PUBLIC CONSULTATION MACROBERT INCORPORATED GREENWAY FARMS (PTY) LTD BOKPOORT OPERATIONS INTEGRATED WATER USE LICENCE APPLICATION

Similar documents
BACKGROUND INFORMATION DOCUMENT:

BASIC ASSESSMENT REPORT. Background Information Document

BASIC ASSESSMENT PROCESS

ENVIRONMENTAL IMPACT ASSESSMENT

APPENDIX D PUBLIC NOTIFICATIONS

ENVIRONMENTAL IMPACT ASSESSMENT

BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION

ENVIRONMENTAL IMPACT ASSESSMENT

SIBAYA WATERLINE BASIC ASSESSMENT PROCESS. PRE-APPLICATION MEETING WITH EDTEA March 2016

Cape Environmental Assessment Practitioners(Pty)

BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

MEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)

Dispute over the requirement for fire door signage to hotel suites at 124 Devon Street West, New Plymouth

City of Hume Planning Scheme Amendment C207. Statement of Expert Evidence Provided to Planning Panels Victoria

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

Draft Hailey Neighbourhood Plan

Anglo American Platinum; Mogalakwena Mine: Construction of Bridge and Gravel Road. Consultation with community members 26 July 2016

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

SITE INVESTIGATION REPORT: CONSTRUCTION OF NTUMBA VEHICULAR/PEDESTRIAN BRIDGE ACROSS A STREAM IN ROOKDALE, OKHAHLAMBA LOCAL MUNICIPALITY

Pine Flat Lake Master Plan Update FACT SHEET September 2014

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).

SINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR

Public Hearing. Preliminary Draft Development Plans (zoning plans) Dutch Quarter and Middle Region. June 28, 2016

Planning Proposal under section 55 of the EP&A Act

Attention: Interested and Affected Party (I&AP) Commenting Period: 22 November January 2018 GNEC Code: 20327

Appropriate Assessment in relation to County Donegal Draft Heritage Plan

SAFETY CODES COUNCIL ORDER. BEFORE THE FIRE TECHNICAL COUNCIL On June 21, 2012

DSO Compliance Report 2009

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Report on the Screening Process for the Proposed Woodstock Local Area Plan

Subject: RE: Greenway Farms: Aansoek om 'n watergebruikerslisensie

1.4 To establish opportunities for local pride in public open spaces. 1.5 To clarify Council s role as an enabler and supporter of this policy.

Peter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).

Terwillegar Community Garden

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

Joanne Taylor, Board Secretary. Su Long, Chief Officer & Chair of Health and Safety Committee

IFLA Regional Office for Latin America and the Caribbean: Call for Applications to host the Regional Office

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

Reg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web:

U N. United Nations Decade on Biodiversity. Convention on Biological Diversity. Ref.: SCBD/SPS/DC/SBG/JL/JA/ November 2017

Baseline Study for Clamp Kilns in South Africa and Possible Regulatory Approaches

Fire Safety Policy. Investing in success. Dukes Centre Dukes Avenue Kingston KT2 5QY 1. Policy

CAIRNGORMS NATIONAL PARK AUTHORITY

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

Business Process and Procedures Workstream. Event Log Collection, Processing & Delivery process (BP05)

GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY

Letcombe Brook Project Officer

ite the correct module for the programme for which they have registered. 1 April in first semester and 1 September in second semester

Request For Quotations. For The. Fire Sprinkler Retrofit Program For Licensed Small Or Rural Retirement Homes. October 11, 2017

CITY OF WESTERVILLE, PLANNING AND DEVELOPMENT. BASSEM BITAR / (614) /

Linden Homes Proposals for land off Ringwood Road, Verwood

CONSULTING Training Courses

South of Eastern Strategic Direction Status Update

DGE 2 EUROPEAN UNION. Brussels, 20 September 2017 (OR. en) 2016/0287 (COD) PE-CONS 28/17 TELECOM 158 FC 54 CODEC 1008

Planning and Building Department APPLICATION FOR CEMETERY EXPANSION BAYVIEW CEMETERY, 720, 726 AND 740 SPRING GARDENS ROAD

HISTORIC SITE AND MONUMENT COMMISSION (HSMC) Instructions for Historical Markers, Monuments, and Public Art Application

Preliminary Design of Major Rehabilitation Works for the Bridge Structure on PTH 1A Over Assiniboine River and CP Rail (Bridge Site No.

CITY OF MOUNT GAMBIER BUILDING FIRE SAFETY COMMITTEE

Draft Western District Plan

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY

CAC OVERVIEW. CAC Roles and Responsibilities CAC Operations CAC Membership CAC DAC Relations

BACKGROUND INFORMATION DOCUMENT

Community Garden Licence

THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI

Request for Qualifications For Administration of the 2016 Summer Sprout Program

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

!"#"$%&'"()*%+*,*-.%/"0.%(,$*&$,(*+%/*)1"* 2"314314("*!.2)/.5)* 0/%-$"/2!,$*+./"*2),).%(*-%,/!/%%'6*78*',/51*9:7;*

WEST HILL BUSINESS PARK AREA STRUCTURE PLAN

Our Constitutional imperative

OPEN SPACE MANAGEMENT WORKSHOP. Johannesburg Botanical Gardens 22 May 2009 TOWN PLANNING SCHEME REQUIREMENTS

COMMISSION DELEGATED REGULATION (EU) /... of

Managing our Landscapes Conversations for Change

Fire Safety Group. The minutes of the meeting held on 25 th March 2013 were accepted as a true record. 12/27 & 12/37 Clinical Fire Arrangements

Agenda for the Informal Meeting of TT-RWH (69 th IEC)

PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY

TSHWANE STRENGTHENING PROJECT PHASE 1, GAUTENG PROVINCE: Draft Scoping Report: Apollo - Verwoerdburg July 2009

Town and Country Planning (Local Planning) (England) Regulations 2012, Regulation 22 Submission of Legacy Corporation Local Plan

The North American Electric Reliability Corporation ( NERC ) hereby submits

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

Planning Proposal Wangi Power Station Complex Administrative Amendment Lake Macquarie Local Environmental Plan 2014

ISO 9001:2015 TRANSITIONS

PPS5: Planning for the Historic Environment

CITY OF BEACON NOTICE TO LANDSCAPE ARCHITECTS GENERAL INFORMATION AND REQUEST FOR PROPOSALS

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH. CENOTAPH COMMITTEE - 4:00 PM Wednesday, October 12, 2016 Council Chambers AGENDA

Local Government Climate Change Support Program Northern Cape Inception Workshop

City of Havana, Prairieland Community Development & 353 Court LLC

ST. JOHN'S URBAN REGION REGIONAL PLAN, 1976 (SJURRP) Amendment No. 3, Digital Map Consolidation

Re: Amendment C234 Cardinia Planning Scheme Pakenham East Precinct Submission by Earldean Pty Ltd and Auscare Commercial Pty Ltd

Alternative Routes. St. Vital to La Verendrye Station - Southern Loop Transmission Corridor. 20 different segments 4 segments common to all routes

Silverwood Masterplan Kickoff Meeting. Jim Neidhart Dane County Parks Planning

Significant Tree Register

REDZ & POWER CORRIDOR GAZETTING. 25 July Environmental Advisory Services

Longmore House Salisbury Place Edinburgh EH9 1SH. 18 January 2008

Ms Ferguson, evidence in chief, Appendix 4 Memorandum for Cashmere / Worsley's Spur Significant Landscape

WRITTLE PARISH COUNCIL

Transcription:

MACROBERT INCORPORATED GREENWAY FARMS (PTY) LTD BOKPOORT OPERATIONS INTEGRATED WATER USE LICENCE APPLICATION Report: JW35/16/F481 - Rev 2 PUBLIC CONSULTATION APPENDIX E - Table of Contents E.1 Minutes of pre-application consultation meeting with DWS E.2 Newspaper advertisement E.3 Letters to landowners Jones & Wagener (Pty) Ltd F481-00_REP-01_r2_th_MvZ_BokpoortIWULA_20160404 Engineering & Environmental Consultants

Jones & Wagener C o n s u l t i n g C i v i l E n g i n e e r s 59 Bevan Road PO Box 1434 Rivonia 2128 South Africa Tel: 00 27 (0)11 519 0200 Fax: 00 27 (0)11 519 0201 email: post@jaws.co.za MACROBERT INCORPORATED Distribution Date: 3 March, 2016 GREENWAY FARMS: BOKPOORT OPERATIONS Job No: F481 INTEGRATED WATER USE LICENCE APPLICATION Our Ref: MINUTES OF PRE-APPLICATION CONSULTATION MEETING WITH DEPARTMENT OF WATER AND SANITATION Held at Bokpoort Farm, Mookgophong on 16 February 2016 f481-00_min- 01_r0_th_meetingdws_2 0160216_cpkc comments PRESENT: NAME: COMPANY: CELL EMAIL Tolmay Hopkins J&W 082 808 2693 tolmay@jaws.co.za Mpho Ntshagovhe DWS 076 169 1660 NtshagovheM@dws.gov.za Pertunia Tjatji DWS 083 232 2348 ptjatji@dwa.gov.za Kenneth Cameron MacRobert Inc. 082 786 7873 kcameron@macrobert.co.za Caroline Pepermans MacRobert Inc. 082 708 0186 cpepermans@macrobert.co.za Vincent Sequeira Greenway Farms 082 554 9662 Vincent@greenwayfarm.co.za Rendani Maugana DWS 072 785 7772 mauganar@gmail.com APOLOGIES: NAME: COMPANY: CELL EMAIL DISTRIBUTION: NAME: COMPANY: CELL EMAIL All above MINUTES OF MEETING 1. WELCOME Vincent Sequeira (VS) welcomed everyone to the Greenway Farms Bokpoort Operation. 2. INTRODUCTION All present introduced themselves and explained their role. Action DATE 3. PRESENTATION Tolmay Hopkins (TH) gave a presentation with an overview of the proposed project. A copy of the presentation is attached in Appendix A. Discussions during the presentation is provided below.

2 4. DISCUSSION Mpho Ntshagovhe (MN) requested clarity on the properties on which the farming operations are located. TH indicated that the Bokpoort Operations is on the farm Bokpoort 312 KR and the Phalala Operations is on the farm Kafferskraal 168 KR. VS indicated that they are in a process to change the name of the Phalala operations to Khomanani. It was agreed that for the purpose of the application, reference will be made to the Phalala Operations. MN enquired whether the current system of water transfer between the Phalala Operations and Bokpoort operations is efficient in light of evaporation losses. A pipeline system may be more efficient. VS explained that the natural system is maintained in this way and that the evaporation losses are not significant. The Bokpoort Operation is the winter farm where propagation takes place at the end of the rainy season. Water is only transferred when it is required. Caroline Pepermans (CP) explained that only a portion of the existing lawful abstraction rights at the Phalala Operations is required for use at the Bokpoort Operations. There is no need for an additional allocation to Greenway Farms. Kenneth Cameron (KC) confirmed that the current abstraction rights are sufficient. Pertunia Tjatji (PT) indicated that the validation and verification documents have to be included in the application. PT enquired when the temporary transfer is lapsing. KC indicated that it will lapse October 2016. PT indicated that it could be extended for another year. KC indicated that it is likely that an application for renewal of the S25(1) transfer will be submitted to bridge the gap until the water use licence is issued. MN indicated that the DWS is trying to stick to the 300 day timeframe for the processing of applications. PT stated that the list of water uses exclude the S21(b) water use for the storage of water. CP indicated that the use of the Bokpoort Dam falls within the ambit of an existing lawful water use. PT stated that comments will have to be obtained from the Environment and Recreation (E&R) section of the Department on the S21(c)&(i) water uses. TH indicated that a desk top assessment with field verification has been done to assess the affected watercourse and this will be included in the application. The assessment however did not include SASS5. TH enquired whether a presentation to the E&R section will be required in this instance. MN indicated that this is usually done for larger applications. A representative of the E&R section will likely conduct a site visit after the application has been submitted as part of their assessment. PT enquired whether the Department of Agriculture has commented on the soil suitability. CP indicated that they were consulted as part of the S25(1) application. It was agreed that their previous comments will be included in the water use licence application. They will also be informed of the fact that Greenway Farm is applying for a water use licence and that their existing comments will also accommodate this application. Action TH DATE BMS: Minutes of Meeting f481-00_min-01_r0_th_meetingdws_20160216_cpkc comments

3 MN provided the following preliminary list of information requirements: Property details Title Deeds Proof of payment (MN to confirm banking details to allow for an electronic transfer) Copy of ID of the applicant. A more comprehensive list will be provided by e-mail after the meeting. PT indicated that the Water User Association also has to be consulted. CP requested confirmation of the timeframe for public consultation. It was agreed that a 30 day period will be sufficient. KC enquired whether confirmation could be provided by the Department on when the licence application consideration period commence. MN confirmed that this will be done. Action MN TH DATE 4. CLOSURE TH thanked everyone for their attendance. The meeting was adjourned and a site visit undertaken to the Bokpoort Dam, point of discharge into the Bokpoortspruit and the Phalala Dam. Minuted by: Tolmay Hopkins for Jones & Wagener Document source: C:\Alljobs\F481_GreenwayFarmsIWULA\Meetings\F481-00_MIN-01_r0_th_MeetingDWS_20160216_cpkc comments.docx Document template: corminutes_12r0.dotx BMS: Minutes of Meeting f481-00_min-01_r0_th_meetingdws_20160216_cpkc comments

4 APPENDIX A COPY OF PRESENTATION BMS: Minutes of Meeting f481-00_min-01_r0_th_meetingdws_20160216_cpkc comments

2016/04/04 Greenway Farms (Pty) Ltd Mookgophong Operations: Water Use Licence Application Pre-application Consultation Meeting with DWS 16 February 2016 Agenda 1. Welcome and Introduction 2. Purpose of meeting 3. Project description 4. Proposed public consultation 5. Discussion 6. Site visit 1

2016/04/04 Agenda 1. Welcome and Introduction 2. Purpose of meeting 3. Project description 4. Proposed public consultation 5. Discussion 6. Site visit Welcome and Introduction Applicant: Greenway Farms (Pty) Ltd Vincent Sequeira Legal Counsel: MacRobert Incorporated Caroline Pepermans Environmental Consultant: Jones & Wagener DWS Case Officer: Tolmay Hopkins Mpho Ntshagovhe 2

2016/04/04 Agenda 1. Welcome and introduction 2. Purpose of meeting 3. Project description 4. Proposed public consultation 5. Discussion 6. Site visit Purpose of meeting Provide description of water uses to be undertaken and to be included in application Confirm the technical requirements for the WULA Confirm relevant timeframes Confirm the requirements for the public participation process Obtain comments and inputs from the DWS 3

2016/04/04 Agenda 1. Welcome and Introduction 2. Purpose of meeting 3. Project description 4. Proposed public consultation 5. Discussion 6. Site visit Project description Greenway Farms (Pty) Ltd supply over 40% of South Africa s carrots Operations in Mookgophong consist of 2 entities: Bokpoort Operations Phalala operations Locality: ~ 20km NW of town ~ 33 km NW of town Irrigation: 600ha centre pivot on 3 year rotational cycle (i.e. 200ha per annum) 60ha centre pivot on 3 year rotational cycle (i.e. 20ha per annum) Production: 16 000 tons/a 1 600 tons/a Lawful abstraction rights: Storage: Bokpoortspruit 589 232 m 3 /a Bokpoort Dam 250 000 m 3 (Lawful) Lephalala River 356 536 m 3 /a Phalala Dam 250 000 m 3 (WULA submitted) 4

2016/04/04 Locality map R520 Mookgophong 5

2016/04/04 Quaternary catchments Project description (continued) Optimum carrot propagation period: from mid-february to mid-june Harvesting: August to November Soil quality at the Bokpoort operations are more favourable for carrot production compared to the soil quality at the Phalala operations Both watercourses from which water may be abstracted are non-perennial Current abstraction allocation at Bokpoort operations does not ensure optimum production at all times Greenway Farms has identified the need to transfer water from the Phalala Operations to the Bokpoort Operations when required Temporary transfer granted in terms of S25(1) of the NWA on 2 October 2015 Greenway Farms has identified the need for permanent solution 6

2016/04/04 Water uses to be included in WULA Water use S21(a) Taking water from a water resource S21(c)&(i) Impeding or diverting the flow of water in a watercourse, and Altering the bed, banks, course or characteristics of a watercourse Description Abstracting water from the Lephalala River for use at the Bokpoort operations: 231 536 m 3 /a Discharge of water abstracted from A50A catchment into Bokpoortspruit (A61H catchment): water is pumped via a pipeline constructed approximately 4 years ago and is discharged into the Bokpoortspruit from where it flows along the watercourse into the Bokpoort Dam WULA - content Motivation for application S27 motivation High level assessment of Bokpoortspruit in support of S21(c)&(i) water use Details and outcome of public participation process S25(2) to be included 7

2016/04/04 Agenda 1. Welcome and Introduction 2. Purpose of meeting 3. Project description 4. Proposed public consultation 5. Discussion 6. Site visit Proposed public consultation Newspaper advertisement Direct consultation with adjacent land owners, specifically downstream land owners Comments and response report to be included in WULA 8

2016/04/04 Agenda 1. Welcome and Introduction 2. Purpose of meeting 3. Project description 4. Proposed public consultation 5. Discussion 6. Site visit Agenda 1. Welcome and Introduction 2. Purpose of meeting 3. Project description 4. Proposed public consultation 5. Discussion 6. Site visit 9

2016/04/04 10

NOTICE OF AN APPLICATION FOR AN INTEGRATED WATER USE LICENCE IN SUPPORT OF THE BOKPOORT OPERATIONS OF GREENWAY FARMS (PTY) LTD, LIMPOPO PROVINCE Notice is hereby given in terms of the National Water Act 36 of 1998 regarding Greenway Farms Pty (Ltd) s intent to apply for an Integrated Water Use Licence for their Bokpoort Operations situated approximately 20km north west of Mookgophong in Limpopo. Jones & Wagener Engineering and Environmental Consultants (J&W) was appointed on behalf of Greenway Farms to conduct the application. The water uses requiring authorisation at the Greenway Farms Bokpoort Operations are: - S21(a): Taking water from a water resource. Abstraction of 231 536 m 3 /annum of water from the Lephalala River (at the Phalala Dam on Portion 1 of the farm Kafferskraal 168 KR) for use at the Bokpoort Operations situated on Portions 3 and 5 of the farm Bokpoort 312 KR. - S21(c) Impeding or diverting the flow of water in a watercourse and/or S21(i) altering the bed, banks, course or characteristics of a watercourse. Changing flow in Bokpoortspruit due to transfer of water from Phalala Dam to Bokpoort Operations during dry season, when required. AVAILABILITY OF THE DRAFT IWULA FOR PUBLIC REVIEW A draft Integrated Water Use Licence Application Report is available for public review and comment from 11 April 2016 to 16 May 2016 on the Jones & Wagener website - www.jaws.co.za. PUBLIC COMMENT ENCOURAGED Interested and Affected Parties (I&APs) are invited to participate by providing comments and raising any issues of concern that they may have. For more information, please contact: Jones & Wagener Engineering & Environmental Consultants (Pty) Ltd, Anelle Lötter/Sibongile Bambisa P O Box 1434, Rivonia, 2128 Tel: (012) 667-4860; Fax: 012 667 6128 Email: anelle@jaws.co.za /sibongile@jaws.co.za

Jones & Wagener Engineering & Environmental Consultants 59 Bevan Road PO Box 1434 Rivonia 2128 South Africa tel: 00 27 11 519 0200 www.jaws.co.za email: post@jaws.co.za Limpopo Department of Agriculture and Rural Development Private Bag X179 Modimolle 0510 10 March, 2016 F481 Our Ref: Your Ref: 2038940 F481_Let_al_20160301 Attention: Mr Ben Greeff Dear Sir APPLICATION FOR AN INTEGRATED WATER USE LICENCE IN SUPPORT OF THE BOKPOORT OPERATIONS OF GREENWAY FARMS (PTY) LTD, LIMPOPO PROVINCE As you are aware, Greenway Farms (Proprietary) Limited (Greenway Farms) undertake carrot farming operations on portions 0 and 1 of the farm Kafferskraal 168 KR and portions 3 and 5 of the farm Bokpoort 312 KR, situated in the Limpopo Province. An application in terms of section 25(1) of the National Water Act 36 of 1998 (NWA) for the temporary transfer of water from an instream dam situated in the Lephalala River on portion 1 of the farm Kafferskraal 168 KR (Phalala Dam) to the instream dam situated in the Bokpoort River on portion 3 of the farm Bokpoort 312 KR (Bokpoort Dam) was submitted during May 2015. As part of this Transfer Application, Greenway Farms was required to obtain comments from the Department of Agriculture as to the application, which comments were set out in your letter to MacRobert Incorporated dated 2 September 2015. The Transfer Application was granted on 2 October 2015 and is renewable for one year. In order to provide a permanent mechanism for the transfer of water from the Phalala Dam to the Bokpoort Dam, Greenway Farms intends to submit an application for an Integrated Water Use Licence (IWULA) in respect of the water uses set out in sections 21(a), 21(c) and 21(i) of the NWA to the Department of Water and Sanitation. Please find attached a notice in this respect. As part of the IWULA, we will be submitting the comments which you provided in respect of the Transfer Application, as set out in your letter dated 2 September 2015. Please can you inform us by no later than 16 May 2016 if this is in order, or alternatively provide us with any additional comments you may have in respect of the IWULA. Details of the availability of the IWULA and the public participation office is provided in the attached notice. We look forward to your response. Yours faithfully Anelle Lotter for Jones & Wagener Document source: M:\F481 - Bokpoort WULA (ENV)\Public participation\f481_let_al_20160301.docx Document template: corlet_16r4_50year

Jones & Wagener Engineering & Environmental Consultants 59 Bevan Road PO Box 1434 Rivonia 2128 South Africa tel: 00 27 11 519 0200 www.jaws.co.za email: post@jaws.co.za 10 March, 2016 F481 Our Ref: Your Ref: F481_Let_al_20160301 Attention: Stakeholder Dear Sir / Madam NOTICE OF AN APPLICATION FOR AN INTEGRATED WATER USE LICENCE IN SUPPORT OF THE BOKPOORT OPERATIONS OF GREENWAY FARMS (PTY) LTD, LIMPOPO PROVINCE Notice is hereby given in terms of the National Water, Act 36 of 1998 (NWA) regarding Greenway Farms (Proprietary) Limited s (Greenway Farms) intent to apply for an Integrated Water Use Licence (IWUL) for their Bokpoort operations situated approximately 20km north-west of the town Mookgophong in the Limpopo province 1. BACKGROUND Greenway Farms supply over 40% of South Africa s carrots and has operations in Tarlton in the Gauteng Province, and in the Mookgophong area in the Limpopo Province. Its Mookgophong operations consist of two farming entities namely the Bokpoort operations, approximately 20 km north-west of the town of Mookgophong; and the Phalala operations (also referred to as Khomanani operations), approximately 33 km north-west of the town of Mookgophong. Water for these operations is obtained from the Bokpoortspruit, a tributary of the Sterkspruit and the Lephalala River in terms of lawful abstraction rights (589 232 m³ and 356 536 m³ per annum respectively). Water is abstracted from two existing instream dams, one in the Bokpoortspruit (referred to as the Bokpoort Dam) and the other situated in the Lephalala River (referred to as the Phalala Dam). In order to efficiently and effectively utilise the lawful abstraction rights from the Bokpoort Dam and the Phalala Dam, Greenway Farms is required to transfer water from the Phalala Dam to the Bokpoort Dam on occasion. Such transfer is not required all year round and may not even be utilised every year. The water from the Phalala Dam needs only to be transferred to the Bokpoort Dam when it is absolutely necessary in periods where rainfall has been low and the Bokpoortspruit is not flowing as well as it usually does. In other words, the transfer from the Phalala Dam to the Bokpoort Dam would be simply to move the water which is lawfully abstracted at the Phalala operations but which is not utilised on such operations to the better soils on the Bokpoort operations.

2 A temporary transfer in terms of Section 25(1) of the NWA was granted by the Department of Water and Sanitation (DWS) on 2 October 2015. This is renewable for a further year. Jones & Wagener Engineering and Environmental Consultants (J&W) has been appointed by MacRobert Incorporated, on behalf of Greenway Farms, to compile the Integrated Water Use Licence Application (IWULA) for the authorisation of the abstraction of water from the Phalala Dam for irrigation at the Bokpoort operations, as well as the water uses associated with the conveyance of such water between the operations. This permanent arrangement will allow Greenway Farms to transfer water from the Phalala Dam to the Bokpoort Operations when required. 2. LEGISLATIVE REQUIREMENTS AND CONTEXT According to the NWA, Greenway Farms has to apply for the following water uses in order to obtain a lawful water use licence: DESCRIPTION OF WATER USE QUATERNARY CATCHMENT CO- ORDINATES PROPERTY TITLE DEED PROPERTY OWNER S21(a): Taking water from a water resource Abstraction of 231 536 m 3 /annum of water from the Lephalala River (at the Phalala Dam) for use at the Bokpoort Operations A50A 24 16 54.4 S 28 31 03.58 E Portion 1 of the farm Kafferskraal 168 KR T83661/1 2 Greenway Farm Property (Pty )Ltd S21(c) Impeding or diverting the flow of water in a watercourse and/or S21(i) altering the bed, banks, course or characteristics of a watercourse Changing flow in Bokpoortspruit due to transfer of water from Phalala Dam in quaternary catchment A50A during dry season, when required A61H 24 18 16.87 S 28 32 22.44 E (point where discharged into Bokpoortspruit) 24 22 02.89 S 28 34 40.96 E (Bokpoort Dam) Greenway Farms have existing lawful abstraction rights from the Lephalala River for its Phalala operations and in order to facilitate IWULA, Greenway Farms has, as part of this application, surrendered part of such entitlement, in terms of section 25(2) of the NWA. Accordingly, the IWULA will not result in the requirement for any additional allocation of water. Please note that a separate water use licence application was submitted for the storage of water (S21(b)) for the Phalala Dam and does not form part of this IWULA. Please note further that the Bokpoort Dam (S21(b)) falls within the ambit of an existing lawful water use in terms of section 32 of the NWA. The application process entails the compilation of an Integrated Water Use Licence Application Report which has to be made available for public review and comment. Jones & Wagener (Pty) Ltd F481_Let_r1_alth_20160331 Engineering & Environmental Consultants

3 Comments received will be considered and the report will be finalised and submitted to the DWS for their consideration. 3. DRAFT INTEGRATED WATER USE LICENCE REPORT FOR YOUR REVIEW A draft Integrated Water Use Licence Application Report (Report) was compiled and is available for stakeholder review and comment from 11 April 2016 to 16 May 2016. The draft Report, which includes the formal application forms which will be submitted to the DWS, includes a detailed description of the proposed water uses, the current environmental situation, relevant maps and a motivation for the licence application. The draft Report is available on the Jones & Wagener website www.jaws.co.za where any person can obtain and review the report. We would appreciate your comments on the Report by 16 May 2016. Should you need additional information, please contact: Jones & Wagener Engineering & Environmental Consultants (Pty) Ltd Anelle Lötter/Sibongile Bambisa P O Box 1434, Rivonia, 2128 Tel: (012) 667-4860; Fax: 012 667 6128 Email: anelle@jaws.co.za /sibongile@jaws.co.za Yours faithfully Anelle Lotter for Jones & Wagener Document source: M:\F481 - Bokpoort WULA (ENV)\Public participation\f481_let_al_20160301.docx Document template: corlet_16r4_50year F481_Let_r1_alth_20160331 Jones & Wagener (Pty) Ltd Engineering & Environmental Consultants