Sydenham Pearl Brownfield Remediation Project

Similar documents
Community Involvement Plan

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Pier 70 Master Plan. Port of San Francisco

Proposed Brampton Fire & Emergency Services Training Campus

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

Public Storage Self-storage Facility (Warehouse)

STAFF REPORT ACTION REQUIRED

DATE: June 17, 2013 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ x ]

Redevelopment Plan for the Former South Gifford Road Landfill

From and

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

The London 2012 Olympic Park and Green Network Legacy

REPORT TO: Council FOR: Regular Meeting. PRESENTED: April 1, 2008 FILE: , Byl 1932 & 1936

Re: Application Type: Proposed Highlands Redevelopment Area Designation

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

Item No Halifax Regional Council February 7, 2017

PUBLIC OPEN HOUSE SEPTEMBER 8 TH, 2010 CITY OF LETHBRIDGE DEVELOPMENT SERVICES

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

Ancient Greek and Roman planners recognized the importance of centralized gathering spaces within urban

LANGAN QUALIFICATIONS FOR THE MORGAN COMPANIES

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

Transforming Ebbw Vale from steelworks to green space

From: Director, Community Planning, Scarborough District. Ward 40 Scarborough-Agincourt

International Blvd. TOD Plan Public Workshop #1

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

Center for Towns Program. Strategic Planning Retreat December 2014

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

MW-401B Area Soil Remediation Report

Residential Stormwater Credit Application

10 Principles for a Sustainable Development of Urban Waterfront Areas

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report

Structural Stormwater Best Management Practices

Posted by Calgary Public Library on November 1, 2012

OUR JOBS Innisfil Heights Strategic Settlement Employment Area Planning Policy Update. Council Workshop April 22, 2015

Chair and Members of the Planning, Public Works and Transportation Committee. Tara Buonpensiero, Senior Planner Policy, MCIP, RPP

141 GEORGE STREET PLANNING RATIONALE

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

WEST OAKLAND SPECIFIC PLAN & DRAFT ENVIRONMENTAL IMPACT REPORT

ONTARIO MUNICIPAL BOARD

City of Toronto. Emery Village Transportation Master Plan

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

Splendor Test Tour TEST TOUR SPLENDOR - 08/02/17

1. Introduction

J. Paul Guyer, P.E., R.A.

BCRC-SEA s PROJECT: DEVELOPMENT OF REGIONAL TECHNICAL GUIDELINES FOR E-WASTE INVENTORY AND ESM 5R OF E-WASTE

Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council

Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed

City of Richland Stormwater Management Plan

COMMERCIAL CORRIDOR PLANNING SW 9 TH STREET CORRIDOR NE CORRIDOR MARKET DISTRICT KEO WAY CORRIDOR

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

4. UTILITIES ELEMENT.

Welcome! Agenda. South Downtown

The Benefits and Challenges Associated with Green Infrastructure Practices

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

PROJECT SPOTLIGHT TOUR: LANGAN LEADER JUNE 2017

here today Public exhibition

DAVENPORT VILLAGE SECONDARY PLAN

1071 King Street West Zoning Amendment Application - Preliminary Report

SECTION ONE: INTRODUCTION. introduction

Inspection and Maintenance of Stormwater Best Management Practices

Case Studies of Master Planning for Sustainable Urban Underground Space Utilization

Christopher J. Webb, PE. Chris Webb & Associates, Inc., PS, Bellingham, WA

Green Infrastructure on Brownfields

Request for Proposal

Taking Action on Fire and Life Safety

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

COMMUNITY OPEN HOUSE. March 28, 2012

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE. MacPherson Room, 10 am 5 pm

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT

Juan C. Feliciano Marvel Marchand Architects. Gowanus Green Master Plan: Reclaiming a Brownfield Site for NYC May 10 th, 2017

Residential Stormwater Credit Application

Pavement Removal Fact Sheet

The Hartford Line Transit-Oriented Development (TOD) Action Plan. Maxwell L. Sokol, AICP WSP USA, Lead Planner New York, NY

Local Growth Planning in North Central Green Line Communities

Aire Valley Leeds Area Action Plan - Marsh Lane Allocation (AV18)

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

AWR Engineering, LLC

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Welcome to the. Open House

Rain Gardens Water Quality the Way Mother Nature Intended

Sewing the Seeds for a

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

Appendix F. Wisconsin. Department of Natural Resources. Contaminated Site Listings. Village. Park Ridge

ORDINANCE NO. WHEREAS, the Comprehensive Plan directs that master plans be developed for each proposed urban village (FLU-18), and

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Planning & Zoning Commission Planning & Development Department February 17, 2014

Chapter 10 The Urban World

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

North Fair Oaks Community Plan Summary and Information

2

Transcription:

Sydenham Pearl Brownfield Remediation Project 2017 Conference - Brownfields: The Next Generation June. 15, 2017 Ed Taves Project Manager CH2M HILL Joshua Schram, BA Policy Planner City of Brantford

Presentation Overview Site Context Historical Background Pre-remediation Environmental Assessments Remediation Phases 2 &3 Key Project Challenges Next Steps

City of Brantford Population: 100,000 Single-tier municipality 2 Major Brownfield Projects Underway Brownfield projects managed by: *Planning Department Technical support from other departments

Site Context Site is comprised of 2 properties owned by the City of Brantford The site area is approximately 2.4 ha (6 acres) Mostly surrounded by a residential neighbourhood. 22 Sydenham Street directly abuts the CN rail line on the north side.

Smaller companies went bankrupt vacant & underutilized infrastructure Prone to vandalism, fire, pests, squatters

Project History 1991-2001 Major industry vacated the Site and portions of onsite infrastructures were demolished. 2002-2004 After a subsequent fires, the City acting as the agent on behalf of the Medical Officer of Health, demolished all remaining structures on site. The City proceeded with environmental investigations of the site, the demolition of above ground structures, and removal of underground storage tanks. 2005-2011 The City entertained options for purchase and sale of the property. City decided to undertake remediation and redevelopment of the site To achieve parkland/residential standards

Project Funding 2012 Council approved $4.6 million to complete the remediation of the Sydenham Pearl Site to the highest environmental standards to support residential/parkland uses.

Remediation Program 2012 Phase One (Technical Background) 2013-2015 Phase Two Environmental Site Remediation Risk Assessment 2016 Risk Assessment-Soil Cap Requirement Site Risk Assessment Approval 2017 Record of Site Condition Finalized regulatory procedures Consideration for Redevelopment

Project Mobilization 2012 RFP: Phase One and Two Environmental Site Assessments CH2M HILL Retained to oversee remediation and provide contract administration 2013-2015 Milestone Environmental Contracting was hired by the City to complete the remediation of the site, and remediation was overseen by CH2M HILL.

Phase Two Environmental Site Assessment (17 Sydenham)

Phase 2 - Remediation Program The remediation took 8 weeks to complete and included: The removal of underground storage tanks Excavation and offsite disposal of petroleum hydrocarbons in soil Insitu-soil mixing to break down volatile organic compounds in soil and groundwater

Phase 2 - Remediation Program

Lang Tool

Phase 3: Soil Cap Design and Construction Phase 3 took roughly 8-10 weeks to complete and included: Asphalt stripping, transport and disposal excavation, Crushing and reuse of concrete onsite; Berm construction (CN requirement); Installation of non-woven geotextile and soil capping over the entire site and; Hydro-seeding, tree planting, and sodding.

Phase 3 Photos Preparation for Concrete Crushing Stockpiling of Crushed Concrete

Phase 3 Photos Infiltration Gallery 22 Sydenham Street Infiltration Gallery 17 Sydenham Street

Phase 3 Photos Non-woven geotextile installed on 17 Sydenham Installation of geogrid on 17 Sydenham

Phase 3 Photos 22 Sydenham (March 2016) 22 Sydenham (Nov 2016) (City of Brantford Planning Department, 2016)

22 Sydenham (Sep 2016) (City of Brantford Planning Department, 2016) 22 Sydenham (Nov 2016)

Key Project Challenges Adjacent Residential Encroachments Public Communication

Next Steps: Public Consultation Future Uses The Public Options Consultants City of Brantford

Project Timelines Task Schedule Record of Site Condition Fall 2017 Staff Report to Council Fall 2017 Public Communication & Information Fall/Winter 2017

THANK YOU - QUESTIONS? Joshua Schram, BA Policy Planner City of Brantford JSchram@brantford.ca Ed Taves Project Manager CH2M HILL etaves@ch2m.com