DMRC at a Glance. Registered : May Construction Commenced : Oct Operation Commenced : Dec Operates 213 RKM in 7 lines, 158 Stations

Similar documents
Delhi Metro System. Emergency and Fire Safety Measures in. - by Sanjeev Kumar & Kailash Chandra Joshi. Fire Protection & Safety

Proposed Commercial Project at Plot No. C3A, Sector-16B, Greater Noida West (U.P)

Jonathan Redding Area Sales Manager FOGTEC Fire Protection Cologne, Germany

Active & Passive Fire Protection System. Page 1 Kalidasan S BT IN SSP-OP

Enclosure 4- RISK ASSESSMENT

Emergency Ventilation System Design - Preliminary Report Shishir Gupta

Smoke Control Requirements for New Railway Infrastructure. Ir Peter Law

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

ERDMP & RISK ASSESSMENT REPORT

Washington Metropolitan Area Transit Authority Arcing/Smoke Event with Passenger Evacuation

Impact of Tunnel Ventilation on Tunnel Fixed Fire Suppression System

18.1 INTRODUCTION 18.2 ANALYSIS METHODOLOGY REGULATORY CONTEXT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

Washington Metropolitan Area Transit Authority (WMATA)

LEARNINGS FROM AMRI HOSPITAL FIRE KOLKATA Date:

FORMULATION OF FIRE SAFETY REQUIREMENTS FOR NEW RAILWAY INFRASTRUCTURES

Innovative Solutions for Active Fire Protection in Road/Rail Tunnels and Underground Facilities

Underground fires in metro systems failures, accidents and terrorism

7.2 SAFETY CODE FOR BUILDING & FIRE FIGHTING SYSTEM

FIRE PROTECTION PROGRAM

EMERGENCY VENTILATION FOR SMOKE CONTROL IN ROADWAY TUNNELS (NCHRP PROJECT TASK 363)

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

VENTILATION & FIRE SAFETY

PHASED CONSTRUCTION AND SAFETY IN MALA KAPELA TUNNEL

1. PIARC Update 2. Tunnel System

Executive Review Panel Report on Arson Incident

TEN STEP PROCESS PREPARING FIRE SAFETY PLANS

Other EC and LS documents may be requested by surveyors, as needed, throughout the survey.

Training Toolbox Series. ICA11v1.0 Information, Digital Media & Technology

4.13 Security and System Safety

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

MAINTENANCE OF ESSENTIAL SAFETY MEASURES EXPLAINED (Building Regulations 2006)

Smoke Management in Subway Stations Due to Train Arson Fire Scenario

161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures

Following are the systems proposed as per NBC & Local Fire Authority:

Fire. IMO fire control signs - according to IMO Resolution A.654 (16) (mm) 150x x200

INITIAL FIRE SAFETY ASSESSMENT

Established /10/2015. Doran Pruisner Dan Wood

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

DISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL

School of Fire & Safety, GSFC University

Increasing Fire Safety of Cologne Main Station by High Pressure Water Mist

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

Impact of quick incident detection on safety in terms of ventilation response

REVIEW OF TECHNICAL STANDARDS AND CALCULATION METHODS FOR DIMENSIONING OF SMOKE AND HEAT CONTROL SYSTEMS IN CASE OF FIRE IN UNDERGROUND CAR PARKS

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

Policies, Practices, & Procedures

INITIAL FIRE SAFETY ASSESSMENT

Essentials of Fire Fighting, Fourth Edition Transition Guide. Chapter 1: The History of the Fire Service (Essentials, Chapter 1)

SCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY

Allfire Site No. a division of Allsaved Ltd. Fire Safety Log Book. Premises Address: Responsible Person:

Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS)

CMS Announcement 3/27/2017. Adoption of 2012 Life Safety Code Health Care Facilities Code. Kenneth Daily, LNHA

FIRE SAFETY & EMERGENCY EVACUATION STRATEGY AND POLICY

automatic FiReFighTing SYSTeMS in PainT booths

INSPECTOR I SKILLS ADMINISTRATION

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

AUTOMATIC FIREFIGHTING SYSTEMS IN PAINT BOOTHS

B. The Facility Emergency Planners and Alternate Planners will successfully complete the in-house DJJ Fire Prevention course.

ICC CODE CORNER 2015 International Fire Code

Public Comment No. 3-NFPA [ Chapter 7 ]

FIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre

Fraternity, Sorority and Dormitory Buildings R-2 Fire and Life Safety Standards Inspection Form Fire Code of New York State (19 NYCRR Part 1225.

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Property Name & Address [ Property Name ] - [ Property Address ]

FIRE SAFETY POLICY. 2.0 Under national, provincial and municipal fire regulations, the Board will ensure compliance with:

Western Michigan University Facilities Management Engineering Division

British Columbia Institute of Technology. BCIT Safety Manual FIRE SAFETY

Fire safety procedure

INITIAL FIRE ASSESSMENT REPORT (FAR)

Risk assessment is a term used to describe the overall process or method where you:

Chapter 3 FF II Fire Department Communications

Branch Solution Wood based panel plants. Fire protection solutions for wood based panel plants

Chapter 1: ADDITIONAL STUDIES

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

EC 5.10 FIRE PREVENTION MANAGEMENT

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements.

Fire Protection and Safety in Tunnels Conference Opening Remarks. Dr Fathi Tarada Secretary, PIARC Tunnel Operations Committee

Pro Board Assessment Methodology Matrices for NFPA 1001

M.P. Bhawan Risk Assessment. Chankya Puri, New Delhi

High-pressure water mist systems and fire testing. Max Lakkonen IFAB Institute for Applied Fire Safety Research

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

Chapter 17 Test. Directions: Write the correct letter on the blank before each question.

OFM-TG FIRE SAFETY PLANNING FOR RECYCLING FACILITIES AND WASTE PROCESSING OPERATIONS

Onsite Fire Risk Reduction Methods

SAFETY. USE OF SAFETY CHECK LISTS A safety check for compliance with current regulations should be performed yearly.

Road Tunnel Classification System for Fire Brigades Prof. Haukur Ingason SP

National Building Code (NBC) and the subsequent revisions

Saving lives with coatings

Agency for Health Care Administration

DMP FOR ONSITE AND OFFSITE

ISLE OF WIGHT FIRE & RESCUE SERVICE

KING S HOUSE SCHOOL FIRE RISK MANAGEMENT POLICY & PROCEDURES

HEALTH, ENVIRONMENT AND SAFETY MANAGEMENT FOR FACILITIES MANAGERS COURSE OUTLINE

A Comprehensive Community Risk Reduction Initiative A COMPREHENSIVE COMMUNITY RISK REDUCTION INITIATIVE

Fire Safety Procedures and Associated Training

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

FIRE SAFETY PRACTICES AND PROCEDURES

Transcription:

FIRE & EMERGENCY PREPAREDNESS IN METRO RAIL Rajesh Agrawal Sr.DGM/E&M 08 SEP 2016

Registered : May 1995 DMRC at a Glance Construction Commenced : Oct 1997 Operation Commenced : Dec 2002 Operates 213 RKM in 7 lines, 158 Stations Underground : 52 RKM ( 35 Stations) Elevated : 154 RKM (117Stations) At Grade : 7 RKM (6 Stations) Highest ridership : 3.29 Millions (17 Aug 16) No accident involving passenger life in last 14 year of operation / Day

Applicable Codes & Standards NBC 2005, Part IV ( Fire & Life Safety ) Clause number 6.4.8 (D7 Assembly Building) NFPA 130 -Standard for fixed guide way transit & Passenger Rail System Chapter 5 Means of Egress and Fire Protection Chapter 7 Emergency Ventilation (station and tunnel) Chapter 9 for Emergency Management Referred for fire safety design of Underground stations. Main IS Codes : IS 15105 For Automatic Fire Sprinklers IS 3844 - For Internal Hydrants IS 2190 - For Portable Fire Extinguishers IS 15501 For Inert Gas System Installations

Fire & Emergency Management Education Prevention Fire & Emergency Preparedness Detection & Suppression (Active) Containment (Passive)

1.Active System (Detection & Suppression) Fire Detection & Alarm system Hydrants, Sprinklers and Tunnel Hydrants Fire Extinguishers & Gas Suppression Systems (Total & Panel specific) Tunnel Hydrant Medium Velocity Water spray system Smoke Extraction System Water Spray system

Active System : Smoke Extraction SMOKEISTHEREALTHREATTHENHEAT Majority of casualties are due to suffocation by SMOKE SMOKE spreads faster and travel to places far away from the location of fire SMOKE effects visibility and hindering evacuation and fire fighting operation. To mitigate above and to extract heat rejected by Trains TVS is provided in underground MRTS.

Smoke Extraction : Salient Features TVS provides safe evacuation path to passenger & maintain the tenable environment inside the tunnel in emergency. TVS is designed to handle 20 MW fire load (one car of train); it have bi-directional operation and capable to start within 180 Seconds. During emergency TVS works in conjunction with station ECS system. Smoke from station is extracted through UPE & OTE. It consists of Various fans, pneumatic dampers, ducts & nozzles and control system.

TVS Operation Normal Mode PISTON EFFECT STATION1 STATION2 LOW TEMPERATURE HIGH TEMPERATURE

TVS Operation Congestion Mode (occur when delays cause disruption to the movement of trains). PISTON PUSH - PULL EFFECT VENTILATION STATION1 STATION2 LOW TEMPERATURE HIGH TEMPERATURE

TVS Operation Emergency Mode (when smoke is generated in the tunnel or station trackway) PISTON PUSH - PULL EFFECT VENTILATION STATION1 STATION2 LOW TEMPERATURE HIGH TEMPERATURE

TVS Operation Emergency Mode (when smoke is generated in the tunnel or station track way ) UP DN

TVS Operation Emergency Mode ( Fire in front of train )

TVS Operation Emergency Mode ( Fire in rear of train )

Blue Line Down Line Up Line NDI Down Line Up Line RCK Down Line Up Line Tunnel Booster Fans Blue Line

If the fire is in front coaches (up to first five of 8- car train / up to first four coaches of 6 - car train) of first train 2 nd train 1 st DN LINE S T A T I O N FRESH AIR Passenger of Incident Train Reversed to just clear Cross Passage Direction of smoke Direction of detrainment Cross Psg UP LINE Fire 4/5 DFS Assistance 2 nd S T A T I O N

Active System : Smoke Extraction: Station

Emergency Mode Operation Hot Smoke Damper Closed Damper Open

2. Passive System Construction Hazard Zonation Selective use of low fire hazard materials Train coach : Under floor of the Coach is rated for 30 Minutes fire rating. Fire Doors Comparmentation Smoke Curtains Smoke Screen for Vertical opening Pressurization (Escape Routes) Fire Door

Plans and Policies 3. Prevention Disaster Management Plan Contingency Plan Station Working Order (SWO) for individual station Standard Operating Procedures (SOPs) 14 Chapters Safety Circulars 36 Nos. Special Policies Preparedness Fire NOC from local fire authorities Inspections& Audits Technical Mock Drills Operational Mock Drills

Electricity policy Outside electricity not allowed Penalty for non-compliance of fire safety measures. LPG Policy Special Policies Cap on Storage capacity <500 Kg. Safe distance >3 meters Sprinklers System DG Set Policy Allowed in special circumstances only for banks etc. Compliance to CPCB norms Hot work permit Only in non-revenue hours Permit by EPIC Fire Watch

Technical Mock Drills Mock Drills Fire Pumps Operation TVS Operation Gas Flooding System Fire Detection & Alarm System Operational Mock Drills OHE Failure Detrainment Fire on Platform/concourse Fire inside Train Terrorist Attack

Training 4. Education Induction Training Refresher Training Classroom Training & Wet Drills Fire Service Week Fire Service Demonstrations at Station premises Public Awareness Programs

If you talk to a man in a language he understands that goes to his head If you talk to him in his language that goes to his heart Nelson Mandela