MAJESTIC DEVELOPMENT in the. DEL PRADO MIXED USE Majestic Housing & Development LLC September 8, 2014

Similar documents
The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

Waterfront West December 6, 2016

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.

Exhibit B Pacific Palisades Commercial Village Redevelopment Project Project Description

PCH & GOLDEN LANTERN. CHARLES COMPANY DANA POINT, CALIFORNIA September 8, 2014

III. PROJECT DESCRIPTION

Design Considerations

VEHICULAR AND PEDESTRIAN CIRCULATION

A new French-Inspired Coastal Village on Scenic 30A

Lynn Housing Authority and Neighborhood Development. Washington Street Gateway District Plan A p r i l

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

Pine Island Road Corridor Master Plan

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

Duke University Medical School. Duke School of Nursing

Waterfront Development Master Plan

Olde Towne Vision Plan

Lehigh Acres Land Development Regulations Community Planning Project

Nature s Garden Chapman s Peak, Noordhoek, Cape Town Sleeps Pool Private pool Bedrooms 4 Views Mountain Bathrooms 4 Beach 1km

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

Market Place Bythell Place Queen Street Park Riverside Park. Public Spaces. Blenheim CBD Streetscape Final Report 36

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

M E M O R A N D U M SITE DATA

open house 3 CITY OF SALEM Downtown Streetscape Plan

DESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018

New Berlin City Center Concept Review PDQ Food Stores, Inc

The West College Avenue Corridor Redevelopment Plan

DRAFT DESIGN GUIDELINES

Preliminary Design Review. Poudre Garage Mixed Use December 14, 2015

DESIGN REVIEW COMMITTEE AGENDA ITEM

Arlington County. Courthouse Square Community Outreach Workshop. 23 April 2014

Roosevelt Station: Transit-Oriented Development. Workshop #3 - February 22, 2017

Concepts. Conclusion. Concept C. Denver Union Station - Public Space Concept Plans

Dyersville Downtown Plan. Open House October 24, 2017

TUSTIN RED HILL DEVELOPMENT TUSTIN CITY COUNCIL WORKSHOP

Existing Site. Ash Crescent at 57th Avenue. Ash Crescent with Low Rise. Ash Crescent with Giant Sequoias

Long Branch-Wayne Local Park Renovation Project

Union Station Master Plan Task 3 Update

23 July Sunshine Alley Design Project Open House Exhibits

WELCOME. Welcome to the Public Open House

Charles P. Johnson and Associates. Annapolis Landscape Architects

Proposed Major Institution Master Plan Street Vacation. March 19, 2009

18 May 2016 CAMPUS MASTER PLAN UPATE

Denton. A. Downtown Task Force

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

Pop-up Workshop #1 Summary of Community Feedback

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Future Proposed Development

appendix and street interface guidelines

5250 // PLAZA WELCOME TO CHARLOTTE S NEW WAY TO WORK, PLAY, + GATHER.

Glen Road Pedestrian Bridge Environmental Assessment

APPLICATION FOR AGENDA ITEM # URBAN DESIGN COMMISSION Project # REVIEW AND APPROVAL Legistar # PROJECT ADDRESS: ALDERMANIC DISTRICT:

Architectural Review Board Report

THEMES, VISION, + PRINCIPLES

Wadsworth Boulevard S TAT I O N A R E A P L A N

Ville de. Côte Gelée

3.1 community vision. 3.3 required plan elements

Incentives Bonus Height RequirementsProgram:: Proposed Mandatory and Elective Building Components

AMITY STATION Revised Concept Plan Review West Rosemary Street Chapel Hill, NC September 27, 2016

Slot Home Task Force Meeting #5 Phase 2 June 8, 2017

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

BRADENTON RIVERWALK EXPANSION MASTER PLAN

.+-M,.-,.+*,,A,--< ;:--t fi. ;,==: r ) i Q ; ',,(.:,*> 8 I-="' e$ ,; \!!&,,u

L L O T DESIGN GUIDELINES. Case Studies

PC RESOLUTION NO ARCHITECTURAL CONTROL (AC)

CENTRAL CITY NEIGHBORHOOD Site Plan and Design Review Guidelines Checklist

Regular Session. Legislative Regular Agenda

Planned Development Application 1450 Sherman Avenue Evanston, IL Responses to DAPR Meeting I City Staff Comments

CONTEXT + PROGRAM. CONTEXT - Site Photos RIALTO THEATRE STATION DEPOT HOTEL CONGRESS GREYHOUND SITE 4TH AVENUE BROADWAY BOULEVARD

Millbrae TOD #2 Project Analysis

*BOLDED ITEMS ARE REQUIRED* *The more info provided, the more detailed your comments from staff will be.* Project Name

Oakridge Redevelopment: New Park Concept Overview and Phase 1 Engagement Results

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

REZONING APPLICATION MPD SUPPLEMENT

ACSA/AIA Housing Design Education Award

East Central Area Plan

Public Art Plan. We have elected to submit Public Art Plans before or concurrently with the CSP Submittal per the FDP Manual

City of Fairfax, Virginia City Council Work Session

New Park / Entry Court & Plaza Concept Design

North Downtown Specific Plan MEMORANDUM

Proposed Stage One Proposed Stage (Pending) Staging. Blenheim CBD Streetscape Final Report 50

La Veranda Summary Notes from DRAC meeting 4/05/16

DINING ENTERTAINMENT SHOPPING

Community Design Plan

DESIGN REVIEW COMMITTEE AGENDA ITEM

CHAPTER 3 LAND USE, ZONING, AND DEVELOPMENT STANDARDS

MARTIN LUTHER KING JR PARK MASTER PLAN MARTIN LUTHER KING JR PARK MASTER PLAN

Taming Tysons Corner Transforming the Quintessential Edge City

Tel: (705) Fax: (705)

SECTION 6 - LAND USE - TOWN CORE

RETAIL SPACE FOR LEASE Somersville Plaza Somersville Road Antioch, CA 94509

Obey Creek July 17, Vicinity Map. Concept Plan Submittal. No

Pedestrian and Bike Bridge LOGO

West Kendall Corridor June 11, 2014

Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT

CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT

to the Jericho Reservoir Project Open House

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

Rocky Mountain Public Media

WELCOME. Welcome to our second public exhibition on proposals for the redevelopment of the Paddington Central Management Office.

Transcription:

MAJESTIC DEVELOPMENT in the Lantern District September 8, 2014 1

Comments and Questions from last workshop Show us how retail and residential loading works How does trash pick up and handling work? Does this project meet F.A.R. limits, per Specific Plan? Consider a different architectural theme for Phase 3 Building elevations should look good from all vantage points Explain elevator heights What is the potential build out of the Town Center? 2

*SHADED AREA DENOTES PUBLIC ACCESSIBLE OPEN SPACE PHASE 1 OPEN SPACE: ~9000 S.F. (23% OF SITE AREA) PHASE 2 OPEN SPACE: ~4500 S.F. (14% OF SITE AREA) CONCEPTUAL PEDESTRIAN CONNECTION PLAN 3

PUBLIC ACCESS CONNECTIVITY TO SHOPS/RESTAURANTS OUTDOOR LOUNGE AREAS OUTDOOR FIREPLACE WATER FEATURE OUTDOOR DINING AREA PUBLIC ART SITE 1 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 4

PUBLIC ACCESS CONNECTIVITY TO SHOPS/RESTAURANTS OUTDOOR LOUNGE AREAS OUTDOOR FIREPLACE WATER FEATURE OUTDOOR DINING AREA PUBLIC ART SITE 2 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 5

CONCEPTUAL PEDESTRIAN CONNECTION PLAN 6

SITE 1 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 7

DEDICATED STREET LOADING AREA SEPARATE FROM PARKING STALLS SITE 1 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 8

RESIDENTIAL MOVE-IN BACK OF HOUSE SERVICE DEDICATED STREET LOADING AREA SEPARATE FROM PARKING STALLS SITE 1 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 9

SITE 2 DETAIL SITE 3 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 10

NEW PUBLIC COURTYARD ADDED PARKING STALLS ON ALLEY SITE 2 DETAIL SITE 3 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 11

DEDICATED STREET LOADING AREA SEPARATE FROM PARKING STALLS SITE 2 DETAIL SITE 3 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 12

BACK OF HOUSE SERVICE DEDICATED STREET LOADING AREA SEPARATE FROM PARKING STALLS RESIDENTIAL MOVE-IN SITE 2 DETAIL SITE 3 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 13

DEDICATED STREET LOADING AREA SEPARATE FROM PARKING STALLS SITE 2 DETAIL SITE 3 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 14

BACK OF HOUSE SERVICE DEDICATED STREET LOADING AREA SEPARATE FROM PARKING STALLS RESIDENTIAL MOVE-IN SITE 2 DETAIL SITE 3 DETAIL CONCEPTUAL PEDESTRIAN CONNECTION PLAN 15

COURTYARDS AND STREETSCAPE 16

SITE 1 AMBER LANTERN PASEO ENTRANCE 17

PASEO ENTRANCE PASEO ENTRANCE SITE 1 AMBER LANTERN 18

ENHANCED WALL TREATMENT AND LANDSCAPE SITE 1 WEST ELEVATION 19

ENHANCED WALL TREATMENT AND LANDSCAPE SITE 1 WEST ELEVATION 20

PASEO ENTRANCE PASEO ENTRANCE SITE 1 DEL PRADO ELEVATION 21

PASEO ENTRANCE PASEO ENTRANCE SITE 1 DEL PRADO ELEVATION 22

PASEO ENTRANCE SITE 1 PCH ELEVATION 23

PASEO ENTRANCE SITE 1 PCH ELEVATION 24

ALLEY ENTRANCE ALLEY ENTRANCE SITE 2 AMBER LANTERN 25

ALLEY ENTRANCE SITE 2 AMBER LANTERN 26

ENHANCED WALL TREATMENT AND LANDSCAPE ALLEY ALLEY SITE 2 EAST ELEVATION 27

ENHANCED WALL TREATMENT WITH WALL ART AND LANDSCAPE ALLEY ALLEY SITE 2 EAST ELEVATION 28

SITE 2 DEL PRADO ELEVATION 29

PASEO ENTRANCE SITE 2 PCH ELEVATION 30

PASEO ENTRANCE ALLEY PASEO ENTRANCE SITE 2 PCH ELEVATION 31

CHANGED ARCHITECTURAL TREATMENT ALLEY SITE 3 VIOLET LANTERN 32

ALLEY ALLEY SITE 3 VIOLET LANTERN 33

PASEO ENTRANCE ALLEY SITE 3 VIOLET LANTERN PASEO ENTRANCE 34

ENHANCED WALL TREATMENT WITH WALL ART AND LANDSCAPE ALLEY SITE 3 WEST ELEVATION 35

ALLEY ALLEY SITE 3 WEST ELEVATION 36

ENHANCED WALL TREATMENT AND LANDSCAPE ALLEY SITE 3 WEST ELEVATION 37

SITE 3 DEL PRADO ELEVATION 38

PASEO ENTRANCE SITE 3 PCH ELEVATION 39

PERSPECTIVE RENDERING 40

D. PROJECT HIGHLIGHTS PROJECT HIGHLIGHTS 41

Fun and interesting public spaces Public art and lush landscaping incorporated into paseos and courtyards Places to lounge and walk Outside dining on the street and in the courtyards Improved shopping experience Social gathering Good parking management offstreet public parking Enhanced architecture Enhanced streetscape Amber Lantern upgrade Alley upgrade More than $4.1 million in fees paid to benefit the community PROJECT HIGHLIGHTES 42

TOWN CENTER MACRO LEVEL PROJECT HIGHLITES 43

AERIAL OVERLAY 44

QUESTIONS AND COMMENTS 45

MAJESTIC DEVELOPMENT in the Lantern District 46