RUBBERSIDEWALKS Installation Manual

Similar documents
TERREWALKS Installation Manual

815 NE 172 nd Avenue Vancouver, WA Installation Manual

Installation Manual May 9/14 No revision

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

Brick Paver Installation Guide

Technical Bullet Series on Clay Brick Pavers

EZ Base is a high-density panel base system that replaces traditional compacted aggregate-base installations.

Pavers Spade, rake (metal prongs), wheelbarrow, wooden stakes, string line, tape measure, pegs and spirit level

Appendix G. Detailed Design

PAVER BLOCK FIXING INSTRUCTIONS VYARA ROTATIONAL INTERLOCK

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

Specify Rubbersidewalks Get Rubbersidewalks

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

Green Street BMP Matrix

Installation & WillowCreekPavingStones.com POWER TOOLS YOU MAY NEED TO RENT PROJECT COMPONENTS. Willow Creek pavers Aggregate base material

Permeable Interlocking Pavers

Construction of Interlocking Concrete Pavements

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

Silva Cell 2 Installation Guidelines

9 Steps to a Lasting Paver Installation

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

SMALL PAVER PROJECT. Home Gardeners School March 19, Presented by Robert W. Bellek Owner

A New Generation of Permeable Pavers

A GUIDE FOR DESIGN INTEGRATION OF CONCRETE PAVERS ANTON C. HARFMANN, AIA GARY E. DAY, RA

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

317)

Subsurface Infiltration Bed

Permeable Pavement Systems

planning, designing and installation guide for interlocking segmental pavers installation guide

Concrete pavers can act as a zipper in the pavement.

Appendix B DETAILED DESIGN

Capillary Action Subsurface Irrigation

Concrete pavers with sand filled joints. Bedding sand 1-1/2 in. (25-40 mm) thick

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Landscape Restoration Specifications

BuildingProductsCorp.com

AZEK Pavers Install Guide

AZEK Pavers Install Guide

The following general requirements will be met for all planter box installations:

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

St. Monica Food Pantry

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS

APPENDIX E COMPACTION CHARACTERISTICS AND EQUIPMENT

Permeable Paving. Sustainable Control Of Urban Storm Water Pollution. The volume of storm water being diverted to

Introduction to Compaction

AZEK Pavers Install Guide

The Concept. Features. Benefits

The Raven Radio Foundation, owner of the Cable House at 2 Lincoln Street, invites lump sum bids for the individual items of work described below.

C L AY PAV E R S Naturally best. How to pave. Easy guide to a good professional finish with Claypave

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

ARCHITECTURAL PAVING STONE PRODUCT CATALOG

Introduction. Functions of Non woven Geotextile (TechGeo) Separation. Filtration. Drainage. Containment. Tech Geo. . Geotextile Overview

HORSE STABLE USING AZEK PAVERS.

Sustainable Drainage Applied Research Group, Coventry University Priory Street, Coventry, CV1 5FB, United Kingdom 3

Stormwater Control Plan: Small (Tier 1) Land Development Project

WQ-07 INFILTRATION TRENCH

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

I N D U S T R I A L Y A R D S

Tech Spec 10. Application Guide for Interlocking Concrete Pavements. Concrete pavers with sand filled joints. Edge restraint/curb

City of Bonita Springs Driveway Permit Information Packet

Milpitas College Extension Milpitas Dry Landscape

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

PAVERS RE-INVENTED, SIMPLY A BETTER PAVER

Protecting Existing Landscape Trees from Construction Damage Due to Grade Changes

Pavement Removal Fact Sheet

Fairfax County s Stormwater Learning Experiences

Topics. Grid Lattice Paving Systems. Gravelpave, Grasspave and Grassy Pavers. Applications, Materials and Construction

SECTION TURF AND GRASSES

A16 Building a garden path

Appendix D - Technical Design Criteria for BMPs

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

What are Grassmats? Playground matting- can you explain more about playground fall height ratings for Grassmats?

Preparing a Stormwater Control Plan for a Small Land Development Project

4/23/2012. Topics. Flexible Pervious Gravel Pavers. Flexible Pervious Gravel Pavers. Grid Lattice Paving Systems

Tree Pits Construction Guide

EZ ROLL GRASS PAVERS TECHNICAL SPECIFICATION GUIDE. Model Numbers: NDC_EZ4X24 and NDC_EZ4X150

EZ ROLL GRASS PAVERS TECHNICAL SPECIFICATION GUIDE. Model Numbers: EZ4X24 and EZ4X150

CUSHIONWALK PAVERS OUTDOOR RUBBER SURFACING INSTALLATION / MAINTENANCE GUIDELINES

P A V E R S Are they really the same? The 3-P s and how they relate to storm water management

6.1 Bioretention Areas

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

Installation guidelines

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

Low Impact Development Site Design

CITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL

Assembly, Installation & Watering Guide VERTICAL GARDEN SYSTEM. Version 4. Product Version. Gro-Wall 4.0.

LET S GET IT DONE STORMWATER MANAGEMENT

Analyzing the Bioretention Construction Sequence

PA01 Concrete Segmental Pavements Detailing Guide

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

As a public park, it is important to plan your community garden to ensure everyone can gain

Ames City Hall Campus: Stormwater Improvements

Transcription:

RUBBERSIDEWALKS Installation Manual

Overview 2 1 2 3 4 5 6 7 8 9 10 11 12 1) Break out existing concrete (use jackhammers near trees) and clean out loose soil 2) Conduct tree root inspection (if applicable) 3) If new site excavate native soil to 4 depth (more depth required for vehicular traffic or heavy loads) 4) Place optional layer of geotextile (dependent on soils engineer recommendation) 5) Confirm paver base/base course material has good drainage 6) Place base material and compact to 90-95% (Refer to FHA Chapter 4, Designing Sidewalks Guidelines;. Refer to ICPI tech specifications for applicable sub base applications) 7) Place and secure top layer of 6-8 oz. non-woven pervious geotextile 8) Using dowels, connect and place sets of RUBBERSIDEWALKS ; remove forms, string lines, etc. 9) Lay restraints along outside edges of pavers 10) Spike restraints into ground 11) Secure restraints to pavers 12) Replace sod or finish adjacent landscape; the sidewalk is ready to walk on 2

Rubbersidewalks pre-installation 3 Each site is different. Consider the following site elements: Accessibility Traffic control Security Utilities Adjacent trees and tree root growth Soil type and conditions Climate conditions Refer to guidelines per: http://www.fhwa.dot.gov/environment/bicycle_pedestrian/publica tions/sidewalks/index.cfm (cut and paste) 3

Shipped Rubbersidewalks product includes: 4 Rubbersidewalks (5 square feet each, 24" x 30" x 1.875", 54 pounds) Eco-Border Recycled Plastic Self-Gripping Connecting Dowels (100 ct./ bag) Black or Gray Permaloc Brick Block Aluminum Paver Restraints (8-foot segments, 40 ct./ box) Permaloc Brick Block Restraint Spiral Spikes (250 ct./box) Step-by-Step Installation Manual and PowerPoint (electronic; hard copy upon request) 4

Customer / contractor provides: 5 Paver base/base course aggregate with good drainage (minimum fines, masonry sand only if needed to increase drainage). Refer to Sieve Analysis Non-woven pervious (punched) geotextile fabric, minimum 6 8 ounce, for top layer and possibly below base course depending on soil stability Optional geo-cells or geo grids, if needed for soil stability 5

Guidelines to installing Rubbersidewalks 6 Rubbersidewalks is an interconnected open-grid modular paving system Rubbersidewalks should be installed/supervised by an experienced interlocking paver professional (ICPI certified preferred) Use specified base materials. Refer to Sieve Analysis Follow guidelines per: http://www.fhwa.dot.gov/environment/bicycle_pedestrian/publications/sid ewalks/index.cfm (cut and paste) Follow base and sub base guidelines per: www.icpi.org/techspec/1025/state (cut and paste, enter state) Attaining sufficient compaction of 90%-95% is essential If removing hardscape, on one end leave 4 inches more in place than site length Be cautious near trees to avoid damage to trunk and roots 6

Step one: break out 7 Break out existing concrete. Excavation depth depends on site use pedestrian or vehicle. Typical pedestrian base depth required is 4 Concrete removal should not remove or tear tree roots Excavation that may remove roots shall not occur until after roots have been pruned on the tree side Clear an additional 1.5 on outside edges for foot of paver restraint Whatever length of the site, you may wish to leave 4 inches more in place on one end. This allows a final cut to accommodate variables and transition 7

Step two: tree roots 8 Assess need for tree root pruning. WORK WITH CONSULTING ARBORIST Roots can be left intact greater than 1.875 inches below finished grade. A string line can be pulled across the opening to measure depth of roots. If the sidewalk is so close that the trunk flare encroaches on the sidewalk area, the sidewalk can be meandered away from the trunk flare. Panels can be cut to meet design (See Special Section) Directional root prune when necessary. Prune roots as far away from tree trunk as possible. Improper or excessive root pruning may result in tree instability and risk of failure, or tree health decline, including death Rubbersidewalks require less than 45% excavation than for concrete and 20% less excavation than for concrete and compacted base 8

Step three: site preparation 9 If new site, excavate and rough grade native soil to 4 depth* and compact with vibra plate compactor When removing existing concrete, typically a depth of 4 will remain; clean away loose soil*. Tree roots are not affected unless in top 1.875 of space Always use caution when working around trees and tree roots. Damage to roots and bark results in decay and often irreversible damage to tree *Heavy loads require greater than 4 depth, and possibly geo-cell or geo-grid support. Consult with your representative or TERRECON, Inc. on case by case basis. 9

Setting string lines and compaction 10 String lines should be set to finish grade elevation following concrete removal (or excavation) Determine how much settling of base material depth will occur during compaction. (This is the most critical step in a sound installation. Rubbersidewalks will not make up for irregularities, and will reflect in the panel in a void, bend, or rocking) Confirm that equipment will achieve 90%-95% compaction. Pervious aggregate allows high compaction while pore space is still retained 10

Use the correct base materials 11 Paver base/base course aggregate with good drainage (minimum fines, masonry sand only if needed to increase drainage). Refer to Sieve Analysis. Test porosity by hosing down or pouring bucket of water on surface to confirm drainage and no pooling. (Blend with up to 20% angular/masonry sand if needed.) Non-woven pervious (punched) geotextile fabric, minimum 6 8 ounce, for top layer, and possibly below base course depending on soil stability Unlike interlocking concrete pavers, sand should not be used in the base (unless as additive) or seams of Rubbersidewalks Recycled concrete and asphalt are unsuitable for base and will bind up 11

Step four: base (bottom & leveling layer) 12 Apply a 2.125 layer of paver base/base course that has been tested for drainage and compaction. (Refer to Sieve Analysis) Add aggregate in two or more lifts, wet down with water, and compact (90%-95%) for proper results Grade and compact 1.875 below string line (pavers are 1.875 in depth) FAILURE TO USE CORRECT BASE MATERIALS AND COMPACT BASE MATERIALS ACCORDING TO INSTRUCTIONS MAY RESULT IN UNSTABLE INSTALLATION, PANEL OFFSET, PRODUCT DEFORMATION, OR SINKING NEXT TO HARDSCAPE 12

Step five: laying geotextile 13 Photos do not illustrate specified non woven permeable geotextile Geotextile is 12.5' wide. Using scissors or cutting tool, cut width according to the width of installation plus 6 inches. Cut length flush on end sections where butted against existing concrete. Place geotextile on top of sub-base extending edges by three inches on each side. Temporarily stake/spike geotextile to soil on either side of bed, cinching fabric tautly. Be careful to not stake into tree roots. 13

Step five: lay and connect pavers 14 Using self-gripping dowels, put two pavers together to create one horizontal pair (4' wide or 5' wide depending on site). Make pairs first, then attach to next set of pairs, etc. Insert dowels into remaining face of each pair (4 dowels). Put second pair together, then slide onto first pair. Mallet or hammer to tighten seam. Tighten seams as you go. (Occasionally dowel holes need to be worked, or cleared out.) Continue along site. Seam width: 1/2" is too large, 1/16"-1/8" is ideal. Note: Due to the inconsistent nature of recycled tire rubber, variables of up to ¼"+ are possible, or yield a part slightly off-square. This may require jogging of pavers, or swapping out one for another to make a better fit. 14

Step five: laying pavers (cont d) 15 When working on installations more than 5 wide, place the installation over a sheet of geotextile, and as rows of pavers are assembled side by side, slide the row into place 15

Step six: tie-in to existing concrete 16 If sections are butted against existing concrete on one end, do open-side last. If sections are butted against existing concrete on both sides, do concrete-end sections first, then work an inner pair into place. Dowel-end sections into existing concrete. Joined pavers can be lifted and dowel-fit into next paver but some cold joints will be required. Pavers facing hardscape, for instance a curb, should be doweled in, using one dowel per paver. Remove remaining wooden form, and remove temporary stakes. 16

Step six: tie-in to existing concrete, finishing 17 Existing concrete is rarely at a perfect right angle, which may result in gaps. Also, pavers may have slight variations. Gaps can be filled with silica, or with concrete/mortar filler and sealant. 17

Step six: tie in to fresh pour concrete 18 Insert dowels into pavers, and into adjoining hardscape at an equal height, so that fresh poured concrete captures extended dowels Remove remaining wooden form, and remove temporary stakes. 18

Step seven: checking pavers and base 19 Walk on each paver checking for base stability, compaction, and proper spacing Make sure pavers are at same height as existing concrete Make sure no drop out exists beneath any paver Pay special attention to pavers and base next to hardscape Make corrections by resetting, filling, and compacting base material as needed 19

Step eight: laying & securing paver restraints 20 Lay rails of Permaloc Brick Block paver restraints flush along outer edges of placed pavers with flange facing outward. (Do not use substitute paver restraints.) Drive spiral spike through hole in flange and into ground every 24" Make sure spike catches both layers of fabric. Do not drive spike into tree roots. On outer edge, at approximate midpoint of each paver, drill a 11/32" hole, 1½" deep, through restraint and paver (one hole per paver.) Tap in a self-gripping dowel, leaving 1½" of the dowel sticking out & exposed. Exposed dowels will be covered by replaced soil, and make maintenance easier. 20

Step nine: replacing adjacent landscape 21 When installation is complete, backfill the adjacent ground with grass, sod, grass seed, gravel or stone. Make sure restraint feet are covered. 21

Special conditions: cutting 22 Rubbersidewalks pavers can be cut in the field using a ripping black (Skill Saw, worm drive) while spraying with soapy water. Keep a bottle of Simple Green soap handy, to lubricate the blade and keep down heat and smoke. Cutting is made easier by placing a wood plank on top and bottom of paver. It is often easier to cut the paver in passes, after a top cut, flip the paver over and make an aligned bottom cut. 22

Special conditions: cutting (cont d) 23 Rubbersidewalks can be cut for light poles and parking meters, making room for irrigation lines, creating radii, and jogs for tree wells. A notch ban be routered in the bottom of the paver to fit over tree roots. 23

Special conditions: cutting (tree roots) 24 Removing portions of Rubbersidewalks is a procedure often recommended by arborists to avoid root pruning and to accommodate large roots. Rubbersidewalks create a safe tree well. 24

Special conditions: cutting (cont d) 25 If pipes are laid in such a way that the spikes will hit rail foot, turn flange inward, under paver(s). Paver must remain flush to the base. Some radii can be best achieved by cutting and inserting pie wedge sections (secure wedge with caulking if needed) Sprinkler heads placed close to the edge of the bed may require leaving a space between restraints (cut restraint as needed.) This will not affect stability of the installation. 25

Base specifications and preparation 26 Permeable base material specifications (Sieve Analysis) Base prep for storm water management Base preparation for heavy loads Base preparation for slope and soil stability 26

Permeable base material specifications (Sieve Analysis) 27 SIEVE ANALYSIS FOR BASE MATERIAL SIEVE SIZE Standard Metric 2" 50mm 1 1/2" 37.5 mm Weight Retained % Weight Retained % Passing Required % Passing Sample 1" 25 mm 100% 100% 3/4" 19 mm 0.1 0 90-100% 100% 1/2" 12.5 mm 7.9 23 77% 3/8" 9.5 mm 13 39 40-100% 61% #4 4.75 mm 21 62 25-40% 38% #8 2.36 mm 153 32 68 18-33% 26% #16 1.18 mm 301 62 38 14% #30 600 um 400 83 17 05-15% 6% #50 300 um 447 93 4 0-7% 3% #100 150 um 462 96 2 2% #200 75 um 475 98 2 0-3% 1% Pan 483 S.E. 85 27

Before placing base, consider: storm water management 28 Most installations must consider storm water management Rubbersidewalks are an open grid, modular pavement system. The optimum performance of storm water capture and drainage is contingent on proper preparation and drainage of the base Follow Soils Engineer evaluation regarding need for French drains, sheet drains or other method for drainage Follow base and sub base guidelines per: www.icpi.org/techspec/1025/state (cut and paste) 28

Before placing base, consider: heavy loads 29 Follow base and sub base guidelines per: www.icpi.org/techspec/1025/state (cut and paste) Heavy loads will require greater than 4 depth, and possibly geo-cell or geo-grid support. Consult with your representative or TERRECON, Inc. Place layer of geotextile on bottom of the trench, which keeps native earth from flowing into the crushed rock layer and stabilizes base Geotextile is 12.5' wide. Cut width according to the width of installation plus 10 inches. Extend fabric up and out on both sides. (Base material will secure fabric) 29

Before placing base, consider: slope and soil stability 30 Rubbersidewalks is an interlocking modular pavement system which is affixed to the base with spikes. Slopes are subject to shifting, erosion, water and gravel collection and other actions which may disrupt and dislocate Rubbersidewalks pavers Several companies offer geotextile fabrics and geogrid products which are appropriate for these applications. Geotextiles range in cost from ~$0.11 /sq. ft. and geogrids cost ~$2.50 /sq. ft., depending upon thickness and use. Please consult with representative or TERRECON, Inc. on a case by case basis 30

Storing Rubbersidewalks 31 Rubbersidewalks must be stored on a flat surface If storing Rubbersidewalks for over two weeks, loosen steel strapping Rubbersidewalks may be stored outside If planning on storing Rubbersidewalks for an extended time, notify TERRECON prior to shipping for special packaging Do not leave unbound material or accessories on job site unattended 31