DRAFT SLAC AREA HAZARD ANALYSIS

Similar documents
A. General Safety LAB/ROOM: INSPECTED BY: DATE:

Chapter 12 HOT WORK OPERATIONS. Purpose:

Safety Best Practices Manual

Department Of Public Works: Internal Operations

HARDWOOD INDUSTRY FACILITY & SAFETY INSPECTION CHECKLIST

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

Facility Safety Rules Hazard Communication Emergency Procedures Fire Safety. Safety Orientation

HEAVY REFRIGERATION MECHANIC// SR. HEAVY REFRIGERATION MECHANIC

Honolulu Community College Health & Safety Inspection Checklist for Shops Tech I. Program: Conducted by: Date: Reference 29 CFR 1910.

General Industry Safety and Health Checklist Guidelines. Building and Premises. Loss Control Bulletin

FIRE SUPPRESSION TECHNICIAN

Facility Hazard Surveillance of JLab Facilities

-SAMPLE- Safety Inspection Checklist: Manufacturing

Fire/General Safety Review Program Key Performance Indicators Environmental Health and Safety

Facility Risk Assessment Questionnaire

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

University of California, Davis Laboratory Self-Inspection Checklist

Laboratory Inspection (version 3) Criteria Action Plan

Hot Work Program & Operational Guidelines. Environmental Health, Safety and Emergency Management (828)

WORKPLACE EVALUATION CHECKLIST & REPORT

WELDING, CUTTING, AND BRAZING SAFETY PROGRAM

Chapter 18 Welding Table of Contents

WORKPLACE SAFETY INSPECTION CHECKLIST

INSTRUCTIONS TO COMPLETE INSPECTION FORM:

B.) Accident -- Any suddenly occurring unintentional event which causes injury or property damage.

CHECKLISTS ORGANIZED BY EXPOSURE CATEGORIES (SPECIFIC AGENTS OR HAZARDS; MIXTURES; MULTIMEDIA; OTHER (PROCEDURES, PROGRAMS)

Proposed construction of National Institute of Homeopathy at Sec-A8, Narela Delhi by Ministry of Ayush. Risk Assessment

MONTHLY SAFETY INSPECTION REPORT

WORKPLACE AND SAFETY SIGNS

LABORATORY CHEMICAL HYGIENE AND SAFETY PLAN

Millard Refrigerated Services Monthly Health and Safety Observations

Family Foster Home Fire Safety Evaluation Checklist Instructions

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

John Jay College of Criminal Justice HOT WORK PERMIT STANDARD OPERATING PROCEDURES

Machine and Power Tool Safety Checklist. Version 1.2 January Chestnut Street, Suite 400, Philadelphia, PA

Laboratory Safety Audit

HALL B WORKER SAFETY AWARENESS TRAINING (SAF111)

Bloomsburg University of Pennsylvania Hot Work Safety Program Effective Date: July 1, 2015

Employee Health Protection

RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN 1.1 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN

PPE HAZARD ASSESSMENT CERTIFICATION FORM

As a rule, UTMB employees are encouraged to implement the RACE acronym in the case of a fire. RACE is defined as the following:

Laboratory Information

September 1, Sincerely, Mike Montgomery Fire Marshal. M.S. Montgomery Fire Marshal

General Workplace Safety Checklist

Evaluating Your Property and Work for Safety Hazards

General. While at work your safety also depends upon your colleagues. If you observe an unsafe situation, point it out to your colleague.

Sample Safety Inspection Checklist for Schools

This policy applies to all Hot Work jobs performed on the Calhoun mill property by AbitibiAbitibiBowater employees.

Laboratory Safety Audit

FLOORS & WALKING SURFACES Y N N/A Corrective Actions Are ALL employees wearing approved slip-resistant footwear?

Contractor Environment, Safety & Health (ESH) Briefing. Suite 100 Bldg. 726 Billerica, MA

NFPA 70E Electrical Safety & Arc Flash Training

product guide 240 VOLTS NO ENTRY 240 VOLTS DANGER SAFETY SIGNS AND LABELS WE DESIGN IT - WE MAKE IT - IN AUSTRALIA

OH&S Purchasing Guidelines

Laboratory Inspection Checklist

CITY OF GREATER SUDBURY (CGS) ARENA EVENTS FIRE REGULATIONS

SCOUT HALL INSPECTION CHECKLIST

Sample Safety Inspection Checklist

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

Warehouse Operations Safety Inspection Checklist

Safety & Security Services Services de Sûreté et Sécurité. Hot Work Protocol

Quarterly Safety/Building Inspection Form

Automatic Water System Pump SERIES

UNIVERSITY OF TOLEDO

Safety Warnings. Work area safety. Electrical Safety. Personal Safety

Building Self-Inspection Program

Title: Fire Prevention During Welding, Cutting and Other Hot Work Plan (formerly the Cutting & Welding Policy)

FIRE SAFETY. This easy-to-use Leaders Guide is provided to assist in conducting a successful presentation. Featured are:

Builders Risk - Fire Prevention Inspection Checklist

IWEA SAFETY COMMITTEE PLANT SAFETY AUDIT (Revised 03/2016)

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE

Shop Safety Test. Common hazards in agricultural mechanics: Name. Handout 4. Instructions: Write the correct letter in the blank provided.

Laboratory Safety Laboratory Inspection Checklist

EMERGENCY RESPONSE GUIDE IMMEDIATE EMERGENCY PROCEDURES

Stillwater Area Community Services Center Inc.

Green Chemistry Safety Training PSE/CH 335. Departments of Forest Biomaterials and Chemistry North Carolina State University

LABORATORY INSPECTION CHECKLIST

Emergency Action and Fire Prevention

Machine Guarding. 1 Copyright 2014, Rev by PEC Safety Management, Inc. PPT-SM-MG 2014, Rev

HEALTH AND SAFETY INDUCTION CHECKLIST

WORKPLACE INSPECTION CHECKLIST FOR LABORATORY ENVIRONMENTS

THE ALLIANCE FOR BANGLADESH WORKER SAFETY BOILER SAFETY

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

Trainee Handbook. Module 0.1. JSTC Rules and Safety Procedures

TECHNICAL EDUCATION FACILITY SAFETY AUDIT

R100 Oil-Less Refrigerant Recovery Unit

GENERAL AREAS OF INSPECTION

WORKPLACE SAFETY INSPECTION CHECKLIST

Woodworking Safety. Machine Guarding. Work Practice Controls. Loss Control Bulletin

General Procedures: Materials Synthesis Lab 1358 CNAM/Toll

HEALTHCARE SAFETY INSPECTION

Scene Shop Procedures

Contractor Safety. Workplace Safety & Environmental Division

Most Frequently Cited Serious Violations in General Industry 2016

MIT Emergency Response Guide

Building and Grounds Self-Inspection Program

OHS WORKPLACE INSPECTION (1) SCHEDULE AND RATINGS

RICHMOND PUBLIC SCHOOLS GENERAL SAFETY RULES AND REGULATIONS. This is a brief presentation on RPS General Safety Rules And Regulations

Electrical Safety Program

Transcription:

DRAFT SLAC AREA HAZARD ANALYSIS Location(s): B750 (Collider Hall) Date: 15 June 04 Processes / Equipment in Area Hazards Recommended Controls & Actions SLAC Large Detector (SLD): Experimental apparatus in standby mode Various (see below for details) SLD has HEEC approval to address hazards not covered by consensus standards. General Various All those who work in the Collider Hall must attend the 8:30 Collider Hall meeting each day before work begins. Contact the EFD Safety Building is kept locked at all times to prevent casual access. HIGH VOLTAGE and STORED ELECTRICAL ENERGY in supply systems and racks, modulators, power supplies, servers, capacitors, distribution chassis, circuit breakers, motor drivers, CAMAC crates, monitors, transformers, ion pumps and associated distribution equipment. HIGH CURRENT in modulators, power supplies, distribution chassis, circuit breakers, motor drivers, transformers, and associated distribution equipment for beam components in and around the BaBar Detector. Electric shock Arc flash/explosion Electric shock Arc flash/explosion HAZARDOUS VOLTAGE MAY EXIST INSIDE and POWER FOR THIS EQUIPMENT IS FED FROM BREAKER BXXXX- YYYY signs are posted on devices to help avoid contact with exposed electrical and permit lockouts. Work on most equipment is limited to PCD engineers and techs who are high-v trained (course #274) or those under their immediate escort. Follow Equipment Lockout Procedure (ELP) posted on equipment. (Contact PCD, ext. 2083, if you can t find an ELP.) De-energize and verify before working on systems >50V, or get and follow administrative and PPE provisions of electrical hot-work permit issued for that specific activity. (See http://www.slac.stanford.edu/esh/forms/hotwork.pdf.) Use safe work practices covered in high-v training: lock tag, hot work, controlled areas, etc. High-current SLC beam components are powered down indefinitely. De-energize and verify before working on systems, or get and follow administrative and PPE provisions of electrical hot-work permit issued for that specific activity. (See http://www.slac.stanford.edu/esh/forms/hotwork.pdf.) Follow Equipment Lockout Procedure (ELP) posted on equipment. (Contact PCD, ext. 2083, if you can t find an ELP.)

Ground level macnine shop: Machine tools (chop saws, drill press, grinding wheels, mills, lathes, table saw, band saw) and their by-products (turnings). Ground level machine shop: Flammable liquids (isopropanol, acetone, MEK, spray paint) HVAC system on rooftops, DC motor in elevator shaft: Motors with fast-moving rotating and reciprocation parts Uninterruptible power supplies containing lead-acid battery bank (B750 NE corner on ground level) Eye injury from flying objects Cuts, lacerations, abrasions, crushing, or amputation from body part caught in machine Cuts from contact with sharp turnings Injury from unexpected machine restart after power outage Inhalation Cuts, lacerations, abrasions, crushing, or amputation from body part caught in moving parts Electric shock Arc flash Burns to eyes or body from sulfuric acid from batteries Use safe work practices covered in high-v training: lock tag, hot work, controlled areas, etc. Use of machine tools allowed by only shop personnel or designees Tools are used according to manufacturer s requirements. Wear safety glasses while operating. Use point-of-operation guards on all tools. While operating, do not wear gloves or clothing that could be caught in moving parts. Tools are on dead-man switches which prevent restarting after a power outage. Clean up turnings immediately Dispose of waste promptly Kept in flammable storage cabinets when not in use. Smoking prohibited in building. Use sparingly and away from ignition sources. extinguishers are found in every indoor area. RECOMMENDED: Fire extinguisher training for regular occupants of area. Liquid containers are labeled with manufacturer s label or SLAC NFPA diamonds. Access to roof is locked. Access is only granted to qualified HVAC workers. Contact the EFD Safety Coordinator at ext. 2686 for more information. Guards kept in place over moving parts prevent access of body parts. Access to elevator is locked. Access is only granted to qualified elevator workers. Contact the EFD Safety Use lock/tag procedures when working on motors Work on battery banks requires Electrical Safety Training (#274) Work on banks requires portable 6-gallon eyewash to be placed within an unobstructed 15 feet of work. Workers must provide eyewash. Wear eye protection (minimum: goggles; recommended: face shield) and latex or neoprene gloves during work on batteries.

Walking and working surfaces, general: unsecured material, objects in path, temporary storage, protruding objects, unexpected and changing working surface configurations Compressed gases (oxygen, acetylene, nitrogen, air, helium) stored in cylinders Portable arc- and oxyacetylene welding rigs Slips, trips, and falls over fixed and temporary objects: support structures, containments, hoses, cords, cables, fixtures, tools, slings, etc. from uncontrolled oxygen/acetylene release Injury from flying material after catastrophic failure after dropping, tipping, or other physical insult of cylinders Unexpected arc flash Wearing open-toed shoes is not permitted in B750. Remove trip hazards to keep designated aisles clear. Clean up spills immediately. Walk with great care. Do not run. Keep eyes on path. Do not walk on loose objects. Oxygen and acetylene cylinders in storage are separated with caps in place All cylinders are double chained to prevent tipping Cylinders are stored upright and capped when not in use Inspect all rig cables, lines, cords, and connections before use. Welders must be experienced and follow manufacturer s instructions for proper use of rigs. Wear welding mask, gloves, and other PPE during use Welding in non-designated welding areas requires a Hot Work Permit from Palo Alto Fire Department. Contact the building manager to identify welding areas. Contact PAFD at ext. 2776. Elevated areas: roofs, SLD surfaces Injury from fall Injury from being struck by falling object 50-T overhead bridge crane 10-T overhead bridge crane Struck by moving or falling load or load component Fall from bridge or trolley during servicing Most commonly-used elevated areas are protected with standard rails and toeboards to prevent falls and falling objects. Work within 6 feet of an unprotected edge from which a fall of more than four feet is possible must be performed in a harness secured with a lanyard and/or inertial reel The B750 pit is a hard-hat area. Bins filled with hard hats are found at the ground-floor elevator. RECOMMENDED: Stairway and Ladder Safety training, Course 293 Crane riggers and operators must receive SLAC H&R certification (training course #280 et seq.) for bridge cranes of like capacity. See http://www.slac.stanford.edu/esh/training/trainops/280.html. The B750 pit is a hard-hat area. Bins filled with hard hats are found at the ground-floor elevator. Access to bridge is locked. Access is only granted to qualified

Gas system for SLD calorimeter (contains argon) Gas system for SLD drift chamber (contains 8% isobutene in helium) Insidious and deadly oxygen deficiency hazard (ODH) and asphyxiation from collection of argon in pit after calorimeter or supply-system rupture Argon is denser than air and will settle into the pit Insidious and deadly oxygen deficiency hazard (ODH) and asphyxiation from He/Isobutane in pit should the drift chamber or its supply system be ruptured Isobutane fire or explosion Compressed shop air Material blown into eye Injection of air into bloodstream by deadending crane maintenance workers. Contact the EFD Safety Crane maintenance personnel wear fall-protection harnesses while within 6 feet of any unprotected edge from which a fall of >4 feet is possible. Gas-bearing argon lines are labeled at regular intervals Pit and areas nearby are equipped with 18 oxygen sensors that will sound a building alarm and activate fresh-air blowers should oxygen levels fall below 19.5% Many sensors are placed at shin level to detect argon settling EVACUATE when any alarm sounds. USE THE STAIRS, NOT THE ELEVATOR. (Building elevators are automatically shut down during ODH alarms.) The gas system and ODH detection measures have been approved by the Hazardous Experimental Equipment Committee. If you accidentally break any gas line, evacuate immediately Gas-bearing DCh lines are labeled at regular intervals Pit and areas nearby are equipped with 18 oxygen sensors that will sound a building alarm and activate fresh-air blowers should oxygen levels fall below 19.5% EVACUATE when any alarm sounds. USE THE STAIRS, NOT THE ELEVATOR. (Building elevators are automatically shut down during ODH alarms.) Gas-bearing drift-chamber gas lines are labeled at regular intervals. The gas system and ODH detection measures have been approved by the Hazardous Experimental Equipment Committee. If you accidentally break any gas line, evacuate immediately Wear safety eyewear with sideshields while using compressed air All nozzle ported to prevent deadending Radiation: Residual, in beam dumps of N and S arcs Ill health effects of radiation exposure Access to beam dumps are locked. Access only granted to RWT 1 and RWT 2 workers. Contact the EFD Safety ALARA/RWT radiation work controls apply to all beam dump

Radiation: Contamination, in beam dumps of N and S arcs work: reduce exposure with time, distance, and shielding. Ill health effects of radiation exposure Access to beam dumps are locked. Access only granted to RWT 1 and RWT 2 workers. Contact the EFD Safety ALARA/RWT radiation work controls apply to all beam dump work: reduce exposure with time, distance, and shielding. SLAC ES&H/OHP Technicians rope off and label contamination areas. Only RWT 2 workers are allowed inside contamination areas. SLD door alignment system: laser Eye damage from exposure to laser light Laser is low-energy (Class 1). Do not stare into beam. SLD Inner Cylinder: pure beryllium tube Shielding around SLC beam components in arcs Ship ladders used to access tunnel entrances from pit floor. General working environment: emergencies Chronic beryllium disease from exposure to beryllium Lead poisoning from chronic exposure to lead Fall from ladder Struck by object dropped by climber Emergency response: injury during or after fire or earthquake Inner cylinder runs through the center of SLD and is not accessible without great disassembly efforts. Any SLD disassembly must be approved by the Research Division Associate Director. Wear gloves while handling lead. Wash hands after handling lead. Those who handle leads more than 30 days per year for more than 30 minutes per day must contact SHA at x4105. Keep hands free while climbing and descending stairs Pit floor is a hard hat area. Building is equipped with sprinklers and smoke detectors connected to building alarms. EVACUATE when any alarm sounds. USE STAIRS, NOT THE ELEVATOR. (Building elevators are automatically shut down during fire alarms.) Evacuation meeting point for the B750 area is at the NW end of the access drive to the building. extinguisher sign above fire extinguisher kept all around indoor areas. Safety eyewash sign above eyewash (just north of the B620 roll-up door). Dial 9-911 from any SLAC phone during emergencies. UNLESS YOU ARE IN IMMEDIATE DANGER stay on the line and answer all questions until the responder hangs up. Print Name Area Responsible Person: Sandy Pierson 15 June 04 Date

Participants: J. Kenny 17 June 04