NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting.

Similar documents
TECHNICAL COMMITTEE MEMBERS PRESENT


NFPA 80 Overview January 21, 2016

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

Committee Input No. 1-NFPA [ Chapter 2 ]

SAF-BCF SECOND REVISIONS WITH STATEMENTS

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No NFPA [ Section No ]

26 of 128 9/23/2014 9:25 AM

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

1 of 4 10/26/2015 1:58 PM. Committee Input No NFPA [ Section No ]


First Revision No. 6-NFPA [ Section No. 2.2 ]

NFPA 30 FLC-SWC First Revisions Page 1 of 10 11/6/2015 9:21 AM. First Revision No. 208-NFPA [ Section No ]

First Revision No. 1-NFPA [ Chapter 2 ]

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Fire and Smoke Door Inspections Qualified Training 02/03/17

Report on First Revisions with Statement June 2014 NFPA 101


Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Fire Rated Door Assemblies: Compliant Designs

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS

"Spray area" is the term that is used throughout the document. This change is for consistency.

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4

WHAT TO EXPECT DURING A FIRE DOOR INSPECTION

Public Comment No. 3-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 2-NFPA [ Section No ]

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

Developing a Healthcare Facility Fire Door Inspection Program

Technical Committee on Fluidized Bed Boilers

Report on First Revisions with Statement June 2014 NFPA 101

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)


Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Committee Input No. 60-NFPA [ Sections , ]

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Swinging Egress and Fire Doors

First Revision No. 158-NFPA [ Global Input ] Submitter Information Verification. Committee Statement

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Changes to the 2018 Joint Commission Comprehensive Accreditation Manual for Hospitals (CAMH)

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

Second Revision No. 2-NFPA [ Section No ]

Public Input No. 3-NFPA [ Chapter 2 ]

IMC Significant Changes Summary Tier I

Report on Public Input June 2014 NFPA 101

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

Report on First Revision June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101

2012 Life Safety and Health Care Facility Codes - Door Inspections and Other Critical Inspection, Testing and Maintenance

SECTION OVERHEAD COILING FIRE DOORS

M E M O R A N D U M. NFPA 1 First Draft Technical Committee FINAL Ballot Results (A2017)

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

About the Instructor & Presenter:

Report on First Revision June 2014 NFPA 5000

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM


Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

First Revision No. 106-NFPA [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

NFPA 37 Public Comment Responses Page 1 of 32

MEMORANDUM. NFPA Technical Committee on Hazard and Risk of Contents and Furnishings. NFPA 556 First Draft TC FINAL Ballot Results (A2015)

Design, Installation, Inspection, and Maintenance

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Page 1 of 5 1/29/2016 4:08 PM. First Correlating Revision No. 3-NFPA [ Section No ] Submitter Information Verification

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

First Revision No NFPA [ Section No ]

UL Revision 5. - Commercial Door Installations -

Second Revision No. 11-NFPA [ Section No. 2.4 ] Submitter Information Verification. Committee Statement

WHEREAS, the City of Albany has adopted a Fire Prevention Regulations in the form of Chapter XI of the Albany Municipal Code; and

INITIAL FIRE SAFETY ASSESSMENT

Changes for the New Edition. Senior Engineer, NFPA NFPA

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

First Revision No. 22-NFPA [ Global Input ] Submitter Information Verification. Committee Statement

NFPA 101 SAF-RES PUBLIC COMMENTS

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

Solutions for Common Problems

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Iowa State Fire Marshal

SECTION Overhead Coiling Doors


National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

CALIFORNIA DEPARTMENT of FORESTRY and FIRE PROTECTION OFFICE OF THE STATE FIRE MARSHAL UL 300

Transcription:

Input No. 7-NFPA 80-2013 [ Section No. 3.3.8 ] 3.3.8 Automatic Fire Detector. A device designed to detect the presence of a fire signature and to initiate action. For the purpose of this standard, automatic fire detectors are classified as follows: Automatic Fire Extinguishing or Suppression System Operation Detector, Fire Gas Detector, Heat Detector, Other Fire Detectors, Radiant Energy Sensing Fire Detector, and Smoke Detector. [72, 2013] Submitter Full Name: Kristin Bigda Organization: National Fire Protection Assoc Submittal Date: Thu Nov 07 11:13:00 EST 2013 Statement NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting. 1 of 9

Input No. 8-NFPA 80-2013 [ Section No. 3.3.116 ] 3.3.116 Smoke Detector. A device that detects visible or invisible particles of combustion. [72, 2013] Submitter Full Name: Kristin Bigda Organization: National Fire Protection Assoc Submittal Date: Thu Nov 07 11:15:08 EST 2013 Statement NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting. 2 of 9

Input No. 54-NFPA 80-2013 [ Section No. 4.8.2 ] 4.8.2 Sills and Thresholds. 4.8.2.1 In buildings with noncombustible floors, a sill shall not be required, provided the floor structure is extended through the door opening. 4.8.2.2 In buildings with combustible floors or combustible floor coverings, a sill shall be required if the floor structure is extended through the door opening, as combustible floor construction shall not be permitted to extend through the door opening. 4.8.2.3 Door openings required to be protected by 1?2 -hour or 1?3 -hour rated fire protection door assemblies shall be exempted from the requirements of 4.8.2.2. 4.8.2.4 Sills shall be constructed of noncombustible materials. 4.8.2.5* For swinging doors with builders hardware and special-purpose horizontally sliding accordion or folding doors with frames having a jamb depth of 4 in. (102 mm) or less, the sill width shall be equal to the jamb depth. 4.8.2.6* Where frames have a greater jamb depth, the sills shall have a minimum width of 4 in. (102 mm) and shall be installed so that the sill extends from the face of the frame on the door side into the frame. 4.8.2.7 For swinging doors with fire door hardware, sills shall extend at least the depth of the door frame for flushmounted doors. 4.8.2.8* For lap-mounted doors, sills shall extend beyond the opening for a length equal to the projection of the installed door or doors. 4.8.2.9* For horizontally sliding fire doors and vertically sliding fire doors, sills shall be constructed of noncombustible material and shall extend 6 in. (152 mm) past the edge of the opening on each side and 4 in. (102 mm) out from the face of the wall. 4.8.2.10 Rolling Steel Fire Doors. For rolling steel fire doors, sills shall be constructed of noncombustible material, shall extend past each jamb as necessary to be completely under the guides, and shall extend out from the centerline of the guide groove a minimum of 4 in. (102 mm) on each side to accommodate deflection of the bottom bar. 4.8.2.11 For service counter fire doors, sills shall be provided as part of the fire door assembly. 4.8.2.12 Flush concrete sills shall extend to the wall opening on both sides. 4.8.2.13* For swinging doors with builders hardware, horizontally sliding doors, and special-purpose horizontally sliding accordion or folding doors, raised noncombustible sills or thresholds shall be permitted wherever combustible floor coverings are contemplated or are in use on one or both sides of the door openings. Submitter Full Name: [ Not Specified ] Organization: [ Not Specified ] 3 of 9

Submittal Date: Thu Nov 14 07:48:42 EST 2013 Statement Current language is not clear regarding the difference between sills and thresholds. The committee will be further investigating the issue before the second draft meeting. Additional input from the public in encouraged. 4 of 9

Input No. 27-NFPA 80-2013 [ Section No. 4.8.4 ] 4.8.4 Clearance. 4.8.4.1 * The The clearance under the bottom of a door shall be a maximum of 3? 4 an average of ¾ in. edge to edge (19 mm) but at no point shall the clearance exceed 1 in. 4.8.4.2 Where * The clearance under the bottom of the door is more than 38 in. (965 mm) above the finished floor, the maximum clearance shall not exceed 3? 8 in. (9.5 mm) or as specified by the manufacturer's label service procedure a door shall be a maximum of ¾ in. at the location of a bottom latch bolt. Supplemental Information File Name A.4.8.4.2.docx Description Submitter Full Name: [ Not Specified ] Organization: [ Not Specified ] Submittal Date: Wed Nov 13 12:21:49 EST 2013 Statement The committee is currently discussing multiple options for door clearances. Additional time and feedback is needed prior to the Second Draft meeting to finalize a solution. The proposed text provides an interim solution to door clearance issues that exist in the field today. Annex A material is being added to 4.8.4.2 provides guidance language to help ensure that door clearance does not interfere with the operation of the latch bolt, if present. 5 of 9

A.4.8.4.2 Door clearances in excess of ¾ where a bottom latch bolt is present cannot ensure the proper performance of the latch bolt. 6 of 9

Input No. 9-NFPA 80-2013 [ Section No. 5.2.2.3 ] 5.2.2.3* The records shall be on a medium that will survive the retention period. Paper or electronic media shall be permitted. [72:14.6.2.3] Submitter Full Name: Kristin Bigda Organization: National Fire Protection Assoc Submittal Date: Thu Nov 07 11:15:31 EST 2013 Statement NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting. 7 of 9

Input No. 29-NFPA 80-2013 [ Section No. 5.5.7 ] 5.5.7 When fastener holes are left in a door or frame due to changes or removal of hardware or plant-ons, the holes shall be repaired by one of the following methods: (1) Install steel fasteners that completely fill cover the holes (2) Fill the screw or bolt holes with the same material as the door or frame (3) Fill holes with material listed for this use and installed in accordance with the manufacturer s procedures. 5.5.8 Holes, other than those as described by 5.5.7 shall be treated as a field modification in accordance with 5.1.4. Submitter Full Name: [ Not Specified ] Organization: [ Not Specified ] Submittal Date: Wed Nov 13 14:14:12 EST 2013 Statement Proposing revisions to NFPA 80 to address repairs of doors. Products are listed for repairing holes in fire doors. The proposed language allows for these listed products. The intent of Secton 5.5.7 was originally to apply to fastener holes. As written, the section could have applied to all holes, of all shapes and sizes, in a fire door. Additional language clarifies the intent of the section. Public Input No. 61-NFPA 80-2013 [Section No. 5.5.7] 8 of 9

Input No. 58-NFPA 80-2013 [ New Section after 20.9.5.2 ] Chapter 21 - Fire Protective Curtains 21.1 General 21.1.1 This chapter shall cover the installation, inspection, testing, and maintence of fire protective curtain assemblies. 21.1.2 Fire protective curtain assemblies shall be in accordance with UL 10D, Fire Tests for Fire Protective Curtains. 21.1.3 Fire protective curtain assemblies shall be installed in accordance with their listing and with the manufacturer's installation instructions. 21.2 Inspection, Testing, and Maintenance 21.2.1 Fire protective curtain assemblies shall be inspected and tested not less than annually. Submitter Full Name: [ Not Specified ] Organization: [ Not Specified ] Submittal Date: Thu Nov 14 11:37:05 EST 2013 Statement NFPA 80 currently does not address fire protective curtain assemblies. A new standard has been developed by UL, Fire Tests for Fire Protective Curtains, which should be followed for the installation of these products. A Input is being developed so as to further investigate and develop a chapter to address these types of opening protectives. These products are different than the current Chapter 20 for fabric fire safety curtains. 9 of 9