Fixed plant and mobile equipment fires on surface coal mines

Similar documents
Contractor Worksheet Underground Fires Major Hazard Standard

AFEX. fire suppression systems AFEXSYSTEMS.COM

Quarterly Stakeholder Call

EM-3.1 SAFETY ALERT HEAVY EQUIPMENT VEHICLE FIRES AND SUPPRESSION SYSTEMS

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

FIRE SAFETY MANAGEMENT PLAN

BUSHFIRE MANAGEMENT PLAN (BMP)

Logbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater

MV THOMSON MAJESTY Engine-room fire South of Gorgona Island 21 October 2016

MACKANTRA ENGINEERING PROJECTS cc

FIRE SAFETY. This easy-to-use Leaders Guide is provided to assist in conducting a successful presentation. Featured are:

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

Installation & Operations Manual for R-290 SERIES. BMG-HGP Model Bottom Mounted Full-Length Swing Glass Door Refrigerator Merchandisers 2/

Fire Suppression Systems. Heavy Duty Mobile Plant Protecting Your Business. Head Office: 14 Baynes Place, Chelmsford, Essex, CM1 2QX

Fire Safety. A TUC guide for trade union activists

Fire safety management issues identified by fire risk assessments

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

Health, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service

Level 2 Award in Fire Safety (QCF) (SCQF Level 5 in Scotland) Unit 1 title: Fire safety principles

MIST FIRES AND EXPLOSIONS: FACT OR MYTH? Introduction

Appendix 3 Fire Suppression Systems For AASA sanctioned events V0.1

IMPLEMENTING RECOMMENDATIONS FROM THE ANGELLALA CREEK AMMONIUM NITRATE VEHICLE EXPLOSION

FIRE RISK ASSESSMENT Self Assessment

Local Rules: Fire Safety

DR J H BURGOYNE AND PARTNERS LLP FORENSIC SERVICES

Australian Standard. Fire protection for mobile and transportable equipment AS AS

Welcome to the Keys to a Successful Fire / Life Safety Inspection and Sustained Tenant & Building Safety

Informational Bulletin

CombustionONE. Improving and Sustaining the Combustion Asset. Driven by the New Standards. Bulletin 53A90A01-01E-A

Workplace FIRE SAFETY

H&S Forum. Fire Safety Policy Glascote Academy

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

AS/NZS :2008

NOTTINGHAM CITY HOMES

FIRE PROCEDURES 1. APPOINTMENTS

Leader s Guide 2007 CLMI Training

Amerex Fire Suppression Systems. Because Operators and the Environment are NOT Disposable Quality is Behind the Diamond.

3200 NON-ADDRESSABLE FIRE ALARM CONTROL PANEL

How SCDF Does it MAJ ANDY CHOO FIRE INVESTIGATION UNIT OPERATIONS DEPARTMENT HQ SCDF

WSU-TFREC Fire Safety Training

SECTION AUXILIARY HEATER

User s Manual RA-3030SS RA-3036SS. NOTE: This unit was designed for indoor residential use and DUCTED operation only.

INTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES

Workplace Guidelines

Emergency Response Plan

Contingency/Emergency Plan for all Hazards Page 1 of 9

BRIDGECLIMB SYDNEY REDUCING TONAL NOISE FROM SAFETY LATCHES

Lakanal House inquest: Statement from the Fire Sector Federation

SUPERIOR THINKING. DEEPER DIGGING. Underground Mining Fire Suppression Systems

FIREDETEC PRODUCT TECHNOLOGY: DIRECT & INDIRECT

Fire Suppression Solutions

Is the address of your property clearly visible and marked in large numbers that can be easily seen from the street?

2010 FIRE CODE OF NEW YORK STATE

June 2017 (Updated 18 January 2018) Fire Safety Policy. Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited

Arbour House. Fire Policy and Procedures

Highly Protected Risks in Power Generation Stewart Kidd outlines the issues to consider when installing active fire suppression in power stations THE

Air Compressor Electrical Fire

AS/NZS 4745:2012. Code of practice for handling combustible dusts AS/NZS 4745:2012. Australian/New Zealand Standard. Superseding AS/NZS 4745:2004

User s Manual WS-4830SS WS-4836SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED.

West Chester Fire Dept. Fire Code Maintenance Handbook. Fire Prevention Saves Lives and Property

Making sense of risk Risk engineering. Metalworking operations

FIRE SAFETY PLAN FOR CONSTRUCTION, RENOVATION AND DEMOLITION SITES

Root Cause Analysis Report Tesoro Golden Eagle Refinery Refinery Power Outage

INFORMATION BULLETIN No. 150

BMG-HGP & BMG-SLP Model Bottom Mounted Full-Length Glass Door Refrigerator Merchandisers

HYDROCARBONENGINEERING June June 2015

FJH-3 5B1/(2) Fuel Fired Air Heater Manual of Installation Operation and Maintenance

City of Chilliwack. Bylaw No A bylaw to regulate fire prevention and the protection of life and property

Title: Fire Protection Effective Date: 7/1/2013 Control Number: THG_0039 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015

HARDWOOD INDUSTRY FACILITY & SAFETY INSPECTION CHECKLIST

Australian/New Zealand Standard

Fire Safety Management Audit Specification August 2017

Title: Room-sealed fanned draught flue systems concealed within voids

Practical guide to rural fire. Put fire safety into your plan

Fire Safety Management

CONTRACTOR WHS HAZARD STANDARD LASER SAFETY EXTERNAL USE ONLY

Summary. firefighter training in Since that time the firefighter had attended semi-annual

Installation & Operations Manual for. BMG-HGP Model Bottom Mounted Full-Length Swing Glass Door Refrigerator Merchandisers. 4/17 Rev.

WET/DRY VACUUM. QUEST for Continuous Improvement Windsor s Quality Management System is Certified ISO MODEL: T1. Operating Instructions (ENG)

The Social Accountability International (SAI) Fire Safety Checklist

CONSULTING Training Courses

Slight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk

Fire Prevention Plan for Cintas Center 1624 Musketeer Drive

Compliance Guidance for non-technical managers

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

Up on the Roof Fire Prevention BY David Laks, P. Eng., CFPS, ARM, RRC

STATEMENT OF THE HEALTH AND SAFETY STRATEGY FOR THE SYDNEY RUSSELL SCHOOL

RULES 1978 UNDERGROUND COAL MINES FIRE PRECAUTIONS

Revision B Printed Fall Elston Manufacturing HC Heater Owners Manual

EMLC Academy Trust. Fire Safety Policy 2017/19. Every child deserves to be the best they can be

To seek Cabinet approval of the Council s Fire Safety Policy. It is proposed that Cabinet approves the Fire Safety Policy.

Management Practices: Fire Protection Impairments November 2015

Appendix J Framework Fire Prevention and Suppression Plan. Prepared by Idaho Power Company 1221 W Idaho Street Boise, ID 83702

BP MAINTENANCE WORK INSTRUCTIONS FREQUENTLY ASKED QUESTIONS

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

User s Manual WS-3230SS WS-3236SS WS-3242SS WS-3248SS

Peponi House Preparatory School Nairobi, Kenya. Peponi House Fire Risk Prevention Policy

IYRS School of Technology & Trades RCRA CONTINGENCY PLAN Bristol Facility 40 CFR 265 Subpart D 29 CFR Emergency Evacuation

Update - Home Improvement

Transcription:

Fixed plant and mobile equipment fires on surface coal mines Mines safety bulletin no. 158 21 November 2016 Version 1 Background Fires on fixed plant and mobile equipment at mines and quarries continue to represent a significant proportion of High Potential Incidents (HPIs) reported to the Queensland Mines Inspectorate. The Mines Inspectorate's concern over the number of equipment fires has been communicated in previous Safety Alerts and Safety Bulletins (reference 1, 2), as well as being identified by the Chief Inspector of Mines (Coal) as one of the Big 9 focus areas at the Annual Mines Briefing held in November 2015. Fire hazards may present an unacceptable risk to coal mine workers, whether they be machine operators, first responders or maintenance crew. A step change to the management of fixed plant and mobile equipment fire hazards is required to reduce the risk to as low as reasonably achievable. This Safety Bulletin: provides an analysis of surface coal mine fire HPIs reported during 2015 recommends strategies for reducing fixed plant and mobile equipment fires. Analysis of 2015 HPI reports During the 2015 calendar year, 2091 HPIs were reported to the Queensland Mines Inspectorate. Of these 385 were reported as fires (see Figure 1), with 305 fires reported from surface coal mines and over 90% of these fires involved fixed plant and mobile equipment (refer Figure 2 and Figure 3). Common causes Common causes of fixed plant and mobile equipment fires reported during 2015 were: Electrical: A total of 77 electrical fires were reported of which 60 involved mobile equipment and 17 fixed plant. Common causes identified in incident investigation reports were: Modifications to electrical circuits not complying with good engineering practices or standards (e.g. no fuse or circuit breaker fitted to the circuit). Worn-through insulation and/or harnesses, looseness of components. Battery leads, starter motor, alternator, solenoids. Mechanical: Of a total 207 mechanical fires reported, 186 were associated with mobile equipment. Fixed Plant: Common causes of fires reported in fixed plant included: Delayed maintenance, e.g. a defective conveyor idler bearing was found but it was decided to continue operations and replace the idler on the planned maintenance day. Before this occurred the idler and other associated equipment caught fire causing significant damage.

Coal fines build-up next to rotating parts, bearing failures, pump and centrifuge drive belt slippage. Mobile Equipment Common causes of fires reported on Dozers included: Maintenance activities: approximately 20% of reported dozer fires occurred post a maintenance activity such as replacement of blown hoses. Blown fuel lines that had not been upgraded as per OEM bulletins Hose failures and rub throughs (specifically in the hell -hole and fan drive areas) Turbo failures, oil soaked lagging, cracked turbo oil feed lines Common causes of fires reported on Trucks included: Maintenance activities: Approximately 15% of reported truck fires occurred post a maintenance activity such as replacement of blown hoses. Re-fuelling systems and practices Hose failure, rub throughs (engine bay area) Turbo failures, oil soaked lagging, cracked turbo oil feed lines Common causes of fires reported on Drills included: Mast/drill head hoses Lack of engine protection Analysis & conclusions Analysis of 2015 fires found a broad range of equipment, fire sources and processes involved. No one piece of mobile plant had a particular issue except of dozers, with one brand identified due to its predominant use throughout industry. Risk assessments Many site fire risk assessments reviewed were completed at a high level and controls focussed on emergency response and protection methods such as fire-fighting response capability. Housekeeping Risks from poor housekeeping standards were sometimes not appreciated. Rags, solvents, waste oil and grease and coal fines caught alight during maintenance at shutdowns, component replacements and in workshops. Failure to clean components after replacing burst fuel lines, hydraulic and coolant hoses caused fires when engine components heated up. First response Many reported fires were detected by coal mine workers and controlled proactively using hand held extinguishers or manually activating fire suppression systems. Mobile plant re-fuelling

Poor re-fuelling practices, typically around field water pumps and lighting plants, and incompatible or poorly maintained fast fill systems on rear dump trucks and excavators figured in a number of incidents. Maintenance and engineering Introduction to site Significant fires occurred on mobile equipment recently introduced to site, including both owner and contractor mobile equipment which was new, recently re-built or with a major component such as an engine replaced. Turbochargers Many reported turbo fires, after further investigation, are found to be due to other components, such as a hydraulic hoses or fuel lines, failing with flammable liquids being ignited by a hot turbo or exhaust surface. Fires are still occurring soon after turbo replacement. Heat affected oil feed and drain lines disturbed during turbo replacement, or oil soaked components, may catch fire after maintenance. Workmanship and inspection standards 15 to 20% of fires occurred after a maintenance event. Investigations indicate: Incorrectly specified components being fitted (e.g. incorrect diameter hoses not secured) Hose clips, clamps not secured correctly Hydraulic fitting o-rings not replaced and subsequently leak when hoses replaced Areas affected by flammables such as fuel, oil and some coolants not thoroughly cleaned Oil soaked lagging not replaced Poor fitting of lagging exposing hot spots Failure to replace heat affected components such as hoses Fire walls, e.g. dozer hell-hole to engine bay area, not re-fitted correctly Inspection standards not providing specific guidance on installation standards Loose and rubbing components (e.g. hoses and cables, not detected and rectified) Suggested fire reduction strategies þÿ I n s a n i t y : d o i n g t h e s a m e t h i n g s o v e r a n d o v e r a g a i n a n d e x p e c t i n g d i f f e r e n t r e s u To reduce the number of fires, a step change in the approach to managing fires is needed, which requires a combination of protection and prevention measures. In addition to current site strategies mines should consider the following if they have not already done so: Site data analysis Analyse site fire reports to identify trends and improvement opportunities to minimise risk of fires. Repeat this periodically to assess the outcome of initiatives and refine strategies. Apply the pareto principle or similar to identify specific improvement targets. Complete specific machine risk assessments and ignition hazard assessment for targeted. equipment, high risk plant or where coal mine workers are exposed to a high risk of fire.

Management commitment and leadership Provide focused senior management commitment and appoint a champion to implement fire reduction strategy Involve site contractors and partners in the strategy development and implementation Introduction of equipment to site standards Ensure all equipment coming to site, including contractor equipment, meets site fire prevention standards. Fire risk review For targeted plant and equipment, undertake specific fire risk assessments and identify controls based on prevention as well as protection. Australian Standard AS 5062:2016 provides guidance on fire protection and the EU directive EN 13463-1 provides guidance on undertaking ignition hazard assessments. Change management Use a change management process and sound engineering principles when fitting after-market equipment to ensure components are correctly rated, compatible and protected. Alternate products Consider alternate products such as approved, non-flammable coolants. Maintenance strategies Review turbo replacement strategies. Life cycle analysis should be undertaken to make sure a best for business replacement strategy has been adopted. Consider replacing oil feed and drain lines, seals and lagging associated with the turbocharger when it is replaced, as heat affected lines which have been disturbed or oil soaked components often catch on fire after maintenance. Consider proactive replacement strategies based on service life of critical components (e.g. hoses). Workmanship & inspection standards During maintenance, clearly define and appropriately resource the scope of repair work. Clearly specify the standard to be met before equipment is returned to service. Examples include: Use correct specification hose (including outside diameter), ensure correct size clamps are fitted and secure, hoses and cables are not rubbing or separated with swivel clips or similar. Areas affected by flammables such as fuel, oil and some coolants are thoroughly cleaned. Oil soaked lagging is replaced and there are no exposed hot spots due to poor lagging fitment. Replace adjacent heat affected components such as hoses. Fire walls (eg dozer hell-hole to engine bay area) are correctly fitted. Consider targeted inspections of high risk components and installations. Photographs of the acceptable site standard of installation are beneficial.

OEMs Involve OEMs in fire investigations and report equipment fires to the OEM. Ensure an effective system is in place at the mine to capture and action OEM service bulletins. Fire prevention implementation - Operations feedback Mines which have implemented a structured approach to fire reduction over the last two years have reported positive results, two sites achieving a reduction of HPI fire reports of around 60%. Reduction in fires has significant consequential benefits to safety, productivity and costs. References and Guidance Information: 1. Safety Bulletin No.113, 12 October 2011; Equipment fires, investigation and response, Queensland Mines Inspectorate 2. Safety Bulletin No. 86, 30 September 2008; Fires on mine sites, Queensland Mines Inspectorate 3. Safety Bulletin No: SB 13-05 Too many underground fires, NSW Trade and Investment, Mine Safety 4. NFPA 122: Standard for Fire Prevention and Control in Metal/Nonmetal Mining and Metal Mineral Processing Facilities 5. FM Global datasheets 6. Australian Standard AS 5062:2016 Fire protection for mobile and transportable equipment. 7. EN 13463-1 Non-electrical equipment for use in potentially explosive atmospheres - Part 1 Basic method and requirements

Authorised by Russell Albury - Chief Inspector of Coal Mines Contact: Anthony Logan, Inspector of Mines, +61 7 3199 8013 anthony.logan@dnrm.qld.gov.au Issued by the Queensland Department of Natural Resources and Mines Placement: Place this announcement on noticeboards and ensure all relevant people in your organisation receive a copy.