January 15, Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL

Similar documents
2018 Annual Landfill Inspection Report

2018 Annual Landfill Inspection Report

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

Technical Manual for Dam Owners Impact of Plants on Earthen Dams FEMA 534

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Stormwater Master Plan Update. City Council Briefing January 8, 2019

CLOSURE PLAN. CFR (b) Fly Ash Reservoir II. Cardinal Plant Brilliant, Ohio. August, 2016

Detention Basin Inspection and Maintenance Guidelines

C-12. Dry Pond. Design Objective

OPERATIONS & MAINTENANCE MANUAL STORMWATER CONTROL STRUCTURE DRY DETENTION POND

International Levee Handbook (ILH) significance for vegetation management. Jonathan Simm HR Wallingford, United Kingdom

Inspection and Maintenance of Stormwater Best Management Practices

Slope Stability in Harris County

AGENDA 2015 Community Stormwater Event

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Maintaining Your Neighborhood Stormwater Facilities

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Best Management Practices

Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

VIA Re: Liner Design Criteria for Existing CCR Surface Impoundments Interstate Power and Light Company (IPL) Prairie Creek Generating Station

Before you build: Locating and Planning

NOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022

Chapter 4 - Preparation of Stormwater Site Plans

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

ENVIRONMENTAL ENGINEERING LAND SURVEYING

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Dam Management. Must be managed No trees allowed

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting

CLOSURE PLAN. CCR (b) GERS Little Broad Run Landfill. Mountaineer Plant New Haven, West Virginia. October, 2016

4.6. Low Impact and Retentive Grading


Technical Specification Guidelines

Consulting Engineers and Scientists. Closure Plan. Submitted by: GEI Consultants, Inc Voyager Drive Green Bay, Wisconsin

CLOSURE PLAN. CCR (b) GERS Landfill Area. Pirkey Power Plant Hallsville, Texas. October, 2016

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

City of Lafayette Study Session Staff Report Design Review Commission

Kittson Parkway / Watershed Park Parking Lot

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES

2016 Annual Inspection Report

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

HIGH PERFORMANCE COAL COMBUSTION RESIDUAL (CCR) SOLUTIONS

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

E PL UNIVERSITY OF KENTUCKY LEXINGTON, KENTUCKY

Alternative Cover Systems

MONITORING AND EMERGENCY ACTION PLAN FOR THE JOHN E. AMOS BOTTOM ASH POND COMPLEX ID # WINFIELD, PUTNAM COUNTY, WEST VIRGINIA

Structural Storm Water Best Management Practices (BMPs)

Ci.ty e>f -V--:1rgi.rria Beach

Tips for Maintaining and Enhancing Stormwater Management Areas

EMERGENCY ACTION PLAN

Cary, NC Owner Name: (or name) 1 st Carolina Properties (919)

Chesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323

Operation & Maintenance of Stormwater Management Facilities

Design, Construction and Maintenance of Irrigation Reservoirs in Ontario

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

MEADOWVIEW HOMEOWNERS ASSOCIATION

AWR Engineering, LLC

Conservation Landscaping Spot Check Inspection Checklist

Stormwater Pollution Prevention Plan Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE

City of Waco Stormwater Management Regulations

Buckingham Lake Berkshire Pond Raft s Pond

A. Regional Detention Requirements

Landscape Rebate: Rainwater Harvesting Rain Garden Installer Guidelines

Geomembranes and Geosynthetic Clay Liners (GCLs)

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

Florida-Friendly Landscaping Program. It s simpler than you think

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Retention Pond T-7. Description. Site Selection

SECTION A-1: DESCRIPTION

LANDFILL FINAL COVER AND MANAGEMENT OF LEACHATE SEEPS BELOW FINAL COVER

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

Tree Pits Construction Guide

STATUS OF REVIEW: ENGINEER WILL COMPLY

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Draft Rhode Island Stormwater Design and Installation Standards Manual

BIORETENTION FACILITY

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

EAST NAPLES SELF STORAGE

Figure 1 Cypress Street Study Area Location Map

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

Mosquito Control Guidelines

NOVEMBER 14, 2016 BURRELL ENGINEERING TROY BURRELL N FLORIDA AVE DUNNELLON, FL 34434

City of Yelm. Public Works Department. July 29, Re: Stormwater Maintenance Re-Inspection Results

Subject Name: RESERVOIR AND FARM POND DESIGN (2+1) CONTENTS

SUBDIVISION INSPECTION REPORT. Submitted to: Rose Bay Homeowners Association, Inc. c/o Mr. Joe Sanfilippo, LCAM, Property Manager

Ponds of. Ballantrae. Part 1 of 2: The Report. Prepared by the Ballantrae Community Development District Board of Supervisors

Safety Factor Assessment Plant McDonough-Atkinson Ash Pond 3 (AP-3) and Ash Pond 4 (AP-4)

April 29, 2015 NOTICE OF VIOLATION

B & W Engineering Laboratories, Inc. P.O. Box Memphis, Tennessee (901)

Florence County Small Commercial Land Disturbance Permit Application

Installation of the ArmorMax/LandLok Plus System. Randy Thompson, P.E. Propex Geotextile Systems

Gwinnett County Development Advisory Committee Wednesday April 19, 2017 at 12:00 p.m. 684 Winder Highway, Lawrenceville Training Room

Building & Site Design Standards Application

GSI Handbook Details Pervious Pavement

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

Carleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University

Transcription:

5012 W. Lemon Street Tampa, Florida 33609 Ph 813.944.3464 Fax 813.944.4959 January 15, 2017 Karen O. Zwolak Tampa Electric Company 702 N. Franklin Street Tampa, FL 33602 kozwolak@tecoenergy.com Subject: Annual (2016) Report East Stormwater Pond, North Recycle Pond, South Recycle Pond, SSU & Settling Pond, Long Term Fly Ash Pond, North Bottom Ash Pond, Bottom Ash Suction Pond, South Bottom Ash Pond, Long Term Bottom Ash Pond Tampa Electric Company Big Bend Power Station Apollo Beach, FL As authorized by Tampa Electric Company (TECO) Work Order Number 50204 dated November 19, 2015, AREHNA Engineering, Inc. (AREHNA) is presenting this Annual Report for the referenced ponds. This report summarizes the findings of the inspections performed by a qualified Professional Engineer in December, 2016. AREHNA s Annual (2016) CCR Impoundment Inspection Report for the Economizer Ash Pond System is presented under separate cover. Project Scope This work included the inspection of the earthen berms surrounding nine ponds located at Tampa Electric s Big Bend Power Station. The annual inspection was performed by a professional engineer. The project scope also includes three quarterly checklist inspections. Attached to this Annual Inspection Report is an aerial photo outlining the ponds and perimeter earthen berms inspected by our Professional Engineer. These ponds are water filled or filled with ash byproducts from the Big Bend Power Station. The perimeter berms were observed, either while on foot or operating a slow moving motorized vehicle. Professional Engineer used a checklist for the following conditions: The Embankment / Liner Penetrations Seepage Soil Deltas Settlement / Subsidence Scarps Animal Burrows Vegetation Overgrowth Cracks Surface Erosion Liner Deficiencies Bulges Vandalism The visual inspection and evaluation outlined in this inspection report was performed in accordance with generally accepted engineering practice ordinarily used by geotechnical engineers practicing in this area at the time the inspections were made. No other warranty, expressed or implied, is made. www.arehna.com

Annual (2015) January 15, 2017 Findings and Recommendations As shown on the attached photos, the earthen berms were found to be in generally good condition. There appeared to be ample freeboard such that overtopping does not appear to be likely. The slopes of the perimeter berms were generally well maintained and free of vegetative overgrowth. No exterior seepage or other critical conditions that would require an immediate response were noted for any of the pond areas. Recycle Settling Pond The repairs that were underway at the time of our last annual inspection were completed and the pond is back online. Long Term Fly Ash Pond - A small bulge was noted beneath the central pipe that drains storm water from the South Economizer Ash Pond to the Long Term Fly Ash Pond. The bulge in the liner below this pipe was first noticed during our March 19, 2014 Quarterly Inspection. The shape of the bulge has changed somewhat over time. The reason for the bulge is not readily apparent. Since the bulge is directly below a drainage pipe, we recommend that this area be further inspected. Small tears were also observed near the top of the slope at the north end of the east and west slopes. Long Term Bottom Ash Pond - An area designated Long Term Bottom Ash Pond Area is currently used occasionally for storm water overflow. This area is rimmed by low berms overgrown with vegetation which is not routinely cut / maintained. Therefore, the area cannot be inspected to the same detail as the other berms. No obvious breaches were noted during our observations of the readily accessible portions of the Long Term Bottom Ash Pond Area. Should this area be used for more permanent storage, we recommend that the east, south, and west berms be re-graded and filled to a uniform elevation, wide enough for vehicular traffic. The slopes should then be grassed. These improvements would facilitate future inspection and maintenance of these berms. We appreciate the opportunity to support you on this project. If you have any questions with regard to this report, please do not hesitate to contact us at 813.944.3464. Sincerely, AREHNA Engineering, Inc. FLORIDA BOARD OF PROFESSIONAL ENGINEERS CERTIFICATE OF AUTHORIZATION NO. 28410 Jessica A McRory Digitally signed by Jessica A McRory DN: c=us, o=identrust ACES Business Representative, ou=arehna ENGINEERING INC., cn=jessica A McRory, 0.9.2342.19200300.100.1.1=A01097C00 00015472088EB70000F980 Date: 2017.05.22 09:52:52-04'00' Jessica A. McRory, P.E. Geotechnical Engineer Florida Registration 68440 Copy to: Zel Jones: ZDJones@tecoenergy.com Randy Melton: RMelton@tecoenergy.com Attachments: Plan 2 Page

ATTACHMENTS Plan

North Recycle Pond East Stormwater Pond Recycle Settling Pond & SSU South Recycle Pond North Bottom Ash Pond Btm Ash Suction Pond South Bottom Ash Pond Long Term Fly Ash Pond Long Term Bottom Ash Pond Earthen Berms Inspected Plan

East Stormwater Pond (south side, looking west) North Recycle Pond (west side, looking northeast)

South Recycle Pond (south side, looking west) Recycle Settling Pond (north side, looking east)

Long Term Fly Ash Pond (west side, looking north) Long Term Fly Ash Pond (south side, looking east)

Long Term Fly Ash Pond (north side, looking east at bulge below central pipe from South Economizer Pond) North Bottom Ash Pond (north side, looking west )

North Bottom Ash Pond (south slope, looking west) North Bottom Ash Pond (west slope, looking north)

North Bottom Ash Pond (west side, looking east) Bottom Ash Suction Pond (east side, looking north)

Bottom Ash Suction Pond (south side, looking west) South Bottom Ash Pond (south side, looking east)

South Bottom Ash Pond (west side, looking northeast) Irregular rutting noted Long Term Bottom Ash Pond (south side, looking west)