St Andrews Park, Uxbridge

Similar documents
Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

Sustainable Urban Drainage Systems. Diederik Rousseau Tineke Hooijmans

paving case study GREAT WESTERN PARK DIDCOT OXFORDSHIRE

An Introduction to Sustainable Drainage

Priors Farm Estate SuDS Retrofitting Project, Cheltenham

Green Roofs and Stormwater Management Virginia Stovin

Forest Way School Coalville, Leicestershire

Green Infrastructure & Low Impact Development

Renfrew Close, London

Howard Street, Salford, Manchester

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

Heron Court Rain Garden, London

Alma Road Rain Gardens, London

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Design Standards. Green Development. Shadow Studies. Standards. July 2010 Updated October 2014

Appendix D - Technical Design Criteria for BMPs

Taking control of SuDS - with permeable paving

Hopwood Motorway Service Area, Worcestershire

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

Queen Caroline Estate, London

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

SUDS: Innovation or a Tried and Tested Practice?

Sustainable Urban Drainage Systems (SuDs)

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

Sustainable Stormwater Retrofit Best Practices

Green Streets and Water

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Junction of Bispham Road and Bristol Avenue, north of Blackpool town centre, Lancashire, next to the former TVR car factory.

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014

J. Paul Guyer, P.E., R.A.

From and

Sewer Flooding Alleviation in the Counters Creek Catchment

Green Street BMP Matrix

Post Construction BMPs

Hollickwood Primary School, London

Delivering SuDS in Leicestershire Early Experiences. Wednesday 23 rd July Introduction

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

rainwise Working with communities to manage rainwater

Water Cycle ARC-452 DESIGN VI: INTEGRATION A5 ENVIRONMENTAL SYSTEM BURGENER SIMON YANGCHUAN SUN

Cambrian North Basin, Llanelli

Kearney Post-Construction Stormwater Program

Melton, School SuDS scheme, Mowbray

Lead Local Flood Authority SuDS Policy Statement

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Why we need the Counters Creek storm relief sewer

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

TarmacDry the asphalt porous paving system. Take control of rainwater management.

SECONDARY BENEFITS OF STORMWATER BMPS. Growing Sustainable Communities, October 2017

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

Sustainable Drainage Systems

Grey to Green Phase 1, Sheffield

Greening streets, retrofit rain gardens, Nottingham

Stebonheath Primary School, Llanelli

4. CONCEPT PLAN DEVELOPMENT

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

When planning stormwater management facilities, the following principles shall be applied where possible.

4. UTILITIES ELEMENT.

Sewer Flooding Alleviation in the Counters Creek Catchment

Appendix E: Illustrative Green Infrastructure Examples

DEALING WITH STORM WATER MANAGEMENT

Leduc Industrial Outline Plan SE W4

The Development of Urban Planning and Landscaping for Sustainable Drainage Systems

Green Infrastructure Recommendations For Parks and Public Spaces

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

Manor Ponds, Sheffield

URWH at various scales

The city perspective. Lessons from Dublin. 14 June 2011 Tom Leahy Executive Manager Dublin City Council

Promoting Sustainable Drainage Systems

How You Can Help With Flood Management

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

Uniclass L534:L217. December permeable. paving CASE STUDY ADOPTION IN OXFORDSHIRE.

APPENDIX G: TOWN ORDINANCE REVIEW

Wessex Water Operations Centre, Claverton Down

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

Fellgate Estate, Jarrow Surface Water Management Plan 2015

West Virginia Stormwater Management Manual: Methods.

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Lesson 2: Stormwater Best Management Practices (BMPs)

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

LANDSCAPE PLANNING ECKLAND LODGE REDDITCH ROAD CRIBBS CAUSEWAY YEW TREE HILL LUBENHAM TENBURY WELLS

Delivering SuDS. in Oxfordshire

USF System Campus Master Plan Updates Goals, Objectives and Policies

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Rainwise. Sustainable Drainage Solutions. Working with communities to manage rainwater. Wuppertal Court, Jarrow

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Promoting SuDS & Green Infrastructure

Urban Water Management and Soils (ESRM 311 & SEFS 507)

LANDMARK HOUSE SUDS NOT DUDS Image Credit: RSH

Clandeboye Primary School Raingarden, Bangor

Blythe Valley Park, Solihull, West Midlands

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Transcription:

St Andrews Park, Uxbridge SuDS used Permeable Paving Swale Detention Basins Benefits Source and Regional Controls Aesthetic for residents 1. Location St Andrews Park, Uxbridge 2. Description The 44 hectare site is located to the west of Central London and is to be redeveloped into a mixed use residential development (1500) with retail, business premises and leisure amenities in the form of an urban park (Dowding Park 40 acre to be opened 17 th March 2018). VSM Estates Limited (VSM) is the strategic developer of the site and is providing the strategic drainage and highway infrastructure across the site. 1

3. Main SuDS components used Source control; various measures including rainwater recycling. This system is incorporated by plot developers through the use of water butts which are the most common means of harvesting rainwater for garden use. Swales; these are vegetated features that store or convey water. For this development, swales are broad and shallow channels covered by grass and/or other suitable vegetation. Located along the spine road through the site to primarily receive surface water run-off from roads and pavements. These swales will be designed to maximise the water quality treatment benefits to surface water run-off by ensuring the conveyance of flows is over vegetated surfaces as long as can be achieved. Filter drains, strips and pervious pavements allow rainwater run-off to infiltrate below finished development surfaces and provide storage if needed. The water is temporarily stored before infiltration into the ground, or discharged to a watercourse or other drainage system. Pervious paving is combined with positive storage facilities (eg storm cell crates) to create additional surface water storage volume where required. These storm cells sit below the pervious pavement construction. Pervious paving will be assessed for use on the secondary roads and it is proposed to utilise a combination of surface infiltration and sub-surface storage. Pervious pavements frequently incorporate perforated carrier pipes within filter trenches running beneath the pavement. With this arrangement, when all design components are used together, the surface water would undergo at least three levels of filtration treatment: through the surfacing, the granular sub-base and through the granular material within the pipe trenches below the sub-base; Retention Basins hold excess water and allow controlled discharge to minimise flood risk; they are surface storage basins that provide flow control through attenuation of stormwater runoff. For this development will normally be dry and only hold open water for short periods during and following rainfall events but they will incorporate ephemeral wetland features to enhance appearance, encourage bio-diversity and provide a level of final treatment before water is discharged to the River Pinn. 4. How it works A combination of source control, site and regional SuDs components are implemented to satisfy the intent of this strategy and the overall agreed discharge rate from the strategic network to the River Pinn is not exceeded. 5. Specific project details Atkins was commissioned by VSM to undertake the design of the strategic surface water and foul water drainage sewer networks. As the strategic developer for the whole site, VSM, will advise individual plot developers of the drainage discharge rate for each plot, who will then be required to demonstrate compliance. Atkins provided technical support to this process and assist in the monitoring of compliance with the overall drainage strategy. Both VSM and their technical advisors have worked closely with the London Borough of Hillingdon (LBH) in this regard. This process was and is on-going until the development is fully built-out. 6. Maintenance & operation Private Management Company to manage in accordance with the Suds Management and Maintenance Plan development for the site. susdrain SuDS Awards

7. Monitoring and evaluation Through the planning process LBH will be able to monitor and control both the foul and surface water sewer proposals for individual plots by requiring the full details of specific drainage arrangements. This strategic document served as the drainage masterplan to inform how LBH should assess these applications. 8. Benefits and achievements An improved environment for residents alongside the main spine road. A reduction in run off rate from free discharge to greenfield run off rate of 12.27 l/s/ha as detailed in the FRA. 9. Lessons learnt Each feature in the chain is as important as the next. However it is important to work from the bottom up to ensure sufficient fall on SuDs elements and how it all interacts. 10. Interaction with local authority London Borough of Hillingdon Vicky Boorman. Establishment of SuDs strategy for the site including sufficient land set aside for swales within the development, creation of a Maintenance and Management Plan and review of detailed design. 11. Project details Construction completed: 2016 /2017 swales project ongoing, park to be opened in March 2018. Cost: NA Extent: NA 12. Project team Clients Designers Contractors Other VSM Estates Ltd http://www.vsmestates.co.uk/ VSM Estates is a joint venture between VINCI PLC and St Modwen Properties PLC established to deliver Project MoDEL, the Ministry of Defence's programme to create a consolidated 21st century MOD Estate at RAF Northolt Atkins Global Design Work ChengFung.Ngo@atkinsglobal.com +44 (0)1214 835000 +44 (0)1214 835252 The Axis, 10 Holliday Street, Birmingham Various depending on parcel See VSM Landscape Architects Vanessa Ross, Technical Director, Allen Pyke Associates; Landscape Architecture, Urban Design, Environmental Planning, The Factory, 2 Acre Road, Kingston upon Thames, Surrey KT2 6EF Tel 020 8549 3434 Mob 07736 920599 3

www.allenpyke.co.uk Laura Smith, Senior Planner, GVA then went to Turley Associates TURLEYASSOCIATES 9 Colmore Row, Birmingham, B3 2BJ D: 0121 234 9105 T: 0121 233 0902 M: 07917 708 120 F: 0121 233 0968 www.turleyassociates.co.uk 13. Project images and illustrations Fig 1: Permeable Paving within Parcels. Waterbutts on each house to the rear. susdrain SuDS Awards

Fig 2: Swales along main spine road. Fig 3: Detention Basin within Dowding Park. 5