Glen Road Pedestrian Bridge Environmental Assessment

Similar documents
GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #1 SEPTEMBER 28, 2016

Bridge Type Assessment and Evaluation

Building the transportation network we need for the future

Victoria Bridge Municipal Class EA Civic Works Committee

Toronto Complete Streets Guidelines

Reconfiguration of The Six Points Interchange. Community Update #2 June 18, 2014

GLEN ROAD PEDESTRIAN BRIDGE AND TUNNEL ENVIRONMENTAL ASSESSMENT STUDY

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada

Relief Line Project Assessment

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

PUBLIC MEETING April, 20161

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

CHAPTER 5: GUIDING PRINCIPLES

3 Development Process 3.1 Stage One page Stage Two page Stage Three page CENTRAL PICKERING DEVELOPMENT PLAN

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Eglinton West LRT Update

PRELIMINARY DESIGN + DEVELOPMENT PLAN

Bloor St. W. Rezoning - Preliminary Report

DESIGN REVIEW PANEL PROCEDURES AND PROTOCOL

Rapid Transit Implementation Working Group September 14, 2017

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

WELCOME TO OPEN HOUSE # 3

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Mavis Road Class Environmental Assessment

St. Clair Avenue West Area Transportation Master Plan

TORONTO COMPLETE STREETS GUIDELINES

TRANSPORTATION COMMITTEE

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

Baby Point Heritage Conservation District Study. Kick-off Community Meeting March 27, 2017 Humbercrest United Church

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

cea Date: March 17, 2016 Project: Glen Road Pedestrian Bridge Class EA Study Location: 22 nd Floor City Hall Toronto PO #: MMM Project #:

South Yonge Street Corridor

DESIGN REVIEW PANEL TERMS OF REFERENCE AND PROTOCOL

City of Toronto. Emery Village Transportation Master Plan

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

LAKEVIEW LOCAL ADVISORY PANEL. THE COPORATION OF THE CITY OF MISSISSAUGA THURSDAY, NOVEMBER 18, 2010

Elfrida Growth Area Study

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.

South of Eastern Strategic Direction Status Update

KING-SPADINA COMMERCIAL HERITAGE CONSERVATION DISTRICT PLAN COMMUNITY CONSULTATION MEETING #1

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

Portage Parkway Environmental Assessment Public Information Centre No. 1

Parkdale Community Hub Project. Community Information Meeting May 16 th, 2018

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

The purpose of tonight s PIC is to:

Ashbridges Bay Erosion and Sediment Control Project

South Yonge Street Corridor

Urban Design Review Panel Submission. The Ottawa Train Yards - Office Development. 405 Terminal Avenue. 17 April Table of Contents.

Garden District Heritage Conservation District Study

Future Proposed Development

Victoria Street Pedestrian Bridge

9 North Downtown Master Plan & Saskatchewan Polytechnic

BATHURST QUAY NEIGHBOURHOOD PLAN IMPLEMENTATION. Streetscape & Public Realm Improvement Plan - Canada Malting Silo Site and Eireann Quay

Richmond Road Complete Street Meeting #1, April 25, 2016

Commissioners Road West Realignment Environmental Assessment

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

New. Stations. Smart Track I tlo MTDRONIO. Public Information Centre

McCowan Precinct Plan Study Background & Deliverables

Municipal Heritage Bridges Cultural, Heritage and Archaeological Resources Assessment Checklist Revised April 11, 2014

Town of Oakville Streetscape Strategy

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

Memorandum CITY OF DALLAS

1071 King Street West Zoning Amendment Application - Preliminary Report

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

V. Gateways GATEWAYS / V-1

Local Growth Planning in North Central Green Line Communities

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

Span McCowan and Market Building Proposal

The Master Plan Framework

Maplewood Avenue Downtown Complete Street Project

Transportation Committee

Relief Line Project Assessment

Union Station Master Plan Task 2 Briefing

Yonge Street Zoning Amendment Application - Preliminary Report

Subject: Transit Planning in Toronto: roles, priorities and our decision making framework

DOWNTOWN GEORGETOWN PLANNING STUDY

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Institute of Transportation Engineers

South Yonge Street Corridor

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

WELCOME TO OPEN HOUSE TWO November 28, 2018

Bayview Avenue Official Plan Amendment, Zoning Amendment and Site Plan Control Applications Request for Direction Report

Blackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014

4121 Lawrence Avenue East Rezoning Application Preliminary Report

Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Public Meeting March 10 th 2011

Parking Garage Site Selection Committee Final Report October 15, 2012

PART 1. Background to the Study. Avenue Study. The Danforth

c. DTAH Toronto Complete Streets Guidelines

Transcription:

Glen Road Pedestrian Bridge Environmental Assessment Presentation to Design Review Panel July 18, 2017 Glen Road Pedestrian Bridge Class Environmental Assessment

STUDY AREA Bloor Street East Streetscape Improvement North St. James Town Development Glen Road Pedestrian Bridge Class Environmental Assessment 2

STUDY AREA Glen Road Pedestrian Bridge Class Environmental Assessment 3

EA SCHEDULE AND PROCESS Municipal Class EA: Schedule C project given the age of the structure (+40 years); cultural heritage value potential A cultural heritage evaluation report was completed: heritage significance found in crossing; views from the valley Phase 1: Problem / Opportunity Phase 2: Alternative Planning Solution Phase 3: Alternative Design Concepts Phase 4: Environmental Study Report Phase 5: Implementation Extensive consultation with area Councillors; community stakeholders Community Walk-shop - June 2016, Notice of Commencement and Public Information Centre - September 2016 RFP scope was revised to include pedestrian tunnel Fall 2016 Glen Road Pedestrian Bridge Class Environmental Assessment 4

EA STUDY PRELIMINARY RECOMMENDATIONS Based on the results of the EA and technical analysis completed to date, the preliminary recommendations are to: Replace the Bridge in same location; and Replace and Reconstruct a Wider Tunnel to the west. These recommendations: Address the condition of the bridge and concerns about security Maintain the cultural heritage value and connections to active transportation and transit facilities Provide opportunities for urban design improvements Add capacity for growth in pedestrian and cyclist traffic Glen Road Pedestrian Bridge Class Environmental Assessment 5

NEXT STEPS Design Review Panel (#1 Review) July 18, 2017 Public Information Centre #2 September 26, 2017 Toronto Preservation Board Fall 2017 Finalize Environmental Study Report; 30-day Public Review Period late Fall 2017 Detailed Design 2018 / 2019 Design Review Panel (#2 Review) Construction 2019 / 2020 Glen Road Pedestrian Bridge Class Environmental Assessment 6

BACKGROUND View from the south end of bridge, looking north to Glen Rd / Dale Ave Glen Road Pedestrian Bridge Class Environmental Assessment 7

BACKGROUND View of vehicular bridge looking south (1913) View on pedestrian bridge looking south Glen Road Pedestrian Bridge Class Environmental Assessment 8

BACKGROUND Tunnel construction underway (1964) View from Glen Road looking north to tunnel and TTC entrance Glen Road Pedestrian Bridge Class Environmental Assessment 9

BACKGROUND View of bridge looking south (1951) View on bridge looking south Glen Road Pedestrian Bridge Class Environmental Assessment 10

ROSEDALE VALLEY View from Rosedale Valley Road looking east Glen Road Pedestrian Bridge Class Environmental Assessment 11

BRIDGE View from mid-bridge looking south View from north abutment looking south Glen Road Pedestrian Bridge Class Environmental Assessment 12

TUNNEL View from Glen Road south looking north to tunnel View looking north to tunnel View from mid-tunnel looking north Glen Road Pedestrian Bridge Class Environmental Assessment 13

NORTH APPROACH View from Glen Road north looking south to bridge approach View of north bridge approach looking south Glen Road Pedestrian Bridge Class Environmental Assessment 14

SOUTH APPROACH View from bridge to south approach and tunnel View from tunnel looking north to bridge Glen Road Pedestrian Bridge Class Environmental Assessment 15

BLOOR STREET EAST View from north side of Bloor Street East looking north View from north side of Bloor Street East looking west Glen Road Pedestrian Bridge Class Environmental Assessment 16

BLOOR STREET EAST View from south side of Bloor Street East looking west View from south side of Bloor Street East looking to tunnel and TTC entrance Glen Road Pedestrian Bridge Class Environmental Assessment 17

PROPOSED CONCEPTS

OVERALL PLAN Glen Road Pedestrian Bridge Class Environmental Assessment 19

BRIDGE ELEVATION Glen Road Pedestrian Bridge Class Environmental Assessment 20

EXISTING - ROSEDALE VALLEY View from Rosedale Valley Road looking east Glen Road Pedestrian Bridge Class Environmental Assessment 21

PROPOSED BRIDGE CONCEPT Overall view from Rosedale Valley Road looking west Final Render in progress Glen Road Pedestrian Bridge Class Environmental Assessment 22

BRIDGE DECK View from north side of bridge looking south Glen Road Pedestrian Bridge Class Environmental Assessment 23

BRIDGE DECK AT NIGHT View from north side of bridge looking south at night Glen Road Pedestrian Bridge Class Environmental Assessment 24

TUNNEL CONCEPT View from tunnel looking north to bridge Glen Road Pedestrian Bridge Class Environmental Assessment 25

TUNNEL CONCEPT View from Glen Road looking north to tunnel Glen Road Pedestrian Bridge Class Environmental Assessment 26

NORTH APPROACH Opportunity to increase sightlines to be determined Planter and plaque location to be determined Glen Road Pedestrian Bridge Class Environmental Assessment 27

NORTH APPROACH View from Glen Road looking south to north bridge approach Glen Road Pedestrian Bridge Class Environmental Assessment 28

SOUTH APPROACH BRIDGE MEETS TUNNEL s Glen Road Pedestrian Bridge Class Environmental Assessment 29

SOUTH APPROACH View from tunnel looking north to south approach of bridge Glen Road Pedestrian Bridge Class Environmental Assessment 30

DESIGN ELEMENTS

DETAILED DESIGN (POST EA) Glen Road Pedestrian Bridge Class Environmental Assessment 32

DETAILED DESIGN (POST EA) Glen Road Pedestrian Bridge Class Environmental Assessment 33

INPUT FROM PANEL Does the Panel have any advice about urban design elements that could be considered to enhance/ address heritage values, and context and views to/from Rosedale Valley? How can the relationship between the proposed bridge and the existing context (North and South Approaches) be enhanced? What design features could be used for the tunnel and its approaches to create a sense of space and a sense of place in relation to the bridge and surrounding area? Glen Road Pedestrian Bridge Class Environmental Assessment 34

CONCEPTS OVERVIEW Glen Road Pedestrian Bridge Class Environmental Assessment 35