Moving Target: A Case Study in Providing Fire Protection Below a Reconfigurable Concert Hall Seating System. Part 1: Concept Design

Similar documents
The Science Behind Water Mist Protection of Typical Building Hazards

Building Description Applicable Codes & Standards Prescriptive Requirements. Performance Based Design

WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS

Fire protection for buildings

Factors Affecting Efficiency of Water Mist Suppression of Solid Combustible Fires in Open Environment

Table EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c

Jonathan Redding Area Sales Manager FOGTEC Fire Protection Cologne, Germany

RESOLUTION MSC.265(84) (adopted on 9 May 2008) AMENDMENTS TO THE REVISED GUIDELINES FOR APPROVAL OF SPRINKLER SYSTEMS EQUIVALENT TO THAT REFERRED TO

Explosion Protection Engineering Principles

and Sprinkler System in Resalat Tunnel of Tehran

An Overview of Extinguishing Systems for Computer Equipment

Fire Detection and Fire Fighting Testing and Approval on Railway Vehicles

Fire Protection in High-rise Buildings

Vacant Building Loss Prevention Best Practices

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.

Fluid Collections at the Smithsonian. Michael Kilby, P.E. Joshua Stewart, P.E. Office of Safety, Health & Environmental Management (OSHEM)

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

LIFE SAFETY CODE ESSENTIALS PRESENTED BY: LARRY VIGIL, RISK CONSULTANT

High Ceiling Protection

Agency for Health Care Administration

COSTCO, SAN FRANCISCO A PRESCRIPTIVE AND PERFORMANCE BASED ANALYSIS OF FIRE PROTECTION SYSTEMS AND DESIGN

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

The Protection of Machinery Spaces by means of the Local Application of Water Mist. Dr. Tim R. Nichols CPhys FIFireE


MODULE 2. Water-Based Suppression System Basics

Will Clay Spring 2014

Challenges of Fire Protection Upgrades in Existing Libraries. Campus Fire Safety Forum

False Sense of Security???

MULTI-LEVEL & COVERED BOOTH CONDITIONS

First Revision No. 6-NFPA [ Section No. 2.2 ]

Releasing Systems. Rob Mennie Senior Consultant Gage-Babcock & Associates Ltd.

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Vaults 5/03/2015. Introduction. Vault Types. Stand alone building Free standing structure VAULTS

Salve Regina University Fire Safety Policy for Events in Assembly Occupancies (Original 2006 revised & updated January 2010 & October 2014)

Advanced Fire Alarm Systems Training Program Outline (5 Day)

Fire Prevention Program

Construction Innovation Center Building 186

2012 International Fire Code Errata (Portions of text and tables not shown are unaffected by the errata)

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

DEPARTMENTAL GUIDELINES CHAPTER 6 TACTICAL OPERATIONS

NFPA 101 Life Safety Code Culture change 2012

TN-25 Tunnel Fire Protection System. Safer. Smarter. Tyco.

PRINTED: 06/09/2017 FORM APPROVED CENTERS FOR MEDICARE & MEDICAID SERVICES OMB NO (X2) MULTIPLE CONSTRUCTION A. BUILDING 03 - A BUILDING

OBC INDUSTRIAL CLASSIFICATION OBOA ANNUAL MEETING AND TRAINING SESSIONS LONDON ON OCTOBER 4, 2011

MORE THAN JUST FIRE PROTECTION

Soot Mitigation Strategies

Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

ICC CODE CORNER 2015 International Fire Code

PLANNING AND MANAGEMENT GUIDE for PUBLIC ASSEMBLY EVENTS

Early Suppression Fast Response Sprinklers and Obstructions

FIREFIGHTER II MANIPULATIVE SKILL OBJECTIVES

Requirements for the protection of High-Piled Combustible Storage (HPCS) Effective Date: January 2011

APPENDIX H (DESIGN SUBMISSION CRITERIA)

January 1, 2014 Mandatory Effective Date

Schools and the Fire Code A Partnership for Safety

California Fire Code (CFC) Part III contains requirements. Building and Equipment Design Features PART. Chapters 5 through 19

Impact of quick incident detection on safety in terms of ventilation response

Changes to the 2018 Joint Commission Comprehensive Accreditation Manual for Hospitals (CAMH)

FIRE PREVENTION AND PROTECTION*

EMERGENCY VENTILATION FOR SMOKE CONTROL IN ROADWAY TUNNELS (NCHRP PROJECT TASK 363)

Redlands Fire Department Fire Protection Standard

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

IFC Significant Changes from the 2009 to the 2015 Edition Tier 1

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Safety Manual Section 7 Fire/Life Safety

University Design Standard Fire Alarm Systems

Fire Inspection FAQ s

Laboratories and Hazardous Materials. Company Overview

Fire Protection System and Life Safety Evaluation of Building X. Anthony W. Sublett

Is the address of your property clearly visible and marked in large numbers that can be easily seen from the street?

CHAPTER 7 ALTERATIONS LEVEL

Building Fire Safety in New York City s Existing Office Buildings

FIRE SAFETY INSPECTION REPORT

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

WATER MIST CONVENTION AND EXHIBITION

HOW COMMERCIAL FIRE PROTECTION SPRINKLER SYSTEMS REALLY OPERATE

1.2 To ensure the safety of all persons working in or occupying a building where a hot work operation is performed.

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

12/14/2013. Fire alarm and emergency power SPRINKLER HEAD

HEAD, CLARA & MARIA FIRE SAFETY PLAN

MORE THAN JUST FIRE PROTECTION

SECTION 907 FIRE ALARM AND DETECTION SYSTEMS

MEDIUM-DENSITY HOUSING # 7. Fire safety

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Engine Module Page 1 of 5 Sprinkler Heads Revised

VENTLESS EXHAUST HOOD OPERATORS MANUAL AND PARTS LIST REV. MAY 2016

This regulation outlines procedures to be followed for fire drills and all school event decorations.

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

Contact person Date Reference Page Richard Johansson P (2) Fire Research

Interim Life Safety Measures (ILSM)

Inspection of Fire Sprinkler Systems. NFPA 25, Inspection, Testing & Maintenance of Water Based Fire Protection Systems

Antifreeze Solutions and Automatic Fire Sprinkler Systems. March 12, 2013

West Chester Fire Dept. Fire Code Maintenance Handbook. Fire Prevention Saves Lives and Property

Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN Fire Marshal: FAX:

Water-mist systems in mass-production industries: A successful application to a tissue-converting plant

Water Mist Fire Suppression

Smoke Alarm Research at NIST

Global Property. QUARTERLY FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

A P P L I C A T I O N S G U I D E. Single-Ended Reflected Beam Smoke Detector

Transcription:

Moving Target: A Case Study in Providing Fire Protection Below a Reconfigurable Concert Hall Seating System Part 1: Concept Design 2

Amy L. Porter, P.E. (TX,VA, NM) AND Michael Wojcik, P.E. (AZ, CO, MA, NM) 3

Tobin Center for the Performing Arts Premier concert venue in San Antonio Recently completed $203 million renovation Updates included installation of a Gala System 4

Tobin Center Gala System Independent movement of 27 rows Seats can be stored below the flooring when not in use 5

Tobin Center Gala System 6

Tobin Center Gala System Floor to ceiling range 7 ft. 6 in. -19 ft. Single row travel range 5 ft. - 11 ft. 6 in. 3 ft. clear zone required below equipment 17-0 7-6 5-0 11-6 19-0 7-6 7

Tobin Center Gala System 8

Code Challenges Sprinkler protection required Accessible Combustibles and ignition sources present Supply air plenum Supply air to auditorium from below floor Non-plenum rated combustibles present Limited Access for Firefighting 9

Stakeholder Requirements -Egress assembly population- Incipient detection for early action Minimize false alarms/unnecessary discharge Control a single fire event by: Protecting under two most extreme configurations Non-hazardous system discharge Avoid systems with finite discharge limits or provide remote backup UL listed and/or FM approved Designed, signed and sealed by a P.E. Installation complete in 6 months 10

Fire Protection Considerations Hazard Definition Complex Geometry Multiple Configurations Obstructions Openings Movement 11

Hazard Definition Ceiling Mounted Chairs Floor Mounted Cable Trays and Motors 12

Fire Load Combustible Properties Values Units Number of Seats 736 Seats Theater Seating Vertical Panels Cables Wooden Railings Total less than 1,134 MJ/m 2 Theater Seating Low Fire Load Combustible Properties Values Units Number of Seats 736 Seats Wool Density 0.68 kg/m 2 Seat Surface Area 0.74 m 2 Wool Cover Mass (Density x Volume) 0.50 Kg Heat of Combustion 20.50 MJ/kg Wool Fire Load / Seat 10.28 MJ Total Theater Seating Fire Load 127,000 MJ Values Total Fire Load 275,000 MJ Floor Area 702 m 2 Fire Load / Floor Area 392 MJ/m 2 Foam Density 59.0 kg/m 3 Cushion Volume 0.037 m 3 Cushion Mass (Density x Volume) 2.18 kg Heat of Combustion (H c ) 10.10 MJ/kg Foam Fire Load / Seat (Mass x H c ) 22.06 MJ Theater Seating Plywood Density 9 Wood Volume / seat 541 0.022 kg/m 3 m 3 Wooden Frame Mass (Density x Volume) 11.90 Kg Heat of Combustion 9 11.80 MJ/kg Plywood Fire Load / Seat 140.44 MJ Wool Density 0.68 kg/m 2 Seat Surface Area 0.74 m 2 Wool Cover Mass (Density x Volume) 0.50 Kg Heat of Combustion 20.50 MJ/kg Wool Fire Load / Seat 10.28 MJ Total Theater Seating Fire Load 127,000 MJ Plywood Density 9 541 kg/m 3 Wood Volume / Panel (full row) 0.34 m 3 Protective Mass / Panel (Density x Volume) 186 Kg Vertical Heat of Combustion Panels 11.80 MJ/kg Plywood Fire Load / Panel 2,197 MJ Total Plywood Panel Fire Load 56,020 MJ Heat of Combustion (H c ) 24.00 MJ/kg 10 AWG Cable Weight 0.0595 kg/m 16 AWG Cable Weight 13 0.0164 kg/m Group 1 Cable Length 6583.68 m Group 1 Cable Mass 249.84 kg Group 1 Fire Load 5996.13 MJ Units Cables Group 2 Cable Length 774.19 m Group 2 Cable Mass 37.73 kg Group 2 Fire Load 905.57 MJ Group 3 Cable Length 1950.72 m Group 3 Cable Mass 116.12 kg Group 3 Fire Load 2786.87 MJ Total Cables Fire Load 9690 MJ Plywood Density 9 541 kg/m 3 Wood Volume / Railing Board 6.40 m 3 Mass / Railing Board (Density x Wooden Volume) 3,460 Kg Automatic Railings Heat of Combustion 9 11.80 MJ/kg Plywood Fire Load / Railing Board 40,900 MJ Total Railing Board Fire Load 81,700 MJ Total Fire Load b 275,000 MJ Floor Area 702 m 2 Fire Load / Floor Area 392 MJ/m 2 * Vondrasek, R., Confinement of Fire in Buildings, NFPA Fire Protection Handbook, 20 th Edition, p. 18-7 13

Hazard Classification Light Hazard OH1 OH2 Low Combustibility Low Combustibility Moderate/High Combustibility Low Quantity of Combustibles Moderate Quantity of Combustibles Moderate/High Quantity of Combustibles Maximum 8 ft. Piles Maximum 12 ft. Piles Low HRR Moderate HRR Moderate HRR High HRR for Piles up to 8 ft. Examples: Theaters, Auditoriums, libraries (except large stack rooms), restaurant seating areas Examples: Restaurant service areas, automobile parking and showrooms, bakeries, laundries Examples: Barns, stables, large library stack rooms, paper processing plants, stages, wood product assembly spaces * Classification Information per NFPA 13, 2013 edition, Section 5 and Appendix Material 14

Fire Protection Considerations Hazard Definition Complex Geometry Multiple Configurations Obstructions Openings Movement 15

Obstructions 16

Openings HVAC System Vents 1/8-1/2 in. gaps surround each platform All openings nonsealable Gaps and Openings 17

Fire Protection Considerations Hazard Definition Complex Geometry Multiple Configurations Obstructions Openings Movement 18

System Movement Ceiling Elevation Seat Rotation Spinning Hinges Sliders Daily-weekly movement 19

Performance Based Solution 20

Solution: Concept Remove/Minimize Ignition Sources High voltage only present while in motion Minimize other power while occupied Supplement Firefighting with Dedicated Standpipe Connections Detection and Suppression Air-Aspirating Smoke Detection Linear Heat Detection High-Pressure Water Mist 21

Detection and Suppression Zoned Deluge Water-Mist Double Interlocked with Smoke and Heat Detection Ensure fire signature for activation Multiple warnings prior to system discharge Zoning Concept Zone defined as the length of two adjacent rows Mist discharge on front of two rows Heat detection determines activation zone Fire zone plus two adjacent to encapsulate event 22

Air Aspirating Detection Set to data center-like sensitivity levels Four tiers of notification Alert: Notifies staff Action: AHU Shut down Fire 1: Initiate A/Vs Fire 2: One component of double interlock for water mist suppression system activation 23

Air Aspirating Detection Detector rides while carrier cable trays protect wiring Pyrotechnics mode Interrupt A/Vs, retain system interlock 24

Linear Heat Detection Low Temperature for Early Detection Initiates Building Fire Alarm Interlock Component that Determines Water Mist Activation Zone 25

High Pressure Water Mist Emulates Total Flooding Small droplet size High velocity discharge Direct line of sight not required Nozzles Listed for OH1 Non-hazardous discharge Minimize water damage 26

High Pressure Water Mist Positive displacement fire pumps Continuous application FM Approved No integrity/hold time required 27

High Pressure Water Mist Moves with System using High Pressure Flex Hoses Not Listed, but previously used in FM insured applications 28

Conclusion: Evaluation Sprinkler protection required Zoned deluge, high-pressure water mist Supply air plenum Early detection, notification and action Suppression for incipient/early fire Limited Access for Firefighting Early detection, notification and action Supplemental standpipe connections 29

Conclusion: Stakeholders -Egress Assembly Population- Incipient detection for early action Minimize false alarms/unnecessary discharge Control a single fire event by: Protecting under two most extreme configurations Non-hazardous system discharge Avoid systems with finite discharge limits or provide remote backup UL listed and/or FM approved Designed, signed and sealed by a P.E. Installation complete in 6 months 30

Conclusion Performance based design solution: Maintains the level of fire protection intended by code for the Tobin Center Gala System occupants without compromising the flexibility afforded by such a unique seating/flooring system. 31

Thank You! Any Questions? 32