TRACE 700. Slide 1. Hello, my name is Nick Cavitt and I m a marketing engineer in the C.D.S. group at TRANE.

Similar documents
Hello, my name is Sarah Hilden and I am a Marketing Engineer in the C.D.S. group at Trane.

Hello, my name is Audra Benzschawel and I m a marketing engineer in the C.D.S. Slide 1 TRACE 700

terminal units only provide sensible cooling, a separate dehumidification system is usually needed.

Direct and indirect evaporative cooling

Supply air temperature reset

Summary Comparison of Simulation Program Features

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80

New Features. IES Virtual Environment 6.4

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

Commercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark

Plate-and-frame free cooling

Pack Calculation Pro. Users guide. Version Morten Juel Skovrup

Best Practices for Condensing Boilers

AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT

Method to test HVAC equipment at part load conditions

THERMAL ICE STORAGE: Application & Design Guide

The Book of AERMEC NRL Sequence of Operation

By Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE

ApacheHVAC User Guide Part B: Equipment, Loops, Components, and Controls

Dehumidifying with Dedicated Outdoor Air

Plant Application Guide

ApacheHVAC in VE 2012

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

HVAC Water chiller selection and optimisation of operation

Plant Application Guide

Terminal. Las Vegas, NV. Technical

Energy Efficiency Through Waste Heat Recovery. Heat Recovery Centrifugal Chillers and Templifier Water Heaters

TOTAL SYSTEM EFFICIENCY: SYSTEM APPLICATIONS & DESIGNS. David Grassl PE Mechanical Engineer Principal

Multiple-Chiller-System Design and Control

Application of Air Source Variable Refrigerant Flow in Cold Climates

Verasys System Operation Overview Technical Bulletin

Over/Undersizing in TRACE 700

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

Description of All Alternatives Considered-

100% Outdoor Air Dehumidification Methods

GEOTHERMAL DESIGN GUIDE

Daikin VRV Sizing & Simulation Plug-in User Guide

Installation Guide. ECL Comfort 210, application A Table of Contents

Daikin Altherma/Viessmann Integration Notes (used with schematics M1 thru M5)

AHRI 920 Performance Rating and Comparisons of DX-DOAS Unit Efficiency

Synergy 405PLUS User Guide Manual

Modular Chiller Systems. Application Guide

Chiller Plant Design. Julian R. de Bullet President debullet Consulting

Daikin VRV Systems Plugin VE2012 User Guide

Engineered for flexibility and performance

Chilled beams. TRACE 700 incorporates two chilled beam strategies: passive and active.

PRESSURE INDEPENDENT CONTROL VALVE TECHNOLOGY. 3/16/2012 Fred Ferrara 1

Existing Mechanical System Operation

Adding More Fan Power Can Be a Good Thing

MicroTech Series 200 Centrifugal Chiller

i-vu CCN 4.0 Owner s Guide

TOTAL SYSTEM EFFICIENCY: CONTROL STRATEGIES & SYSTEM DISTRIBUTION. David Grassl PE Mechanical Engineer Principal

Air Conditioning Clinic. Absorption Water Chillers One of the Equipment Series TRG-TRC011-EN

Chiller Plant Design. Application Guide AG McQuay International. Elevation Difference. Column Height When Pump Is Off

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

A Technical Introduction to Cool Thermal Energy Storage Commercial Applications

Fans and Pumps I. Dr. Sam C. M. Hui Department of Mechanical Engineering The University of Hong Kong

June 2001 / BULLETIN Way Valves. The right solenoid valve for any job.

ECL Comfort 110, application 116

HIGH EFFICIENCY FIRETUBE CONDENSING GAS BOILER

HEAT HEAT HEAT COOL COOL PUMP OWNER S MANUAL 7-DAY TOTALINE

BRINE CIRCULATED ICE THERMAL STORAGE SYSTEM DESIGN - CASE ILLUSTRATION - Partial Ice Storage for Air Conditioning Application

1 Air Handling Units In ICE

For an administrative fee of $9.97, you can get an un-locked, printable version of this book.

ECL Comfort 110, application 130

Weather compensated flow temperature control of heating and boiler systems

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop

Trim Pump Impellers. Fredrick/Weinman Engineered Products 2-1/2 KH, 2-1/2 x 3 x 12

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Accomplish Maximum Green Results in Commercial Buildings #

Psychrologix Controller W/ DHC

Performance Climate Changer Next generation air handler from Trane

MODEL SF-10 CONTROL OPERATION AND INSTRUCTION MANUAL

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

- Data Brochure Universal Reset Module 423

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

2009 IECC Commercial Mechanical Requirements

HEAT COOL. Meets Commercial California Title 24

Instruction Guide: Thermostat Operation

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

Reference Guide for Microprocessor Controller

V4 15JUNE2016 (COPYRIGHT: DEPARTMENT OF INDUSTRY)

Mechanical Systems Design

June Copyright Climatec

ASHRAE JOURNAL ON REHEAT

Adsorption Chillers Energysmart Green Cooling

Alfa Laval Wet Surface Air Coolers (WSAC ) FAQs

Homeowner s Guide / 1

Energy Savings Potential of Passive Chilled Beam System as a Retrofit Option for Commercial Buildings in Different Climates

ATC32U03 igate Communicating, Programmable Thermostat

T7350 Programmable Thermostat FOR CONVENTIONAL/HEAT PUMP SYSTEMS

ENERGY LIGHT USER S GUIDE ENERGY LIGHT USER S GUIDE

High-Performance VAV Systems

- Data Brochure Universal Reset Module 422

CONTENTS. B. System Design and Performance Requirements

Appendix 13. Categories of Cooling and Heating systems

Copyright 2017 Integrated Environmental Solutions Limited. All rights reserved.

Radiant Heating. Systems

Transcription:

Slide 1 TRACE 700 Chiller Sequencing and Controls Hello, my name is Nick Cavitt and I m a marketing engineer in the C.D.S. group at TRANE. Today, we will be talking about the Plant Sequencing and Controls focusing on Chiller Plant functionality in TRACE 700. Slide 2 Learning Objectives Define Sequencing and how TRACE uses it Understand different sequencing options Plant and Equipment Control options TRACE World vs. Real World In this video we will define Sequencing and how TRACE uses it, discuss the different sequencing types and learn how to set up a sequence. We ll also learn the difference between Cooling Equipment Controls and Plant Controls and discuss the different controls options for each. Finally, we ll discuss a few areas where actual controls programming may conflict and be more sophisticated than TRACE is capable of directly simulating. Let s begin by defining what sequencing means in TRACE. Slide 3 What is Sequencing? Typically used to describe order of operation TRACE 700 Definition : Plant Configuration Sequencing: Switchover Sequencing or order of operation In common practice, the term Sequencing is used to describe the order in which equipment operates or is staged. In TRACE language, we use it to connote two different ideas. The section where it is most commonly encountered is on the Cooling Equipment tab of Create Plants. There is a Sequencing type field, which defines the hydronic arrangement of your cooling equipment. Simplified, this defines how the cooling equipment operates and handles the load or interacts and shares the load with each other in cases of multiple pieces of equipment within a single plant. The other usage within the program more closely resembles how sequencing is generally viewed. This is referred to as Switchover 2015 Trane a business of Ingersoll Rand 1

Sequencing in TRACE and allows the user to vary how the individual pieces of equipment are staged based on different variables. We will look at Switchover Sequencing in much greater detail later but first, let s look at the different arrangements or s within TRACE. Slide 4 Single (default) Base Load Parallel Parallel-Decoupled Series Sidecar Optimal While there are quite a few different and creative pumping schemes utilized in cooling plants throughout the world, TRACE uses seven different equipment sequences that are more commonly utilized. Let s look at each of these sequencing types in a little more detail. Slide 5 Single The first type we will discuss is Single, which is the default sequencing type when creating a new cooling plant. The schematic for a single chiller is fairly basic and straight forward; it includes one (1) piece of equipment and one (1) pump. This sequencing type should only be used when there is only a single piece of equipment in the cooling plant. 2015 Trane a business of Ingersoll Rand 2

Slide 6 Base Load The second type is Base Load. Often seen in scenarios with highly efficient or heat recovery chillers, Base load is used when there is more than one chiller and one of those chillers is defined as the permanent lead chiller. This simulates a scenario where one chiller is always loaded to capacity first and additional chillers are enabled to make up the difference. This chiller should always be listed first in the sequence list. The simplest way to do this is to create that Base Load chiller first. To base load a chiller in real life usually requires that it be piped in a preferential position on the system. It can be difficult to base load a chiller when all are in parallel without extensive piping and control involvement so if they're all in parallel, a better option may be the next one. Slide 7 Parallel Parallel sequencing indicates chillers piped in parallel. When this sequencing type is used, the first chiller listed will load first and when the maximum capacity is reached for that chiller, the load is then split proportionally in relation to the design capacity of each chiller between that chiller and the next one in sequence. This scenario uses a dedicated pump for each chiller to circulate water throughout the system. This sequencing type can be with both variable speed pumping, variable primary flow for instance, or constant volume pumping schemes. Slide 8 Parallel-Decoupled Parallel Decoupled sequencing has a similar arrangement to the Parallel sequence with the addition of a decoupler or bypass line. It also adds a secondary pump for variable flow distribution to the actual building loads. This scenario is often referred to as a Primary Secondary scheme and will require you to set up a secondary distribution pump within the Plant Controls. We will cover this option later. This arrangement allows for constant flow through the chillers whenever operating thus eliminating the potential issues regarding system and chiller flow rate or rate of change limitations that can result with the Parallel configuration. In addition, all chillers that are operating are loaded proportionally, that is in 2015 Trane a business of Ingersoll Rand 3

equal percentages, just like the previously mentioned Parallel sequencing type. Slide 9 Series A Series arrangement requires two (2) or more chillers piped in a series configuration with the lead chiller handling the entire load until it s capacity has been exceeded. Once the lead chiller s capacity has been reached, the next chiller in sequence will be enabled to handle the remaining load. Please note, this configuration does not split the load as in Parallel configurations but maintains the full load on the lead chiller with the next chiller in sequence only handling the remaining load. Slide 10 Sidecar The Sidecar configuration places a chiller or other heat exchanger in the configuration shown. Often these chillers are absorption or heat recovery chillers and they handle as much load as possible. Once their capacity has been met, the remaining chillers will share the remaining load. Please note; there can only be one chiller using the Sidecar sequencing type per cooling plant and, like Base Load, must be listed first. 2015 Trane a business of Ingersoll Rand 4

Slide 11 Optimal Finally, with version 6.3.2 we have added Optimal sequencing. Using this Optimal sequence allows the program to operate at the best part load condition using the Power Consumed curve and run the chiller at this point whenever possible. As such, this will set a sort of limit so that once a chiller hits this point, it will maintain this part load condition and enable additional chillers as required. You will need to have this sequence selected on at least one of the chillers in your plant and either series, parallel, etc. on the other chillers. For more information on this feature and how to implement it, please refer to the F1 Help and the Version 6.3.2 release notes. It is very important to note that in order for multiple pieces of equipment in a plant to operate no matter what sequence type you ve chosen, the capacity for all but the final chiller must be entered. For example, if you have two chillers in a cooling plant, chiller 1 must have a capacity entered in order for chiller 2 to see any load. If chiller 1 has a blank capacity field, TRACE will not know what the maximum capacity for that chiller is and will size it to handle all of the load. Now that we ve covered all of the Sequencing Types, let s take a look at the Switchover Sequencing functionality. Slide 12 Sequencing Switchover Sequencing Only pieces of equipment within a Cooling or Heating Plant can be sequenced Sequencing based upon three variables Time-of-day Outside Air Dry Bulb Load All sequences must use the same variable and operator The Sequencing Button allows users to vary the operation of their cooling plants in regards to how equipment within each plant is staged or utilized. Please note, sequencing can only be done within an individual plant. Multiple cooling plants cannot be sequenced to work with each other. For instance, if you have 2 cooling plants, you cannot create a sequence where Cooling Plant A handles the load from midnight to 1 PM and Cooling Plant B handles the load from 1 PM to the following midnight. You can only sequence individual pieces of equipment within cooling plants. For example, Chiller 1 would be the lead chiller when the load is less than 300 tons and Chiller 2 would be the lead chiller when the load is 300 tons or 2015 Trane a business of Ingersoll Rand 5

greater. As alluded to, this sequencing functionality can be set up to change on a number of different variables. Those variables being Time of Day, Outside Air Dry Bulb Temperature and Load. This sequence functionality needs only be used when different pieces of equipment within a cooling plant must vary depending on these variables. The default sequence for most sequencing types as just reviewed will be for the first chiller listed to be enabled first and handle the load until its capacity has been met. All sequences within a single cooling plant must use the same variable. There can be no mixing of sequence variables. Let s take a look at how to create a Switchover Sequence using one of these variables. Slide 13 **Sequencing Screencast** Let s say we want different chillers to be the primary chiller depending upon the Outside Air Temperature. As you can see, we have three chillers in the Cooling Plant. Let s say we would like Chiller 2 to be lead whenever the Outside Air Dry Bulb temperature is cooler than 70 degrees Fahrenheit, Chiller 1 to come on first when it s between 70 and 85 degrees and Chiller 3 to be the primary anytime it s over 85. To access the Switchover Sequencing functionality, highlight the Cooling Plant you d like to apply the sequencing to and click the Sequencing button on the Configuration Tab. Once you ve done this, a new window will appear and you will see that the default sequence will be in the order in which the pieces of equipment are listed on the Configuration tab. Let s start by creating the three different sequences. To start, highlight and click the delete key or simply select the blank space for each piece of equipment. Then select the 2015 Trane a business of Ingersoll Rand 6

order in which the equipment will come on. Since chiller 2 will have priority up to 70 degrees, let s select it first and maintain the order after that choosing 3 and then 1. Once that third chiller has been selected, you ll notice the next sequence line is created. Let s use this line to define the order for temperatures 70 to 85 which will be chiller 1 and then we ll use chiller 2 and then three will be last again. For the third sequence we ll start with chiller 3 since it will operate as the primary chiller anytime we are over 85 degrees. Now that we have our sequences defined, let s set up the variable and table to determine when each sequence is used. When creating these tables, you will need to determine which operator, less than, less than or equal to, greater than or greater than or equal to you d like to use. The reason for this is due to the fact that TRACE locks in the operator once chosen to avoid gaps in your equipment operation. Let s choose greater than as our operator. When using this operator, you ll want to start with the lowest temperature first and work up from there. Please note, if using the less than or less than or equal to operators, the opposite will be true and you will want to start with the highest value. Since the weather location we ve chosen is in a heating dominant climate, we ll start with a significantly low temperature to ensure there are no gaps. If unsure where you should start, you can check your weather data to ensure you are starting with a low enough or high enough temperature. Since we are starting with our coolest temperature, we will start with the first sequence created. In the sequence column, we ll select that first entry, then select the greater than operator and finally, we ll enter that lowest temperature and corresponding unit. Once that has been created, we can move to the second line and select the second sequence. You ll notice that on this second line, the operator cannot be changed. We will then enter that 70 degree temperature and we will then move down to set up the final line 2015 Trane a business of Ingersoll Rand 7

which will define the third chiller as our primary anytime it s over 85 degrees outside. You will then want to make sure to click OK to ensure that sequence is saved. There you have it, we ve defined a Switchover Sequence based upon the given temperatures. To delete the sequencing, simply highlight either the sequences in the upper or lower areas and click the delete button. Next, we ll talk about the features within Cooling Equipment Controls. Cooling Equipment Controls are accessed on the Cooling Equipment tab. Since these are specific to an individual piece of equipment, the proper piece of equipment must be selected in the Equipment tag field. Once you have selected the proper equipment tag, simply click the Controls button along the right side of the window. Again, these are for individual pieces of cooling equipment. We will cover controls for an entire plant next. Once you have clicked this button, you will see a new window appear with a number of different configuration options which we will now review. Slide 14 Cooling Equipment Controls Applies to specific pieces of equipment Options for Chiller Equipment Free Cooling Evaporator and Condenser Water Reset Load Shedding Economizer Equipment Schedule Demand Limiting Priority Design Chilled and Condenser Water Delta T Cooling Equipment Controls relate to specific pieces of equipment so if when trying to apply these strategies to multiple chillers, you will need to set up these controls for each chiller or, alternatively, you could set up the first chiller completely and then copy that chiller. Among the options we are going to discuss are Free Cooling, Evaporator and Condenser Water Leaving Reset Options and Load Shedding Economizer. We will also touch on how the Equipment Schedule affects plant operation, how Demand Limiting Priority functions and the Design Chilled and Condenser Water Delta T overrides. Options such as Evaporative Pre Cooling and Hot Gas Reheat for Dehumidification will not 2015 Trane a business of Ingersoll Rand 8

be covered. However, look for these features to be discussed in future videos and as always, you can find additional information using the F1 Help. Let s take a look at each of these options in detail. Slide 15 Cooling Equipment Controls Reject Condenser Heat Ground Domestic Hot Water Heating Plant Upon clicking the Controls button on the Cooling Equipment tab, you will be presented with this window which allows for each of these options to be configured. Free Cooling allows for different water side economizer techniques to be applied to individual pieces of equipment. For more information on each of the different free cooling methods offered, please use the F1 Key to bring up the Help documentation which includes a write up on each Free Cooling scheme. The Evaporator and Condenser Water Leaving Reset Options fields allow users to reset the temperature leaving the Evaporator or Condenser based upon the Outside Air Temperature or the temperature of the water returning from the building. Condenser Water Reset is only available with heat recovery applications. Changing the condenser water temperature entering the typical chiller is accomplished on the Options tab of your Cooling Equipment library member. To use the Condenser Water Reset feature, a chiller must be selected and the Reject Condenser Heat field must be set to Ground, Domestic Hot Water or Heating Plant. For both Evaporator and Condenser Water Reset, a Reset curve must be selected if basing the reset upon outside air temperature and if basing the reset upon return water temperature, the Max Reset TD or Temperature Difference field will be used. Please note, this is not the same as 2015 Trane a business of Ingersoll Rand 9

Condenser Water ENTERING Reset which is not a specific feature but can be accomplished to a certain degree using the Hourly Ambient Wet Bulb Offset field associated with the Heat Reject equipment. Load Shedding Economizer is a heat recovery concept. This strategy uses an airside economizer to control the cooling load on a heat recovery chiller so that the heat recovered from the condenser matches the heating demand. If this option is enabled, the airside economizer in Create Systems should not be used. Additionally, this option can not be used for all equipment. Please refer to the F1 Help and the User s Manual for more detail. The Equipment Schedule functions in a similar fashion as any other schedule in the program. This field does not set a limit on how much the equipment will load but rather what availability for the piece of equipment is when required to run. For instance, if the load on a 1000 ton chiller is 100 tons for a given hour but the schedule during that hour is set to 50%, then the chiller will only produce 50 tons. Typically, we recommend not changing this from Available (100%) unless you have a scenario where the equipment should not run or if you are modeling thermal storage which requires the schedule to be changed to one that allows for thermal storage. The default Available (100%) schedule does not allow for thermal storage. The Demand Limiting Priority field simply allows the user to set the priority in which equipment will be disabled should the Maximum kw Demand of the building be exceeded as set in the Energy Management section of Create Plants. For instance, a priority of one means it is the first piece of equipment limited. Up to 10 pieces may be demand limited. The Design Chilled and Condenser Water Delta T fields override the corresponding fields as set in the Cooling Equipment Library and are only available for air cooled and water cooled chiller equipment. These values are used to determine chilled and condenser water flow rates at design conditions as well as Part Load chilled water entering and leaving conditions 2015 Trane a business of Ingersoll Rand 10

and the Design condenser water leaving conditions. Next, we are going to look at the controls options for an entire plant. Slide 16 Plant Controls Applies to the entire plant Not equipment specific Set-up plant-assigned equipment Heat Rejection Equipment Cogeneration Distribution Pumps Thermal Storage As mentioned, the Plant Controls apply to the entire plant and are not specific to any one piece of equipment within that plant. The user is able to define the sizing method as well as set the parameters for any equipment serving the entire plant such as a shared Cooling Tower, a building Distribution Pump as used in a Parallel Decoupled or Primary Secondary and Variable Primary pumping schemes for example or a Geothermal Well Field. Let s look at the options on this screen in more detail. Slide 17 **Plant Controls Screencast** There are two ways to access the Plant Controls. The first is via the Configuration tab. Start by selecting the plant you would like to modify the Plant Controls options for and click the Plant Control button along the right side of the window. You can also access them through the Cooling Equipment Controls window by clicking the Cooling Plant and Geothermal Controls button. The Sizing Method field allows for the user to select the methodology used to size the Cooling or Heating Plant. The methods to choose from for Cooling Plant sizing are Block Based on Design Simulation, 2015 Trane a business of Ingersoll Rand 11

Block Based on System Simulation and Peak Based on Design Simulation. Block Based on Design Simulation sets the plant capacity equal to the sum of the block capacities of the airside cooling coils assigned to the given plant as calculated during the Design Phase. Block Based on System Simulation sets the plant capacity at the sum of the highest block load for the assigned airside cooling coils as calculated during the System Simulation. Peak Based on Design Simulation sets the plant capacity to the sum of the assigned airside cooling coil capacities The methodologies to size a Heating Plant are either Block Plant or Peak Plant. Both are sized during the Design Phase. Block Plant sets the Heating Plant capacity at the sum of the block airside heating coil capacities. Peak Plant sets the plant capacity equal to the peak capacities of the airside heating coils. The Heat Rejection fields set the parameters for Heat Rejection equipment assigned directly to the Plant. For example, if you have a cooling tower that is shared by three water cooled chillers, you would delete the cooling towers that are assigned to each chiller and drag a cooling tower directly onto the plant. This cooling tower would then be shared by all three chillers and you would set the Type and Hourly Ambient Wet Bulb Offset on this Plant Controls window. This same principle applies to the Cogeneration, Secondary Distribution Pump and Thermal Storage options. All of these fields pertain to the options assigned to the plant as a whole and are not specific to any pieces of equipment within the Plant. Please note, Cogeneration can only be set up when accessing Plant Controls for a Heating Plant The Geothermal Loop field offers similar 2015 Trane a business of Ingersoll Rand 12

functionality and you can find much more indepth detail on it in our video on Ground Source Heat Pump Systems. Please note that there can only be one Geothermal Loop per Alternative. Even if there are multiple Plants within a given Alternative, only one of those plants may have a valid Geothermal Loop setup. I d now like to highlight a few instances where TRACE modeling and some Real World scenarios conflict. Slide 18 Sequencing TRACE versus Real World Heat Recovery Chiller operation based upon Heating Demand Sequentially loading chillers in parallel configuration Enable/disable based upon outside air conditions, flow rates, etc. While TRACE does have quite a bit of flexibility, there are a few real world sequences that the program is not able to simulate. For instance, when modeling a heat recovery chiller, the chiller is only able to operate based upon cooling demand. Recovered heat is a byproduct of this operation. The chiller will not become enabled nor operate to maintain heat requirements if there is not enough cooling load to supply the required heating BTU s. Additionally, if you are looking to sequentially load chillers in a parallel configuration, TRACE is unable to model this scenario. The parallel or parallel decoupled configurations only operate as previously discussed with the chillers operating in tandem and ramping up and down to share the load. The program is not able to maintain the full load chiller operation on the primary chiller and gradually load the second chiller to meet demand. However, in real life it is very difficult to preferentially load a chiller piped in parallel with other chillers as previously mentioned, so TRACE is likely to be very close to reality in this case. As such, the only way to sequentially load chillers is to use the Series. Also, enabling and disabling chillers based upon different variables such as outside air conditions other than temperature, flow rate, etc. is not a possibility. As mentioned when we 2015 Trane a business of Ingersoll Rand 13

discussed Switchover Sequencing, the only variables available are outside air temperature, load and time of day. You may be familiar with the Reset and Lockout table functionality within schedules however, this feature is not available for Equipment Schedules. In a similar vein, chillers can only be disabled in the order in which they were enabled. For example, if the chillers were enabled in the order of A, then B, then C, C will be the first one to be disabled, then B and then A. Slide 19 Additional resources TRACE 700 User s Manual TRACE online (F1) help C.D.S. Help elearning Library Engineer s Newsletters (trane.com/en) Series Chillers and VPF Chiller Plants (Vol. 38-3) Free Cooling using Water Economizers (Vol. 37-3) That covers Chiller Sequencing and Controls. Hopefully, we ve answered any questions you have on these features but if you would like more detail on this or any other elements of TRACE 700, here are some additional resources available to you. Slide 20 contact us phone I 608.787.3926 fax I 608.787.3005 email I cdshelp@trane.com Web I www.tranecds.com As always, please feel free to contact the C.D.S. Support Center by phone or email with any comments, questions or modeling issues you may be experiencing. Thank you for your time and we wish you continued success. 2015 Trane a business of Ingersoll Rand 14