Philips Software, Bangalore System Indoor Climate Control Software Development Centre Phase 1 Area : 100,000 sq. ft. Air-conditioning and ventilation system Ventilation system at the basement level Adequate fresh air in each room Appropriate toilet air exhausts Sound proof system for better acoustic control Climate control solution extended to server security 400 TR (2 x 200TR) water-cooled chiller 4 x 15 TR precision air-conditioner 8 x 8.5TR packaged air- conditioner 20 cassette air-conditioners (VRV) 12 Hi-wall split air-conditioner (VRV) Secondary chilled water pumps with VFD Cooling towers Treated fresh air, air-handling units In-line fans
Embassy Golf Link Software Park, Bangalore System Indoor Climate Control Software Development Park for IBM Area : 350,000 sq ft Air-conditioning and ventilation system Adequate fresh air in each room Appropriate toilet air exhausts Sound proof system for better acoustic control Climate control solution extended to server security 1000 TR (5 x 200 TR) Air-cooled water chilled plants 16 air-handling units Ventilation fans Exhaust fans Chilled water pumps Secondary pumps
ITC Welcom Group Sonar Bangla Sheraton & Towers, Kolkata System Indoor Climate Control s Seven star super Deluxe Hotel Rooms : 239 Banquet Hall : 7,000 sq. ft. Health Spa : 12,000 sq. ft. Restaurants, Pubs & Discotheques, sourcing, installation and commissioning of system Acoustics and vibration control Silent, draught- free air circulation at optimum temperature and humidity Adequate freshness in each room Engineering audit to minimize operating cost and service and maintenance requirements Systems designed to suit the elegance of the interior design 1200 TR ( 3 X 400 TR ) water-cooled screw chillers Secondary chilled water pumps with VFD Cooling towers 120 air- handling units 310 fan coil units 125 ventilation fans
Max Devki Devi Hospital, Delhi System Indoor Climate Control s Super speciality Hospital Number of beds : 800 Area : 470,000 sq. ft. Operation Theatres : 10 Special Opticell 2000 system to ensure clean laminar flow on operation beds system with minimal noise level CO 2 - free air circulation preventing crosscontamination and air flow pattern to ensure quick and effective dust removal Hygiene and cleanliness focus in operation theatres 1800 TR ( 6 x 300TR ) water cooled screw chiller Secondary chilled water pumps Hot water pumps 94 air-handling units 330 fan coil units 144 ventilation fans Cooling Towers
Delhi Metro Rail Corporation, Delhi Electrification & Fire Protection and Hydraulics India s first intra-city, state-of-art Metro Rail Area : 15 elevated stations and two under ground stations and detailed engineering of the under ground section comprising of cabling, lighting, earthing systems, lighting wiring for the stations, tunnels, ramp area & concourse level and hydraulics, fire detection and alarm system Approval of design of the stations from the Delhi Fire Authorities LT Power distribution of the stations as per BS standards with dimming systems with back up EM Modules LT power panels conforming to BS standards ZSLH XLPE copper cables & fire survival cables conforming to BS standards Earthing systems Fire detection and alarm panels Fire suppression system Hydraulic system Four 80 KVA & one 6 KVA UPS 2 x1000 KVA generators with acoustic insulation Fire detection and alarm systems, fire fighting systems Inergen based fire suppression system Hydraulic system for under ground station Power supply to lifts, escalators, generators, UPS DG Power supply for the station
Garuda Mall, Bangalore & Bangalore s biggest shopping mall & multi-level car park (MLCP) Area : 721,000 Sq. ft. (includes 83 shops, MLCP capacity for 1000 cars, food court, hotel and multiplex) Detailed engineering, supply, installation, testing & commissioning of under ground H.T. cabling ( H.D.D. method ), substation and transformer & electrification Power supply to shops, lifts, escalators & system Complete illumination of common area Approvals from CEIG for design & installation 11 Kv / 433 Kv substation Two 2000 KVA & one 1200 KVA transformer LT power panels confirming to IS standards AMF panel with synchronization and auto load sharing for two 1100 KVA & two 750 KVA generators Earthing station Raising main (1600 Aluminum)
Wockhardt Hospital, Mumbai System Indoor Climate Control s Super Speciality Hospital Number of beds : 250 Area : 125,000 sq. ft. Operation Theatres : 6 Special Opticell 2000 system to ensure clean laminar flow on operation beds system with minimal noise level CO 2 - free air circulation preventing cross contamination and air flow pattern to ensure quick and effective dust removal Hygiene and cleanliness focus on operation theatres 750 TR ( 3 x 250 TR ) water cooled screw chiller Secondary chilled water pumps Cooling tower 35 air-handling units 155 fan coil units 65 ventilation fans Bacteria control