ESB Development Program (since 1981) Objectives Target Areas ESB Increase competitiveness in the world market. Open new gateway to connect with int l sea transportation networks. Create new economic / industrial base. Distribute growth/economic activities from BKK. Create a more even growth distribution for the country. Provide alternative for investment. Create new labor market. Laem Chabang (Chon Buri Province) LCB Industrial Estate (Export oriented/ light industries) LCB Commercial Port Map Ta Phut (Rayong Province) MTP Industrial Estate (Heavy industries, Natural gas/petro chemical-based industries) MTP Industrial Port
and Benefits of ESB Development Program in ESB Benefits of ESB Development Public (1983-2014) : US$ 8,388 million (0.30 trillion baht) Mostly infrastructure development. Included JICA ODA loan Private (1995-2014) : US$ 46,993 million (1.68 trillion baht) Industries : Petrochemical/Chemical, Electronics, Auto&Spare Parts etc. Private 85% 1 US$ = 35.75 BAHT Public 15% ESB s Gross Regional Product in 2014 US$ 65,264 million (2.33 trillion baht) 18% of Thailand GDP ESB s Growth Rate from 1991-2014 Year 1991-1995*: - GPP Growth 74% (15% per year) - Manufacturing Sector Growth 137 % (24% per year) Year 1995-2014**: - GPP Growth 144.25% (5% per year) - Manufacturing Sector Growth 128.43% (4.76% per year) Create Industrial Base 39 Industrial Estates/Parks Petrochemical /Oil Refineries/ Chemical Products Power Plants Rubber / Plastics Electronics Automobile and Spare Parts ESB Share in Thailand s Industrial GDP in 2014** US$ 39,067 million (1.41 trillion baht) Approx. 1/3 (34%) of Thailand s Industrial GDP. * = current market price ** = CVMs (reference year 2002)
NEXT STEP of ESB : Effective and Sustainable Growth Applying Eco Industrial Town Concept Province Level Town Level Industrial Level
ESB Development Plan : Chon Buri / Rayong / Chachoengsao Infrastructure Development Deep-Sea Port / Indusial Estate / Road / Railway / Reservoir / Water pipeline / Water Supply / Electricity / Telecommunications / Community Housing etc. Industrial Development Gas Separation Plant / Petrochemical industry / Oil Refineries / Chemical Products / Electronics / Automobile and Spare Parts etc. Community and Social Services Residence / Education / Health Care etc. Others Promotion measures / Environmental- Protection Measures
Laem Chabang Deep Sea Port (Port Authority of Thailand) SRTO Project in brief 11 Container Ports : 8 million TEUs/year Ongoing Development 3 Ro-Ro Ports (for Car) : 1.95 million car per year 3 Multipurpose Ports : 2.56 million Tons Coastal Port (A1) : a 1,864 m.baht project which will be complete by 2016. It will be designated port for coastal ship with capacity of 0.3 TEUs /year. Single Rail Transfer Operator (SRTO) : a 2,944 m. Baht project which will be complete by 2017. It will help reduce time and logistic cost in LCB Port. 5
Intercity Motorway : Pattaya Map Ta Phut (Department of Highway) distance 37 Km. (Including Service Road) Project in brief 4-Lanes Highway Standard, concrete pavement Full control system Design Max. speed 120 km / hour Civil work Land acquisition 14,200 MB. 6,000 MB. 20,000 MB. Current status Under Construction (about 5.73%) Opening July 2018 6
Dual-track rail : KhengKoi Klong Sip Khao Chachoengsao distance 106 Km. (State Railway of Thailand) Project in brief Current status Construction of the new track along the line total distance of 106 km. The Design max. speed 160 km./hr. for the passenger train 120 km./hr. for the goods train about 11,348 MB. Under Construction (about 0.52%) Note : All Eastern Railway Line is now Double-track. Opening February 2019 7
High speed rail : Bangkok - Rayong 193.5 Km. (Under Thailand's Infrastructure Development Master Plan (2015 2022 plan ) Passing 4 provinces with 6 stations (State Railway of Thailand) Project in brief Current Status Design Speed : 250 km./hr. Travel Time : 65 min. about 152,712 MB. Under FS study for submit to the Public Private Partnership Committee in July 2016 Opening 2021 Note : The Railway cooperation between China and Thailand will commence the construction in Bangkok Nakon Ratchasima in 2016. Thai side will be solely responsible for investment of the Project. 8
U-Tapao Airport (Royal Thai Navy) Project in brief Capacity 0.8 Million Passenger/year Runway 3,505 x 60 meter (Class E Airplane - Boeing 747 Airbus 380) 49 Remote Aprons Cargo Facilities, Maintenance Repair Overhaul: MRO Facilities (by Thai airways) Ongoing Development (Phase I : 2014 2016) New Terminal: with capacity of 3 Million Passenger/year. New Apron: with 2 connecting bridge to terminal building. New Ground Service and Cargo Facilities 9
Aeropolis @ U-Tapao Rayong, Thailand Aim to promote Thailand as a regional aviation hub, providing aircraft maintenance and aviation training services to all ASEAN countries. An estimated investment of 15.274 billion (around $443 million) over the next 15 years. Incentives Provided by Board of Manufacture or repair of aerospace, including aerospace parts and equipment or onboard equipment - 8-year corporate income tax exemption without being subject to a corporate income tax exemption cap - Exemption of import duty on machinery, raw or Essential materials used - Other non-tax incentives.. 2 nd Phase (2021-2023) Enhancing the capacity to handle all domestic flights (or 96 aircrafts) Aeropolis 3 nd Phase (2026-2028) Serve as the repair and maintenance for over 250 aircrafts in Thailand and neighboring countries. 1 st Phase (2016-2018) Increase the U-Tapao Airport s handling capacity to 3 million passengers per year Establishing Maintenance Repair and Overhaul: MRO The aviation industrial estate will be able to service around 48 aircraft per year. 10
Water supply facilities development in Rayong Ongoing Project 3 Projects Phattaya unit, Rayong unit and Pak-nam Pra-sae unit Coverage area Increased capacity New Project Pluak Daeng / Klaeng/ Mueang Rayong/Ban Khai 38,400 m 3 /day About 1 bn THB 1 Project Phattaya-Laem Chabang-Si Racha Coverage area Increased capacity Bang Lamung/Sattahip /Nikhom Phatthana/Pluak Daeng/Si-Racha 153,600 m 3 /day About 3.4 bn THB 11
Electricity Supply and Transmission Line in Eastern Area Status Electricity Supply EGAT: 2,500 MW IPP: 2,088 MW - NG Refinery Unit 1,2,3,5 Rayong - NG Refinery - Power Plant Ongoing Project Transmission Line Development in Eastern Area Objective Coverage area Construction Period Enhance electrical system stability and increase the capacity of the electrical system in the eastern area Chachoengsao/ Rayong 7 year (2013-2019) 1.2 bn THB 7
LNG Terminals and Oil Refineries in Eastern Area Status LNG Terminal Oil Refineries 1 Unit (Maptaphut Phase 1) Capacity 5 M tones/year 6 Units Capacity 1.18 bn barrel/day Shares of Oil Refinery Capacity Ongoing Project LNG Receiving Terminal Project (Maptaphut Phase 2) Capacity Year Completed 2017 Future Project LNG Receiving Terminal Project (Rayong) Capacity Year Completed 2022 10 M tones/year 21.4 bn THB 7.5 M tones/year 38.5 bn THB 8
International Submarine Cable Network Project in brief The consortium of international carriers construction 3 submarine cable system which are Asia Africa Europe 1 (AAE-1), Southeast-Asia Middle East Western Europe 5 (SEA-ME-WE 5) and Southeast Asia - Japan Cable System (SJC) Increase Capacity about 5,979.14 MB. 8,600 Gbps New Project : High Speed Broadband Project in brief Expanding internet service via FTTx network to coverage all potential area about 13,662 MB. 14