials Response Contractor (Clean Harbors) shall provide the required personnel and equipment. B. Spill Equipment Provided at each Site: 1. CO 2 or ABC Fire Extinguisher 2. Chemical absorbent pads 3. Absorbent containment trays 4. Mercury Spill Kit - goggles, gloves, ty-vek suit. XII. Fire Control Equipment Provided: 1. 10 lb. ABC inside; 2. (2) 10 lb. CO 2 just outside room. 3. Sprinklered XI. Evacuation Procedures: A. In the event of a hazardous materials incident that requires complete building evacuation, the building fire and alarm systems will be activated. The determination for evacuation may be made by persons with knowledge of the incident, the hazardous materials involved, and/or the characteristics of the building. Alternatively, the decision to evacuate may be made by the Emergency Coordinator. In the event that a partial evacuation is adequate to provide for the health and safety of all personnel, verbal instructions shall be given in the immediate area of the spill or release. The following evacuation procedures will be used to ensure safe evacuation in the event of a building evacuation: XIII. Building Evacuation Procedures A. All building evacuations will occur when an alarm sounds (e.g., fire alarm) and/or upon verbal notification by Public Safety or other responsible parties.

B. When the building evacuation alarm is activated or verbal notification is provided, occupants are to leave by the nearest marked exit. If the nearest exit is smoke filled, or blocked by another hazard, proceed to an alternate exit and alert others to do the same. Directions may be given as to the location of a safe assembly area. However, if no directions are conveyed, proceed to the outside of the building. C. Once outside, occupants should proceed to a clear area that is at least 100 feet away from the affected building. Keep streets, fire lanes, hydrant areas and walkways clear for emergency vehicles and personnel. During periods of inclement weather, relocate to an alternate building, which will be determined at the time of the crisis and conveyed to all persons affected. D. Occupants will not be permitted to return to an evacuated building unless told to do so by the Portland Fire Department or other responding agency. E. Elevators should never be used in cases of fire or earthquakes. XIV. Emergency Procedures: Emergency Coordinator Responsibilities: 1. Whenever there is an imminent or actual emergency situation such as an explosion, fire, or release of hazardous materials, the emergency coordinator (or his/her designee) shall: a. Identify the character, exact source, amount, and a real extent of any released hazardous materials. b. Assess possible hazards to human health or the environment that may result from the explosion, fire, or release. This assessment must consider both direct and indirect effects (e.g., the effects of any toxic, irritating, or asphyxiating gases that are generated, the effects of any hazardous surface water run-off from water or chemical agents used to control fire, etc.). c. Activate internal facility alarms or communications systems, where applicable, to notify all facility personnel. d. Notify appropriate local authorities (i.e., call 911). e. Notify the Maine Department of Environmental Protection (DEP) at (207) 822-6300 or (Oil Spill 800-482-0777.) or (Hazardous Material spill 800-452-4664) f. Monitor for leaks, pressure build-up, gas generation, or ruptures in valves, pipes, or other equipment shut down in response to the incident. g. Take all reasonable measures necessary to ensure that fires, explosions, and releases do not occur, recur, or spread to other hazardous materials at the facility. 2. Before facility operations are resumed in areas of the facility affected by the incident, the emergency coordinator shall: a. Provide for proper storage and disposal of recovered waste, contaminated soil or surface water, or any other material that results from an explosion, fire, or hazardous materials release. b. Ensure that no material that is incompatible with the released material is transferred, stored, or disposed of in areas of the facility affected by the incident until cleanup procedures are completed. c. Ensure that all emergency equipment is cleaned, fit for its intended use, and available for use. d. Notify the fire department s hazardous materials response team that the facility is in compliance with requirements 2-a and 2-b above. e. The following actions are to be followed by USM personnel in response to fire, explosion, or release of hazardous materials or waste.

3. Immediately notify (call) USM Police at 911 reporting location and emergency. a. USM Police will notify the appropriate Emergency Coordinator of the release including the nature and extent of the incident b. USM Police will notify the USM UEH&S Office and Facilities Management. c. The USM University Environmental Health and Safety director or director of Facilities will notify DEP at (1-800-452-4664) if the situation requires notification d. All notifications to the DEP are to be reported for documentation purposes to the USM University Environmental Health & Safety office within 24 hours. e. Submit a written report to DEP within fifteen days of the incident including the following information: i. Name and telephone ii. Facility (site) address iii. Specific location iv. Time and type of incident v. Name and quantity of materials released vi. Injuries, if any vii. Possible human health or environmental hazards. XI. Mutual Aid Agreements: 1. A copy of this plan along with a cover letter requesting Mutual Aid in the event of a hazardous materials incident, has been sent to the following organizations annually: a. Portland Fire Department b. Portland Hazardous Materials Response Team c. Portland Police Department d. Maine Medical Center e. Clean Harbors 2. It is the responsibility of the University of Southern Maine Environmental Health and Safety Department to send the above mentioned cover letter. The Letter must include a request that the agency provide support to the site in case of fire, explosion, or release of hazardous materials/waste. In accordance with 264.53(b), 264.37(b) a. A copy of the letter of request will be included in the contingency plan. The Letter will be sent via Certified mail to each entity listed in XI. 1. b. Copies of the responses from the entities listed in XI. 1. will be included in the contingency plan. If an agency declines to enter into such an arrangement, document their refusal. If you receive no response to your request document that the letter was sent to the agency. 3. Agreements must be renewed annually by the University of Southern Maine Environmental Health and Safety Department. If the plan is changed and/or amended, Copies of the plan and all revisions shall be submitted on an annual basis or as the plan is amended to the aforementioned authorities in section XI.1. Copies of the University s Emergency Response Plan for Hazardous Materials shall be maintained at the facility within Environmental Health and Safety office located at 222 Bailey Hall, Gorham, ME 04038 and on our website; http://usm.maine.edu/sites/default/files/safety/contingency%20plan2016.pdf The Emergency Response Plan for Hazardous Materials shall be reviewed and amended by Environmental Health and Safety on an annual basis and when any of the following situations occur: 1. Applicable regulations are revised; 2. Plan fails during an emergency; 3. List of emergency coordinators changes; 4. List of emergency equipment changes; or 5. Any facility change that would affect the plan.