Blowdown Separator & Aftercoolers

Similar documents
Blowdown Separator & Aftercoolers Installation, Operation, & Maintenance

Section H11 BLOWDOWN SEPARATORS CONTENTS FEATURES AND BENEFITS...H11-3 PRODUCT OFFERING...H11-3 SAMPLE SPECIFICATIONS...H11-11 ILLUSTRATIONS

Aldrich Blowdown Separators & Cooling Manifolds

Series 1140 and 1141 Temperature Regulators

BuildingName The Description of the Project P DOCUMENTS

Centrifugal Blowdown Separators and Tanks

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

Armstrong J Series Float, Thermostatic Steam Traps, Condensate Controllers & Liquid Drainers Installation and Maintenance Manual

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

Silhouette. Feedwater Heater. Boiler Feedwater

High Capacity Instantaneous Steam Fired Water Heater

Yankee Dryer Safety. Program

Armstrong Flo-H2O Water to Water Instantaneous Heater Installation and Maintenance & Operation

VENTS. Main Steam Vents. How to Select Steam Vents. For Steam Vent selection information, please refer to Selection Guidelines on page 133.

Steam System Best Practices Document No. 11

InterSeptor Centrifugal Separators Operating & Maintenance Manual

Intelligent Refrigeration Solutions

REIMERS ELECTRA STEAM, INC. INSTRUCTION MANUAL JG & JJ MODELS Serial No.:

REIMERS ELECTRA STEAM, INC. INSTRUCTION MANUAL JG & JJ MODELS

Steam Condensing Heat Exchanger SR-3 / SR-8

Pure Performance For Steam Mains and Tracers

Pamphlet A2404. Mechanical Pump & Pump/ Trap. GP Series GT Series

Installation, Operation, and Maintenance Manual CEMLINE CORPORATION

UNFIRED STEAM GENERATORS STANDARD EQUIPMENT

SERVICE MANUAL. For Service & Parts please call APK THERMAL at or SAFETY INSTRUCTION

Main Steam Vents. Hoffman Specialty Regulators. How to Select Steam Vents

MODELS R & RH 10 THRU 20 RB SERIES ELECTRIC STEAM BOILERS

Stainless Steel Condensate Return Units

INSTRUCTION MANUAL. Keep this manual in a safe place for future reference TEMPERATURE CONTROL STEAM TRAP LEX3N-TZ LEX3N-TZ.

.2 Section Waste Management and Disposal..5 Section Performance Verification of Mechanical Piping Systems.

Series 300 VTB. Installation Instructions

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

SECTION HEATING BOILER FEEDWATER EQUIPMENT

STEAM SYSTEMS TOP SAFETY ITEMS FOR STEAM OPERATIONS. July, 2018

BERMAD Fire Protection

FUEL-FIRED VERTICAL TUBELESS BOILERS

Instruction Manual. Pharma-line ESE02198-EN Original manual

Niles Steel Tank Hot Water Generator Installation and Operation Manual

Inverted Bucket Steam Traps

Installation and Maintenance "L" and "LS" Series

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-214(C) Series 61 Low Water Cut-Off OPERATION

MODEL EH ELECTRIC BOILER OPERATION AND INSTALLATION INSTRUCTIONS

LQE(E,G,S) Air heater for hot water

PRESSURE MOTIVE PUMP (PMP) APPLICATIONS

MONITRON II MODEL EH-M2 ELECTRIC BOILER OPERATION AND INSTALLATION INSTRUCTIONS. Four stage electronic control with energy saving and other features.

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING

FFH Series. Steam Fired Instantaneous Feed Forward Water Heaters

Tray ST5. Tray Type Deaerator Pressurized.005 cc/liter. industrialsteam.com

MODELS N150/300/675/900/1500/2500/2600 INSTALLATION, SERVICING AND MAINTENANCE INSTRUCTIONS

100 years of boiler technology leadership.

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

Installation, Operation, and Maintenance Information

REIMERS ELECTRA STEAM, INC. CAUTION:

Spray Flow II cc/liter Atmospheric Deaerator. industrialsteam.com

Spray Flow II cc/liter Atmospheric Deaerator. industrialsteam.com

COLMAC COIL. Installation, Operation, and Maintenance ENG Rev A. Air Cooled Fluid Coolers. Contents. When you want Quality, specify COLMAC!

SECTION STEAM AND STEAM CONDENSATE SPECIALTIES

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

Series 47 and 247 Mechanical Water Feeders. Series 47-2 and Combination Mechanical Water Feeder/Low Water Cut-Off ! WARNING

THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS

WATER HAMMER something that never should occur in a steam system

Fuel-Fired Vertical Tubeless Boilers

Installation, Operation and Maintenance

Steam Ancillary Equipment. Primary Steam System, Water Treatment and Auxiliary Steam System Equipment

A. This Section includes the following domestic water piping specialties:

Essex County College - West Essex Campus Addition And Renovations dib # / SECTION HYDRONIC PIPING SPECIALTIES PART 1- GENERAL

PIP PNE00004 Steam Trap Guidelines

Inverted Bucket Steam Traps. for efficient condensate drainage of industrial and HVAC equipment

Oil burners fuel unit with solenoid valve

WHY THE REMOVAL OF NONCONDENSABLE GASES AND AIR IS CRITICAL IN A STEAM SYSTEM

Akva Lux VX District heating substation for indirect heating and domestic hot water systems

PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS

HEAT GENERATION 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods

INSTALLATION & MAINTENANCE MANUAL EZ PLATE INSTANTANEOUS WATER HEATER

Cemline Steel Tanks. Carbon Steel, Stainless Steel, Galvanized Steel, Copper A.S.M.E. Code, Non-Code

Drum Level Instrumentation and. The ASME Boiler Code Requirements. Presented by: Jim Kolbus. Topics

Chapter 2.3: Steam System

Drum Level Instrumentation and

MOHICAN. MOHICAN 4-Pass Water Boiler, HP, PSI Section

Water Fuel + Air for combustion Blowdown

Unfired Steam Generators (Series RB) Installation, Operation and Maintenance

EHB Series. STONESTEEL Commercial Electric Water Heaters Individually Mounted Elements Vertical or Horizontal CEMLINE CORPORATION

UW50 UTENSIL/PAN WASHER

VS SERIES NH3 STEAM VAPORIZERS OPERATION MANUAL

Evaporative Cooling products

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

Instant hot water Feed-Forward system unlimited supply accurate to +/- 4 F

Steam and Condensate Technology. Solutions which are brilliant in their simplicity. combined with a first-class design & consultancy service.

Form 2143 Date: 4/3/03 Repl: 2/1/99 BRYAN STEAM LLC. Installation and Operating Service Manual BOILER FEED SYSTEM

SECTION PLUMBING EQUIPMENT

Air Vents for Hot and Chilled Water Systems

TK-2001, TK-2012, TK-2201, TK-3001, TK-3201, TK-4001, TK-4012, TK-4212 TK

Technical Data CONDENSATE COMMANDER PUMP SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 9902D

R- RH- and RHC-Steam Boiler Models (RB-Series)

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

USG Series. Unfired Steam Generators Generate Clean Steam With Boiler Steam or High Temperature Hot Water as the Energy Source

Transcription:

Blowdown Separator & Aftercoolers Installation, Operation, & Maintenance Thermaflo Engineering PO Box 473639, Charlotte, NC 28247

Blowdown Separator & Aftercoolers Installation, Operation, & Maintenance INSTALLATION BLOWDOWN SEPARATOR Installation of the FS Blowdown Separator is not complicated. However, proper installation is necessary and the following may suggest some possible system configurations. In the examples that follow, the boiler, blowdown valves, and piping to and from the separator would be provided by others. Installations may vary from the examples shown. The inlet should be piped from the boiler blowdown valves using Sch. 80 min. code rated materials. The piping pressure to the inlet should be rated to the design pressure of the boiler. A dead- boiler drain should be provided off the inlet piping as shown. The FS separator is an instantaneous separator - th erefore sufficient drainage must be provided to allow the unit to drain as quickly as the blowdown flow is separated. The floor drain should be steel, cast iron, or concrete of the same size or larger than the separator drain and aftercooler. Drains should be sloped a minimum of 1 per 100. More slope or larger size should be used on obstructed or angled drains. The vent should also be as direct as possible to atmosphere to limit pressure drop. The same size pipe as the separator vent should be used. The vent should be extended above buildings, work areas, and personnel to a safe point of discharge. Flashing should be used when vent is through a composition roof. Use common sense about roof discharge. 04/2010 3

Figure A shows the simplest and most practical installation. This arrangement will provide ready drainage for most heating or process boilers. A dead-boiler drain is also included (boiler, piping, and blowdown valves provided by others). Optional angle iron legs can be provided to support the separator off the floor. These legs vary in length depending on the size of drain and type of after cooler used. Figure A As an option, water tempering may be added to the separator as shown. Our water tempering aftercooler package includes aftercooler fitting, temperature regulator valve, strainer and bimetal thermometer. A check valve and pressure reducing valve (not shown) could also be provided as an option. Cooling water pressure to the valve should be limited to 60 psig. See additional instructions below for the aftercooler fitting installation. Boiler Blowdown Valves Blowdown Separator Dead-Boiler Drain Temp. Regulating Valve Drain Figure B Elevated or outdoor installations (Figure B) may be used where boiler room floor space is at a premium. Boiler Blowdown Valves Temp. Regulating Valve Dead-Boiler Drain Blowdown Separator Drain Outdoor installations are popular because underroof space is not consumed. The installation can be off the ground as in Figure A or elevated as in Figure B. Because the separator is selfdraining, there is no risk of freezing. The temperature regulator valve should be located indoors and the bulb and capillary protected from freezing. Wall mounting brackets can be supplied as an option for wall mounted installations. 4 Thermaflo Engineering PO Box 473639, Charlotte, NC 28247

Localities requiring storage tempering may use a blowdown separator only if discharged to a holding device such as an open, closed but vented, slotted or grid top receiver. The receiver should be capable of holding the accumulation of two blowdowns. A manual drain or a siphon drain may be used on the receiver. The siphon drain turn should be located at the top of the first blowdown level. The separator should be located at a sufficient height so that additional blowdown mixes well with the cooled blowdown being held in the receiver. A manual drain should always be provided on the receiver for periodic cleaning. Figure C Local regulations should prevail at all times. Consult your insurance agency for additional requirements regarding the use and installation of blowdown separators. Welding on an ASME Blowdown Valves Dead-Boiler Drain code pressure vessel requires a certified welder who carries the appropriate stamp for the procedure. Boiler Hot Well Blowdown Separator! CAUTION DANGER These separators handle hot steam and condensate. Caution should be used when working on or around the pressure vessel. OPERATION and MAINTENANCE The separator is an integrally welded unit with no removable or replaceable parts. The only maintenance required on the separator is to keep the vessel exterior clean and free of rust. Normal boiler blowdown procedures as recommended by the boiler manufacturer should be used as the operating procedure for the separator. To minimize shock and water hammer, the blowdown valve should be opened slowly to allow the blowdown line and separator to warm. This can also help cooling water mixing to start. Refer to aftercooler instructions below for separators with drain water cooling accessories. Since the separator is self-draining and self-drying, there are no other instructions. Simply follow the normal boiler blowdown procedure. INSTALLATION AND OPERATION AFTERCOOLERS The selected aftercooler is screwed into the drain line after the separator. The cold water inlet coupling should then be piped to the cooling water through the valve and accessories as illustrated below. The bottom of the aftercooler is then piped to a service drain. The drain should be steel, cast iron, or concrete of the same size or larger than the aftercooler. Drains should be sloped a minimum of 1 per 100. More slope or larger size should be used on obstructed or angled drains. Thermaflo Engineering PO Box 473639, Charlotte, NC 28247 5

Figure D shows the MC manual aftercooler with recommended piping including manual valve and accessories. The MC is a manual aftercooler. Cooling water is added to the hot condensate stream by opening the manual valve. The check valve and strainer protect the manual valve. Figure D commended piping for the temperature regu- Figure E shows the AC automatic aftercooler with re lator valve and accessories. The AC is an automatic aftercooler. The self-actuating valve senses the drain temperature and adds cooling water until the set temperature is met. A mixing tongue is provided on 4 units and larger. The drain temperature can be continuously monitored on the bi-metal thermometer. The middle flanges permit rotation for various pipe fitting requirements and also serve as a dismantling point. Figure E The self actuating temperature regulating valve bulb or the solenoid valve sensing element and the bi-metal thermometer stem are inserted into the bulb connections on the aftercooler in that order. If a bulb does not fit correctly into the aftercooler, a nipple could be added to lengthen the connection. The bulbs should project into at least the center of the aftercooler. Instructions also accompany the temperature regulator valve or solenoid valve. FS aftercoolers are non-clogging. The short nozzles and high velocities prohibit deposit buildup and clogging which can typically occur at high temperatures.! CAUTION DANGER The surface of the aftercooler may be hot. Use caution when working around the vessel. 6 Thermaflo Engineering PO Box 473639, Charlotte, NC 28247

Thermaflo Engineering PO Box 473639, Charlotte, NC 28247 Phone 704-940-1228 Fax 704-940-1227 www.thermafloengineering.com