BUILDING CODE ACCESS CONSULTING ESSENTIAL SERVICES

Similar documents
Baseline Data Required for AS

Developments in Australian Standard AS (Emergency Lighting)

MAINTENANCE OF ESSENTIAL SAFETY MEASURES EXPLAINED (Building Regulations 2006)

SCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY

Client Advisory Note June 2015:

LICENCE. for. Click on the red box above to activate the Licence Agreement scroll bar.

Essential Services and Inspection Guide Checklist

Annual Essential Safety Measures Report. 29 Bay Sample Street Port Melbourne VIC 3207

FIRE AND SECURITY CONSULTING SERVICES

COMPLYING DEVELOPMENT CERTIFICATE APPLICATION Made under the Environmental Planning and Assessment Act 1979 Sections 85, 85A

South Australian Regulatory Requirements

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

Inspection Records Schedule- Fire Extinguisher

Engineering Standard MCST FIRE PROTECTION SYSTEMS AND EQUIPMENT MAINTENANCE IN THE MURL

Australian Standard. Automatic fire detection and alarm systems System design, installation, and commissioning AS

What you need to know about. Maintaining essential safety measures in your building

Australian Standard. The use of mechanical ventilation and air conditioning in buildings. Part 1: Fire and smoke control AS 1668.

AS Fire detection, warning, control and intercom systems System design, installation and commissioning. Presented by: DAVID ISAAC

Fire Protection, Inspection and Testing Qualifications Forums. Jeremy Rose (Artibus Innovation) Chris Wyborn (FPA Australia)

FIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre

Certification Assessment Instrument and Guidelines

AS 1851:2012 The Use and Adoption of the New Standard The impacts and challenges for the fire protection and property management industries.

American Fire Sprinkler Association. An Introduction to the IBC and IFC

AS/NZS :2016. Refrigerating systems and heat pumps Safety and environmental requirements AS/NZS :2016. Part 3: Installation site

AIRPORT OFFICE BUILDING. Smoke Control System. Testing Procedures Manual. September 10, 2016

Management Standard: Fire Safety

COMPLYING DEVELOPMENT CERTIFICATE APPLICATION FORM

highline SVCS-1 INSTALLATION & USER MANUAL SMOKE VENT CONTROL SYSTEM * enclosure design may vary software version: SVCS1r6 SVCS1r7 SVCS1r10

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Compliance Schedule Handbook Prepared by the Ministry of Business, Innovation and Employment

FIRE SAFETY MANAGEMENT PLAN

AS AS Australian Standard. Installation of fire hose reels. This is a free 6 page sample. Access the full version online.

Dear Customer. Section Old F8 January 2017 Amendment 4. Replace with new title page and document history pages 1 2B

Fire Collars for Floor Wastes Understanding BCA Compliance Options

Use this guide to assist you when completing the Evacuation scheme application form.

Fire Safety & Evacuation Procedures

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Explosion Protection Engineering Principles

AS 2419 OVERVIEW OF PROPOSED CHANGES. Gary Nenadovich Director G N Consulting

Retain. Retain. Retain. Board Advisory. Board Advisory. Retain. Disposition. (Statute, Rule, FBC, Industry)

Australian/New Zealand Standard

Design and Construction Standards

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Australian/New Zealand Standard

NZS 4517:2010. New Zealand Standard. Fire sprinkler systems for houses. Superseding NZS 4517:2002 NZS 4517:2010

Alarm Signalling Equipment: Connection Requirements (Victoria) TAN 06. Technical Advisory Note. Version 1 October 2018

Australian Standard. Fire detection, warning, control and intercom systems System design, installation and commissioning. Part 1: Fire AS 1670.

Fire Certificate. An issue of Maintenance from the Technical and Legal perspective

Substation Signage. Document Number: 1-11-FR-12

Information Bulletin

Workplace Guidelines

DSCR Communications Room Standards

WESTIN HOTEL. Smoke Control System. Testing Procedures Manual. October 10, Copyright Impact Engineering, Inc All Rights Reserved

Fire Risk Assessment

Scope of Section 2. AS vs. Application Issues. Schedules & Log- Contents. Books

Health, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service

Owner Profile. Property Profile. Building Use Classification Permit Date. Building Use Classification Permit Date. Year Built Year Refurb Permit No.

Intumescent Fire Dampers

Part 3 BUILDING CODE MYTHS & INTERPRETATIONS

Fire Systems Maintenance and Fire Detection Systems. Dwayne Smith Fire Protection Engineer

FIRE IMPAIRMENT NOTICE

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

2004 AUSTRALIAN STANDARDS UPDATE

Emergency. Management. Emergency. Readiness Checklist

SURVEY ON FIRE SERVICE INSTALLATIONS FOR OFFICE BUILDINGS IN HONG KONG

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

Australian Fire Association

Australian Standard. Water mist fire protection systems System design, installation and commissioning AS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Australian/New Zealand Standard

Local Rules: Fire Safety

FIRE SAFETY POLICY Revised March 2013

Blue Whirl Building. General Fire Safety Checklist. conducted for. Location 1029 McLean Ave, Dallas, TX 75211, USA. Visit 20 Sep :08 PM

AS/NZS :2014

Electrical Safety Policy and Management System

Design criteria for public cyclone shelters

NZQA registered unit standard version 4 Page 1 of 5

Brighton Area Fire Authority

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

Loss Prevention Standards

Application Form. Qualified Accreditation

7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS SELF INSPECTION CHECKLIST

BP MAINTENANCE WORK INSTRUCTIONS FREQUENTLY ASKED QUESTIONS

EC 5.10 FIRE PREVENTION MANAGEMENT

CURTIN UNIVERSITY PROJECT DELIVERY GUIDELINES

Delhi Metro System. Emergency and Fire Safety Measures in. - by Sanjeev Kumar & Kailash Chandra Joshi. Fire Protection & Safety

Fire Precautions During Construction of Large Buildings. Technical Design Guide issued by Forest and Wood Products Australia

Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD

NZS 4510:2008 Incorporating Amendment No. 1. New Zealand Standard. Fire hydrant systems for buildings. Superseding NZS 4510:1998 NZS 4510:2008

DENVER INTERNATIONAL AIRPORT MAIN AND NORTH TERMINALS 2016

Unified Fire Authority - Fire Prevention Bureau

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety

Areas of the building to which access was not available. Details of any onsite management (if known)

AS/NZS :2016. Refrigerating systems and heat pumps Safety and environmental requirements AS/NZS :2016

FIRE RISK ASSESSMENT Retirement Housing (Independent Living) (v3.november 2016)

Australian Standard. Security screen doors and security window grilles AS AS 5039

Transcription:

Essential Safety Measures - Fire & Smoke Control of Mechanical Services Antony Rickards Building Compliance BUILDING CODE ACCESS CONSULTING ESSENTIAL SERVICES

Essential Safety Measures What we will cover. Victorian Building Regulations Maintenance Requirements Responsibilities Adoption of AS1851-2012 Smoke Control Features of Mechanical Systems Building Code of Australia Part E Australian Standards AS1668.1 Comparison & Changes between AS1851-2005 & AS1851-2012 System Interface Testing Functional Testing Performance Testing Industry observations

Essential Safety Measures What are Essential Safety Measures? They are the fire & life safety systems required in buildings and places of public entertainment being a Class 1b, 2, 3, 4, 5, 6, 7, 8 or 9 buildings. This includes residential, commercial, industrial & public buildings to ensure the safety of occupants in the event of a fire or an emergency and to prevent loss of life and injury. Examples: fire compartmentation, fire sprinklers, fire alarm & detection systems, emergency lights, exit signs, paths of travel to exits, portable fire extinguishers, fire hydrants, fire hose reels, fire doors, smoke doors, heat & smoke control systems, etc.

Essential Safety Measures When are Essential Safety Measures required? Essential Safety Measures are required to be installed in line with the National Construction Code (Building Code of Australia Vol 1) and relevant Australian Standards.

VIC State legislation Are Essential Safety Measures required to be maintained? Yes Part 12 of the Victorian Building Regulations Owners are responsible for maintenance certification of the whole building Maintenance schedule nominated on the Occupancy Permit (This may be any version of AS1851) Issue Annual Essential Safety Measures Report (AESMR) Documentation to be available for Council within 24hrs

VIC State legislation Are Essential Safety Measures required to be maintained? Yes Part 12 of the Victorian Building Regulations Reg. 1205A Compliance with AS 1851 2012 taken to be compliance with earlier standards This is a new Regulation allowing for the adoption of AS1851-2012 We would recommend to the Owner they get an updated schedule prepared and issued if they are adopting AS1851-2012. Provides an updated accurate schedule with correct frequencies Can be referred to in contracts Referenced on the AESMR Meeting your Insurance obligations

Smoke Control Systems Smoke Control Features of Mechanical Systems National Construction Code 2016 Building Code of Australia Volume 1 Class 2 to 9 buildings

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part A0 APPLICATION Must meet the Performance Requirements Performance Solution Or Deemed-to-satisfy

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 PERFORMANCE REQUIREMENTS Fie Engineering Report

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 Deemed-to-Satisfy Provisions Prescriptive requirements

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 Table E2.2a GENERAL PROVISIONS Fire-Isolated Stairs & Air Pressurisation

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 Table E2.2a GENERAL PROVISIONS Buildings more than 25m effective height Buildings Less than 25m effective height

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 Table E2.2a GENERAL PROVISIONS Air Pressurisation Smoke detection & alarm Sprinkler Systems Zone Smoke Control Smoke Exhaust system

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 Table E2.2b SPECIFIC PROVISIONS Class 6 Retail >2000sqm Class 6 Retail >3500sqm Enclosed Malls Class 9b Assembly Buildings Nightclubs Theatres Halls Cinemas

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 SPECIFICATIONS Spec E2.2a Smoke Detection and Alarm Systems

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 SPECIFICATIONS Spec E2.2b Smoke Exhaust Systems Smoke Exhaust Capacity Smoke Exhaust Fans

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 SPECIFICATIONS Spec E2.2b Smoke Exhaust Systems Smoke Exhaust Rates

Smoke Control Systems Smoke Control Features of Mechanical Systems Building Code of Australia Part E2 SPECIFICATIONS Spec E2.2b Smoke Exhaust Systems Smoke Exhaust Fan locations Make-up air System control / activation Reference AS1668.1

Smoke Control Systems Smoke Control Features of Mechanical Systems AS/NZS1668.1 2015 The use of ventilation and air conditioning in buildings Part 1: Fire and smoke control in buildings

Smoke Control Systems Smoke Control Features of Mechanical Systems AS/NZS1668.1 2015 The use of ventilation and air conditioning in buildings Part 1: Fire and smoke control in buildings

Smoke Control Systems Smoke Control Features of Mechanical Systems AS/NZS1668.1 2015 Fire Protection of Openings; Fire Dampers, Sub-Ducts, Fire Resistance Levels (FRL)

Smoke Control Systems Smoke Control Features of Mechanical Systems AS/NZS1668.1 2015 Smoke Exhaust Fans Sprinkler protected building; Shall operate for a period of not less than 2 h with a smoke exhaust air temperature of 200 C. Non-Sprinkler protected building; Shall operate for a period of not less than 30 min with a smoke exhaust air temperature of 300 C.

Smoke Control Systems Smoke Control Features of Mechanical Systems AS/NZS1668.1 2015 Stair Pressurisation Door opening force Air flow velocities Floor Pressure differentials Max Noise levels Measuring air flow rates

Smoke Control Systems Smoke Control Features of Mechanical Systems AS/NZS1668.1 2015 Fire Mode Operation Shutdown Zone Pressurisation Smoke exhaust Supply Air Relief Air Make-up Air Air Dampers; Open/Close

AS1851-2005 Vs AS1851-2012 AS1851-2005 Vs AS1851-2012 Maintenance of fire protection systems and equipment: Prepared by the Standards Committee FP001 Developed as a means of satisfying the OHS and Building Regulations, for the relevant state legislation. AS 1851 Part 1-16 Superseded suite of Standards. AS1851-2005 was published on 5 September 2005 and amalgamated previous editions of AS1851 and is designed to be read as one document. Contains 19 Sections. AS1851-2012 was published on 3 December 2012 and was produced as a simplified and consolidated version of AS1851-2005. Contains 14 Sections. This also allowed for a reduction and consolidation of service regimes one of which was to save water through testing of wet fire systems.

AS1851-2005 Vs AS1851-2012 AS1851-2005 Maintenance activities are required on all Essential Services assets with detailed reporting at asset level It is an integrated approach addressing all measures that require System Interface Testing of related services in one routine Reporting requirements were increased and must be transparent and auditable. Warden training was introduced as an additional item covered by AS1851

AS1851-2005 Vs AS1851-2012 AS1851-2005 Stage 1: System inspection & test routines Stage 2: Maintenance reporting & functionality records Stage 3: Annual inspection, testing, reporting and defect rectification Stage 4: Annual System Interface Test and defect rectification Stage 5: Annual Condition Report and defect rectification

AS1851-2005 Vs AS1851-2012 AS1851-2012 Updated AS1851: A new title for 2012 From: Maintenance of Fire Protection Systems and Equipment To: Routine Servicing of Fire Protection Systems and Equipment

AS1851-2005 Vs AS1851-2012 AS1851-2012 Baseline data... There is now an understanding of the requirement for the standard of performance to which a system has been designed. This is the criteria to which it must perform. Examples of baseline data include; Size, Capacity, Speed, Volume, Type, Make, Age, Length, etc. Where required baseline data is available, the routine service result shall be verified against it. Where required baseline data is unavailable, its unavailability shall be recorded and reported as a non-conformance.

AS1851-2005 Vs AS1851-2012 AS1851-2012 Annual survey: The specification must be auditable and measurable as there is now a more detailed requirement to comply with AS4655 Standard for Essential Services Auditing. This audit must be completed annually by an independent organisation, this cannot be performed by the maintenance provider. Extract from AS1851-2012

AS1851-2005 Vs AS1851-2012 AS1851-2012 Systems Interface Testing (Appendix D)... This is a better definition for the old AS1851-2005 requirements for the system functionality testing and system interface control test. The intent of this new requirement is to ensure there is an 'end to end' test of all of the integrated safety measures to ensure they work concurrently. An informative appendix was added to provide examples of how these tests should be performed and how they should be documented.

System Interface Testing System Interface Testing AS 1851-2012 System Interface Test; Functional Testing Manual Override Controls Ancillary actions; Door release EWIS cascade FFCP correct indication Performance testing; Air Flow Rates Fire Matrix

System Interface Testing System Interface Testing AS 1851-2012 System Interface Test; Functional Testing Manual Override Controls Ancillary actions; Door release EWIS cascade FFCP correct indication Performance testing; Air Flow Rates Manual override controls

System Interface Testing System Interface Testing AS 1851-2012 System Interface Test; Functional Testing Manual Override Controls Ancillary actions; Door release EWIS cascade FFCP correct indication Performance testing; Air Flow Rates Performance solution on delayed EWIS

System Interface Testing System Interface Testing AS 1851-2012 System Interface Test; Functional Testing Manual Override Controls Ancillary actions; Door release EWIS cascade Performance testing; Air Flow Rates Motorised window for make-up air

System Interface Testing System Interface Testing AS 1851-2012 System Interface Test; Functional Testing Manual Override Controls Ancillary actions; Door release EWIS cascade Performance testing; Air Flow Rates Measuring exhaust air flow rates

Industry Observations Industry Observations None or limited baseline data No fire matrix present Some fire matrix only have mechanical operation lacking the ancillary interface testing requirements Functional Testing completed without performance testing Contracts only include functional testing and exclude performance testing

Industry Observations Industry Observations Mechanical contractors with DA-19 knowledge only and no AS1851 knowledge Lack of preparation and inadequate equipment for conducting interface testing; eg. Access, scissor lifts, testing equipment A lack of reporting & recording of results provided from the mechanical contractor during the interface testing. Annual compliance statements or condition reports incorrectly presented and referencing the wrong standards Defecting items based on current design standards rather than the applicable standard at the time of construction

Questions? Questions? Thank-you