SMITH SUBDIVISION LANDSCAPE CONSTRUCTION PLANS

Similar documents
The Board of Supervisors of the County of Riverside ordains as follows: Ordinance No. 859 is hereby amended in its entirety to read as follows:

Landscape Documentation Package Review

LANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE

14.0 LANDSCAPING AND IRRIGATION

C H A P T E R 43. Landscaping, Irrigation and Grading. Sections

iii. Soil Management Report; iv. Landscape Design Plan; v. Irrigation Design Plan; and vi. Grading Design Plan. 4. Soil Management Report (SMR)

ORDINANCE NO. 859 (AS AMENDED THROUGH 859.3) AN URGENCY ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES

COUNCIL POLICY Policy Effective Number Subject: Number Date of Pages SINGLE FAMILY RESIDENTIAL LANDSCAPE

This ORDINANCE shall be known as the [insert name of Entity] Regional Landscape Water Conservation Ordinance.

Water-Efficient Landscape & Irrigation Standards Plan Submittal Check List Revised August 10, 2016

City of Placerville Planning Commission AGENDA REPORT ITEM 7

REDUCING WATER BILLS THROUGH WATER EFFICIENT LANDSCAPING

Project No. Tract No. APN ETo Zone No. MAWA = ccf ETWU = ccf

SMART Irrigation practices and NEW technology

LANDSCAPE AND IRRIGATION REGULATIONS FOR THE CITY OF SAN MARINO

1. New development including where permanent in-ground irrigation systems are installed.

New Rehabilitated Area (ft 2 ) Private Homeownerinstalled

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

How to Convert Spray Irrigation to Drip

PERFORMANCE APPROACH (For landscape areas over 2500 square feet)

Drainage and Irrigation

Prentice Hall. Landscape Design, Construction and Maintenance North Carolina VoCATS Course Blueprint Landscape Construction and Maintenance

CHAPTER LANDSCAPING

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE

Irrigation Requirements

SECTION TREE TRANSPLANTING

FREE How to get up and running using waterwise drip irrigation.

RULE WATER EFFICIENT LANDSCAPE REQUIREMENTS

Chapter LANDSCAPING

SECTION LANDSCAPE

River Friendly Landscape Program Frequently Asked Questions (FAQs) December 2016

Kevin A. Rudat CID,CIC,CLIA EPA Water Sense Partner. IANE President IANE Education Chairman

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

Your guide to a waterwise garden

Land Use Code Ordinance to Support Water Conservation

IRRIGATION FOR CONSERVATION

The Intelligent Use of Water: Water Efficient System Overview

CITY OF EL MONTE Water Efficient Landscape Ordinance Documentation Package Chapter Water Efficiency Ordinance El Monte Municipal Code (EMMC)

LANDSCAPE DOCUMENTATION PACKAGE SUBMITTAL FORM To be completed by applicant and submitted with the required materials.

WaterSmart Landscape MAKEOVER SERIES WELCOME! Class 3: Intelligent Irrigation and Implementation

CHAPTER 13: Bubbler irrigation of trees

DIVISION 32 EXTERIOR IMPROVEMENTS

These are only examples of reference books available and are not specifically endorsed by MSU Extension. Online resources are also available through

EXTERIOR PLANTS

Irrigation Tech II HYDRAULIC TROUBLESHOOTING

Your Guide to Water-Wise Landscaping for the Inland Northwest

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

Irrigation for Lawns and Gardens

Attachment A ORDINANCE NO.

What is micro-irrigation. Easy Drip Irrigation for Your Garden. A little about myself. Why drip irrigation. Why drip irrigation

ESPLANADE LANDSCAPE MAINTENANCE STANDARDS

BMPs for Water Conservation in Turf. Dr. Charles H. Peacock NC State University

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

Sprinkler Troubleshooting

ORDINANCE NO Adopted by the Sacramento City Council. November 24, 2015

H2Overhaul: A Water-Wise Landscape Transformation

5 Selecting Sprinklers and Spacing Ranges

ORDINANCE NUMBER 1265

What is Xeriscape? Why Xeriscape?

Unit 4 Landscape Installation

ACCESSIBLE STUDIO DWELLING UNIT 111A VINE/ESPALIER BOTANICAL NAME / COMMON NAME CONT

LANDSCAPE MAINTENANCE AGREEMENT

CHAPTER LANDSCAPING STANDARDS

GUIDELINES FOR IMPLEMENTATION OF THE CITY OF ANAHEIM LANDSCAPE WATER EFFICIENCY ORDINANCE

Exhibit A Section 1: Commerce City Right Of Way Landscape Maintenance Scope of Service

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

Austin, Texas GENERAL LEGEND SYMBOL ABBREVIATIONS DESCRIPTION DETAIL REFERENCE MATERIAL OR FINISH REFERENCE SYMBOL SECTION CUT REFERENCE

Water Conservation Rebate Requirements

MISSION SPRINGS WATER DISTRICT WATER EFFICIENT LANDSCAPING GUIDELINES

Inground irrigation systems. Design Use Maintenance

2-B-18-UR. Revised: 3/27/2018

CITY OF LANCASTER LANDSCAPE AND IRRIGATION DESIGN STANDARDS. Development Services Department. February 2016

Chapter LANDSCAPE FOR PLANNING APPLICATIONS

5.0 Storm Water Landscape Guidance Introduction

SITE TOPSOIL & FINISH GRADING

ACTIVITY: Trees, Shrubs and Vines ES 10

Drip Irrigation. Why Irrigate? Why Drip Irrigation? 2/17/2016. Wes Brittenham

Homeowner s Guide to Basic Landscape Care in Colorado

WOBBLER TECHNOLOGY Irrigating Orchards and Groves

Creating A Waterwise Landscape. Conservation Garden Park South 1300 West West Jordan, UT

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Using the Free Landscape Design Templates 3/28/2019

Model Water Efficient Landscape Ordinance

14 HIGHWAY PLANTING AND IRRIGATION

DIVISION 32 EXTERIOR IMPROVEMENTS

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE

Funding: Department of Water Resources Proposition 84. River-Friendly Landscaping Turf Buy Back Program

GUIDELINES FOR IMPLEMENTATION OF THE CITY OF SAN DIMAS MODEL WATER EFFICIENT LANDSCAPE ORDINANCE (MWELO)

CONTENTS. Purpose. Applicability 1. Definitions 2. Tier 1 - New Construction and Rehabilitation Projects 3

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

WILSON PLACE FINAL DESIGN

GUIDELINES FOR IMPLEMENTATION OF THE CITY OF LA HABRA WATER EFFICIENT LANDSCAPE ORDINANCE

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

WaterSmart. Converting Thirsty Lawns to Beautiful Beds: Turf Removal and Efficient Irrigation

Master Gardener Recommended Horticulture Best Management Practices

Concepts, tools, and procedures necessary to implement irrigation management in Urban Green Areas


LOT 66 VACANT Ca (4) 3 BICYCLE PARKING SPACES. REFER ARCH. CANOPY ABOVE (SHOWN DASHED) REFER ARCH.

The Role of the Landscape Contractor to Conserve Water

Transcription:

SMITH SUBDIVISION SHEET INDEX LANDSCAPE CONSTRUCTION PLANS SHEET # 1 2-4 5-6 7 8 9-11 12 SHEET TITLE TITLE SHEET IRRIGATION PLANS AND NOTES IRRIGATION DETAILS IRRIGATION RUN TIME SCHEDULES WATER CONSERVATION PLAN PLANTING PLAN AND NOTES PLANTING DETAILS I AM FAMILIAR WITH AND AGREE TO COMPLY WITH THE REQUIREMENTS FOR LANDSCAPE IMPROVEMENTS AS DESCRIBED IN CHAPTER 18.56 OF THE VISTA DEVELOPMENT CODE. THIS PLAN HAS BEEN PREPARD IN COMPLIANCE WITH THOSE REGULATIONS. I CERTIFY THAT THE PLAN IMPLEMENTS THE REGULATIONS TO PROVIDE EFFICIENT LANDSCAPE WATER USE. TIMOTHY MICHAEL SMITH, LLA #48 BRUCE SMITH (APPLICANT) SHEETS 2 & 9 SHEETS 3 & 1 SHEETS 4 & 11 1. FOLLOWING GRADING BUT PRIOR TO THE COMMENCEMENT OF THE IRRIGATION SYSTEM'S INSTALLATION, A SOILS MANAGEMENT REPORT MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. IT SHALL CONTAIN THE FOLLOWING: AN ANALYSIS OF THE SOIL FOR THE PROPOSED LANDSCAPE AREA OF THE PROJECT INCLUDING SOIL TEXTURE, SOIL INFILTRATION RATE, ph, TOTAL SOLUBLE SALTS, PLANT SODIUM, PERCENT ORGANIC MATTER, HORTICULTURAL SUITABILITY, AND RECOMMENDATIONS FOR SOIL AMENDMENTS ANDMULCH THAT MAY BE NECESSARY TO PROVIDE FOR HEALTHY PLANT SURVIVAL AND GROWTH. 2. THE PROJECT LANDSCAPE ARCHITECT SHALL SUPERVISE THE INSTALLATION TO INSURE THAT THE WORK IS INSTALLED PER THE PLANS APPROVED BY THE CITY. THIS SHALL INCLUDE AN OBSERVATION OF THE IRRIGATION SYSTEM OF ALL POINTS OF CONNECTION (PRIOR TO BACKFILL), BACKFLOW PROTECTION DEVICES, MAINLINES, ELECTRICAL CONNECTIONS, AUTOMATIC CONTROLLERS, CONTROL VALVES, AS WELL AS ALL SOIL AMENDMENTS, ROOT BARRIERS, EXISTING AND PROPOSED PLANTINGS, TREE STAKING AND MULCH. THE COMPLETED IRRIGATION SYSTEM MUST BE TESTED TO VERIFY ADEQUATE COVERAGE AND THAT NO OVERSPRAY OR RUNOFF IS OCCURRING. 3. PRIOR TO REQUEST OF THE APPLICATN FOR REVIEW AND APPROVAL BY THE CITY OF THE PROJECT'S COMPLETION, PROVIDE AN IRRIGATION SCHEDULE SHOWING THE TIME PERIOD WHEN IRRIGATION WILL BE SCHEDULED AND CONFIRM THAT NO OVERHEAD IRRIGATION SHALL BE USED BETWEEN THE HOURS OF 1: AM AND 8: PM. 4. PRIOR TO THE REQUEST OF THE APPLICATN FOR REVIEW AND APPROVAL BY THE CITY OF THE PROJECT'S COMPLETION, IDENTIFY THE ENTITY WHO WILL BE RESPONSIBLE FOR MAINTENANCE AND PROVIDE A LANDSCAPE AND IRRIGATION MAINTENANCE SCHEDULE TO INCLUDE THE FOLLOWING: 4.1. ADJUSTMENTS AND REPAIR OF THE IRRIGATION SYSTEM TO PREVENT RUNOFF AND EROSION AND TO DETECT IRRIGATION SYSTEM FAILURE. 4.2. REPLACEMENT OF DEAD, DYING AND DISEASED VEGETATION 4.3. ERADICATION OF INVASIVE SPECIES 4.4. ADDITION OF SOIL AMENDMENTS WHEN NECESSARY TO SUPPORT AND MAINTAIN HEALTHY PLANT GROWTH 4.5. FERTILIZING, PRUNING AND WEEDING AND MAINTAINING TURF AREAS 4.6. MAINTENANCE TO AVOID OBSTRUCTION OF MOTORIST'S VIEW. 5. THE SUBMISSION BY THE PROJECT LANDSCAPE ARCHITECT'S CERTIFICATE OF COMPLETION SHALL SERVE AS A FORMAL REQUEST FOR FINAL OBSERVATION BY THE CITY. THE CERTIFICATE OF COMPLETION SHALL INCLUDE: 5.1. CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS WITH ANY DEVIATIONS NOTED, 5.2. AN UPDATED IRRIGATION SCHEDULE, 5.3. IRRIGATION AND MAINTENACE SCHEDULE, AND 5.4. SOILS MANAGEMENT REPORT. 6. THE CITY'S INSPECTION SHALL INCLUDE, BUT NOT BE LIMITED TO CONFORMANCE WITH THE APPROVED IRRIGATION AND PLANTING PLANS. TENTATIVE APPROVAL SHALL BE GRANTED WHEN THE CITY IS SATISFIED THAT THE INSTALLATION OF THE LANDSCAPING AND IRRIGATION SYSTEM HAS BEEN SATISFACTORILY INSTALLED PER THE APPROVED PLANS. 7. FINAL APPROVAL OF LANDSCAPE INSTALLATION SHALL REQUIRE AND ADDITIONAL FIELD OBSERVATION OF THE LANDSCAPING AND IRRIGATION SYSTEM BY THE CITY NO SOONER THAN ONE YEAR FROM THE DATE OF TENTATIVE APPROVAL. PRIOR TO THE REQUEST FOR FINAL APPROVAL, THE OWNER IS REQUIRED TO OBTAIN AN IRRIGATION AUDIT REPORT PREPARED BY A CERTIFIED LANDSCAPE IRRIGATION AUDITOR, CERTIFYING SATISFACTORY TESTING FOR THE FOLLWOIGN: DISTRIBUTION UNIFORMITY, OVERSPRAY AND RUNOFF CONTROL, AND THAT WATER USE DOES NOT EXCEED THE MAWA ONCE LANDSCAPING HAS BEEN ESTABLISHED. THIS REPORT MUST BE SUBMITTED PRIOR TO THE REQUESTED FINAL INSPECTION BY THE CITY. 3 6 9 SHEET KEY MAP SCALE: = 3' 1

IRRIGATION SCHEDULE SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI DETAIL Hunter MP1 PROS- 25 4 4/6 Shrub Rotator, fixed-riser, pressure regulated to 4 psi (2.76 bar), MP Rotator nozzle. M=Maroon adj arc 9 to 21, L=Light Blue 21 to 27 arc, O=Olive 36 arc on PRS4 body. Hunter MP2 PROS- 8 4 4/6 Shrub Rotator, fixed-riser, pressure regulated to 4 psi (2.76 bar), MP Rotator nozzle. K=Black adj arc 9-21, G=Green adj arc 21-27, R=Red 36 arc on PRS4 body. Hunter MP1 PROS-12-CV (2) 28 4 5/6 Shrub Rotator, 12" (3.48 cm) pop-up with check valve, pressure regulated to 4 psi (2.76 bar), MP Rotator nozzle. M=Maroon adj arc 9 to 21, L=Light Blue 21 to 27 arc, O=Olive 36 arc on PRS4 body. 4 21.1 5 13.9 6 12. 7 9.3 Hunter MP2 PROS-12-CV (2) 7 4 4/6 Shrub Rotator, 12" (3.48 cm) pop-up with check valve, pressure regulated to 4 psi (2.76 bar), MP Rotator nozzle. K=Black adj arc 9-21, G=Green adj arc 21-27, R=Red 36 arc on PRS4 body. Hunter PROS-PRS3--MSBN 8 3 6/6 Multi-Stream Bubbler, fixed riser, 25=.25gpm, 5=.5gpm, 1=1.gpm, 2=2.gpm. 3 15.6 2 2. 1 11.2 SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL Hunter ICZ-11-25 1 3/6 Drip Control Zone Kit. ICV Globe Valve with HY1 filter system. Pressure Regulation: 25psi. Flow Range: 2 GPM to 2 GPM. 15 mesh stainless steel screen. Area to Receive Dripline Hunter PLD-6-12 (14) 15,238 s.f. 5/5 In-Line Pressure Compensating Landscape Dripline with Built-In Check Valve..6GPH emitters at 12." O.C. Dripline laterals spaced at 14." apart, with emitters offset for triangular pattern. UV Resistant. MATCHLINE - SEE SHEET 3 SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL Hunter PGV-11-MB 7 4/5 Plastic Electric Remote Control Valve, for Residential/Light Commercial Use. Male Thread x Barb Inlet/Outlet. Globe Configuration, With Flow Control. Febco 825YA 1-1/2" 1 2/5 Reduced Pressure Backflow Preventer Hunter IC-18-PED-SS 1 1/5 Modular Controller, 18 stations, Outdoor Model, Stainless Steel Pedestal. Commercial Use. With two ICM-6 modules included. Hunter WSS 1 Wireless Solar, rain freeze sensor with outdoor interface, connects to Hunter PCC, Pro-C, and I-Core Controllers, install as noted. Includes 1 year lithium battery and rubber module cover, and gutter mount bracket. Hunter FLOW-CLIK-1 1 3/5 Flow Sensor SOV with Interface Panel, Schedule 4 Sensor Body, 24 VAC, 2 amp, install Interface Panel as required. V.I.T. Products SBBC-3CR 1 Low profile, tube and wire construction smooth touch surface, cold rolled steel, backflow enclosure. 31.5"L, 28"H, 17.75"W (8.1cm L, 71.12cm H, 45.85cm W). 17 8.1 Water Meter 1 Vista Irrigation District Irrigation Lateral Line: PVC Class 2 SDR 21 2,267 l.f. 2/6 Only lateral transition pipe sizes and above are indicated on the plan, with all others being 3/4" in size. # #" # Irrigation Mainline: PVC Schedule 4 1,528 l.f. 7/5 Valve Callout Valve Number Valve Flow Valve Size SEE SHEET 4 FOR IRRIGATION NOTES, VALVE SCHEDULE AND VAVLE CRITICAL ANALYSIS MATCHLINE - SEE SHEET 5 SHEET KEY MAP - SCALE =15' 2 4 6 IRRIGATION PLAN AND NOTES SCALE: = 2' 2

IRRIGATION SCHEDULE SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI DETAIL Hunter MP1 PROS- 25 4 4/6 Shrub Rotator, fixed-riser, pressure regulated to 4 psi (2.76 bar), MP Rotator nozzle. M=Maroon adj arc 9 to 21, L=Light Blue 21 to 27 arc, O=Olive 36 arc on PRS4 body. Hunter MP2 PROS- 8 4 4/6 Shrub Rotator, fixed-riser, pressure regulated to 4 psi (2.76 bar), MP Rotator nozzle. K=Black adj arc 9-21, G=Green adj arc 21-27, R=Red 36 arc on PRS4 body. Hunter MP1 PROS-12-CV (2) 28 4 5/6 Shrub Rotator, 12" (3.48 cm) pop-up with check valve, pressure regulated to 4 psi (2.76 bar), MP Rotator nozzle. M=Maroon adj arc 9 to 21, L=Light Blue 21 to 27 arc, O=Olive 36 arc on PRS4 body. Hunter MP2 PROS-12-CV (2) 7 4 4/6 Shrub Rotator, 12" (3.48 cm) pop-up with check valve, pressure regulated to 4 psi (2.76 bar), MP Rotator nozzle. K=Black adj arc 9-21, G=Green adj arc 21-27, R=Red 36 arc on PRS4 body. 8 12. Hunter PROS-PRS3--MSBN 8 3 6/6 Multi-Stream Bubbler, fixed riser, 25=.25gpm, 5=.5gpm, 1=1.gpm, 2=2.gpm. 14.5 9 15. 1 16. 11 SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL Hunter ICZ-11-25 1 3/6 Drip Control Zone Kit. ICV Globe Valve with HY1 filter system. Pressure Regulation: 25psi. Flow Range: 2 GPM to 2 GPM. 15 mesh stainless steel screen. MATCHLINE - SEE SHEET 2 11.3 12 15.4 13 2. 14 Area to Receive Dripline Hunter PLD-6-12 (14) 15,238 s.f. 5/5 In-Line Pressure Compensating Landscape Dripline with Built-In Check Valve..6GPH emitters at 12." O.C. Dripline laterals spaced at 14." apart, with emitters offset for triangular pattern. UV Resistant. SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL Hunter PGV-11-MB 7 4/5 Plastic Electric Remote Control Valve, for Residential/Light Commercial Use. Male Thread x Barb Inlet/Outlet. Globe Configuration, With Flow Control. Febco 825YA 1-1/2" 1 2/5 Reduced Pressure Backflow Preventer Hunter IC-18-PED-SS 1 1/5 Modular Controller, 18 stations, Outdoor Model, Stainless Steel Pedestal. Commercial Use. With two ICM-6 modules included. Hunter WSS 1 Wireless Solar, rain freeze sensor with outdoor interface, connects to Hunter PCC, Pro-C, and I-Core Controllers, install as noted. Includes 1 year lithium battery and rubber module cover, and gutter mount bracket. Hunter FLOW-CLIK-1 1 3/5 Flow Sensor SOV with Interface Panel, Schedule 4 Sensor Body, 24 VAC, 2 amp, install Interface Panel as required. V.I.T. Products SBBC-3CR 1 Low profile, tube and wire construction smooth touch surface, cold rolled steel, backflow enclosure. 31.5"L, 28"H, 17.75"W (8.1cm L, 71.12cm H, 45.85cm W). Water Meter 1 Vista Irrigation District Irrigation Lateral Line: PVC Class 2 SDR 21 2,267 l.f. 2/6 Only lateral transition pipe sizes and above are indicated on the plan, with all others being 3/4" in size. # #" # Irrigation Mainline: PVC Schedule 4 1,528 l.f. 7/5 Valve Callout Valve Number Valve Flow Valve Size 14.1 15 MATCHLINE - SEE SHEET 4 SHEET KEY MAP - SCALE =15' 2 4 6 IRRIGATION PLAN AND NOTES SCALE: = 2' 3

MATCHLINE - SEE SHEET 2 MATCHLINE - SEE SHEET 3 14.1 15 17.1 16 2 4 6 IRRIGATION PLAN AND NOTES SCALE: = 2' CRITICAL ANALYSIS VALVE SCHEDULE Generated: 213-2-14 15:21 P.O.C. NUMBER:1 Water Source Information: Vista Irrigation District FLOW AVAILABLE Water Meter Size: Flow Available: 37.5 gpm PRESSURE AVAILABLE Static Pressure at POC: 126. psi Elevation Change: 5. ft Service Line Size: 1 1/4" Length of Service Line: 2. ft Pressure Available: 123. psi DESIGN ANALYSIS Maximum Station Flow: Flow Available at POC: Residual Flow Available: 21.9 gpm 37.5 gpm 16.41 gpm NUMBER MODEL SIZE TYPE PSI PSI @ POC GPM PRECIP 1 Hunter ICZ-11-25 Area for Dripline 47.23 65.94 11.24.87 in/h 2 Hunter PGV-11-MB Bubbler 36.44 64.94 2. 3.64 in/h 3 Hunter ICZ-11-25 Area for Dripline 55.19 77.3 15.64.87 in/h 4 Hunter ICZ-11-25 Area for Dripline 66.37 92.23 21.9.87 in/h 5 Hunter ICZ-11-25 Area for Dripline 51.75 68.18 13.89.87 in/h 6 Hunter PGV-11-MB Bubbler 33.79 48.69 12. 3.64 in/h 7 Hunter ICZ-11-25 Area for Dripline 45.4 57.9 9.26.87 in/h 8 Hunter PGV-11-MB Bubbler 32.91 45.45 12. 3.64 in/h 9 Hunter PGV-11-MB Shrub Rotary 45.8 59.87 14.5.29 in/h 1 Hunter PGV-11-MB Shrub Rotary 44.4 59.8 14.97.28 in/h 11 Hunter PGV-11-MB Bubbler 35.2 51.27 16. 3.64 in/h 12 Hunter ICZ-11-25 Area for Dripline 47.32 63.2 11.33.87 in/h 13 Hunter ICZ-11-25 Area for Dripline 54.38 74.77 15.37.87 in/h 14 Hunter PGV-11-MB Bubbler 37.87 64.73 2. 3.64 in/h 15 Hunter ICZ-11-25 Area for Dripline 53.35 74.31 14.13.87 in/h 16 Hunter ICZ-11-25 Area for Dripline 58.9 85.85 17.14.87 in/h 17 Hunter ICZ-11-25 Area for Dripline 43.33 61.71 8.5.87 in/h Critical Station: 4 Design Pressure: 3. psi Loss Elev. high head to valve:. psi Pipe Loss Critical Head:.33 psi Loss Fitting Factor:.3 psi Loss through Valve: 36. psi Pressure Req. at Critical Station: 66.36 psi Loss for Fittings: 1.8 psi Loss for Main Line: 1.75 psi Loss for POC to Valve Elevation:. psi Loss for Backflow: 11.51 psi Loss for Water Meter: 2.53 psi Critical Station Pressure at POC: 92.23 psi Pressure Available: 123. psi Residual Pressure Available: 3.77 psi SHEET KEY MAP - SCALE =15' 4

1 PEDESTAL MOUNT CONTROLLER 2 REDUCED PRESSURE BACKFLOW 3 FLOW SENSOR ASSEMBLY 4 RCV WITH UNION S.O.V. TECHLINE CV MAXIMUM LENGTH OF SINGLE LATERAL (FEET) TECHLINE CV FLOW PER 1 FEET END FEED EXAMPLE CENTER FEED EXAMPLE 6 QUICK COUPLING VALVE IN BOX 7 MAINLINE PIPE TRENCH DETAIL ISLAND LAYOUT IRREGULAR AREAS: TRIANGULAR BRANCHING OUT LATERALS JOINING LATERALS IRREGULAR AREAS: ODD CURVES SLOPE FEED LAYOUT 5 HUNTER IN-LINE PLD CV REQUIREMENTS 6

1 SLEEVE UNDER PAVING 2 PIPE TRENCHING DETAIL 3 DRIP VALVE/FILTER/REGULATOR 4 SHRUB SPRAY KBI FIXED RISER 5 MP ROTATOR 6 BUBBLER ON FLEX HOSE RISER 6

7

REFERENCE_NOTES_SCHEDULE HYDROZONES SYMBOL DESCRIPTION QTY H-11 LOW PRECIPITATION MP ROTORY IRRIGATION FOR SHRUBS AND GROUNDCOVERS ON SLOPES 4,774 sf H-12 BUBBLER IRRIGATION FOR TREES 1,131 sf H-13 IN-LINE DRIP IRRIGATION FOR SHRUBS AND GROUNDCOVER 14,421 sf 3 6 9 HYDROZONE PLAN SCALE: = 3' 8

PLANT SCHEDULE MATCHLINE - SEE SHEET 1 HYDROZONE NOTES: 1. ALL TREES TO BE ON BUBBLER HYDROZONE - H12. 2. ALL SHRUBS AND GROUNDCOVER ARE ON BOTH THE H-11 AND H-13 HYDROZONES DEPENDING ON THE GRADE. PLANTING ON SLOPES WILL BE ON AN MP ROTORY SYSTEM HYDROZONE H-11 AND ALL OTHER AREAS TO BE ON AN IN-LINE DRIP SYSTEM HYDROZONE H-13. 3. SEE SHEET 11 FOR HYDROZON PLAN SEE SHEET 11 FOR PLANTING NOTES SHEET KEY MAP - SCALE =15' 2 4 6 PLANTING PLAN AND NOTES SCALE: = 2' 9

PLANT SCHEDULE MATCHLINE - SEE SHEET 9 SEE SHEET 11 FOR PLANTING NOTES MATCHLINE - SEE SHEET 11 SHEET KEY MAP - SCALE =15' 2 4 6 PLANTING PLAN AND NOTES SCALE: = 2' 1

PLANTING NOTES MATCHLINE - SEE SHEET 9 MATCHLINE - SEE SHEET 1 2 4 6 PLANTING PLAN SCALE: = 2' PLANT SCHEDULE SHEET KEY MAP - SCALE =15' 11

MAINTENANCE NOTES 1. LANDSCAPES SHALL BE MAINTAINED BY THE PROPERTY OWNER TO ENSURE WATER USE EFFICIENCY AND CONTINUING COMPLIANCE WITH THE APPROVED LANDSCAPE DOCUMENTATION PACKAGE. 2. ALL REQUIRED PLANTINGS SHALL BE MAINTAINED IN GOOD GROWING CONDITION AND WHENEVER NECESSARY, SHALL BE REPLACED WITH SIMILAR PLANT MATERIALS TO ENSURE CONTINUED COMPLIANCE WITH APPLICABLE LANDSCAPING, BUFFERING, AND SCREENING REQUIREMENTS. 3. ALL LANDSCAPING AND IRRIGATION SYSTEMS SHALL BE PROPERLY MAINTAINED FOR THE LIFE OF THE PERMIT AND PER THE APPROVED IRRIGATION AND MAINTENANCE SCHEDULES. 4. BROKEN OR MALFUNCTIONING EQUIPMENT AND MATERIAL SHALL BE REPAIRED OR REPLACED IMMEDIATELY WITH EQUIPMENT AND MATERIAL OF THE SAME TYPE AND OPERATING CHARACTERISTICS AS THE ORIGINAL. 5. ALL IRRIGATION SYSTEMS SHALL BE MAINTAINED IN A FULLY OPERATIONAL CONDITION. THE IRRIGATION SYSTEM MUST FUNCTION AT A MINIMUM AVERAGE EFFICIENCY FACTOR OF.71. 6. OWNER WILL BE RESPONSIBLE FOR ON-GOING MAINTENANCE, INCLUDING RUNOFF AND OVERSPRAY PREVENTION, REPAIRS OF BROKEN OR MALFUNCTIONING IRRIGATION EQUIPMENT, REPLACEMENT OF DEAD, DYING, OR DISEASED VEGETATION, AND CONTINUAL COMPLIANCE WITH THE PROJECT'S APPROVED WATER CALCULATIONS. 7. OWNER SHALL INSURE THAT THE FOLLOWING MAINTENANCE TASKS ARE REGULARLY PERFORMED: A. ROUTINE INSPECTION OF THE IRRIGATION SYSTEM. B. ADJUSTMENTS AND REPAIR OF THE IRRIGATION SYSTEM AND ITS COMPONENTS. 1 GROUNDCOVER PLANTING 2 TREE PLANTING WITH STAKING C. REPLENISHING MULCH IN ALL PLANTED AREAS WITH SLOPES LESS THAN 3:1. D. FERTILIZING OF NON-NATIVE VEGETATION - SEE NOTES FROM SOILS REPORT ON THIS SHEET. E. PRUNING, WEEDING AND REMOVING ANY OBSTRUCTION TO EMISSION DEVICES. 8. WEEDS SHALL BE REMOVED FROM LANDSCAPE AREAS AS SOON AS POSSIBLE. THE LANDSCAPE CONTRACTOR RESPONSIBLE FOR MAINTENANCE SHALL INSURE THAT THE ROOTS ARE REMOVED SO AS TO PREVENT THEIR RE-GROWTH. 9. ALL PLANTS WHICH FAIL TO THRIVE BECAUSE OF DISEASE, DAMAGE, ACCIDENT OR OTHER CAUSE SHALL BE IMMEDIATELY REPLACED WITH A PLANT OF THE SAME SPECIES AND SIZE AS ORIGINALLY APPROVED. AT THE DISCRETION OF THE CITY PLANNER, REPLACEMENT OF ANY PLANT MATERIALS THAT HAVE BEEN IMPROPERLY MAINTAINED SHALL BE REQUIRED AT A SIZE EQUAL TO THE SIZE OF THE PLANT HAD IT BEEN PROPERLY CARED FOR. 1. ALL TREES SHALL BE MAINTAINED IN A MANNER THAT RETAINS THE NATURAL FORM OF THE SPECIES. TOPPING AND AGGRESSIVE PRUNING WILL NOT BE ALLOWED. 11. MAINTENANCE CONTRACTOR SHALL IMPLEMENT SUSTAINABLE OR ENVIRONMENTALLY FRIENDLY PRACTICES FOR OVERALL LANDSCAPE MAINTENANCE. 3 SHRUB PLANTING 1 AND 5 GALLON 12