WOOSTER SAFETY CENTER

Similar documents
Memorandum CITY OF DALLAS

FIRE STATION PLACEMENT REVIEW AND RECOMMENDATIONS FOR EXPANSION DES MOINES FIRE DEPARTMENT CITY OF DES MOINES, IOWA

Baker County Volunteer Fire Department Fire Protection Assessment Update

EMS Station Locations

Department of Facilities Management Division of Maintenance. The Division of Maintenance: Supporting Student Success

5.8 PUBLIC SERVICES FIRE PROTECTION AND EMERGENCY SERVICES

Fire Chief: Jeff L. Hogan

Master Project List Report

Facility Improvements

New High School Concept

2017 Annual Report. King County Fire District No. 27 Fall City, WA

ASHLAND, MASSACHUSETTS

Master Facility Planning Update School Board Meeting May 26, 2016

Mission. Vision. To set the standard for excellence and innovation in public safety. Department Description

Newfoundland and Labrador Association of Fire Services PMA Conference St John s April 23,

APPROVED: Dayroom: Space for activities that is situated immediately adjacent to the youth sleeping areas and separated from them by a wall.

Centers for Regional Excellence. Downriver Fire Authority. Organization Committee Objective. Operations Committee Report 2007

SAN JOSE FIRE FIGHTERS

8 October 14, 2015 Public Hearing

Measure W Review. East Nicolaus High School District March 9, 2017

Pebble Beach Community Services District Fire Department 3101 Forest Lake Road, Pebble Beach, CA

foi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7

GEORGIA DEPARTMENT OF CORRECTIONS Standard Operating Procedures

WATER WISE SURV EY. Santa Barbara City College

Agency for Health Care Administration

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

A. All 203 Uniformed/Sworn members of the Cranston Fire Department are White Males; B. Minorities are under-represented in the sworn workforce; and,

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

7370 E 38 th St, Tulsa, OK Worksheet for Outlining A Disaster Plan

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN

Fire Department Orientation / Organization

Mary Bradford, Director of Parks Mike Riley, Deputy Director of Parks John E. Hench, Ph.D., Chief, Park Planning & Stewardship Division

CITY OF OWENSBORO OWENSBORO FIRE DEPARTMENT DEPLOYMENT ANALYSIS

Agency for Health Care Administration

Beaufort County Community College. Maintenance and House Keeping Plan

DEPARTMENT OF PUBLIC SAFETY INTEROFFICE MEMORANDUM

Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout

VILLAGE OF LOMBARD COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION PERMIT FEES. VILLAGE OF LOMBARD 255 E. Wilson Avenue Lombard, IL 60148

D. L. Frazeur, Chief Deputy, Emergency Operations Emile W. Mack, Chief Deputy, Administrative Operations

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE

ENHANCED ODOR-DETECTION SYSTEMS. A Patented System Developed by K-9 Search on Site (K-9 SOS)

FIRE DEPARTMENT FIRE CHIEF. Deputy Fire Chief Operations Section. Assistant Fire Chief Planning & Budget Section

STORMWATER UTILITY PRESENTATION November 18, 2014

4 January 11, 2012 Public Hearing APPLICANT:

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Brad Goudie May 16, Fire Marshal EMS Emergency Management Fire Department

FIRE STATION BUILDING COMMITTEE

A portion of the fire fighting personnel is continually rotated without a formal orientation regarding the unique characteristics of the island.

Design Review of Facility Improvement Projects

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

Bill de Blasio, MAYOR. build safe live safe. Rick D. Chandler P.E., COMMISSIONER

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

PEMBROKE PINES FIRE DEPARTMENT ISO Class 1 Department

Long Branch-Wayne Local Park Renovation Project

HEATING - the largest part p your home's energy bill

8. PRE-PLANNED FIRE AND EMS RESPONSE SYSTEMS

NITRATE FILM PRESERVATION FACILITY

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

MONTGOMERY COUNTY ARCHIVES. Guide to the Printed Material of RECORD GROUP 7: PUBLIC SAFETY , 2001

A Strategic Plan By Steamboat Springs Fire Rescue September 2018

8004 S El Dorado St., French Camp February 11, 2010 Posted Substandard/404B

Nanuet Fire District Proposed Firehouse Project. Presented to the Nanuet Civic Association March 3, 2011

SAGINAW FIRE DEPARTMENT SAFER

The blank report forms are enclosed. If additional blank forms are needed you may contact my office at (210) and ask for Maria Castoreno.

Safety & Security Checklist by Layers of Building and Grounds The Church Safety and Security Guidebook (Brotherhood Mutual Insurance)

Fire Service Manual Volume 3 Building Construction

F & S Caretaking Department Design Standards For New or Renovated U of T Premises February 2015

CITY OF TULSA PUBLIC FACILITIES & INFRASTRUCTURE

INTERNATIONAL ASSOCIATION OF FIRE FIGHTERS

Simple Security Improvements Can Go A Long Way

ESD # 122 UNION RIDGE MODULAR CLASSROOM

Truro Police Department. Fire Emergencies. Policy Number: OPS-9.02 Effective Date: June 1, 2000 REFERENCE:

PUBLIC SERVICES ELEMENT GOALS / POLICIES / MEASURES

Southern Baptist Theological Seminary. The Michael Minger Act Report for Activity Reported for Calendar Year 2004

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC

Presentation to Elko County Commission June 2013 Presented by: Gary Zunino

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

New Facilities. Minimum Requirements

Fire Department & Bannock County Ambulance District

Inside Out Home Inspections

NUUC CONGREGATIONAL MEETING

SIOUX FALLS FIRE RESCUE STRATEGIC PLAN

Clarendon Park Framework Plan. Chicago Park District Department of Planning & Development June 7, 2008

Single Room Occupancy Hotel Safety & Stabilization Task Force

Community Development and Recreation Committee

Fire Station #8 Relocation Siting Process Community Meeting #1. St. Mary s Episcopal Church June 25, 2015 from 7-9pm

SOUTH CAROLINA LIQUEFIED PETROLEUM GAS PROGRAM (LP-GAS)

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

WELCOME TO ROSEVILLE UNIVERSITY

4. Plumbing fixtures. a) The plumbing fixtures are from the original building. They are appear old and not to comply with ADA requirements.

PROCTOR TERRACE ELEMENTARY SCHOOL

Safety & Security update April 2014

Steven Craft, PhD, P.Eng. FIRE SAFETY DURING THE COURSE OF CONSTRUCTION

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Transcription:

WOOSTER SAFETY CENTER Police and Fire Service Needs and Proposal Joel Montgomery, PE Director of Administration 1 I. Fire Station Needs II. Police Station Needs III. Safety Center Solution INTRODUCTION 2 1

Building and facilities improvements Facility locations and response times I. FIRE STATION NEEDS 3 Fire Stations #1 & 2 Poor Design Layout Extreme Lack of Space Aging-Deteriorating Building 4 2

Fire Stations #1 & #2 Poor Design / Layout No public receiving area No evidence retention area No training room Inadequate office space No provision for co-ed fire fighters Inadequate parking facilities 5 Fire Stations #1& #2 Extreme Lack of Space Inadequate storage Overcrowded for current manpower needs Equipment stored outside Aging-Deteriorating Building Over 50 years old (Built in 1962) Water Damage Drainage and plumbing problems 6 3

Fire Station #1 Poor Design Layout Captain & Chief s Offices 7 Fire Station #1 Poor Design Layout Small Engine Maintenance 8 4

Fire Station #1 Extreme Lack of Storage Plan Storage Loft Storage 9 Fire Station #1 Extreme Lack of Storage Storage in Dayroom Storage in Truck Bay 10 5

Fire Station #1 Extreme Lack of Storage Office & Storage Bedroom & Plan Storage 11 Fire Station #1 Poor Layout / Lack of Storage Fire Prevention Office Air Packs in Truck Bay 12 6

Fire Station #1 Aging / Deteriorating Building Ceiling Damage Roof Leak Typical Flooring Issues 13 Fire Station #1 Aging / Deteriorating Building Surface Wiring due to Electrical Shorts Multiple Subpanels to Subpanels 14 7

Fire Station #1 Aging / Deteriorating Building Asbestos Pipe Insulation 15 Fire Station #2 Aging / Deteriorating Building Poor Design / Layout 16 8

Fire Station #2 Aging / Deteriorating Building Rotting Door Frames 17 Fire Station #2 Aging / Deteriorating Building Asbestos Pipe Insulation Disintegrating Door 18 9

Fire Station #2 Poor Design / Layout Weight Room in Truck Bay Multiple Electrical Subpanels, Storage, Sink 19 Fire Station #2 Poor Design / Layout Single, Men s Restroom Single Office 20 10

Fire Station #2 Poor Design / Layout Shop, Laundry, Furnace, Storage Room Mop Room, Storage, IT Closet 21 Fire Station Study & Master Plan (2007) Facilities Locations & Response Times I. FIRE STATION NEEDS 22 11

Fire Station Study and Master Plan (2007) Three fire stations are required to adequately provide fire service coverage and responses times to the entire City Station #1 is adequately located, but needs renovations to comply with Building Code and Fire Service Standards (ISO & NFPA) Station #2 has no redeeming qualities in terms of location, site or facility FACILITY LOCATIONS & RESPONSE TIMES 23 Fire Station Study and Master Plan Extensive analysis of Time, Personnel and Deployment FACILITY LOCATIONS & RESPONSE TIMES 24 12

Fire Station Study and Master Plan Wooster s Fire Station coverage exceeds standards for: Square miles / Fire Station by 41% Population / Fire Station by 25% Wooster s Fire Station coverage leaves millions of $$ and thousands of people with limited Fire/EMS protection FACILITY LOCATIONS & RESPONSE TIMES 25 CITY GROWTH 26 13

CITY GROWTH 27 City Growth in last 45 years: 4000 3500 Historic Comparison - Fire Division 1990-2010 Calls for Service - Fire Number of Staff - Fire 3895 100 90 Population = 40% 80 City Area = 86% Housing Units = 83% 3000 2500 70 Fire & EMS Calls increased 150% in the last 25 years 2000 1500 1553 36 39 60 50 40 1000 1990 2010 30 CITY GROWTH 28 14

FIRE STATION STUDY & MASTER PLAN 29 LOCATION & COVERAGE EVALUATION Response times for Fire, EMS, BLS, ALS, High Risk Only One site combo met 100% of criteria: Ex. Fire Station #1 Burbank/Friendsville SR585/Long Rd FIRE STATION STUDY & MASTER PLAN 30 15

LOCATION & COVERAGE EVALUATION Phase One combo meets 85% of criteria: Ex. Fire Station #1 Burbank/Friendsville FIRE STATION STUDY & MASTER PLAN 31 DETAILED SITE ANALYSIS Site Capacity, Facility & Support Space, Zoning Req.s Operational Flexibility & Responsiveness Potential Traffic Conflicts Development Barriers & Costs Expansion Capabilities FIRE STATION STUDY & MASTER PLAN 32 16

DETAILED SITE ANALYSIS Site Capacity, Facility & FIRE STATION STUDY & MASTER PLAN 33 Fire Station Needs Summary Improvements needed to 50 year old Buildings and Facilities Substantial City Growth & Increases in Fire Service Calls Fire Station Study & Master Plan validated needs and locations I. FIRE STATION NEEDS 34 17

Current Location Wayne County Justice Center 35 Existing Police Station Wayne County Justice Center Aging & Deteriorating Building Severe Lack of Evidence Storage Space Facility Significantly Undersized for Current Police Service Requirements 36 18

Existing Police Station Wayne County Justice Center Aging & Deteriorating Building Nearly forty years old (built in 1977) with little or no renovations Example: Building still operating the same forty year old boilers 37 Existing Police Station Wayne County Justice Center Aging & Deteriorating Building Floor Damage 38 19

Existing Police Station Wayne County Justice Center Aging & Deteriorating Building Shower Floor & Fixture Damage 39 Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space Evidence is currently spread across three floors of the building. Evidence is kept in the Safety Administrative Supervisors office. This can lead to the office smelling strongly of drugs. Space maximizing strategies like roller shelves have been completed and the current space is still not adequate. 40 20

Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space With improvements in technology and defense strategies officers are taking more items of evidence than they did 40 years ago. Changes in the law, like Senate Bill 77 now require police agencies to keep biologic evidence in some crimes for 30 years. This requires more storage space. Due to a lack of evidence space, interview rooms frequently have to be used as make shift evidence storage rooms. This is not a good practice. 41 Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space Safety Admin Supervisor Office Evidence Storage 42 21

Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space 43 Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space 44 22

Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space This is a floor drain located in Evidence Room 3. This drain must be kept covered at all times. If it is not covered, noxious sewer gases fill evidence room 3 with a foul odor. 45 Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space Cage Storage 46 23

Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space Cage Storage 47 Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space Temporary Evidence Storage Lockers 48 24

Existing Police Station Wayne County Justice Center Temporary Evidence Storage 49 Existing Police Station Wayne County Justice Center Temporary Evidence Storage 50 25

Existing Police Station Wayne County Justice Center Severe Lack of Evidence Storage Space Overall, storage space for the Police Department is maxed out. Our Cage area that stores extra equipment and records is full. It has also been equipped with roller shelves to maximize storage. 51 City Growth by Year 30.0 26.1 27.0 25.0 20.0 18.7 19.3 17.3 17.5 15.0 10.0 5.0 9.4 10.3 6.4 7.2 11.8 11.7 0.0 1970 1980 2010 2013 Population (thousands) City Area (sq. miles) Housing Units (thousands) CITY GROWTH 52 26

CITY GROWTH 53 City Growth in last 45 years: 20,000 18,000 Historic Comparison - Police Division 1980-2010 Calls for Service - Police 18,893 Number of Officers 100 90 Population = 40% City Area = 86% Housing Units = 83% 16,000 14,000 14,319 80 70 Police Calls increased 177% in the last 25 years 12,000 10,000 8,000 60 50 40 6,000 31 6,821 34 32 30 1980 1990 2010 54 27

Facility Significantly Undersized for Current Police Service Requirements The Police Department currently occupies 4,693ft of its own space and 8,910ft of shared space for a grand total of 13,603 feet space within the Wayne County Justice Center. This is a fraction of the 27,900 square feet that was recommended by a Police Station Study & Space Analysis 55 Facility Significantly Undersized for Current Police Service Requirements 56 28

57 58 29

Police Station Options 1. Expand at Existing Justice Center Wayne County Commissioners have indicated no plans for expansion No way to expand without acquiring additional property or constructing additional stories Either of these options would require a significant amount of funding, and would not be the most efficient approach 59 Police Station Options 1. Expand at Existing Justice Center cont d Justice Center expansion would not address issues with public parking access versus Police Dept. secured parking and operations County representatives have indicated potential plans for use of the vacated space Current negotiations with the County will require exiting the Justice Center within the next three years 60 30

Police Station Options 1I. Purchase Larger Facility to Renovate Available, suitable facilities investigated and priced. Costs for facilities alone ranged from $2.5 million to $5 million, not including renovation costs. Layton School was investigated for renovation. Building and Safety Code requirements resulted in an estimated cost of $2.6 to $3.1 million. Future, near term expansion would be required of 2000 to 3000 square feet at a cost of $250,000 Renovation of any existing facility would require Safety and Building Code upgrades costing $2.5 to $3 million for required space 61 Police Station Options 1II. Build New Police station and Relocate New, stand-alone Police Stations meeting current Safety and Building Codes cost $3.2 to $3.5 million for required space Approximately the same cost to build a new facility to meet the current Police Service needs for the City of Wooster 62 31

Police Station Relocation Police stations are not as sensitive to location as Fire stations Police forces are already out patrolling assigned areas of the City Proposed location is within One mile of more than 68% of the Wooster Schools student population This is exciting, and I am sure that many of our families would embrace such a relocation Dr. Michael Tefs, Wooster City Schools Superintendent City has already purchased the property 63 Police Station Needs Summary Improvements needed to 40 year old Buildings and Facilities Substantial City Growth & Increases in Police Service Calls Police Station Study & Space Analysis validated expanded facility needs 64 32

Safety Center Solution Preliminary Estimated Budget for Safety Center = $ 7 Million $2.7 million for Police Facilities $2.3 million for Fire Facilities $2.0 million for shared facilities Shared Spaces between Police and Fire reduces costs by $2.0 million City will avoid $120,000/year in Justice Center use, maintenance and capital costs 65 III. SAFETY CENTER SOLUTION 66 33

New Safety Center Updates and Replaces 40 50 year old facilities Solves Building and facilities improvement needs Satisfies Fire Service coverage requirements Satisfies Police Service space needs III. SAFETY CENTER SOLUTION 67 SUMMARY Current Police and Fire facilities designed and constructed to serve a different Wooster 40 to 50 years ago Police and Fire facilities, codes and services have changed significantly in the past 4 to 5 decades A new Safety Center will meet the needs of Wooster today and the foreseeable future Questions? III. SAFETY CENTER SOLUTION 68 34