ATLANTA S RESILIENT GREEN INFRASTRUCTURE WITH PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Similar documents
Intercept, Detain and Release. Custer Avenue CSO Relief GRESHAM, SMITH AND PARTNERS

Building Green: An Update on Atlanta's Green Infrastructure Approach

Portland, Oregon, (population 551,000) endeavors to maintain

Pavements Built for the Future

Building Green: An Update on Atlanta's Green Infrastructure Approach

Ted Turner Drive Resilience Corridor Challenge

Appendix G. Detailed Design

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

George Bialecki, Jr. takes green building seriously. Autumn Trails Pioneers

Preparing a Stormwater Control Plan for a Small Land Development Project

Flooding Hearing: Long and Short Term Strategies

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers

Permeable Interlocking Pavers

Why pavers?case. Study. Community Center Parking Lot City of benicia. Community Center Parking Lot City of benicia

Appendix B DETAILED DESIGN

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

Stormwater Control Plan: Small (Tier 1) Land Development Project

ENVIRONMENTAL PAVING SOLUTIONS

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

BY GEOFF DEIGAN 2 0 I l l i n o i s P a r k s a n d R e c r e a t i o n w w w. I L i p r a. o r g

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

PERMEABLE PAVEMENTS. Have been around for a long time, but are poised for a resurgence

Green Infrastructure Overview

Small Town Sustainable Stormwater Solutions

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

GSI Handbook Details Pervious Pavement

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

2016 WORKSHOP LVR Field Trip

Brigitte A. Berger, Director of Engineering

6.1 Bioretention Areas

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Appendix D - Technical Design Criteria for BMPs

Case Study. New San Francisco 49ers Stadium Scores Big with BioMod System. Project Overview. The BioMod Method. Design & Construction Team

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

4. CONCEPT PLAN DEVELOPMENT

Sewer & Storm Drain Systems

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Can Urban Redevelopment Restore Aquatic Resources

Subsurface Infiltration Bed

The Benefits and Challenges Associated with Green Infrastructure Practices

water that enters our streams during storms. Any water the rain garden can t accept will continue into the storm sewer system.

AWR Engineering, LLC

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

INFILTRATION TRENCH - LEAKY PIPE

The City of Boynton Beach

Separate Storm Sewer System Study Questions/Answers

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

Sustainable Stormwater Retrofit Best Practices

Stormwater Runoff and the District of Columbia RiverSmart Homes Defined:

Worksheet #14 Water Runoff Management

City of Vallejo. Stormwater Control C.3 Compliance Information. Addendum to C.3 Guidebook by Contra Costa Clean Water Program

University Park Subdivision Street Assessment Report

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA

Third Ave CSO Integrated Green Infrastructure

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Green Infrastructure and Low-Impact Development Technologies

Stormwater & South Carolina. A Case for Low Impact Development

Green Infrastructure on Brownfields

Charles City Permeable Streetscape Phase I Landscape Performance Benefits Assessment

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA. February 21, 2018

From and

Green Infrastructure & Low Impact Development

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

City of Manassas Park Proposed Stormwater Management Funding

Sustainable Storm Water Management

3. Are there any projects exempt from the definition of Regulated Projects?

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Tale of Two Cities: Exploring How Two Communities are Using Green Infrastructure to Reduce Flood Risk

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

CITY OF VALPARAISO STORMWATER MASTER PLAN

Selecting Appropriate Stormwater Control Measures for Your Development Project

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Stormwater Prevention and Control

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Outflow to Saw Mill Run

What is YOUR biggest challenge in stormwater control measure accounting/planning?

North Street Reconstruction & Integrated Stormwater Management System

Camden SMART Initiative Stormwater Management and Resource Training

Rebecca Dohn October 13, 2017

Stormwater Retrofits Made Practical City of Eugene Oregon. Doug Singer, P.E., CSM Principal Civil Engineer City of Eugene Public Works

Key Environmental Issues in U.S. EPA Region 2 Panel 4 Water Issues

Ames City Hall Campus: Stormwater Improvements

City of Petersburg, Virginia Stormwater Utility Program Residential Fee Credit Manual (Revised March 2014)

WEFTEC.06. ** City of Caldwell, Idaho

POLE BRIDGE ROAD NEAR FIVE LOT FARM

Rainwater Harvesting: Where does the Rainfall Go?

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Old Mill Community Association Bioretention Facility

Kittson Parkway / Watershed Park Parking Lot

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

A: Downtown Diversion Pipe

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Retrofitting Commercial Shopping Centers

Transcription:

ATLANTA S RESILIENT GREEN INFRASTRUCTURE WITH PERMEABLE INTERLOCKING CONCRETE PAVEMENT Permeable interlocking concrete pavers are a very effective solution for stormwater management, especially in highly urban areas with combined sewers that need capacity relief. Todd Hill, PE, Interim Deputy Commissioner, City of Atlanta Department of Watershed Management

In July 2012, a series of storms caused combined sanitary and storm sewer overflows in southeast Atlanta, making a flooded mess of streets and homes. The flooding occurred at the nexus of impervious pavement drained mostly by sewers overflowing with runoff and sewage from downtown Atlanta. The downstream recipients were the Peoplestown, Mechanicsville and Summerhill neighborhoods. They received sanitary sewage exacerbated by stormwater runoff from a 1,500-acre (607 ha) highly urbanized, mostly impervious drainage area. These particular storms were a gamechanger for Atlanta. After visiting the flooded neighborhoods, Mayor Kasim Reed committed to finding a long-term solution. Thus began the Southeast Atlanta Green Infrastructure Initiative that created resilient infrastructure by converting the street system to carry and infiltrate drainage rather than generate runoff and send it further downstream. This initiative led to the largest permeable interlocking concrete pavement (PICP) road project in North America with more than four miles (6.4 km). 2 Atlanta Green Infrastructure Initiative: The Largest PICP project in America 4 miles of PICP streets = 1.5 million concrete pavers Figure 1. Four miles of PICP streets in southeast Atlanta neighborhoods: 1 = Peoplestown; 2 = Summerhill; 3 = Mechanicsville. First Responders With a mandate from the Mayor s Office to solve flooding problems, the Department of Watershed Management rose to the challenge. We went out into the field with our contractors to conduct assessments and returned with conceptual sketches to implement these projects quickly, said Todd Hill, Interim Deputy Commissioner, Office of Watershed Protection from the Department of Watershed Management. We then developed a phased approach. The bottom line, comprehensive flood abatement solution meant managing about 24 million gallons (106 million liters) of runoff choking combined sewers. Addressed in phases, the first response was a 30-day program to clean all catch basin inlets, raising curbs, installing bioswales and rain gardens on city property. These efforts resulted in 350,000 gallons (1.3 million liters) of sewer capacity relief. Not a lot, but a start, Mr. Hill said. 3 Permeable Pavers Gateway Intersections Phase two involved constructing a 5.8 million gallon (22 million liter) underground storage vault to hold storm and sanitary sewer outflow. The massive vault saw installation underneath a parking lot at Turner Field during the four months offseason for the Atlanta Braves baseball team. This phase included converting several flood-prone streets to PICP. These are shown in Figure 1. In March 2015, construction began on the PICP street replacements that took almost a year and a half to complete. With 2 to 4 ft (0.6 to 1.2 m) thick, open-graded aggregate subbase reservoirs, the streets stored just over four million gallons (15.1 million liters). An unexpected benefit from the PICP was infiltrating about a fourth of this volume into underlying clay soils. This volume disappeared thanks to working with Mother Nature. 1 2

At this writing, phase three is currently underway. It mitigates two million gallons (7.5 million liters) through sewer capacity relief ponds at a community park in Peoplestown. Most of the homes that once stood on this block have been removed. Resilient Street Design Yields an Economical Return At the outset of planning their roadway renovations, Mr. Hill and his team asked, What will get us the biggest bang for our buck? Considering PICP they agreed, If we re going to do a paver project, we re going big, Mr. Hill said. And that s just what they did. Looking back, the pavers with thick aggregate storage reservoirs were less expensive than the underground water storage vaults. homes, so we had to make a decision to remove that portion, Mr. Hill said. According to Mr. Hill, their desire was to install as much PICP as possible and not deplete the budget on extra labor costs for removing century-old urban archeology. This pragmatic approach brought the project to completion on time and under budget. But there were still other challenges to overcome during construction. Unforeseen Infrastructure Renovation With some street sections nearly 100 years old, the first surprise encountered by construction crews was a layer of old concrete below the asphalt roads that required additional demolition time. Once the old pavements and bases were removed, a new set of challenges emerged. We had utilities showing up that shouldn t have been there, and some at depths that weren t shown on any plans, Mr. Hill said (see Figure 2). Brick manholes were especially difficult to work around and many were replaced (see Figure 3). Water mains and old pipes ruptured during excavation and required repair. Of the $1.1 million originally earmarked for utility replacement and repairs, unforeseen infrastructure brought the total closer to $3 million by project completion. With a budget of $15.8 million that initially included $1.1 million in allowances for restoring utility lines, the Department of Watershed Management began excavation and installation of PICP on the first of many streets upstream from the flood-prone areas. Volume reduction and sewer capacity relief goals were met with PICPs thanks to thick aggregate reservoirs beneath them. We selected residential streets that contributed to the flooding of our combined sewer system, said Mr. Hill. Collectively, the four miles (6.4 km) of permeable paver roads provided about four million gallons (15.1 million liters) of capacity relief. The original plan had six miles (9.6 km) of roadways slated to receive PICP. Once crews started peeling back the old streets, they unearthed some unforeseen complications. On some of the larger stretches, crews uncovered old streetcar lines alongside utility lines encased in two feet of concrete. The timeline to even remove a few feet at a time was going to be so outrageous that it would blow our schedule, blow the budget, and make it impossible for residents to access their Figure 2. Excavation included removal of abandoned utility lines. Figure 3. Reconstructing a brick manhole. 3

While achieving relief to flooded sewers and neighborhoods was the main objective, the decision to use PICP also contributed to increased property values for some communities, and led to new development investments. Figure 4. The screeded bedding layer ready to receive the concrete pavers. Another construction concern was the close proximity of older homes to some streets. Crews excavated two to four feet (0.6 to 1.2 m) for the aggregate subbase layer and installed impermeable liners against the sidewalks to prevent lateral migration of stormwater toward these homes and their basements. Figure 7 illustrates an example of installed impermeable liners. Figure 5. Machine-installed concrete pavers place them in their final laying pattern. The pavers were placed on a screeded, 2 in. (50 mm) thick bedding layer of ASTM No. 89 aggregate. Figure 4 illustrates this bedding layer which rests on a 4 in. (100 mm) thick layer of No. 57 aggregate. This base chokes or prevents the bedding layer from entering the thick ASTM No. 2 aggregate subbase reservoir. Due to their layout and age, street widths and curbs varied as much as a foot (0.3 m) from one block to the next, adding a substantial amount of cutting time for the concrete edge pavers. Despite this challenge, machine-installed concrete pavers manufactured and placed in their final laying pattern helped maintain an average rate of about 5,000 sf (464 m 2 ) per day with no time required for concrete to cure. Figure 5 illustrates a machine placing the concrete pavers on a screeded bedding layer. The pavers were compacted, joints filled with ASTM No. 89 aggregate, swept clean and compacted again. Managing road closures and rerouting traffic, including public transit buses, also posed a significant challenge. During the construction phase, there was a bit of inconvenience, to put it mildly, said Cameo Garrett, External Communications Manager for the Department of Watershed Management. It was very important that, as things changed during construction, we continuously provided information and updates to the affected communities. The original construction time estimates anticipated that residents would lose access to their driveways for only a few days. But with unforeseen utility repairs needed, the average road closures stretched to 1½ weeks. Coordinated community outreach and engagement was a necessity for a project of this magnitude, said Cory Rayburn, Watershed Manager II for the Department of Watershed Management. The contractor, along with the City s Communications staff, went out of their way to address the needs of the residents who were directly affected. 4

Capacity Relief Permeable interlocking concrete pavers are a very effective solution for stormwater management, especially in highly urban areas with combined sewers that require capacity relief, Mr. Hill said. We have been surprised by and pleased with the amount of infiltration into the ground. We were estimating much less. Many of the sloped streets used check dams within their subbases to encourage infiltration. Figures 6 and 7 illustrate how the dams detain water for flow control and infiltration into the soil subgrade. With the check dams and deep aggregate subbases, the streets store runoff from a four-hour, 25-year storm yielding 3.68 in. (3 mm) of rainfall. While achieving relief to flooded sewers and neighborhoods was the main objective accomplished by this project, the decision to use PICP also contributed to increased property values for some communities, and led to new development investments. Based on feedback we have received from members of the community, the houses on the PICP streets are more sought after than on other streets in these neighborhoods, Mr. Hill said. The residents who live in those areas really love the pavers and think they re very beautiful, Ms. Garrett said. Figure 8 demonstrates increased neighborhood character from the PICP street. Figure 6. Sloped soil subgrades meant use of regularly spaced check dams made with an impermeable liner with drain hole penetrations. Figure 7. A check dam in place ready to receive supporting aggregate. Figure 8. By improving neighborhood character and eliminating flooding, property values rose. 5

Our council member for this district is very pleased with the project, and other council members and residents have asked if they can have pavers in their districts for their stormwater management, Mr. Hill said. While the project drew attention of some jealous neighbors, it has expanded nationally as well as in the region. Just to the north of Atlanta, the City of Roswell installed its first permeable paver roadway last year after staff visited the Atlanta project during construction. An Ounce of Prevention Yields The Atlanta Department of Watershed Management focuses efforts on educating contractors who will be working on or around their permeable pavement to prevent damage before it occurs. Nonetheless, some accidents happen from uninformed users who might assume that spills head to catch basins, then forget about the pollution. In one instance, a concrete mixing bucket was washed into the gutter and ran down one of the paver roadways. The runoff clogged the paver joints as well as the aggregate subbase, resulting in a $6,000 repair bill. In other instances, construction sites adjacent to the PICP roads needed to carefully contain sediment so it didn t run into the street. It s going to take education to ensure that anyone digging into these paver roadways has either gone through training or read the maintenance manual, Mr. Rayburn said. The maintenance manual provided by the design-build contractor was revised by the Department of Watershed Management, and the first training course was with the Department of Public Works. As of now, the protocol is to call our construction inspectors, the ones who were onsite during the paver installations, to monitor any tie-in construction involving water or sewer lines, Mr. Rayburn said. The city has a three-year contract with the project s design-build contractor to provide maintenance for the PICP. Once that period is up, it will take a coordinated effort between the Public Works Department and the Watershed Department to ensure these paver roads are protected and that preventive maintenance is engrained in our daily processes, Mr. Rayburn said. Figures 9 and 10. After completion in 2015, a 3-year maintenance contract ensures care for high use areas such as intersections and utility access. The City takes over maintenance at the end of this contract. 6

There are numerous case studies that highlight the benefits of using green infrastructure, not just to improve water quality or provide capacity relief, but to also deliver social and economic development benefits. Cory Rayburn, Watershed Manager II, Atlanta Department of Watershed Management with our Public Works Department to increase understanding of these types of practices and develop standard details to simplify design, Mr. Rayburn said. There are numerous case studies that highlight the benefits of using green infrastructure, not just to improve water quality or provide capacity relief, but to also deliver social and economic development benefits. In Atlanta s case, the green infrastructure initiative had a direct impact on new investment. The Historic 4th Ward watershed project near Ponce City Market helped spur a huge amount of economic growth while addressing flooding issues within a combined sewer area, Mr. Rayburn said. Whereas traditional gray infrastructure, such as tunnels and vaults, has been used historically to address flooding and sewer capacity issues, we re now looking at a combination of gray and green infrastructure to solve these problems while providing something the community can be proud of. The Triple Bottom Line from Resilient Green Infrastructure For any municipality contemplating PICP streets, Mr. Hill advises, Spend a lot of time planning the process, and assess the condition of all existing utilities, so that rehabilitation can be included in the construction contract. Particularly with older urban streets, there may be layers of unknown mysteries beneath the surface. Have a full-blown SUE [Subsurface Utility Exploration] done for every road to identify some of the harder-to-locate utilities before starting work, Mr. Rayburn said. The SUE helps the design-builder come up with a more comprehensive design prior to excavation or construction, saving time and minimizing surprises. We are very grateful that our administration was so farsighted with regard to sustainability and provided the support to allow us to install this project that contributes to making Atlanta a leader in sustainability. They provided the necessary support to make this project a reality, Mr. Hill said. We worked closely The Size of the Challenge 4 million gallons of PICP storage capacity = the water in about 6 Olympic size pools 7

Interlocking Concrete Pavement Institute 14801 Murdock Street Suite 230 Chantilly, VA 20151 703-657-6900 E-mail: icpi@icpi.org icpi.org CANADA P.O. Box 1150 Uxbridge, ON L9P 1N4 Canada ICPI Concrete Paver Manufacturer Members Acker-Stone Industries Air Vol Block, Inc. Alamo Concrete Pavers Angelus Block Company, Inc. Armtec LP Artistic Paver Mfg. Barkman Concrete, Ltd. Basalite Concrete Products Best Way Stone, Ltd. Bolduc Concrete Products Borgert Products, Inc. Brown s Concrete Products, Ltd. Building Products Corporation Calstone Company Cambridge Pavers, Inc. County Materials Corporation E.P. Henry Corporation Eagle Bay Hardscape Products Fendt Builders Supply, Inc. Gagne and Son Genest Hardscapes USA Interlock Paving Systems, Inc. Lowcountry Paver Company McNear Brick & Block Midwest Block & Brick Mutual Materials Company NewLine Hardscapes Nicolock Paving Stones Oaks Landscape Products Oberfield s LLC Oldcastle Architectural, Inc. Olsen Pavingstone, Inc. ORCO Block & Hardscape Pavers by Ideal Pavestone Company R.I. Lampus Company RCP Block & Brick, Inc. RINOX - Canada Rochester Concrete Products Santerra Stonecraft Shaw Brick Southwest Block, Inc. Stepstone, Inc. Techo-Bloc Willow Creek Concrete Products, Inc. Copyright ICPI July 2017. All rights reserved.