STER 1981 ANNUAL INDUSTRIAL SUMMARY OF FIRE AND PROPERTY DAMAGE EXPERIENCE. Monsanto. MOUND FACILITY Miemisburg. Ohio MLM.ML

Similar documents
A FIRST RESPONDERS GUIDE TO PURCHASING RADIATION PAGERS

Management Practices: Fire Protection Impairments November 2015

Title Page. Report Title: Downhole Power Generation and Wireless Communications. for Intelligent Completions Applications

A Cost Effective Multi-Spectral Scanner for Natural Gas Detection

NATIONAL COMPETENCY STANDARD

NATURAL CONVECTION HEAT EXCHANGERS FOR SOLAR WATER HEATING SYSTEMS. Technical Progress Report April 1,1995 to May 31,1995

p?:uam SYSTEMS Technical Progress Report Jane H. Davidson NAllJRAL CONVECTION HEAT EXCHANGERS FOR SOLAR WATER HEATING February 1,1996 to March 31,1996

New Construction Builders Challenge: Sealed Attic and High Efficiency HVAC in Central Florida: A Year in Review

CHAPTER 15: FIRE PREVENTION & AWARENESS POLICY

FIRE PREVENTION PLAN EMERGENCY ACTION

Electronic Refrigerant Leak Detector DE-FG36-98G Micronic, Inc. Elie Talamas, Jr. Period: 10/1/99 to 12/31/99

THERMAL VACUUM TESTS OF A FIVE WATT PSEUDO CHIP SEM-X ELECTRONIC MODULE CLAMPED IN A SATELLITE BOX

UNIVERSITY OF TOLEDO

Emergency Action Fire Prevention Plan

The Social Accountability International (SAI) Fire Safety Checklist

TECHNICAL EDUCATION FACILITY SAFETY AUDIT

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

Department Of Public Works: Internal Operations

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

FIRE SAFETY MANAGEMENT PLAN

Why Thermostats Matter

Emergency Evacuation Plan

Fire System Impairment Policy

Fire Prevention Plan Program

Building Self-Inspection Program

INTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES

FIRE PROTECTION PROGRAM

EC 5.10 FIRE PREVENTION MANAGEMENT

Interim Life Safety Measures. Healthcare Construction Certificate - Level 1

HEALTH AND SAFETY INDUCTION CHECKLIST

Emergency Evacuation Plan. Kettering Labs. School of Engineering

Preparedness Committee Security and Life Safety Commercial Office Building Protective Measures

Measures (ILSM) Process

polyurethane & polyisocyanurate foam Six Steps for

Risk Management Services

Emergency Evacuation Plan South Patterson Building (SPB)

Fire Safety. Version 1.0

Safety Manual: Emergency Response

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

REQUIREMENTS. For FIRE DEPARTMENTS. State of West Virginia. Bob Wise Governor THE DEPARTMENT OF MILITARY AFFAIRS AND PUBLIC SAFETY

GEORGIA DEPARTMENT OF CORRECTIONS Standard Operating Procedures

ARKANSAS FIRE PROTECTION LICENSING BOARD ACT 743 OF 1977

Statement of Policy. Fire Extinguisher Use Policy #: SMS-041

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ROLE OF THE FIRE PROTECTION ENGINEER IN THE CONSTRUCTION DESIGN PROCESS

SYSCO CENTRAL PENNSYLVANIA, LLC. HARRISBURG, PENNSYLVANIA

Hospital Codes, Safety, Exposure Control, Emergency Plans Handout

FIRE SAFETY AND PREVENTION POLICY

Fire Prevention Program

9S / 9E Inspection Worksheets. The fire department should complete the following sheets prior to inspection date

FINAL ABSTRACT. CRADA TITLE. Miniature Transducers for Flight Test Unit Instrumentation - Magnetic Field Detector CRADA NUMBER: LA98C10367.

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

Sheetz Inc. Fire Protection Service Guidelines

RAMBLER PARK FIRE SAFETY INFORMATION

ARAMARK CLEANROOM SERVICES LOS ANGELES, CALIFORNIA

CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS

Fire Safety Plan (FSP) Review Checklist 1

Fire Safety Plan (FSP) Review Checklist 1

Fire Prevention Plan Program Prepared by: Allied Insurance Brokers, Inc.

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

HUDSON VALLEY COMMUNITY COLLEGE BUILDING EMERGENCY ACTION PLAN FOR OUTSIDE EMERGENCY ASSISTANCE: DIAL 911 TO REACH THE SARATOGA CTY POLICE & FIRE

AS Australian Standard. Portable fire extinguishers Guide to servicing. This is a free 7 page sample. Access the full version online.

FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY

INTERNATIONAL STANDARD

IIPP. Injury & Illness Prevention Program Hartog Drive San Jose CA Responsibilities. Workplace Hazards. Training. Incident Investigations

Evacuation Fire Safety Program

Title: Fire Protection Effective Date: 7/1/2013 Control Number: THG_0039 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015

Fire Drill Policy. Facilities Manager DCD. Statutory. Principal. Staff. REVIEW DATE 20 th August Owner. Version Number: 8 Legal Sign:

Management Standard: Fire Safety

ASSIGNMENT - 1, MAY DIPLOMA IN FIRE AND SAFETY MANAGEMENT PAPER I : FIRE ENGINEERING Maximum : 25 MARKS Answer ALL questions.

Renovation Program. Renovation Program GENERAL

INITIAL FIRE SAFETY ASSESSMENT

FIRE SAFETY INSPECTION REPORT

Stillwater Area Community Services Center Inc.

Pebble Beach Community Services District Fire Department 3101 Forest Lake Road, Pebble Beach, CA

Emergency Response Plan

W. T. Roybal J. T. Bradley III D. E. Rees P. Torrez D. K. Warner J. Debaca. LINAC 2000 Monterey, CA August ,2000

Pebble Beach Community Services District

Hospice of Rutherford County Policies and Procedures

NITRATE FILM PRESERVATION FACILITY

Safety Best Practices Manual

Fire Prevention Plan for

CENTRAL TEXAS COLLEGE SYLLABUS FOR FIRT 1347 INDUSTRIAL FIRE PROTECTION I. Semester Hours Credit: 3 INSTRUCTOR: OFFICE HOURS:

Invitation to Bid WATER HEATER HHS & WHH

Environmental emergency preparedness and response

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN

State of North Carolina Department of Environment and Natural Resources Division of Waste Management. Safety and Risk Management Program

Model Policy On Portable Fire Extinguishers (Ontario Version)

Fire Enforcement Report

POLICY NUMBER ISSUE DATE REVISED DATE REVIEW DATE

Report on the Suitability of Class 6, U.S. Government Security Repositories for the Storage of Small Quantities of High Explosives

Risk Management Resources

FIRE DEPARTMENT FIRE CHIEF. Deputy Fire Chief Operations Section. Assistant Fire Chief Planning & Budget Section

Fire Prevention and Emergency Preparedness Plan for Black Oak Wind Farm

AMADOR FIRE PROTECTION DISTRICT

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Fire Prevention Plan for Cintas Center 1624 Musketeer Drive

NOTTINGHAM CITY HOMES

FIRE SAFETY. This easy-to-use Leaders Guide is provided to assist in conducting a successful presentation. Featured are:

Transcription:

DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, reammendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof...-. '- -.* ~, MLM.ML.82.42.1 1981 ANNUAL INDUSTRIAL SUMMARY OF FIRE AND PROPERTY DAMAGE EXPERIENCE February 1982 MOUND FACILITY Miemisburg. Ohio 45342 Monsanto operated by MONSANTO RESEARCH CORPORATION e subsidiary of Monsento Company for t h e U. S. DEPARTMENT OF ENERGY Contract No. DE-AC4-76-DP53 OBTRIBUTION OF THIS DOCUMENT IS UNLIMITED STER -

DISCLAlMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

1981 ANNUAL INDUSTRIAL SUMMARY OF FIRE AND OTHER PROPERTY DAMAGE EXPERIENCE U, S, DEPARTMENT OF ENERGY DAYTON AREA OFFICE MONSANTO RESEARCH CORPORATION MRC-MOUND This report summarizes the 1981 Calendar Year experience and activities of this, organization relative to the control of ALO property damage/losses from fire and other accident causes.

I. INTRODUCTION AND OVERVIEW OF FIRE AND PROPERTY DAMAGE LOSSES FOR 1981 Nine fires were reported for the year with loss being held to $65. on two minor vehicle fires. A. Fire or Property Damage Loss Over $1. 1. On March 6, 1981, a motor generator set failed and supplied low voltage power to an elevator motor causing it to burn up. Loss was $1981.. 2. On December 23, 1981, an employee, while exiting the plant-site, lost control due to a malfunction of a steering component on her vehicle and hit an electric pole. No injuries resulted, however, damages were listed at $1352.49." 3. On September 9, 1981, an electrician made accidental contact with one phase of a 44-volt supply inside a substation. A breaker tripped out and power was shut off in HH Building. Continuous processes in HH Building were stopped. 'Losses of product were $4. Manhours to restart processes were $1. B. 1981 Total Monetary Damage or Loss by Accident Type LOSS IN.DOLLARS Category Number of Occurrences Over $1. Government Reimbur sed and Other Total Electrical 2 6981. Fire 1 6. 6. Mechanical 2. 2. Radiation/ Nuclear 1. Miscellaneous 1 * "1352.49 6981. 1352.4 9 "Anticipate full or partial reimbursement from individual's insurance company. 1

11. 1981 RECURRING LOSS PREVENTION COSTS Recurring k s s Prevention Costs are broken down into three categories with major deviations from 198 explained. Total CY-1979 and CY-198 are also shown as points of reference. A. Salaries 1979 1. Fire Protection Engineering $ 2. Fire Control Personnel $282, 3. Fire Brigade 25,5 1981 198 27,5 $ 28, $329,5 $342, $ 1981 Sub-Total 9 Subtotal $37, B. Inspections 1. Outside contracts $ $ 2. Maintenance $ 2, $ 2,. $ $ 2,5 Subtotal $ 2,5 C. Other Costs 1. Outside Contracts $ 5, $ 6,2 $ 2. Training Materials $ 1, $ 1,2 $ 4, 3. Equipment Replacement $ 8,5 $ 9,8 $19,8 Contract is for hydrostatic testing and recharging of high pressure cylinders such as CO2, breathing air, and Halon 3,7 ' Calendar Year 1979 grand total Calendar Year 198 grand total Calendar Year 1981 grand total $324, $377,1 $4, *Equipment replacement cost is up this year due to increased repair costs for fire apparatus and a fire extinguisher replacement program to replace CO2's with Halon in many areas. The replacement program will be a cost savings in the long run.. 2 t

111. PROPERTY DAMAGE WLNERABILITY OF MRC-MOUND A loss in excess of $1,. is considered to be not possible at Mound. 3

IV. MAJOR FIRE PROTECTION ACCOMPLISHMENTS DURING CY-1981 A. Sprinkler protection was extended into the north dock of W-Building, and in Room 127A of DS Building. New buildings that were sprinklered include the,guard Post one addition, new plating facility, two modular office buildings, one trailer, and a solvent storage shed. B. The GW-Building was totally renovated for Advanced Devices Production Control and Bonded Storage. The sprinkler protection was totally replaced and smoke detectors were installed in one area. C. The carbon dioxide extinguishing system that was in the transformer vault in T-4, has been replaced with a Halon-131 extinguishing sys tem. D. The expanded computer aided Design/Manufacturing Facility on the 3rd floor of OS-Building was provided with sprinkler and smoke detection sys tems. E; Fire protection criteria was developed to protect a major new program area in T-Building. F. The area of Rooms 125 and 125A in DS-Building where flammable liquids were used in a fashion not meeting the necessary requirements of storage and ventilation, have now-been upgraded by providing approved. storage equipment and ventilation. This upgrading also resulted in a high standard of housekeeping. G. A survey in the crawlspace of R-Building was performed and deficiencies such as openings in the fire partition, debris etc. were corrected. H. A study was performed to evaluate the adequacy of the 6" underground fire main that provides the water supply to the sprinkler systems in Buildings 27, 42 and the Energetic Materials Support Building (Building-67) presently under construction. Upgrading of the 6" underground fire water main will occur when funding becomes available. I. Fire Loss Audits were made on all new completed and occupied buildings with the remainder of the buildings being audited on schedule for the year 1981. J. Approval was received and design work is in process for a long-awaited addition to the Central Fire Station (Building 47). Due to an unexpected funding problem, the construction completion date of Spring 1982 has been slipped to Spring 1983. 4

L. In addition to routine training, the fire department, emergency brigades and Electronics Department personnel were recertified in Cardio- Pulmonary Resuscitation. M. Design work has been completed, the bid let and installation of the new alarm system has begun. N. Three new firefighters were hired to complete a newly formulated 32 hr. training program. Our program now meets the requirements for full certification by the State of Ohio. Upon completion of the training, the hirees were placed on laid-off status from the Firefighter Classification until the need arises for additional personnel.. A new program was started to replace the "Fire Hazard Reduction Inspection Program." Tours will be made of all MRC-Mound buildings at least annually. The tour group consists of the assigned Fire Protection Foreman, the assigned Safety Engineer and the Building Manager. The primary purpose of the tour is to identify Safety and Fire Protection problems, either housekeeping or process in the building. Secondary purpose includes introducing a Building Safety or Fire Protection contact person and improving lines of communication. 5

V. MAJOR OBJECTIVES FOR THE 1982 FIRE PROTECTION PROGRAM A. Complete an addition to the Central Fire Station to provide for operation of the Fire Control Group from one central location. B. Complete the installation of the new computer based alarm sys tem. C. Provide timely and accurate fire protection engineering criteria and assistance to all process and construction projects including prompt response to all department fire protection requests. D. Recertify all firefighters as E2nergency Medical Technicians. 6

VI. OBSERVATIONS. CONCLUSIONS AND RECOMMENDATIONS A. The Fire Control Group responded to 232 requests for emergency. response during 1981. This number is up slightly from 2.9 in 198. B. The Fire Control apparatus was driven a total of 38 miles and used 1,28 gallons of gasoline during drills, tests, and responding to the previously mentioned alarms. C. The success of our Safety and Loss Prevention Program is due in large part to top management's commitments to loss prevention. A synopsis of some of the programs that contributed to this success is included for your review. (See Attachment I).

ATTACHMENT I MRC-MOUND HOUSEKEEPING, SAFETY, AND LOSS PREVENTION PROGRAMS EXECUTIVE SAFETY COMMITTEE This committee is composed of top plant management and is permanently chaired by the Director, MRC-Mound. The committee is responsible for providing plant direction on all health, safety and environmental protection matters. Annual results are established and their progress is reviewed on a monthly basis. HAZARDOUS CHEMICALS COMMITTEE This committee is chaired by the Industrial Hygienist and includes one representative from each of three departments; Engineering, Advanced Devices and Nuclear Operations. The representatives are appointed by their Department Director. Every area of the plant is audited routinely with emphasis given to Fire Protection Hazards (flammable liquids), Facility Safety and Industrial Hygiene. The audit is an awareness program with hazardous material information disseminated to operations people on a person-to-person basis and is followed up with recommendations made to improve Facility safety. FIRE LOSS AUDIT PROGRAM The Fire Loss Audit Program was reviewed and updated for all buildings scheduled during 1981. The frequency of the audits vary depending on value, programmatic impact and hazards of each building. SAFETY SUGGESTION PROGRAM This program allows employees to document safety concerns. The employee's supervisor 2s required to implement the suggestion within 1 days of receipt of the suggestion. The supervisor must keep the employee who made the suggestion advised if it is impossible to 'implement within 1 days. This program was developed as another tool for employee/supervisor communications to assure solution to safety concerns in a timely manner. LOSS PREVENTION AND ENVIRONMENTAL CONTROL (LP&EC REVIEW P R O G W, ) The purpose of this program is to coordinate the review of engineering projects and operating processes by Safety, Fire Protection, Health Physics, Industrial Hygiene, Criticality, Security, Environmental Protection, and Waste Management functions. This activity reviewed 38 conceptual designs, 25 internal Monsanto Research Corporation project designs and 16 DOE project reports. 8 -. - _ I _ -

SAFETY AND HOUSEKEEPING INSPECTION PROGRAM Maintenance of the high level housekeeping desired to reduce fire and property loss was achieved by the Safety and Housekeeping Inspection Program. In 1981 the program was developed to heighten management participation in the day-today safety effort at the Facility and increase visibility of top management in the work areas. The program provided for a minimum of three inspections annually of specified areas by inspection teams headed by Department Directors. Some modifications will be made to the Safety and Housekeeping Inspection Program in 1982. SYSTEMS SAFETY. The Systems Safety Program provides systematic safety reviews of facility and process designs for the purpose of identifying personnel or environmental risks associated with operations. These risks are documented in the form of Safety Analysis Reports or Safety Analysis Documents. This program also supports the LP&EC Program in reducing risks through systems analysis while engineering design of facilities is underway. Techniques such as MORT and Fault Tree Analysis are commonly used within the Systems Safety Program. NUCLEAR CRITICALITY SAFETY COMMITTEE This group is responsible for administration of the Nuclear Criticality Safety Program for the Facility. The program insures the safe handling, storage and transportation of fissile materials. The committee reviews and approves procedures for fissile operations and periodically audits these functions to assure compliance. Furthermore, the committee also conducts training programs for persofinel working with.fissile material. The committee provides technical guidance as required and is responsible for the Nuclear Criticality Procedures Manual MD 138. The committee consists of two representatives from Nuclear Operations and one from Engineering and is chaired by the Nuclear Criticality Safety Engineer at' Mound. 9