Date: Wednesday, July 26, :00 7:00 p.m. Wesbrook Community Centre, Room 201, 3335 Webber Lane

Similar documents
U Boulevard Area, 2018 Update. U Boulevard Area Update. Public Consultation Summary Report

THE CORPORATION OF THE CITY OF NORTH VANCOUVER

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Welcome! UBC Community Conversations. Proposed new community garden space in Chancellor Place and Wesbrook Place. Traffic flow on Iona Drive

Rm 107, Aquatic Ecosystems Research Laboratory (AERL), 2202 Main Mall

Hammond Area Plan Process

NEW WESTMINSTER DESIGN PANEL

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

University Endowment Lands Minutes from the ADVISORY DESIGN PANEL MEETING Tuesday, July 8, 2014

1.0 Call to order by the Chair and approval of the agenda as circulated

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

1 Welcome! UBC Okanagan Master Plan Update - Open House

Urban Design Review Panel Terms of Reference

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

ITEMS REVIEWED AT THIS MEETING

Executive Summary. NY 7 / NY 2 Corridor

ACU DEVELOPMENT PLAN OBJECTION RESPONSE

Development Permit for 723 Dogwood (DP ) THAT the staff report regarding Development Permit (DP ) be received;

PLANNING ADVISORY COMMITTEE

City of Lake Elmo Planning Commission Meeting Minutes of August 10, 2015

implementation r expression in landscape

Public Storage Self-storage Facility (Warehouse)

MINUTES OAK BAY ADVISORY PLANNING COMMISSION TUESDAY, JUNE 6, 2017 AT 5:00 PM COUNCIL CHAMBERS, MUNICIPAL HALL, 2167 OAK BAY AVENUE

Advisory Design Panel Minutes

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Intelligence Community Campus- Bethesda (ICC-B)

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

Planning & Development. Background. Subject Lands

This Review Is Divided Into Two Phases:

Agincourt Mall Planning Framework Review Public Open House #2 Consultation Summary

Minister of the Environment Representative

DESIGN REVIEW PANEL TERMS OF REFERENCE AND PROTOCOL

Arbour Lake Development Application

CORPORATION OF THE TOWNSHIP OF ESQUIMALT DESIGN REVIEW COMMITTEE AGENDA. WEDNESDAY, May 13, :00 P.M. ESQUIMALT COUNCIL CHAMBERS

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

NEW WESTMINSTER DESIGN PANEL Tuesday, June 27, :00p.m. Council Chamber

1120 Haist Street - Pelham Arena Community Co-Design Recommendation Report Haist Street - Pelham Arena Community Co-Design Recommendation Report

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Official Plan Review: Draft Built Form Policies

SITE PLAN (REVISED 8/13/18) l. Development Data Table

Welcome. Walk Around. Talk to Us. Write Down Your Comments

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

38 Queen s University Campus Master Plan Part 1

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

The petition proposes the development of five townhomes on a vacant parcel between Charlotte Latin School and Providence Presbyterian Church.

Steering Committee Meeting

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

Advisory Design Panel Minutes

FACT SHEET: COMMUNITY INPUT S IMPACT ON THE DESIGN FOR THE OBAMA PRESIDENTIAL CENTER

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

DESIGN REVIEW PANEL PROCEDURES AND PROTOCOL

Design Alternatives Workshop. Hilfiker Park Master Plan Workshop #2

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239

Application Guide. Should you have any questions on the Outline Application please contact:

CITY OF MAPLE GROVE PLANNING COMMISSION AGENDA SEPTEMBER 12, :00 P.M.

Working Group Meeting

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

Glenmont III Parking Garage: Approval of Supplemental Public Hearing Staff Report and Staff Recommendations

FRASER LANDS CD-1 GUIDELINES (BLOCKS 68 AND 69) Adopted by City Council April 1989

Smart Growth Development Checklist

SECTION 4(f) DE MINIMIS DOCUMENTATION

MINUTES CITY OF FARMINGTON HILLS PLANNING COMMISSION REGULAR MEETING FARMINGTON HILLS CITY HALL COMMUNITY ROOM October 13, 2016, 7:30 P.M.

DP Hillcrest Drive Lakecrest Townhouse Development Permit Council Presentation. April 28, 2015

City Council Special Meeting AGENDA ITEM NO. C.

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

University Endowment Lands Minutes from the ADVISORY DESIGN PANEL MEETING Tuesday, June 9, 2015

Proposed Kenmount Hill CDS Amendment. Public Hearing October 25 th, 2018

LAKEVIEW LOCAL ADVISORY PANEL. THE COPORATION OF THE CITY OF MISSISSAUGA THURSDAY, NOVEMBER 18, 2010

ARB ACTION MEMO. Mr. Missel called the meeting to order at 1:00 p.m. and established a quorum.

Rezoning. Rezone from C-4 and RA to RF-9C and RF-12C to allow subdivision into approximately 47 small single family lots in East Clayton.

RESOLUTION NO. WHEREAS, the proposed Master Plan for Villa Esperanza (VE), located at 2116

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015

Emery Village Road 2A Municipal Class Environmental Assessment Study

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

REPORT TO THE BOARD OF GOVERNORS

1. Welcome to the Squamish Nation Traditional Territory Ha7lh en skwalwn Kwis tl'iknumut tl'a Skwxwuu7mesh Uxwumixw

Institutional Master Plan The Arnold Arboretum of Harvard University

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

City of Surrey PLANNING & DEVELOPMENT REPORT File:

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

M E M O R A N D U M. Chair and Members of North West Planning Advisory Committee

Planning Board. TOWN OF BRUNSWICK 336 Town Office Road Troy, New York MINUTES OF THE PLANNING BOARD MEETING HELD APRIL 6, 2017

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

Appendix 7 Precinct Analysis Carlton

ADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.

The Residences at Alewife Station

Sewanee Village + Request for Builder/Developer Proposals

Transcription:

minutes UBC Development Permit Board Meeting Date: Wednesday, July 26, 2017 Time: Place: Members present: Members absent: Staff: Guests: Presenters: 5:00 7:00 p.m. Wesbrook Community Centre, Room 201, 3335 Webber Lane Bryce Rositch (Chair) John Metras (Vice Chair) Qiuning Wang Michael White (ex-officio) Andre Gravelle, Student Member (Vacant) Grant Miller and Karen Russell, Campus and Community Planning Approx. 8 Guests/Observers Hugh Ker, Polygon Walter Francl, Francl Architecture Bruce Hemstock, PWL Partnership Landscape Architects Inc. 1.0 Call to Order by Chair and Approval of Agenda The Chair declared a quorum was present and called the meeting to order at 5:00 pm. The Agenda was adopted as circulated. 2.0 Approval of Minutes from the August 10, 2016 meeting. The Minutes from the August 10, 2016 meeting were adopted subject to minor edits. 3.0 Development Permit Application 3.1 DP17016: The Residences at Nobel Park, Wesbrook Place Lots 7 & 8 Karen Russell (KR) introduced the project, presenting the context for Lots 7 & 8 in the Wesbrook Place Neighbourhood and an overview of the policy documents that guided this development (Land Use Plan, Wesbrook Place Neighbourhood Plan, and Development Handbook). Major themes of the public consultation comments were summarized and the variances requested on this project were introduced. Project Architect, Walter Francl, of Francl Architecture, presented the architectural plans and introduced the rest of the applicant team including Hugh Ker of Polygon and Bruce Hemstock of PWL Partnership Landscape Architects Inc., who presented the landscape design. The project was generally praised for it s elegant design and the following comments were provided by Board members:

Courtyard Noise: Noise can be amplified in a typical courtyard setting. What mitigation measures are in place for this project? o Reality is that the trees and water feature may soften the sound, but sound will not be fully attenuated. Noise is a reality of courtyard living. Sequence of Development in Wesbrook Place: Clarification was requested on the sequence of development in Wesbrook Place. These concerns were raised in the online feedback for this project. o Campus and Community Planning has no position on the phasing strategy of the neighbourhood as it is not a component of the policy context at UBC. C+CP staff manage the impact of construction on individual construction sites. This question was deferred to the representative of UBC Properties Trust, in their role as master developer of Wesbrook Place. o Paul Young, UBC Properties Trust, explained the rationale for sequencing of development: to balance staging areas, construction parking and construction sites on Wesbrook Mall. Development moves sequentially through the neighbourhood on both sides of Wesbrook Mall. Impact on UBC Farm: Approval of this project should be subject to an environmental impact assessment on the impact of this development on the farm and the remaining tree buffer. o Prior to the 2011 amendment to the neighbourhood plan, the farm was held as a future residential reserve area. The 2011 update accommodated that residential reserve area density elsewhere within the neighbourhood. The Farm was a participant in the advisory planning committee that supported the 2016 amendment to the Wesbrook Place neighbourhood plan. o An engagement process for the future greenway area will be a separate public consultation process. PWL has been working with Perry and Associates, the design consultants for the future greenway, to minimize impacts on trees on the edge of the development site. Replacement Trees on Site Confirm quantity of trees that will be removed and replaced as a result of this development. o 83 trees will be removed and 48 trees will be replaced on site. Locations for the remaining trees not replaced on site will be identified at a later date in consultation with the University Landscape Architect. Stormwater Management: What is the stormwater management plan for this site to minimize the impact on the Farm. o Site conditions are working in conjunction with the overall neighbourhood strategies to mitigate the effect of storm water impact in the area to replicate pre-development flow conditions. The depths of soil provided over the underground parkade range from 300 to 900mm, with most of the landscape area at 450mm depth. The depths will absorb much of the peak flow within the growing medium. The site is also a tributary to the stormwater detention pond under Nobel Park, which handles all drainage on the west side of the neighbourhood to replicate pre-development flow conditions. 2

Sustainability: Confirm what s being done to meet REAP Gold Innovation and Student Research Project Credits. Building envelope could be a potential area of study. o Building envelope elements (cladding, glazing and installation systems) will be an innovative element in this building. We are working with clients and industry and upping our game. Consultant E3 are part of the design team. o For the Student Research Project, details are to be determined. An example was given from a previous Polygon development (The Laureates) where a Master s student conducted a study on bicycle storage in residential buildings on campus. Accessibilty on Site: Given grade changes on site, please confirm how you will manage to make the site accessible for those with mobility challenges. Think about increasing the percentage of units that are accessible from grade. o They will be able to pass through the site at grade but there will be steps up to all of the townhouses. The grade has been kept fairly level for the townhomes. Traffic Congestion in the Neighbourhood: In light of the public commentary on traffic congestion in Wesbrook Place, Campus and Community Planning should confirm what studies have been done on traffic congestion. Given some of the recent concerns, Campus and Community Planning should take another look at this issue. o The Neighbourhood is approximately 50% built out and the construction activity that causes stress to the neighbours also makes it difficult to conduct accurate post occupancy studies. The design intent of the street layout in Wesbrook Place was to keep the streets fairly narrow to manage multiple modes of transportation and to create more safety on the street by decreasing speeds. The traffic studies that were conducted back when the neighbourhood plan was established estimated a population of 12,000 for the neighbourhood. The 2016 neighbourhood plan amendment redistributed but did not increase overall density in the area. Members of the public were invited to comment on the project: What are the local bus routes in the area?: A local shuttle bus operated by TransLink runs up Ross Drive and the 41 route runs along Wesbrook Mall Elevations of building and greenway trees: Are the trees in the greenway the same height as the tower? Will there be a full or partial view of the farm from the tower and vice versa. o Tree heights vary but some reach the height of the tower. There should be a partial view of the farm from the tower. Public Engagement: There were concerns regarding the notification for this development application during the summer months when few students are around. Students of Land and Food Systems and Forestry have not been given the opportunity to review and voice their concerns about this development. Students of all faculties, should be allowed the opportunity to comment. 3

o o There is a challenge to engage students between April and September when most students are away. Campus and Community Planning schedules open houses as the project applications are submitted. Development Permit applications typically require only one open house, some of the notification measures employed for this project include: notification/signage on site, letters notices sent to neighbours within 30m including: residents of the Prodigy development, the Dean of the Faculty of Land and Food Systems, the UBC Botanical Garden newpaper advertising in the Courier/Ubyssey (when school is in session) email notice to the UNA and other key stakeholders on Campus flyer mailout through Campus mail to all departments Ecological Impacts on the Forest Buffer: Ecological intergrity of remaining forest buffer will be compromised by this development and upcoming greenway project. An Environmental Impact Assessment is warranted to look at hydrology, soil compaction, and biodiversity. Farm Participation in Lot 7&8 Development and the Upcoming Greenway Project: A representative from the Farm expressed interest in participating on the upcoming greenway project. Chair Summary This project will be a handsome addition to the Wesbrook Place community. Many of the comments received for this project were not site specific and are a bit more systemic. Summary of the issues include: Phasing of Development Impacts on UBC Farm Density in the Neighbourhood Traffic/Amenities/Parks/Spaces. Revisit original neighbourhood studies to ensure they are still relevant. Consultation during the summer months. Balance development at times when more people are present. A discussion of many of the systemic issues raised will be brought back for discussion at the next Board meeting. The Development Permit Board recommended to Staff that Campus and Community Planning should play an active role consulting with Land and Food Systems, Forestry and neighbourhood residents when planning the south greenway. Contemplate design, trees, path, and impact to the UBC Farm. 4

The following motion for Lots 7 & 8 in the Wesbrook Place Neighbourhood was moved, seconded and CARRIED: That the Development Permit Board recommend that the Director of Planning, Campus and Community Planning issue a Development Permit for the market-lease residential development on consolidated Lots 7 and 8 in Wesbrook Place neighbourhood comprising 241 apartment units (146 units in the 14 storey high rise and 95 units in the 5/6 storey low rise) and 26 townhouse units as detailed in the attached drawings prepared by Francl Architecture and PWL Partnership (Attachment A), subject to the following conditions: 1) That SC2B.4(a), SC2B.4(b) and SC2B.4(c) of the Development Handbook be relaxed for this project to permit reductions in minimum setback requirements on the front, side and rear yards at various locations for balcony projections; and 2) That SC2B.4(d) be varied to allow a 1.9 metre projection for a portion of the roof on the highrise to extend beyond the 43.0 m height maximum. The project was Moved, Seconded, and carried by a vote of 2-1. 4.0 Adjournment Meeting adjourned at 7:00 pm Minutes submitted by Steven Lecocq 5