ELECTRICAL SAFETY INSPECTION REPORT

Similar documents
ELECTRICAL SAFETY INSPECTION REPORT

TIME KNITWEAR (PVT) LTD.

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ANLIMA TEXTILE LTD, DHAKA, BANGLADESH

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL FIRE SAFETY ASSESSMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

FIRE SAFETY INSPECTION REPORT

INSTALLATION, OPERATION & MAINTENANCE MANUAL

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL FIRE SAFETY ASSESSMENT

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

INITIAL FIRE ASSESSMENT REPORT (FAR)

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

CITY OF PASADENA FIRE DEPARTMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

1-300 Fire and/or Smoke Dampers to Inspect $ Fire and/or Smoke Dampers to Inspect $34.30

INITIAL FIRE ASSESSMENT REPORT (FAR)

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection

FIRE SAFETY INSPECTION REPORT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

User Information Sheet 008 : 2010

Electrical Preventive Maintenance (EPM) Program

INITIAL FIRE SAFETY ASSESSMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

COMPACT DRYER GDZ5-1 Training Presentation

FHHT 18 3 PHASE /32A / 400V ELECTRIC HEATER PRODUCT MANUAL P

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

PRINTED: 06/09/2017 FORM APPROVED CENTERS FOR MEDICARE & MEDICAID SERVICES OMB NO (X2) MULTIPLE CONSTRUCTION A. BUILDING 03 - A BUILDING

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

BR342 Ducted Installation Instructions Australian Version Electronic Wall Control

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

INSTALLATION INSTRUCTIONS

FIRE PREVENTION GUIDELINE

INSTALLATION, INSTRUCTION AND SERVICE MANUAL

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

INSTALLATION, INSTRUCTION AND SERVICE MANUAL

INSTALLATION, INSTRUCTION AND SERVICE MANUAL

Survey of electrical equipment installed in hazardous areas on tankers

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

FH3HT. 3Kw HIGH TEMPERATURE ELECTRIC FAN HEATER PRODUCT MANUAL

1. GENERAL INTRODUCTION 2. OPERATING CONDITIONS

INITIAL FIRE SAFETY ASSESSMENT

DUST COLLECTOR OPERATION AND SAFETY INSTRUCTIONS FM230 CAUTION: READ THE INSTRUCTION MANUAL BEFORE USING THE APPLIANCE

Hodge Clemco Ltd. MJC Mini Cartridge Filters Owners Manual. TSOM 556 Date of issue 13/07/04. Hodge Clemco Ltd

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

Rules for Classification and Construction Additional Rules and Guidelines

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

installation, operation & Maintenance manual Floor-mounted Induction units acb 30/35

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Transcription:

ELECTRICAL SAFETY INSPECTION REPORT MILLENNIUM TEXTILES (SOUTHERN) LTD., Bara Rangamatia, Ashulia, Savar, Dhaka 1341, Bangladesh Factory List: MILLENNIUM TEXTILES (SOUTHERN) LTD., Inspected on April 8, 2014

SUMMARY The Millenium Textiles(Southern) Ltd., factory is started in 2002 in a five-storied building which was constructed in 2000. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which will be further addressed as part of follow-up inspections. Table below summarizes the major electrical safety issues identified during the inspection. Recommendations have been provided to address each issue. An implementation schedule shall be developed by the factory to remediate each of the findings. The specific timing of improvements, including any requested extensions due to design / installation constraints, shall be submitted to the Accord for approval. MILLENNIUM TEXTILES (SOUTHERN) LTD., Page 2 of 6

FINDINGS AND RECOMMENDATIONS Finding #: E- 1 Category: SERVICE LINE Overhead service cables are not supported. Overhead service cables must be must be supported with suitable means from the transformer to the building (may be supported providing catenary wire). Service cables from electric pole. MILLENNIUM TEXTILES (SOUTHERN) LTD., Page 3 of 6

Finding #: E- 2 Category: GENERATOR ROOM Cables terminating to generator output terminal box are laid on floor. Cables may be laid in cable-trench with protective covers or supported in cable trays installed on floor to avoid mechanical damages from falling objects/stepping of occupant. Cables terminating from generator output. Finding #: E- 3 Panel back cover left open to allow cable connection. Panel rear cover must be closed with nuts and bolt and make circular hole at the base plate/top plate of panels and provide cable gland according to the respective cable size for cable entry and exit so that the cables are not stressed on the sharp edges of the hole of panels. Provide covers (of noncombustible material) if any additional gap remains after installing cable glands. Panel without back cover. Finding #: E- 4 Category: CABLE & CABLE SUPPORTS Cable ducts covered with combustible materials Remove combustible materials covering cables or used as tray/duct covers. Provide cover made of noncombustible material on the channel for preventing ingress of dust and debris /risk of spreading fire. Cable duct in production floor. MILLENNIUM TEXTILES (SOUTHERN) LTD., Page 4 of 6

Finding #: E- 5 Crowded inside panel (MCCB, MCB, Bus bars and Wires) Check the capacity of the panel & establish a load management program for avoiding any installation exceeding its capacity in future. Install slotted wiring-duct inside the panel to arrange and latch the haphazard cables. Crowd inside panel. Finding #: E- 6 Category: CABLE & CABLE SUPPORTS Excessive lint deposit in cable duct. Disconnect the power source of the cable laid into channel and clean dust and debris of all interior components. Establish a periodic cleaning program and maintain records of the activities. Provide cover made of noncombustible material on the channel for preventing ingress of dust and debris in future. Cable duct in production floor. Finding #: E- 7 Category: WIRINGS PVC casing capping wiring damaged. Damaged PVC casing used for surface wiring must be replaced to protect wires in it throughout its length. PVC casing capping. MILLENNIUM TEXTILES (SOUTHERN) LTD., Page 5 of 6

Finding #: E- 8 Hot spots at terminations inside panel. Arrange periodic inspection & thermal scan to identify the overloading, loose connection, unbalanced load which may cause the excessive heat-rise and take action accordingly. Hot spot at MCCB. Finding #: E- 9 Cables entering panels are not firmly fixed. Cables must be supported into the covered cable tray up to the top plate/base plate of panels to prevent any physical damage to insulation of the cable. Cables entering to panel. Finding #: E- 10 Category: CABLE & CABLE SUPPORTS Cables/wires passing through wall not protected and remaining gaps around the cable/wiring not sealed. Cables/wirings passing through permanent wall must be protected in covered cable duct and remaining gaps must be sealed with fire resistant materials. Cable also must be protected throughout the length providing cover (metallic) to the tray to prevent damage due to harsh weather. Cables are entering to factory building. MILLENNIUM TEXTILES (SOUTHERN) LTD., Page 6 of 6